BUILDING222-PLOTFILE.pdf

PDF 854 KB Posted

Attached to
SITE CHILLED WATER, STEAM & NATURAL GAS METERING at NIST GAITHERSBURG
Solicitation number
SB1341-14-RP-0017
Issued by

About this file

BUILDING222-PLOTFILE.pdf

View the file

Other files

File Type Posted
Amendment_003_Metering_Project.pdf PDF
1352.215-70_Proposal_Preparation_(updated_30_May_2014).pdf PDF
Sign-In_Sheet-Site_Visit.pdf PDF
Section_J_(updated_30_May_2014).docx DOCX document
Amendment_002_Metering_Project.pdf PDF
Attachment_5_Questions_ _Answers_(Final_Round).doc DOC document
Attachment_4_Questions_ _Answers_(Initial_Round).pdf PDF
Amendment_001_Metering_Project.pdf PDF
Revised_Drawings.zip ZIP file
Specifications-Revised_15_May_2014.pdf PDF
BUILDING235-PLOTFILE.pdf PDF
BUILDING302-PLOTFILE.pdf PDF
BUILDING202-PLOTFILE.pdf PDF
BUILDING226-PLOTFILE.pdf PDF
BUILDING224-PLOTFILE.pdf PDF
BUILDING225-PLOTFILE.pdf PDF
BUILDING236-PLOTFILE.pdf PDF
BUILDING203-PLOTFILE.pdf PDF
BUILDING245-PLOTFILE.pdf PDF
BUILDING237-PLOTFILE.pdf PDF
Attachment_2_GUIDELINES_FOR_OFPM_CONTRACTORS.doc DOC document
BUILDING320-PLOTFILE.pdf PDF
BUILDING312-PLOTFILE.pdf PDF
BUILDING301-PLOTFILE.pdf PDF
BUILDING223-PLOTFILE.pdf PDF
BUILDING101-PLOTFILE.pdf PDF
Attachment_1_SAFETY_PROCEDURES_5-13-09.doc DOC document
BUILDING303-PLOTFILE.pdf PDF
Specifications.pdf PDF
BUILDING231-PLOTFILE.pdf PDF
BUILDING233-PLOTFILE.pdf PDF
BUILDING206-PLOTFILE.pdf PDF
BUILDING221-PLOTFILE.pdf PDF
BUILDING220-PLOTFILE.pdf PDF
BUILDING304-PLOTFILE.pdf PDF
BUILDING227-PLOTFILE.pdf PDF
SB1341-14-RP-0017_Metering_Project.pdf PDF
BUILDING230-PLOTFILE.pdf PDF
BUILDING215-PLOTFILE.pdf PDF
Attachment_3_Pricing_Worksheet_for_SB1341-14-RP-0017.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PB-1-4 (E)

POLES 30 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES: SIEMENS P1C30HB100CTS

SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ATTIC

AIC 10,000 MAIN 60 AMPS MCB FED FROM BUSDUCT

NEUTRAL 100 %

LOAD CKT PHASE KVA CKT LOAD

LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION

CARD READER WEST STAIR 0.18 20 1 0.90 2 20 0.72 RECEPT. HALLWAY

SPARE 20 3 0.36 4 20 0.36 WATER COOLER

LIGHTS BASEMENT 0.90 20 5 0.90 6 20 SPARE

SPARE 20 7 0.18 8 20 0.18 RECEPT. ELEV. PIT

ALERTON CONTROL PNL 0.36 20 9 0.36 10 20 SPARE

SPARE 20 11 12 20 SPARE

LIGHTS OUTSIDE 0.90 20 13 1.08 14 20 2#12, 1#12G, IN 34/4"C 0.18 FLOW METER CONTROLS

SPARE 20 15 16 20 SPARE

SPARE 20 17 18 20 SPARE

E1-13 BASEMENT 0.36 20 19 0.36 20 20 SPARE

SPARE 20 21 22 20 SPARE

SPARE 20 23 24 20 SPARE

SPARE 20 25 26 20 SPARE

SPARE 20 27 28 20 SPARE

FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 29 0.18 30 20 SPARE

TOTAL CONNECTED KVA PER PHASE 2.5 0.7 1.1

LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY

CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY

LIGHTING 2.0 1.25 2.5 7 1.00 7

RECEPTACLES 1.6 NEC TABLE 220-13 1.6 5 1.00 5

KITCHEN EQUIPMENT 0.4 0.65 0.2 1 1.00 1

LARGEST MOTOR 1.25 - - 1.00 -

OTHER LOADS 0.4 1.00 0.4 1 1.00 1

DEMAND AMPS 13

NOTES

PB.A.4 (E)

POLES 30 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES: SIEMENS P1C30HB100CTS

SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ATTIC

AIC 10,000 MAIN 100 AMPS MCB FED FROM BUSDUCT

NEUTRAL 100 %

LOAD CKT PHASE KVA CKT LOAD

LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION

LIGHTS ROW 2 0.90 20 1 1.80 2 20 0.90 LIGHTS ROW 5

LIGHTS ROW 8 0.90 20 3 1.80 4 20 0.90 LIGHTS ROW 6

LIGHTS ROW 4 0.90 20 5 1.80 6 20 0.90 LIGHTS ROW 7

LIGHTS ROW 3 0.90 20 7 1.80 8 20 0.90 LIGHTS ROW 9

LIGHTS ROW 1 0.90 20 9 1.80 10 20 0.90 LIGHTS A.C. 1

RECEPT. 0.36 20 11 0.72 12 20 0.36 RECE[PTACLE

RECEPT. 0.36 20 13 0.54 14 20 0.18 FILTER CONTROL AC-2

FILTER CNTRL. AC-1 20 15 0.18 16 20 0.18 FILTER CONTROL AC-4

VENT ELEV. RM. 20 17 0.18 18 20 0.18 TELEPHONE

WATER HEATER 20 19 0.18 20 20 0.18 BMS ACU-12

SPARE 20 21 0.18 22 20 0.18 ACU-12 RECEPT.

RECEPT. 0.36 20 23 0.36 24 20 SPARE

SPARE 20 25 0.18 26 20 0.18 HONEYWELL DGP #1

RECEPT. 20 27 28 20 SPARE

FLOW METER 0.18 2 #12, #12 GD, 3/4"C. 20 29 0.36 30 20 0.18 (E) LOAD

31 32 20

33 34 20

35 36 20

37 38 20

39 40 20

41 42 20

TOTAL CONNECTED KVA PER PHASE 4.5 4.0 3.4

LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY

CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY

LIGHTING 9.9 1.25 12.4 34 1.00 34

RECEPTACLES 2.0 NEC TABLE 220-13 2.0 6 1.00 6

KITCHEN EQUIPMENT - 0.65 - - 1.00 -

LARGEST MOTOR 1.25 - - 1.00 -

OTHER LOADS - 1.00 - - 1.00 -

DEMAND AMPS 40

NOTES

BLDG NO. BUILDING NAME LOCATION PIPE SIZE (IN.)

BASIS OF DESIGN

METER MODEL

FLOW

DIRECTION PEAK LOAD

(GPM)

OFF PEAK LOAD

(GPM)

NOTES

SERVICE ENTRANCE 14" EXISTING RETURN

SERVICE ENTRANCE 14" GE DF868 SUPPLY

ATTIC 14" EXISTING SUPPLY

ATTIC 14" EXISTING RETURN

1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.

2.

3.

4.

5. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.

CHILLED WATER METER TABLE

TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATION.

GENERAL NOTES:

640 ALL

UNLESS NOTED OTHERWISE, HOT TAPPING WILL BE REQUIRED FOR CHILLED WATER SUPPLY AND RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA COLLECTION. REFER TO PLANS FOR LOCATIONS.

GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.

222 CHEMISTRY BUILDING 1,047

BLDG NO. BUILDING NAME LOCATION

STEAM PIPE SIZE

(IN.)

BASIS OF DESIGN

STEAM METER

MODEL

PUMPED

CONDENSATE

RETURN SIZE (IN.)

BASIS OF DESIGN

CONDENSATE

METER MODEL

CONNECT

LOAD (PPH)

OFF PEAK

LOAD (PPH)

NOTES

ATTIC 6" EXISTING ‐ ‐ 6,7

SERVICE ENTRANCE 6" ABB Vortex 3" GE DF868 1,2,3,4,5

1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.

2. DUE TO ALL HIGH PRESSURE STEAM METER INSTALLATION REQUIREMENTS, CONTRACTOR SHALL SCHEDULE WITH COTR BUILDING SHUTDOWN/OUTAGE UPON AWARD OF CONSTRUCTION CONTRACT.

3.

4.

5.

6. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.

7. LPS = LOW PRESSURE STEAM 15 LBS.

STEAM AND CONDENSATE METER TABLE

TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.

CHEMISTRY BUILDING 222

GENERAL NOTES:

6,600 3,960

HOT TAPPING WILL BE REQUIRED FOR ALL PUMPED CONDENSATE RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA

COLLECTION. REFER TO PLANS FOR LOCATIONS.

ABB SWIRL AND VORTEX ARE FLANGED FITTING METERS AND GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.

222-688
222-689
222-690
222-691
222-692

File details come from the government source that posted it. Updated .