PB-1-4 (E)
POLES 30 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES: SIEMENS P1C30HB100CTS
SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ATTIC
AIC 10,000 MAIN 60 AMPS MCB FED FROM BUSDUCT
NEUTRAL 100 %
LOAD CKT PHASE KVA CKT LOAD
LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION
CARD READER WEST STAIR 0.18 20 1 0.90 2 20 0.72 RECEPT. HALLWAY
SPARE 20 3 0.36 4 20 0.36 WATER COOLER
LIGHTS BASEMENT 0.90 20 5 0.90 6 20 SPARE
SPARE 20 7 0.18 8 20 0.18 RECEPT. ELEV. PIT
ALERTON CONTROL PNL 0.36 20 9 0.36 10 20 SPARE
SPARE 20 11 12 20 SPARE
LIGHTS OUTSIDE 0.90 20 13 1.08 14 20 2#12, 1#12G, IN 34/4"C 0.18 FLOW METER CONTROLS
SPARE 20 15 16 20 SPARE
SPARE 20 17 18 20 SPARE
E1-13 BASEMENT 0.36 20 19 0.36 20 20 SPARE
SPARE 20 21 22 20 SPARE
SPARE 20 23 24 20 SPARE
SPARE 20 25 26 20 SPARE
SPARE 20 27 28 20 SPARE
FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 29 0.18 30 20 SPARE
TOTAL CONNECTED KVA PER PHASE 2.5 0.7 1.1
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY
LIGHTING 2.0 1.25 2.5 7 1.00 7
RECEPTACLES 1.6 NEC TABLE 220-13 1.6 5 1.00 5
KITCHEN EQUIPMENT 0.4 0.65 0.2 1 1.00 1
LARGEST MOTOR 1.25 - - 1.00 -
OTHER LOADS 0.4 1.00 0.4 1 1.00 1
DEMAND AMPS 13
NOTES
PB.A.4 (E)
POLES 30 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES: SIEMENS P1C30HB100CTS
SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ATTIC
AIC 10,000 MAIN 100 AMPS MCB FED FROM BUSDUCT
NEUTRAL 100 %
LOAD CKT PHASE KVA CKT LOAD
LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION
LIGHTS ROW 2 0.90 20 1 1.80 2 20 0.90 LIGHTS ROW 5
LIGHTS ROW 8 0.90 20 3 1.80 4 20 0.90 LIGHTS ROW 6
LIGHTS ROW 4 0.90 20 5 1.80 6 20 0.90 LIGHTS ROW 7
LIGHTS ROW 3 0.90 20 7 1.80 8 20 0.90 LIGHTS ROW 9
LIGHTS ROW 1 0.90 20 9 1.80 10 20 0.90 LIGHTS A.C. 1
RECEPT. 0.36 20 11 0.72 12 20 0.36 RECE[PTACLE
RECEPT. 0.36 20 13 0.54 14 20 0.18 FILTER CONTROL AC-2
FILTER CNTRL. AC-1 20 15 0.18 16 20 0.18 FILTER CONTROL AC-4
VENT ELEV. RM. 20 17 0.18 18 20 0.18 TELEPHONE
WATER HEATER 20 19 0.18 20 20 0.18 BMS ACU-12
SPARE 20 21 0.18 22 20 0.18 ACU-12 RECEPT.
RECEPT. 0.36 20 23 0.36 24 20 SPARE
SPARE 20 25 0.18 26 20 0.18 HONEYWELL DGP #1
RECEPT. 20 27 28 20 SPARE
FLOW METER 0.18 2 #12, #12 GD, 3/4"C. 20 29 0.36 30 20 0.18 (E) LOAD
31 32 20
33 34 20
35 36 20
37 38 20
39 40 20
41 42 20
TOTAL CONNECTED KVA PER PHASE 4.5 4.0 3.4
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY
LIGHTING 9.9 1.25 12.4 34 1.00 34
RECEPTACLES 2.0 NEC TABLE 220-13 2.0 6 1.00 6
KITCHEN EQUIPMENT - 0.65 - - 1.00 -
LARGEST MOTOR 1.25 - - 1.00 -
OTHER LOADS - 1.00 - - 1.00 -
DEMAND AMPS 40
NOTES
BLDG NO. BUILDING NAME LOCATION PIPE SIZE (IN.)
BASIS OF DESIGN
METER MODEL
FLOW
DIRECTION PEAK LOAD
(GPM)
OFF PEAK LOAD
(GPM)
NOTES
SERVICE ENTRANCE 14" EXISTING RETURN
SERVICE ENTRANCE 14" GE DF868 SUPPLY
ATTIC 14" EXISTING SUPPLY
ATTIC 14" EXISTING RETURN
1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.
2.
3.
4.
5. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.
CHILLED WATER METER TABLE
TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATION.
GENERAL NOTES:
640 ALL
UNLESS NOTED OTHERWISE, HOT TAPPING WILL BE REQUIRED FOR CHILLED WATER SUPPLY AND RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA COLLECTION. REFER TO PLANS FOR LOCATIONS.
GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.
222 CHEMISTRY BUILDING 1,047
BLDG NO. BUILDING NAME LOCATION
STEAM PIPE SIZE
(IN.)
BASIS OF DESIGN
STEAM METER
MODEL
PUMPED
CONDENSATE
RETURN SIZE (IN.)
BASIS OF DESIGN
CONDENSATE
METER MODEL
CONNECT
LOAD (PPH)
OFF PEAK
LOAD (PPH)
NOTES
ATTIC 6" EXISTING ‐ ‐ 6,7
SERVICE ENTRANCE 6" ABB Vortex 3" GE DF868 1,2,3,4,5
1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.
2. DUE TO ALL HIGH PRESSURE STEAM METER INSTALLATION REQUIREMENTS, CONTRACTOR SHALL SCHEDULE WITH COTR BUILDING SHUTDOWN/OUTAGE UPON AWARD OF CONSTRUCTION CONTRACT.
3.
4.
5.
6. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.
7. LPS = LOW PRESSURE STEAM 15 LBS.
STEAM AND CONDENSATE METER TABLE
TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.
CHEMISTRY BUILDING 222
GENERAL NOTES:
6,600 3,960
HOT TAPPING WILL BE REQUIRED FOR ALL PUMPED CONDENSATE RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA
COLLECTION. REFER TO PLANS FOR LOCATIONS.
ABB SWIRL AND VORTEX ARE FLANGED FITTING METERS AND GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.
| 222-688 |
| 222-689 |
| 222-690 |
| 222-691 |
| 222-692 |