BUILDING203-PLOTFILE.pdf

PDF 674 KB Posted

Attached to
SITE CHILLED WATER, STEAM & NATURAL GAS METERING at NIST GAITHERSBURG
Solicitation number
SB1341-14-RP-0017
Issued by

About this file

BUILDING203-PLOTFILE.pdf

View the file

Other files

File Type Posted
Amendment_003_Metering_Project.pdf PDF
1352.215-70_Proposal_Preparation_(updated_30_May_2014).pdf PDF
Sign-In_Sheet-Site_Visit.pdf PDF
Section_J_(updated_30_May_2014).docx DOCX document
Amendment_002_Metering_Project.pdf PDF
Attachment_5_Questions_ _Answers_(Final_Round).doc DOC document
Attachment_4_Questions_ _Answers_(Initial_Round).pdf PDF
Amendment_001_Metering_Project.pdf PDF
Revised_Drawings.zip ZIP file
Specifications-Revised_15_May_2014.pdf PDF
BUILDING235-PLOTFILE.pdf PDF
BUILDING302-PLOTFILE.pdf PDF
BUILDING202-PLOTFILE.pdf PDF
BUILDING226-PLOTFILE.pdf PDF
BUILDING224-PLOTFILE.pdf PDF
BUILDING225-PLOTFILE.pdf PDF
BUILDING236-PLOTFILE.pdf PDF
BUILDING245-PLOTFILE.pdf PDF
BUILDING237-PLOTFILE.pdf PDF
Attachment_2_GUIDELINES_FOR_OFPM_CONTRACTORS.doc DOC document
BUILDING320-PLOTFILE.pdf PDF
BUILDING312-PLOTFILE.pdf PDF
BUILDING301-PLOTFILE.pdf PDF
BUILDING222-PLOTFILE.pdf PDF
BUILDING223-PLOTFILE.pdf PDF
BUILDING101-PLOTFILE.pdf PDF
Attachment_1_SAFETY_PROCEDURES_5-13-09.doc DOC document
BUILDING303-PLOTFILE.pdf PDF
Specifications.pdf PDF
BUILDING231-PLOTFILE.pdf PDF
BUILDING233-PLOTFILE.pdf PDF
BUILDING206-PLOTFILE.pdf PDF
BUILDING221-PLOTFILE.pdf PDF
BUILDING220-PLOTFILE.pdf PDF
BUILDING304-PLOTFILE.pdf PDF
BUILDING227-PLOTFILE.pdf PDF
SB1341-14-RP-0017_Metering_Project.pdf PDF
BUILDING230-PLOTFILE.pdf PDF
BUILDING215-PLOTFILE.pdf PDF
Attachment_3_Pricing_Worksheet_for_SB1341-14-RP-0017.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG NO. BUILDING NAME LOCATION

STEAM PIPE SIZE

(IN.)

STEAM METER

TYPE

PUMPED

CONDENSATE

RETURN SIZE (IN.)

CONDENSATE

METER TYPE

CONNECT

LOAD (PPH)

OFF PEAK

LOAD (PPH)

NOTES

203 STANDARD REFERENCE MATERIAL FACILITY UTILITY PIT 3" EXISTING 2" EXISTING 1,130 678 ALL

1. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.

GENERAL NOTES:

STEAM AND CONDENSATE METER TABLE

BLDG NO. BUILDING NAME LOCATION PIPE SIZE (IN.)

BASIS OF DESIGN

METER MODEL

FLOW

DIRECTION

PEAK LOAD

(GPM)

OFF PEAK LOAD

(GPM) NOTES

3" GE DF868 SUPPLY

3" GE DF868 RETURN

1 REFER TO DETAIL SHEET AND SPECIFICATION FOR INSTALLATION REQUIREMENTS.

2.

3.

4. GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.

CHILLED WATER METER TABLE

TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.

203 STANDARD REFERENCE MATERIAL FACILITY MECH RM 201

GENERAL NOTES:

UNLESS NOTED OTHERWISE, HOT TAPPING WILL BE REQUIRED FOR CHILLED WATER SUPPLY AND RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE

SENSORS FOR TOTAL ENERGY DATA COLLECTION. REFER TO PLANS FOR LOCATIONS.

27 16 ALL

PANEL PB-2-A1 (E)

POLES 42 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:

SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION MECH ROOM 201

AIC 22,000 MAIN 150 AMPS MCB FED FROM VIA 45 KVA XFMR T1

NEUTRAL 100 %

LOAD CKT PHASE KVA CKT LOAD

LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION

(N) FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 1 1.14 2 20 0.96 RECEPT. COPIER

CUH STAIR #1 0.36 20 3 0.90 4 20 0.54 RECEPT. OFFICE

WH CLNG. RECEPT. 0.36 20 5 0.90 6 20 0.54 RECEPT. OFFICE

AHU1-LIGHT & RECEPT. 0.36 20 7 0.90 8 20 0.54 RECEPT. WAREHOUSE

AHU2-LIGHT & RECEPT. 0.36 20 9 0.90 10 20 0.54 RECEPT. WAREHOUSE

DOWNLIGHTS MEETING RM. 0.90 20 11 1.44 12 20 0.54 RECEPT. WAREHOUSE

EF-1, EF-2, EF-3 0.72 20 13 1.26 14 20 0.54 RECEPT. WAREHOUSE

ROOFTOP RECEPT. 0.18 20 15 1.14 16 20 0.96 COPIER RECEPT. SHIPPING

VENT FAN VF-1 0.36 20 17 0.90 18 20 0.54 RECEPT. MECH. RM.

PUMP P-AHU-1 0.36 20 19 0.54 20 20 0.18 CEILING RECEPT. PACKNG.

DRINKING FNTN. RECEPT. 0.18 20 21 0.72 22 20 0.54 RECEPT. CONF. RM.

BATHROOM RECEPT. 0.18 20 23 0.72 24 20 0.54 RECEPT. CONF. RM.

MECH RM. RECEPT. 0.54 20 25 1.08 26 20 0.54 RECEPT. CONF. RM.

MECH RM. RECEPT. 0.54 20 27 0.90 28 20 0.36 REFRIG. CONF. RM.

MECH RM. RECEPT. 0.54 20 29 1.62 30 20 1.08 HEAT TAPE

FORK LIFT CHARGER 0.60 20 31 1.32 32 0.72

FORK LIFT CHARGER 0.60 20 33 1.32 34 20 0.72 O/H DOOR

SPARE 20 35 0.72 36 0.72

SPARE 20 37 38 20 SPARE

PUMP P-1 0.36 20 39 1.08 40 20 0.72 AC-1

AHU-3 LIGHT & RECEPT. 0.36 20 41 1.08 42 0.72

TOTAL CONNECTED KVA PER PHASE 6.2 7.0 7.4

LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY

CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY

LIGHTING 0.9 1.25 1.1 3 1.00 3

RECEPTACLES 13.4 NEC TABLE 220-13 11.7 32 1.00 32

KITCHEN EQUIPMENT 0.4 0.65 0.2 1 1.00 1

LARGEST MOTOR 1.25 - - 1.00 -

OTHER LOADS 5.9 1.00 5.9 17 1.00 17

DEMAND AMPS 53

NOTES

203-000
203-001
203-002
203-003

File details come from the government source that posted it. Updated .