BLDG NO. BUILDING NAME LOCATION
STEAM PIPE SIZE
(IN.)
STEAM METER
TYPE
PUMPED
CONDENSATE
RETURN SIZE (IN.)
CONDENSATE
METER TYPE
CONNECT
LOAD (PPH)
OFF PEAK
LOAD (PPH)
NOTES
203 STANDARD REFERENCE MATERIAL FACILITY UTILITY PIT 3" EXISTING 2" EXISTING 1,130 678 ALL
1. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.
GENERAL NOTES:
STEAM AND CONDENSATE METER TABLE
BLDG NO. BUILDING NAME LOCATION PIPE SIZE (IN.)
BASIS OF DESIGN
METER MODEL
FLOW
DIRECTION
PEAK LOAD
(GPM)
OFF PEAK LOAD
(GPM) NOTES
3" GE DF868 SUPPLY
3" GE DF868 RETURN
1 REFER TO DETAIL SHEET AND SPECIFICATION FOR INSTALLATION REQUIREMENTS.
2.
3.
4. GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.
CHILLED WATER METER TABLE
TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.
203 STANDARD REFERENCE MATERIAL FACILITY MECH RM 201
GENERAL NOTES:
UNLESS NOTED OTHERWISE, HOT TAPPING WILL BE REQUIRED FOR CHILLED WATER SUPPLY AND RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE
SENSORS FOR TOTAL ENERGY DATA COLLECTION. REFER TO PLANS FOR LOCATIONS.
27 16 ALL
PANEL PB-2-A1 (E)
POLES 42 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:
SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION MECH ROOM 201
AIC 22,000 MAIN 150 AMPS MCB FED FROM VIA 45 KVA XFMR T1
NEUTRAL 100 %
LOAD CKT PHASE KVA CKT LOAD
LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION
(N) FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 1 1.14 2 20 0.96 RECEPT. COPIER
CUH STAIR #1 0.36 20 3 0.90 4 20 0.54 RECEPT. OFFICE
WH CLNG. RECEPT. 0.36 20 5 0.90 6 20 0.54 RECEPT. OFFICE
AHU1-LIGHT & RECEPT. 0.36 20 7 0.90 8 20 0.54 RECEPT. WAREHOUSE
AHU2-LIGHT & RECEPT. 0.36 20 9 0.90 10 20 0.54 RECEPT. WAREHOUSE
DOWNLIGHTS MEETING RM. 0.90 20 11 1.44 12 20 0.54 RECEPT. WAREHOUSE
EF-1, EF-2, EF-3 0.72 20 13 1.26 14 20 0.54 RECEPT. WAREHOUSE
ROOFTOP RECEPT. 0.18 20 15 1.14 16 20 0.96 COPIER RECEPT. SHIPPING
VENT FAN VF-1 0.36 20 17 0.90 18 20 0.54 RECEPT. MECH. RM.
PUMP P-AHU-1 0.36 20 19 0.54 20 20 0.18 CEILING RECEPT. PACKNG.
DRINKING FNTN. RECEPT. 0.18 20 21 0.72 22 20 0.54 RECEPT. CONF. RM.
BATHROOM RECEPT. 0.18 20 23 0.72 24 20 0.54 RECEPT. CONF. RM.
MECH RM. RECEPT. 0.54 20 25 1.08 26 20 0.54 RECEPT. CONF. RM.
MECH RM. RECEPT. 0.54 20 27 0.90 28 20 0.36 REFRIG. CONF. RM.
MECH RM. RECEPT. 0.54 20 29 1.62 30 20 1.08 HEAT TAPE
FORK LIFT CHARGER 0.60 20 31 1.32 32 0.72
FORK LIFT CHARGER 0.60 20 33 1.32 34 20 0.72 O/H DOOR
SPARE 20 35 0.72 36 0.72
SPARE 20 37 38 20 SPARE
PUMP P-1 0.36 20 39 1.08 40 20 0.72 AC-1
AHU-3 LIGHT & RECEPT. 0.36 20 41 1.08 42 0.72
TOTAL CONNECTED KVA PER PHASE 6.2 7.0 7.4
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY
LIGHTING 0.9 1.25 1.1 3 1.00 3
RECEPTACLES 13.4 NEC TABLE 220-13 11.7 32 1.00 32
KITCHEN EQUIPMENT 0.4 0.65 0.2 1 1.00 1
LARGEST MOTOR 1.25 - - 1.00 -
OTHER LOADS 5.9 1.00 5.9 17 1.00 17
DEMAND AMPS 53