BLDG NO. BUILDING NAME LOCATION
STEAM PIPE SIZE
(IN.)
BASIS OF DESIGN
STEAM METER
MODEL
PUMPED
CONDENSATE
RETURN SIZE (IN.)
BASIS OF DESIGN
CONDENSATE
METER MODEL
CONNECT
LOAD (PPH)
OFF PEAK
LOAD (PPH)
NOTES
223 MATERIALS BUILDING SERVICE ENTRANCE 6" ABB Vortex 3" GE DF868 7,680 4,610 ALL
1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.
2. DUE TO ALL HIGH PRESSURE STEAM METER INSTALLATION REQUIREMENTS, CONTRACTOR SHALL SCHEDULE WITH COTR BUILDING SHUTDOWN/OUTAGE UPON AWARD OF CONSTRUCTION CONTRACT.
3.
4.
5.
HOT TAPPING WILL BE REQUIRED FOR ALL PUMPED CONDENSATE RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA
COLLECTION. REFER TO PLANS FOR LOCATIONS.
ABB SWIRL AND VORTEX ARE FLANGED FITTING METERS AND GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.
STEAM AND CONDENSATE METER TABLE
TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.
GENERAL NOTES:
BLDG NO. BUILDING NAME LOCATION PIPE SIZE (IN.)
BASIS OF DESIGN
METER MODEL
FLOW
DIRECTION PEAK LOAD
(GPM)
OFF PEAK LOAD
(GPM)
NOTES
SERVICE ENTRANCE 12" SUPPLY
SERVICE ENTRANCE 12" RETURN
1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.
2.
3.
4.
UNLESS NOTED OTHERWISE, HOT TAPPING WILL BE REQUIRED FOR CHILLED WATER SUPPLY AND RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA COLLECTION. REFER TO PLANS FOR LOCATIONS.
ABB SWIRL AND VORTEX ARE FLANGED FITTING METERS AND GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.
ALL
CHILLED WATER METER TABLE
TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATION.
GENERAL NOTES:
MATERIALS BUILDING223 1,150 714GE DF868
PANEL PB-1-1 (E)
POLES 24 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:
SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION RM B101
AIC 10,000 MAIN 100 A MCB FED FROM PANEL H2
NEUTRAL
LOAD CKT PHASE KVA CKT LOAD
LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION
SPARE 20 1 0.18 2 20 0.18 SECURITY BLACK BOX
CLEANING RECPT. COR. 0.54 20 3 0.90 4 20 0.36 HANDYCAP DOORS
SPARE 20 5 0.54 6 20 0.54 CURF PUMPS
LTS. ON LOADING DOCK 0.90 20 7 1.44 8 20 0.54 RECPT. IN ME RM. BASEMENT
LTS. OVER ENTRANCE 20 9 0.18 10 20 0.18 LTS. & RECPT. IN ELEV. PIT
FLR. RECP.IN. RMS. A105, A111, & A113 0.54 20 11 1.44 12 20 0.90 LTS. & RECPT. IN TELEPHONE BOOTH
LTS. IN M.E. RM. BASEMENT 0.90 20 13 1.44 14 20 0.54 RECPT. IN RECEIVE AREA
LTS. IN M.E. RM. BASEMENT 0.90 20 15 1.26 16 20 0.36 RECPT. FOR DRINKING FOUNTAIN
CLOCK RELAY FEED 0.18 20 17 0.72 18 20 0.54 FLR. RECPT. IN RM. B108, B110, B112
RELAY FEED CONCOURSE 0.18 20 19 0.36 20 20 2 #12, #12GD, 3/4"C. 0.18 FLOW METER CONTROLS
FLR. RECP.IN. RMS. A105, 111, 113 & 115 0.90 20 21 1.44 22 20 0.54 (E) LOAD 199
(E) LOAD 0.54 20 23 1.08 24 20 0.54 (E) LOAD A-107
TOTAL CONNECTED KVA PER PHASE 3.4 3.8 3.8
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY
LIGHTING 3.8 1.25 4.7 13 1.00 13
RECEPTACLES 5.9 NEC TABLE 220-13 5.9 17 1.00 17
KITCHEN EQUIPMENT - 0.65 - - 1.00 -
LARGEST MOTOR 1.25 - - 1.00 -
OTHER LOADS 1.3 1.00 1.3 4 1.00 4
DEMAND AMPS 33
NOTES
| 223-382 |
| 223-383 |
| 223-384 |
| 223-385 |
File details come from the government source that posted it. Updated .