BUILDING220-PLOTFILE.pdf

PDF 803 KB Posted

Attached to
SITE CHILLED WATER, STEAM & NATURAL GAS METERING at NIST GAITHERSBURG
Solicitation number
SB1341-14-RP-0017
Issued by

About this file

BUILDING220-PLOTFILE.pdf

View the file

Other files

File Type Posted
Amendment_003_Metering_Project.pdf PDF
1352.215-70_Proposal_Preparation_(updated_30_May_2014).pdf PDF
Sign-In_Sheet-Site_Visit.pdf PDF
Section_J_(updated_30_May_2014).docx DOCX document
Amendment_002_Metering_Project.pdf PDF
Attachment_5_Questions_ _Answers_(Final_Round).doc DOC document
Attachment_4_Questions_ _Answers_(Initial_Round).pdf PDF
Amendment_001_Metering_Project.pdf PDF
Revised_Drawings.zip ZIP file
Specifications-Revised_15_May_2014.pdf PDF
BUILDING235-PLOTFILE.pdf PDF
BUILDING302-PLOTFILE.pdf PDF
BUILDING202-PLOTFILE.pdf PDF
BUILDING226-PLOTFILE.pdf PDF
BUILDING224-PLOTFILE.pdf PDF
BUILDING225-PLOTFILE.pdf PDF
BUILDING236-PLOTFILE.pdf PDF
BUILDING203-PLOTFILE.pdf PDF
BUILDING245-PLOTFILE.pdf PDF
BUILDING237-PLOTFILE.pdf PDF
Attachment_2_GUIDELINES_FOR_OFPM_CONTRACTORS.doc DOC document
BUILDING320-PLOTFILE.pdf PDF
BUILDING312-PLOTFILE.pdf PDF
BUILDING301-PLOTFILE.pdf PDF
BUILDING222-PLOTFILE.pdf PDF
BUILDING223-PLOTFILE.pdf PDF
BUILDING101-PLOTFILE.pdf PDF
Attachment_1_SAFETY_PROCEDURES_5-13-09.doc DOC document
BUILDING303-PLOTFILE.pdf PDF
Specifications.pdf PDF
BUILDING231-PLOTFILE.pdf PDF
BUILDING233-PLOTFILE.pdf PDF
BUILDING206-PLOTFILE.pdf PDF
BUILDING221-PLOTFILE.pdf PDF
BUILDING304-PLOTFILE.pdf PDF
BUILDING227-PLOTFILE.pdf PDF
SB1341-14-RP-0017_Metering_Project.pdf PDF
BUILDING230-PLOTFILE.pdf PDF
BUILDING215-PLOTFILE.pdf PDF
Attachment_3_Pricing_Worksheet_for_SB1341-14-RP-0017.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG NO. BUILDING NAME LOCATION

STEAM PIPE SIZE

(IN.)

BASIS OF DESIGN

STEAM METER

MODEL

PUMPED

CONDENSATE

RETURN SIZE (IN.)

BASIS OF DESIGN

CONDENSATE METER

MODEL

CONNECT

LOAD (PPH)

OFF PEAK

LOAD (PPH)

NOTES

SERVICE ENTRANCE 6" EXISTING

SERVICE ENTRANCE 4" ABB Swirl

1. REFER TO DETAIL SHEET AND SPECIFICATION FOR INSTALLATION REQUIREMENTS.

2. DUE TO ALL HIGH PRESSURE STEAM METER INSTALLATION REQUIREMENTS, CONTRACTOR SHALL SCHEDULE WITH COTR BUILDING SHUTDOWN/OUTAGE UPON AWARD OF CONSTRUCTION CONTRACT.

3.

4.

5.

6. MULTIPLE FLOW METER INSTALLATION. SEE PLANS FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.

HOT TAPPING WILL BE REQUIRED FOR ALL PUMPED CONDENSATE RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA COLLECTION.

REFER TO PLANS FOR LOCATIONS.

ABB SWIRL ARE FLANGED FITTING METERS.

STEAM AND CONDENSATE METER TABLE

TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.

METROLOGY BUILDING 220 3" GE DF868 10,430 6,260 ALL

GENERAL NOTES:

BLDG NO. BUILDING NAME LOCATION PIPE SIZE (IN.)

BASIS OF DESIGN

METER MODEL

FLOW

DIRECTION

PEAK LOAD

(GPM)

OFF PEAK LOAD

(GPM) NOTES

14" EXISTING SUPPLY

14" GE DF868 RETURN

3" GE DF868 SUPPLY

3" GE DF868 RETURN

1. REFER TO DETAIL SHEET AND SPECIFICATION FOR INSTALLATION REQUIREMENTS.

2.

3.

4.

5. MULTIPLE FLOW METER INSTALLATION. SEE PLANS FOR ADDITIONAL INFORMATION.

6. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.

CHILLED WATER METER TABLE

TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.

GENERAL NOTES:

1,531 954 ALL

TRANSFORMER VAULT C09

UNLESS NOTED OTHERWISE, HOT TAPPING WILL BE REQUIRED FOR CHILLED WATER SUPPLY AND RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE

SENSORS FOR TOTAL ENERGY DATA COLLECTION. REFER TO PLANS FOR LOCATIONS.

GE DF868 ULTRASONICS METERS ARE STRAP‐ON TYPE METERS.

METROLOGY BUILDING 220

SERVICE ENTRANCE

PANEL PB.B.4 (E)

POLES 42 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:

SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ELECT. RM 272

AIC 10,000 MAIN 100 AMPS MCB FED FROM PANEL H2

NEUTRAL 100 %

LOAD CKT PHASE KVA CKT LOAD

LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION

(N) FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 1 0.18 2 20 SPARE

SPACE 20 3 4

LIGHTS SUB-BSMT. 0.90 20 5 1.26 6 20 0.36 WATER COOLER

RECEPT. RMS. B50, B52 0.54 20 7 0.86 8 20 0.32 LIGHTS GEN. RM.

RECEPT. RMS. B50, B52 0.54 20 9 0.86 10 20 0.32 LIGHTS GEN. RM.

LIGHTS GEN. RM. 0.90 20 11 1.22 12 20 0.32 LIGHTS GEN. RM.

LIGHTS GEN. RM. 0.90 20 13 1.33 14 20 0.43 LIGHTS BATTERY RM.

LIGHTS GEN. RM. 0.90 20 15 1.33 16 20 0.43 LIGHTS BATTERY RM.

LIGHTS GEN. RM. 0.90 20 17 1.33 18 20 0.43 LIGHTS BATTERY RM.

LIGHTS GEN. RM. 0.90 20 19 1.98 20 20 1.08 L5-30R MECH. RM.

LIGHTS GEN. RM. 0.90 20 21 #REF! 22 20 1.08 L5-30R MECH. RM.

LIGHTS GEN. RM. 0.90 20 23 1.26 24 20 0.36 (E) LOAD

(E) LOAD 0.54 20 25 0.90 26 20 0.36 (E) LOAD

(E) LOAD 0.54 20 27 0.90 28 20 0.36 (E) LOAD

(E) LOAD 0.54 20 29 0.90 30 20 0.36 (E) LOAD

(E) LOAD 0.54 20 31 0.90 32 20 0.36 (E) LOAD

(E) LOAD 0.54 20 33 0.54 34 20 SPARE

(E) LOAD 0.54 20 35 0.54 36 20 SPARE

(E) LOAD 0.54 20 37 0.54 38 20 SPARE

SPACE 39 40 20 SPARE

SPACE 41 42 20 SPARE

TOTAL CONNECTED KVA PER PHASE 6.7 #REF! 6.5

LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY

CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY

LIGHTING 9.5 1.25 11.8 33 1.00 33

RECEPTACLES 9.2 NEC TABLE 220-13 9.2 26 1.00 26

KITCHEN EQUIPMENT - 0.65 - - 1.00 -

LARGEST MOTOR 1.25 - - 1.00 -

OTHER LOADS 0.2 1.00 0.2 0 1.00 0

DEMAND AMPS 59

NOTES

220-632
220-633
220-634
220-635

File details come from the government source that posted it. Updated .