SITE CHILLED WATER, STEAM & NATURAL GAS METERING at NIST GAITHERSBURG
Solicitation number
SB1341-14-RP-0017
Issued by

About this file

BUILDING215-PLOTFILE.pdf

View the file

Other files

File Type Posted
Amendment_003_Metering_Project.pdf PDF
1352.215-70_Proposal_Preparation_(updated_30_May_2014).pdf PDF
Sign-In_Sheet-Site_Visit.pdf PDF
Section_J_(updated_30_May_2014).docx DOCX document
Amendment_002_Metering_Project.pdf PDF
Attachment_5_Questions_ _Answers_(Final_Round).doc DOC document
Attachment_4_Questions_ _Answers_(Initial_Round).pdf PDF
Amendment_001_Metering_Project.pdf PDF
Revised_Drawings.zip ZIP file
Specifications-Revised_15_May_2014.pdf PDF
BUILDING235-PLOTFILE.pdf PDF
BUILDING302-PLOTFILE.pdf PDF
BUILDING202-PLOTFILE.pdf PDF
BUILDING226-PLOTFILE.pdf PDF
BUILDING224-PLOTFILE.pdf PDF
BUILDING225-PLOTFILE.pdf PDF
BUILDING236-PLOTFILE.pdf PDF
BUILDING203-PLOTFILE.pdf PDF
BUILDING245-PLOTFILE.pdf PDF
BUILDING237-PLOTFILE.pdf PDF
Attachment_2_GUIDELINES_FOR_OFPM_CONTRACTORS.doc DOC document
BUILDING320-PLOTFILE.pdf PDF
BUILDING312-PLOTFILE.pdf PDF
BUILDING301-PLOTFILE.pdf PDF
BUILDING222-PLOTFILE.pdf PDF
BUILDING223-PLOTFILE.pdf PDF
BUILDING101-PLOTFILE.pdf PDF
Attachment_1_SAFETY_PROCEDURES_5-13-09.doc DOC document
BUILDING303-PLOTFILE.pdf PDF
Specifications.pdf PDF
BUILDING231-PLOTFILE.pdf PDF
BUILDING233-PLOTFILE.pdf PDF
BUILDING206-PLOTFILE.pdf PDF
BUILDING221-PLOTFILE.pdf PDF
BUILDING220-PLOTFILE.pdf PDF
BUILDING304-PLOTFILE.pdf PDF
BUILDING227-PLOTFILE.pdf PDF
SB1341-14-RP-0017_Metering_Project.pdf PDF
BUILDING230-PLOTFILE.pdf PDF
Attachment_3_Pricing_Worksheet_for_SB1341-14-RP-0017.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG NO. BUILDING NAME LOCATION PIPE SIZE (mm)

BASIS OF DESIGN

METER MODEL

FLOW

DIRECTION

PEAK LOAD

(GPM)

OFF PEAK LOAD

(GPM) NOTES

450 GE DF868 RETURN

450 EXISTING SUPPLY

1. REFER TO DETAIL SHEET AND SPECIFICATION FOR INSTALLATION REQUIREMENTS.

2.

3. COMMON CHILLED WATER SUPPLY AND RETURN SERVE BUILDINGS 216, 217, 218, AND 219.

4. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.

ALL

CHILLED WATER METER TABLE

TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.

GENERAL NOTES:

215 CLEAN ROOM BUILDING UTILITY TUNNEL 3,514 2,913

BLDG NO. BUILDING NAME LOCATION

STEAM PIPE SIZE

(mm)

BASIS OF DESIGN

STEAM METER

MODEL

PUMPED

CONDENSATE

RETURN SIZE (mm)

BASIS OF DESIGN

CONDENSATE

METER MODEL

CONNECT

LOAD (PPH)

OFF PEAK

LOAD (PPH)

NOTES

215 CLEAN ROOM BUILDING UTILITY TUNNEL 250 ABB Swirl 75 GE DF868 22,610 18,490 ALL

1. REFER TO DETAIL SHEET AND SPECIFICATION FOR INSTALLATION REQUIREMENTS.

2. DUE TO ALL HIGH PRESSURE STEAM METER INSTALLATION REQUIREMENTS, CONTRACTOR SHALL SCHEDULE WITH COTR BUILDING SHUTDOWN/OUTAGE UPON AWARD OF CONSTRUCTION CONTRACT.

3.

4.

5.

6. COMMON STEAM SUPPLY AND CONDENSATE RETURN SERVE BUILDINGS 216, 217, 218, AND 219.

HOT TAPPING WILL BE REQUIRED FOR ALL PUMPED CONDENSATE RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA COLLECTION.

REFER TO PLANS FOR LOCATIONS.

ABB SWIRL ARE FLANGED FITTING METERS AND GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.

STEAM AND CONDENSATE METER TABLE

TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.

GENERAL NOTES:

PANEL B6-2-LL/70-1

POLES 42 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:

SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION MECH RM. A01

AIC 65,000 MAIN 400 AMPS MCB FED FROM VIA 75KVA XFMR DT

NEUTRAL 100 %

LOAD CKT PHASE KVA CKT LOAD

LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION

RECEPT. C002-2 0.18 20 1 0.36 2 20 0.18 RECEPT. B003

RECEPT. C004-1 0.54 20 3 1.08 4 20 0.54 RECEPT. B002

RECEPT D00-4 0.54 20 5 1.08 6 20 0.54 RECEPT. A003

RECEPT. CD-C-0 0.54 20 7 1.08 8 20 0.54 RECEPT. A002

RECEPT. C002-2 0.54 20 9 1.08 10 20 0.54 J-BOX C008

RECEPT. C008 0.54 20 11 1.08 12 20 0.54 J-BOX C008

RECEPT. CO- UT-O1 0.54 20 13 0.90 14 20 0.36 DUMBWAITER LIGHTS

RECEPT. CO-UT-01 0.54 22 15 0.54 16 20 SPARE

CLOCK 0.18 24 17 0.30 18 20 0.12 JB CLOCK CD-C-0

(N) FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 19 0.18 20 20 SPARE

WATER FILTER 0.54 20 21 1.08 22 20 0.54 RECEPT. RM. 304

RECEPT. B004 0.54 20 23 1.08 24 20 0.54 RECEPT. RM. 304

RECEPT. A004 0.54 20 25 0.54 26 20 SPARE

AC CONTROL PANEL 0.18 20 27 0.66 28 15 0.48 PP-43

PP-29 0.36 20 29 0.36 30 20 SPARE

DWH-4 0.72 20 31 1.26 32 40 0.54 RECEPT. RM. 304

GLYCOL PUMP 0.42 20 33 0.96 34 20 0.54 RECEPT. RM. 304

RECEPT. C013 0.54 20 35 0.54 36 SPACE

37 5.40 38 5.40

SPARE 200 39 5.40 40 150 5.40 B6-2-P11/32-1

41 5.40 42 5.40

TOTAL CONNECTED KVA PER PHASE 9.7 10.8 9.8

LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY

CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY

LIGHTING 0.4 1.25 0.5 1 1.00 1

RECEPTACLES 11.8 NEC TABLE 220-13 10.9 30 1.00 30

KITCHEN EQUIPMENT - 0.65 - - 1.00 -

LARGEST MOTOR 1.25 - - 1.00 -

OTHER LOADS 2.0 1.00 2.0 6 1.00 6

16 - -

DEMAND AMPS 37

NOTES

PANEL B4-2-SS/67.6-1

POLES 42 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:

SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION MECH RM. A01

AIC 65,000 MAIN 225 AMPS MCB FED FROM VIA 75KVA XFMR DT

NEUTRAL 100 %

LOAD CKT PHASE KVA CKT LOAD

LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION

SHUNT TRIP RM. 215 0.18 20 1 0.18 2 20 SPACE

SPARE 20 3 4 20 SPACE

SPARE 20 5 6 20 SPACE

SPARE 20 7 8 20 SPACE

SPARE 20 9 10 20 SPACE

SPARE 20 11 12 20 2 #12, #12GD, 3/4"C. FLOW METER CONTROLS (N)

5.40 13 9.84 14 4.44

B4-3-SS/67-1 5.40 150 15 9.84 16 150 4.44 B4-3-SS/68-2

5.40 17 9.84 18 4.44

SPARE 20 19 20 20

SPACE 20 21 22 20

SPACE 20 23 24 20 SPARE

SPACE 20 25 26 20 SPARE

SPACE 20 27 28 20

SPACE 20 29 30 20 SPARE

SPACE 20 31 32 40 SPARE

SPACE 20 33 34

SPACE 20 35 36 SPACE

0.36 37 0.36 38 SPACE

SPD 0.36 15 39 0.36 40 SPACE

0.36 41 0.36 42 SPACE

TOTAL CONNECTED KVA PER PHASE 10.4 10.2 10.2

LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY

CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY

LIGHTING - 1.25 - - 1.00 -

RECEPTACLES 0.2 NEC TABLE 220-13 0.2 1 1.00 1

KITCHEN EQUIPMENT - 0.65 - - 1.00 -

LARGEST MOTOR 1.25 - - 1.00 -

OTHER LOADS 1.1 1.00 1.1 3 1.00 3

16 - -

13 - -

DEMAND AMPS 4