BLDG NO. BUILDING NAME LOCATION PIPE SIZE (mm)
BASIS OF DESIGN
METER MODEL
FLOW
DIRECTION
PEAK LOAD
(GPM)
OFF PEAK LOAD
(GPM) NOTES
450 GE DF868 RETURN
450 EXISTING SUPPLY
1. REFER TO DETAIL SHEET AND SPECIFICATION FOR INSTALLATION REQUIREMENTS.
2.
3. COMMON CHILLED WATER SUPPLY AND RETURN SERVE BUILDINGS 216, 217, 218, AND 219.
4. CONTRACTOR SHALL CONFIRM WITH GOVERNMENT EXISTING METERING WILL PROVIDE DATA COLLECTION POINTS REQUIRED IN THIS SCOPE OF WORK.
ALL
CHILLED WATER METER TABLE
TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.
GENERAL NOTES:
215 CLEAN ROOM BUILDING UTILITY TUNNEL 3,514 2,913
BLDG NO. BUILDING NAME LOCATION
STEAM PIPE SIZE
(mm)
BASIS OF DESIGN
STEAM METER
MODEL
PUMPED
CONDENSATE
RETURN SIZE (mm)
BASIS OF DESIGN
CONDENSATE
METER MODEL
CONNECT
LOAD (PPH)
OFF PEAK
LOAD (PPH)
NOTES
215 CLEAN ROOM BUILDING UTILITY TUNNEL 250 ABB Swirl 75 GE DF868 22,610 18,490 ALL
1. REFER TO DETAIL SHEET AND SPECIFICATION FOR INSTALLATION REQUIREMENTS.
2. DUE TO ALL HIGH PRESSURE STEAM METER INSTALLATION REQUIREMENTS, CONTRACTOR SHALL SCHEDULE WITH COTR BUILDING SHUTDOWN/OUTAGE UPON AWARD OF CONSTRUCTION CONTRACT.
3.
4.
5.
6. COMMON STEAM SUPPLY AND CONDENSATE RETURN SERVE BUILDINGS 216, 217, 218, AND 219.
HOT TAPPING WILL BE REQUIRED FOR ALL PUMPED CONDENSATE RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA COLLECTION.
REFER TO PLANS FOR LOCATIONS.
ABB SWIRL ARE FLANGED FITTING METERS AND GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.
STEAM AND CONDENSATE METER TABLE
TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.
GENERAL NOTES:
PANEL B6-2-LL/70-1
POLES 42 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:
SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION MECH RM. A01
AIC 65,000 MAIN 400 AMPS MCB FED FROM VIA 75KVA XFMR DT
NEUTRAL 100 %
LOAD CKT PHASE KVA CKT LOAD
LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION
RECEPT. C002-2 0.18 20 1 0.36 2 20 0.18 RECEPT. B003
RECEPT. C004-1 0.54 20 3 1.08 4 20 0.54 RECEPT. B002
RECEPT D00-4 0.54 20 5 1.08 6 20 0.54 RECEPT. A003
RECEPT. CD-C-0 0.54 20 7 1.08 8 20 0.54 RECEPT. A002
RECEPT. C002-2 0.54 20 9 1.08 10 20 0.54 J-BOX C008
RECEPT. C008 0.54 20 11 1.08 12 20 0.54 J-BOX C008
RECEPT. CO- UT-O1 0.54 20 13 0.90 14 20 0.36 DUMBWAITER LIGHTS
RECEPT. CO-UT-01 0.54 22 15 0.54 16 20 SPARE
CLOCK 0.18 24 17 0.30 18 20 0.12 JB CLOCK CD-C-0
(N) FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 19 0.18 20 20 SPARE
WATER FILTER 0.54 20 21 1.08 22 20 0.54 RECEPT. RM. 304
RECEPT. B004 0.54 20 23 1.08 24 20 0.54 RECEPT. RM. 304
RECEPT. A004 0.54 20 25 0.54 26 20 SPARE
AC CONTROL PANEL 0.18 20 27 0.66 28 15 0.48 PP-43
PP-29 0.36 20 29 0.36 30 20 SPARE
DWH-4 0.72 20 31 1.26 32 40 0.54 RECEPT. RM. 304
GLYCOL PUMP 0.42 20 33 0.96 34 20 0.54 RECEPT. RM. 304
RECEPT. C013 0.54 20 35 0.54 36 SPACE
37 5.40 38 5.40
SPARE 200 39 5.40 40 150 5.40 B6-2-P11/32-1
41 5.40 42 5.40
TOTAL CONNECTED KVA PER PHASE 9.7 10.8 9.8
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY
LIGHTING 0.4 1.25 0.5 1 1.00 1
RECEPTACLES 11.8 NEC TABLE 220-13 10.9 30 1.00 30
KITCHEN EQUIPMENT - 0.65 - - 1.00 -
LARGEST MOTOR 1.25 - - 1.00 -
OTHER LOADS 2.0 1.00 2.0 6 1.00 6
16 - -
DEMAND AMPS 37
NOTES
PANEL B4-2-SS/67.6-1
POLES 42 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:
SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION MECH RM. A01
AIC 65,000 MAIN 225 AMPS MCB FED FROM VIA 75KVA XFMR DT
NEUTRAL 100 %
LOAD CKT PHASE KVA CKT LOAD
LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION
SHUNT TRIP RM. 215 0.18 20 1 0.18 2 20 SPACE
SPARE 20 3 4 20 SPACE
SPARE 20 5 6 20 SPACE
SPARE 20 7 8 20 SPACE
SPARE 20 9 10 20 SPACE
SPARE 20 11 12 20 2 #12, #12GD, 3/4"C. FLOW METER CONTROLS (N)
5.40 13 9.84 14 4.44
B4-3-SS/67-1 5.40 150 15 9.84 16 150 4.44 B4-3-SS/68-2
5.40 17 9.84 18 4.44
SPARE 20 19 20 20
SPACE 20 21 22 20
SPACE 20 23 24 20 SPARE
SPACE 20 25 26 20 SPARE
SPACE 20 27 28 20
SPACE 20 29 30 20 SPARE
SPACE 20 31 32 40 SPARE
SPACE 20 33 34
SPACE 20 35 36 SPACE
0.36 37 0.36 38 SPACE
SPD 0.36 15 39 0.36 40 SPACE
0.36 41 0.36 42 SPACE
TOTAL CONNECTED KVA PER PHASE 10.4 10.2 10.2
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY
LIGHTING - 1.25 - - 1.00 -
RECEPTACLES 0.2 NEC TABLE 220-13 0.2 1 1.00 1
KITCHEN EQUIPMENT - 0.65 - - 1.00 -
LARGEST MOTOR 1.25 - - 1.00 -
OTHER LOADS 1.1 1.00 1.1 3 1.00 3
16 - -
13 - -
DEMAND AMPS 4
NOTES
| 215-278 |
| 215-279 |
| 215-280 |
| 215-281 |
| 215-282 |