BUILDING221-PLOTFILE.pdf

PDF 862 KB Posted

Attached to
SITE CHILLED WATER, STEAM & NATURAL GAS METERING at NIST GAITHERSBURG
Solicitation number
SB1341-14-RP-0017
Issued by

About this file

BUILDING221-PLOTFILE.pdf

View the file

Other files

File Type Posted
Amendment_003_Metering_Project.pdf PDF
1352.215-70_Proposal_Preparation_(updated_30_May_2014).pdf PDF
Sign-In_Sheet-Site_Visit.pdf PDF
Section_J_(updated_30_May_2014).docx DOCX document
Amendment_002_Metering_Project.pdf PDF
Attachment_5_Questions_ _Answers_(Final_Round).doc DOC document
Attachment_4_Questions_ _Answers_(Initial_Round).pdf PDF
Amendment_001_Metering_Project.pdf PDF
Revised_Drawings.zip ZIP file
Specifications-Revised_15_May_2014.pdf PDF
BUILDING235-PLOTFILE.pdf PDF
BUILDING302-PLOTFILE.pdf PDF
BUILDING202-PLOTFILE.pdf PDF
BUILDING226-PLOTFILE.pdf PDF
BUILDING224-PLOTFILE.pdf PDF
BUILDING225-PLOTFILE.pdf PDF
BUILDING236-PLOTFILE.pdf PDF
BUILDING203-PLOTFILE.pdf PDF
BUILDING245-PLOTFILE.pdf PDF
BUILDING237-PLOTFILE.pdf PDF
Attachment_2_GUIDELINES_FOR_OFPM_CONTRACTORS.doc DOC document
BUILDING320-PLOTFILE.pdf PDF
BUILDING312-PLOTFILE.pdf PDF
BUILDING301-PLOTFILE.pdf PDF
BUILDING222-PLOTFILE.pdf PDF
BUILDING223-PLOTFILE.pdf PDF
BUILDING101-PLOTFILE.pdf PDF
Attachment_1_SAFETY_PROCEDURES_5-13-09.doc DOC document
BUILDING303-PLOTFILE.pdf PDF
Specifications.pdf PDF
BUILDING231-PLOTFILE.pdf PDF
BUILDING233-PLOTFILE.pdf PDF
BUILDING206-PLOTFILE.pdf PDF
BUILDING220-PLOTFILE.pdf PDF
BUILDING304-PLOTFILE.pdf PDF
BUILDING227-PLOTFILE.pdf PDF
SB1341-14-RP-0017_Metering_Project.pdf PDF
BUILDING230-PLOTFILE.pdf PDF
BUILDING215-PLOTFILE.pdf PDF
Attachment_3_Pricing_Worksheet_for_SB1341-14-RP-0017.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG NO. BUILDING NAME LOCATION

STEAM PIPE SIZE

(IN.)

BASIS OF DESIGN

STEAM METER

MODEL

PUMPED

CONDENSATE

RETURN SIZE (IN.)

BASIS OF DESIGN

CONDENSATE

METER TYPE

CONNECT

LOAD (PPH)

OFF PEAK

LOAD (PPH)

NOTES

221 PHYSICS BUILDING SERVICE ENTRANCE 6" ABB Vortex 3" GE DF868 11,160 6,700 ALL

1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.

2. DUE TO ALL HIGH PRESSURE STEAM METER INSTALLATION REQUIREMENTS, CONTRACTOR SHALL SCHEDULE WITH COTR BUILDING SHUTDOWN/OUTAGE UPON AWARD OF CONSTRUCTION CONTRACT.

3.

4.

5.

HOT TAPPING WILL BE REQUIRED FOR ALL PUMPED CONDENSATE RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA

COLLECTION. REFER TO PLANS FOR LOCATIONS.

ABB VORTEX ARE FLANGED FITTING METERS AND GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.

STEAM AND CONDENSATE METER TABLE

SCHEDULE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.

GENERAL NOTES:

BLDG NO. BUILDING NAME LOCATION PIPE SIZE (IN.)

BASIS OF DESIGN

METER MODEL

FLOW

DIRECTION

PEAK LOAD

(GPM)

OFF PEAK LOAD

(GPM) NOTES

SERVICE ENTRANCE 12" GE DF868 RETURN

3RD FLR. MECH SHAFT 12" GE DF868 SUPPLY

1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.

2.

3.

CHILLED WATER METER TABLE

TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.

GENERAL NOTES:

UNLESS NOTED OTHERWISE, HOT TAPPING WILL BE REQUIRED FOR CHILLED WATER SUPPLY AND RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE

SENSORS FOR TOTAL ENERGY DATA COLLECTION. REFER TO PLANS FOR LOCATIONS.

PHYSICS BUILDING 1,620 1,014 ALL

PANEL PB-B-1 (E)

POLES 24 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES: ITE TYPE ND44

SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ROOM A01

AIC 10,000 MAIN 100 AMPS MCB FED FROM PANEL H2

NEUTRAL 100 %

LOAD CKT PHASE KVA CKT LOAD

LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION

CEILING RECEPT. 20 1 2 20 RECEPT. CORE AREA

3 4 20 RECEPT. SUB-BSMT.

CONV. RECEPT. 20 5 6 20 FLOOR RECEPT. A03, A05

WATER COOLER 20 7 8 20 DOOR SECURITY

FLOOR RECEPT. B02,04,08,10,12 20 9 10 20 WATER DTECT. SYST.

LIGHTS SUB-BSMT. 20 11 0.18 12 20 0.18 FLOW METER CONTROLS (N)

(E) LOAD 20 13 14 20 SPARE

(E) LOAD 20 15 16 20 SPARE

(E) LOAD 20 17 18 20 SPARE

SPARE 20 19 20 20 (E) LOAD

SPARE 20 21 22 20 SPACE

20 23 24 20 SPACE

TOTAL CONNECTED KVA PER PHASE 0.2

LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY

CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY

LIGHTING - 1.25 - - 1.00 -

RECEPTACLES - NEC TABLE 220-13 - - 1.00 -

KITCHEN EQUIPMENT - 0.65 - - 1.00 -

LARGEST MOTOR 1.25 - - 1.00 -

OTHER LOADS 0.2 1.00 0.2 1 1.00 1

DEMAND AMPS 1

NOTES

PB.A.2 (N)

POLES 32 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:

SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ATTIC

AIC 10,000 MAIN 60 AMPS MCB FED FROM BUSDUCT

NEUTRAL 100 %

LOAD CKT PHASE KVA CKT LOAD

LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION

FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 1 0.18 2 20 SPARE

SPARE 20 3 4 20 SPARE

SPARE 20 5 6 20 SPARE

SPARE 20 7 8 20 SPARE

SPARE 20 9 10 20 SPARE

SPARE 20 11 12 20 SPARE

SPARE 20 13 14 20 SPARE

SPARE 20 15 16 20 SPARE

SPARE 20 17 18 20 SPARE

SPARE 20 19 20 20 SPARE

SPARE 20 21 22 20 SPARE

SPARE 20 23 24 20 SPARE

SPARE 20 25 26 20 SPARE

SPARE 20 27 28 20 SPARE

SPARE 20 29 30 20 SPARE

TOTAL CONNECTED KVA PER PHASE 0.2

LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY

CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY

LIGHTING - 1.25 - - 1.00 -

RECEPTACLES 0.2 NEC TABLE 220-13 0.2 1 1.00 1

KITCHEN EQUIPMENT - 0.65 - - 1.00 -

LARGEST MOTOR 1.25 - - 1.00 -

OTHER LOADS - 1.00 - - 1.00 -

DEMAND AMPS 1

NOTES

221-435