BLDG NO. BUILDING NAME LOCATION
STEAM PIPE SIZE
(IN.)
BASIS OF DESIGN
STEAM METER
MODEL
PUMPED
CONDENSATE
RETURN SIZE (IN.)
BASIS OF DESIGN
CONDENSATE
METER TYPE
CONNECT
LOAD (PPH)
OFF PEAK
LOAD (PPH)
NOTES
221 PHYSICS BUILDING SERVICE ENTRANCE 6" ABB Vortex 3" GE DF868 11,160 6,700 ALL
1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.
2. DUE TO ALL HIGH PRESSURE STEAM METER INSTALLATION REQUIREMENTS, CONTRACTOR SHALL SCHEDULE WITH COTR BUILDING SHUTDOWN/OUTAGE UPON AWARD OF CONSTRUCTION CONTRACT.
3.
4.
5.
HOT TAPPING WILL BE REQUIRED FOR ALL PUMPED CONDENSATE RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE SENSORS FOR TOTAL ENERGY DATA
COLLECTION. REFER TO PLANS FOR LOCATIONS.
ABB VORTEX ARE FLANGED FITTING METERS AND GE DF868 ULTRASONICS ARE STRAP‐ON TYPE METERS.
STEAM AND CONDENSATE METER TABLE
SCHEDULE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.
GENERAL NOTES:
BLDG NO. BUILDING NAME LOCATION PIPE SIZE (IN.)
BASIS OF DESIGN
METER MODEL
FLOW
DIRECTION
PEAK LOAD
(GPM)
OFF PEAK LOAD
(GPM) NOTES
SERVICE ENTRANCE 12" GE DF868 RETURN
3RD FLR. MECH SHAFT 12" GE DF868 SUPPLY
1. REFER TO DETAIL SHEET AND SPECIFICATION FOR GENERAL INSTALLATION REQUIREMENTS.
2.
3.
CHILLED WATER METER TABLE
TABLE IS FOR INFORMATION PURPOSES ONLY. FLOW METER SIZE AND INSTALLATION SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATION.
GENERAL NOTES:
UNLESS NOTED OTHERWISE, HOT TAPPING WILL BE REQUIRED FOR CHILLED WATER SUPPLY AND RETURN LINES FOR INSTALLATION OF DRY WELL TYPE INSERTION TEMPERATURE
SENSORS FOR TOTAL ENERGY DATA COLLECTION. REFER TO PLANS FOR LOCATIONS.
PHYSICS BUILDING 1,620 1,014 ALL
PANEL PB-B-1 (E)
POLES 24 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES: ITE TYPE ND44
SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ROOM A01
AIC 10,000 MAIN 100 AMPS MCB FED FROM PANEL H2
NEUTRAL 100 %
LOAD CKT PHASE KVA CKT LOAD
LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION
CEILING RECEPT. 20 1 2 20 RECEPT. CORE AREA
3 4 20 RECEPT. SUB-BSMT.
CONV. RECEPT. 20 5 6 20 FLOOR RECEPT. A03, A05
WATER COOLER 20 7 8 20 DOOR SECURITY
FLOOR RECEPT. B02,04,08,10,12 20 9 10 20 WATER DTECT. SYST.
LIGHTS SUB-BSMT. 20 11 0.18 12 20 0.18 FLOW METER CONTROLS (N)
(E) LOAD 20 13 14 20 SPARE
(E) LOAD 20 15 16 20 SPARE
(E) LOAD 20 17 18 20 SPARE
SPARE 20 19 20 20 (E) LOAD
SPARE 20 21 22 20 SPACE
20 23 24 20 SPACE
TOTAL CONNECTED KVA PER PHASE 0.2
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY
LIGHTING - 1.25 - - 1.00 -
RECEPTACLES - NEC TABLE 220-13 - - 1.00 -
KITCHEN EQUIPMENT - 0.65 - - 1.00 -
LARGEST MOTOR 1.25 - - 1.00 -
OTHER LOADS 0.2 1.00 0.2 1 1.00 1
DEMAND AMPS 1
NOTES
PB.A.2 (N)
POLES 32 VOLTS 120/208 VOLTS MOUNTING SURFACE NOTES:
SECT 1 PH/WIRE 3 PHASE/4 WIRE (A, B, C, N, EG) LOCATION ATTIC
AIC 10,000 MAIN 60 AMPS MCB FED FROM BUSDUCT
NEUTRAL 100 %
LOAD CKT PHASE KVA CKT LOAD
LOAD DESCRIPTION KVA FEEDER TRIP # A B C # TRIP FEEDER KVA LOAD DESCRIPTION
FLOW METER CONTROLS 0.18 2 #12, #12 GD, 3/4"C. 20 1 0.18 2 20 SPARE
SPARE 20 3 4 20 SPARE
SPARE 20 5 6 20 SPARE
SPARE 20 7 8 20 SPARE
SPARE 20 9 10 20 SPARE
SPARE 20 11 12 20 SPARE
SPARE 20 13 14 20 SPARE
SPARE 20 15 16 20 SPARE
SPARE 20 17 18 20 SPARE
SPARE 20 19 20 20 SPARE
SPARE 20 21 22 20 SPARE
SPARE 20 23 24 20 SPARE
SPARE 20 25 26 20 SPARE
SPARE 20 27 28 20 SPARE
SPARE 20 29 30 20 SPARE
TOTAL CONNECTED KVA PER PHASE 0.2
LOAD COMPUTATIONS AND MINIMUM FEEDER AMPACITY
CATEGORY CONNECTED KVA DMD FACTOR DMD KVA DEMAND AMPS MULTIPLIER MIN AMPACITY
LIGHTING - 1.25 - - 1.00 -
RECEPTACLES 0.2 NEC TABLE 220-13 0.2 1 1.00 1
KITCHEN EQUIPMENT - 0.65 - - 1.00 -
LARGEST MOTOR 1.25 - - 1.00 -
OTHER LOADS - 1.00 - - 1.00 -
DEMAND AMPS 1
NOTES
| 221-435 |
| 221-436 |
| 221-437 |
| 221-438 |
| 221-439 |