Appendix J-11 Product Evaluation Template.docx
DOCX document 445 KB Posted
- Solicitation number
- SAQMMA11R0186
About this file
Appendix J-11 Product Evaluation Template
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix J-11
| <Product Name> |
| Product Evaluation |
Version <0.1>
DRAFT
| Produced for: |
| Department of State |
| Technology Development Branch |
| Produced by: | |
| Systems Development & Engineering | |
| DS/FSE/TDB, SA-24 | |
| 5800 Barclay Drive | |
| Alexandria, VA 22315 |
Date: <MM/DD/YYYY>
Equipment type: < >
EXECUTIVE SUMMARY
The <Product Name> was evaluated by the DS/TDB/SDE test and evaluation staff. This product is classified as: Generic Equipment[footnoteRef:1], Standardized Equipment[footnoteRef:2], or cleared American access equipment[footnoteRef:3] [1: Generic Equipment is defined as Technical Security COTS Equipment that is compatible with standardized DS systems or equipment suites.] [2: Standardized Equipment is defined as non-generic technical security equipment needed to meet DS installation and maintenance standardization requirements] [3: Cleared American access equipment is defined as proprietary technical security equipment and systems restricted to those that are crucial to the Department's CI posture, and whose use is restricted to cleared Americans.]
Evaluation Results/Recommendation:
The <Product Name> was found to be ACCEPTABLE / UNACCEPTABLE for BETA TESTING / GENERAL FIELD USE / DOMESTIC USE ONLY.
Discuss <Product Name> in terms of how it meets the requirements set to advance in the evaluation cycle - limit to half page or less.
Comments: List comments or reservations.
If reservations are associated with the product's approval, list as follows The reservations associated with the system are as follows:
· Reservations, in bullet format
Include free-form comments on the general quality and usefulness of product documentation.
S-AQMMA-11-R-0186 Appendix J-11 Department of State Supply Chain Management
PUBLICATION HISTORY
| Date |
| Version |
| Description |
| Author |
| 10/19/2010 |
| 0.1 |
| Initial Draft Product Evaluation |
| J. Kazimir |
This document can be found on the OpenNet at:
https://intranet.ds.state.sbu/DS/C/ST/FSE/TDB/default.aspx Please refer to the TDB website for the latest version.
Corrections, comments, or questions should be sent to:
| Department of State |
| ATTN: ISE Section Chief |
| DS/TDB/ISE, SA-24 |
| 5800 Barclay Drive |
| Alexandria, VA 22315 |
Table of Contents
| 1 | Introduction | 4 |
| 1.1 | Purpose of the Evaluation | 4 |
| 1.2 | References | 4 |
| 1.3 | Product Description | 4 |
| 1.4 | Product standard features | 4 |
| 2 | Project Context and Background | 4 |
| 3 | Test Methods and Evaluation | 4 |
| 3.1 | Procedures | 4 |
| 3.2 | Data recording | 4 |
| 4 | System Requirements / Product Specifications Table | 4 |
| 5 | DS-Specific Modifications | 4 |
| 6 | Test Data | 4 |
| 7 | Evaluation Results | 4 |
| Appendix A | 4 | |
| Manufacturer Data | 4 | |
| Contract Data | 4 | |
| Cost | 4 |
Table of Figures
Introduction
Purpose of the Evaluation Use a clear, concise statement. Ex. This evaluation will test the applicability of the <product> to the previously identified system requirements for <this type of technology>.
The purpose of the Evaluation is to achieve the following:
· Define testing strategies for each area and sub-area to include all the functional and quality (non-functional) requirements.
· Identify testing risks.
· Identify required resources and related information.
· Provide visible confirmation to test-effort stakeholders that adequate consideration has been given to governing the test effort.
References
· System Requirements Specification Documents
· Manufacturer literature
· Other
Product Description <Identify the product being tested by name. Give a short description of the product’s purpose and capabilities.> Include photo.
Product standard features
USE BULLET STATEMENTS.
Project Context and Background [Provide a brief description of the background surrounding the project. Include information such as the key problem being solved and the major benefits of the solution.
Note that where this information is defined sufficiently in other documents, you might simply include a reference to those other documents if appropriate; however, it may save readers of this document time and effort if a limited amount of information is duplicated here: so you should use your judgment. As a general rule, this section should only be about one to three paragraphs in length.]
Test Methods and Evaluation
Describe test activities that address system requirements. The intent is to show that the test plan covers all functionality, performance, and other requirements associated with each design element in the system requirements (SRS) document. The granularity of the list should be detailed enough that each requirement is simple and testable.
Procedures
Specify the step-by-step procedures to accomplish the test. Include test setup, initialization steps, and termination. Also include effectiveness criteria or pass criteria for each test procedure.
Data recording
This section describes the method used for recording test results and other information about the testing.
System Requirements / Product Specifications Table A system requirements / product specifications table is used to link the product testing procedures to the requirements recorded in the system requirements specification (SRS) document. It is an essential part of the evaluation documentation for all projects. It should be possible to test the product’s features against each of the system requirements as listed in the table below.
Indicate whether the product’s specifications Meets / Does Not Meet the requirements specification as described in the SRS. Where the requirement does not apply, use N/A.
Refer to the test data, Section 6 as needed; otherwise, refer to manufacturer’s materials or indicate other standards references, (e.g. IEEE standards).
Insert photos as needed.
Requirements / Specifications Table
| Requirement Identifier |
| System Requirements Specification |
| Product Specification |
(Meets / Does Not Meet Requirement)
| 3 |
| Architecture and Design Constraints |
| 3.1 |
| Physical Constraints |
Size
Weight
| 3.2 |
| System Component Specific Constraints |
| Meets / Does not Meet Requirement |
Power Consumption
Storage Capacity
Buffer Size
Data and Content Constraints
Hardware Constraints
Software Constraints
Personnel Constraints
| 3.3 |
| Standards |
| Meets / Does not Meet Requirement |
Governmental Standards
Industry Standards
International Standards
| 3.4 |
| Acquisitions |
Purchasing Constraints
Pre-deployment warehousing issues
Shipping
| 3.5 |
| Legal and Regulatory Constraints |
Import/Export Restrictions, Certifications, etc.
Production Environment Constraints
| 3.6 |
| Lifecycle Issues |
Decommissioning
Regulatory Issues
Hazardous Materials Issues
Controlled/Secure Material Handling
| 4 |
| System Operational Requirements |
| Meets / Does not Meet Requirement |
| 4.1 |
| Personnel |
| 4.2 |
| Hardware |
| 4.3 |
| Software |
| 4.4 |
| Support Systems |
| 4.5 |
| Other |
| 5 |
| User-Oriented Quality Requirements |
| Meets / Does not Meet Requirement |
| 5.1 |
| Audit ability |
| 5.2 |
| Configurability |
| 5.3 |
| Accuracy |
| 5.4 |
| Precision |
| 5.5 |
| Timeliness |
| 5.6 |
| Operational Environmental Compatibility |
| 5.7 |
| Interoperability |
| 5.8 |
| Operational Availability |
| 5.9 |
| Capacity |
| 5.10 |
| Latency |
| 5.11 |
| Response Time |
| 5.12 |
| Reliability |
| 5.13 |
| Robustness |
| 5.14 |
| Safety |
| 5.15 |
| Security |
| 5.15.1 |
| Identification |
| 5.15.2 |
| Authentication |
| 5.15.3 |
| Authorization |
| 5.15.4 |
| Integrity |
| 5.15.5 |
| Intrusion Detection |
| 5.15.6 |
| System Maintenance Security |
| 5.16 |
| Usability |
| 6 |
| System General Requirements |
| Meets / Does not Meet Requirement |
| 6.1 |
| Transport |
| 6.2 |
| Installation |
| 6.3 |
| Maintenance |
Parts
Ease of maintenance
Downtime (MTTR)
Manufacturer customer support
| 6.4 |
| Training |
Operator training
Supervisor training
Maintenance training
Diplomatic Security Training Center (DSTC)
| 6.5 |
| Lifecycle-Oriented Quality Requirements (if applicable) |
| Meets / Does not Meet Requirement |
| 6.5.1 |
| Warranty |
Warranty Timing (start and length)
Warranty Coverage
Warranty stipulations, certifications
Commissioning
| 6.5.2 |
| Estimated Life |
Availability during Lifecycle
Parts
Software/Firmware revisions
Updated Training and Serviceability Materials
Transportability during lifetime and transit issues
Disposal
| 6.6 |
| Manufacturer Documentation |
| Meets / Does not Meet Requirement |
Maintenance and repair
Training
User manuals
| 6.7 |
| Other Requirements |
DS-Specific Modifications
The following modifications have been made to the standard <Product name> to bring it into accordance with the needs of the Department of State:
· List modifications in bullet format
OR
No modifications were made to the <Product name. The product fits the needs of the Department of State as is.
Include photos / diagrams as needed.
Test Data
Include test data results, either numerical or pass / fail.
Evaluation Results
Evaluation Results/Recommendation:
The Product Name was found to be ACCEPTABLE / UNACCEPTBLE for BETA TESTING / GENERAL FIELD USE / DOMESTIC USE ONLY.
Appendix A Manufacturer Data
| Manufacturer Name: |
| Street Address: |
| City/State/Zip Code: |
| Phone: |
Toll Free:
| FAX: |
| WWW: |
Local Point of Contact or Representative:
| Name: |
| Company: |
| Address: |
| Phone: |
| FAX: |
| E-Mail: |
Contract Data State Dept. BPA TDB GSA Contract Logistics
| POC | Russ Parrish | |
| Phone: | 703-923-6784 |
CMMS Maximo Item number:
NOTE: If the product is NOT approved, then there is no need for an item number.
Cost GSA DS cost of the <Product name> is $
S-AQMMA-11-R-0186 Appendix J-11 Department of State Supply Chain Management
<Month date, year>
UNCLASSIFIED
ACTION MEMORANDUM FOR DS/ST/FSE, MR. MICHAEL J. BARELA
FROM: DS/FSE/TDB – Warren Garrett
SUBJECT: <Product name> Evaluation Results Decision
Recommendation:
That you authorize DS/FSE/TDB, to move to the next phase of the <product name> evaluation flow, pilot project testing.
Approve_________________ Disapprove_________________
| ____________________________________ | ______________ | |
| DS/ST/FSE – Mr. Michael J. Barela | Date |
Summary:
The <product name> has been evaluated in the lab and found to be ACCEPTABLE as a(n) <equipment type>, TDB evaluation dated <month date, year>. The system is recommended for pilot project testing by the Technology Development Branch (DS/FSE/TDB) test and evaluation staff in coordination with ESO/ESC staff at the selected test site(s). If chosen to move forward, a pilot project plan document will be generated.
image1.jpeg image2.png image3.png
File details come from the government source that posted it. Updated .