This is a Solicitation, Offer, and Award (SF 1442) form and complete RFP for a firm-fixed-price construction contract to renovate the first floor of Building 1 at Fresno VA Medical Center to create an Acute Respiratory Clinic (ARC). The Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 21 is soliciting offers for Project No. 570-23-223 with solicitation number 36C26126R0049. The work includes HVAC upgrades, architectural, mechanical, electrical, structural, and fire protection modifications to create a new respiratory clinic where patients with flu-like symptoms can segregate from the general hospital population during flu season. The contractor must furnish all labor, materials, transportation, engineering services, overhead, and profit. The place of performance is Fresno VA Medical Center, 2615 East Clinton Avenue, Fresno, CA 93703-2223, with a performance period of 224 calendar days after Notice to Proceed.

This is a total service-disabled veteran-owned small business (SDVOSB) set-aside with NAICS code 236220 (Commercial and Institutional Building Construction) and a small business size standard of $45 million. The offer due date is June 15, 2026, at 2:00 P.M. PDT, with RFI submissions required by May 28, 2026, at 10:00 A.M. PDT. A pre-proposal site visit is scheduled for May 20, 2026, at 11:00 A.M. PDT. Bid bonds, payment bonds, and performance bonds are required. Award will be made using a best-value tradeoff approach under FAR 15.103-1, evaluating proposals on: (1) Technical Approach, (2) Project Experience (up to four relevant projects), (3) Past Performance (minimum five CPARS evaluations or Past Performance Questionnaires), and (4) Price, with technical and past performance factors combined being approximately equal in importance to price. Offerors must be SDVOSB-certified and verified in the SBA Small Business Search at time of proposal submission and prior to award. Submit one email copy each of technical and price proposals to daniel.jhun@va.gov with subject line citing RFP number; file size must not exceed 10MB. Technical proposals are limited to 35 pages front and back (excluding CPARS/PPQ questionnaires). Applicable wage determination is DBA Wage Determination No. CA20260018 dated January 30, 2026.

View the file

Other files

File Type Posted
570-23-223-90134-Fresno ARC-Electrical-E701R 1.pdf PDF
BULLETIN NO1 3.pdf PDF
Chilled Water AS Builds.pdf PDF
Bulletin No 2 - CW HW RPM.pdf PDF
VA Fresno ARC Pre-Bid RFI Responses 6-19-26.xlsx XLSX spreadsheet
S06 - Amendment to Solicitation No. 36C26126R0049 0003.docx DOCX document
Original Stuctural.pdf PDF
570-23-223-90134-Fresno ARC-Mechanical Bulletin No 2 - 2026.06.18.pdf PDF
S06 - 36C26126R0049 0002.docx DOCX document
S06 - 36C26126R0049 0001.docx DOCX document
Sign in Sheet Fresno Arc.PDF PDF
Attachment - Price Breakdown.xlsx XLSX spreadsheet
REQUEST FOR INFORMATION FORM.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
90134 - 570-23-223 - Fresno Design to Renovate 1st floor ARC Fi.pdf PDF
Fresno Design to Renovate 1st floor ARC Final Specs 20260423.pdf PDF
ATTACHMENT A - FACTOR 2 - PROJECT EXPERIENCE.xlsx XLSX spreadsheet
DBA Wage Determination No. CA20260018 dated 20260130.docx DOCX document
ATTACHMENT B - FACTOR 3 - Past Performance Questionnaire.docx DOCX document
VAAR 852.219-75.pdf PDF
Pre-proposal Site Visit Briefing Slide.pptx PPTX presentation
90134 - 570-23-223- Final Bid Set Fresno ARC BOD - 20260407.pdf PDF
570-23-223_SOW Fresno ARC.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0049 Solicitation No. 36C26126R0049, Project No. 570-23-223, Renovate Building 1, First Floor for Acute Respiratory Clinic at Fresno VA Medical Center

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

Of 120

36C26126R0049

X 05-12-2026

570-23-223 36C261 Department of Veterans Affairs Network Contracting Office (NCO) 21 Construction Team II 4951 Arroyo Road, Building T34, RM 100 Livermore CA 94550-9650 Offerors are authorized to send offer proposals via email. Offers should be emailed to daniel.jhun@va.gov

Daniel Jhun

650-493-5000 EXT 60009

A. Project Number: 570-23-223 Project Title: Renovate Building 1, First Floor for Acute Respiratory Clinic at Fresno VA Medical Center NAICS Code: 236220 - Commercial and Institutional Building Construction; Small Business Size Standard: $45M.

B. This is a firm-fixed-price construction requirement. Offeror must furnish all labor, material, transportation, required engineering services, overhead, profit to renovatethe existing space to create an acute respiratory clinic (ARC) at the front of building 1, main hospital. The general scope of this requirement is to construct a new respiratory clinic on the first (1st) floor of Building 1. This projectincludes HVAC Upgrades to support a respiratory clinic that negative to the surrounding building. Architectural, mechanical, electrical, structural, and fire protection. The completed project will provide a new respiratory clinic where patients with flu-like symptoms can segregate from the general hospital during flu season.

C. Place of Performance: Fresno VA Medical Center, 2615 East Clinton Avenue, Fresno, CA 93703-2223.

D. Period of Performance: 224 Calendar days after NTP

E. This contract will be awarded in accordance with FAR Part 15, using Tradeoff approach (RFO FAR 15.103-1) in conjunction with FAR Part 36.

F. This procurement is a total service-disabled veteran-owned small business (SDVOSB) set-aside. Public Law 109-461 is the final authority on SDVOSB set-aside. Offerors must be verified in SBA Small Business Search the time submission offer and prior to award. SBA Small Business Search Link: https://search.certifications.sba.gov/. SBA DSBS will be used as the official source for SDVOSB verifications for this solicitation until further notice from the SBA.

G. A pre-proposal conference and site visit has been scheduled on Wednesday, May 20, 2026, at 11 AM PDT, by the parking Lot of Engineering Building 3, Fresno VA Medical Center, 2615 East Clinton Avenue, Fresno, CA 93703-2223. Offerors are strongly recommended to attend this site visit, but it is not mandatory.

H. Questions and/or request for information (RFI) must be submitted using the RFI form attached and are due by May 28, 2026 at 2:00 PM PDT. via email to daniel.jhun@va.gov.

I. Bid bonds, payment and performance bonds are required under this solicitation and resultant contract.

J. All contractors are required to be registered and current in System for Award Management (SAM), the official website of the U.S. Government at www.sam.gov.

X X

N/A X

2:00 PM

PDT

06-15-2026 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C261 Department of Veterans Affairs Network Contracting Office (NCO) 21 Construction Team II 4951 Arroyo Road, Building T34, RM 100 Livermore CA 94550-9650

Department of Veterans Affairs FMS VA-9(101) Financial Services Center

PO Box 149971 Austin TX 78714-9971

Daniel Jhun Contracting Officer

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE6
ITEM INFORMATION6
A.4 DELIVERY SCHEDULE6
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS6
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS7
INSTRUCTIONS TO OFFERORS7
4.252.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)20
4.352.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)20
4.552.228-1 BID GUARANTEE (SEP 1996)21
4.652.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)22
4.752.233-2 SERVICE OF PROTEST. (SEP 2006) (DEVIATION NOV 2025)22
4.8852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)23
4.9852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)24
2.11VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (FEB 2023)24
REPRESENTATIONS AND CERTIFICATIONS24
3.152.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (DEVIATION NOV 2025)24
3.252.209-13 Violation of Arms Control Treaties or Agreements-Certification. (DEVIATION NOV 2025)26
3.352.229-11 TAX ON CERTAIN FOREIGN PROCUREMENT – NOTICE AND REPRESENTATION (DEVIATION) (SEP 2025)28
GENERAL CONDITIONS30
4.152.204-7 SYSTEM FOR AWARD MANAGEMENT – REGISTRATION (NOV 2024) (DEVIATION NOV 2025)30
4.2 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (DEVIATION) (NOV 2025)33
4.3 52.204-13 SYSTEM FOR AWARD MANAGEMENT—MAINTENANCE (DEVIATION) (NOV 2025)35
4.4 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (DEVIATION) (NOV 2025)37
4.5 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (JAN 2025) (DEVIATION NOV 2025)38
4.6 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)40
4.7 52.209-9 UPDATED OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (DEVIATION) (NOV 2025)40
4.8 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015) (DEVIATION NOV 2025)41
4.9 52.215-2 AUDIT AND RECORDS-NEGOTIATION (JUN 2020) (DEVIATION NOV 2025)42
4.10 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (DEVIATION) (NOV 2025)44
4.11 52.219-27 NOTICE OF SET-ASIDE FOR, OR SOLE-SOURCE AWARD TO, SERVICED-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) CONCERNS ELIGIBLE UNDER THE SDVOSB PROGRAM (DEVIATION) (NOV 2025)46
4.1252.222-12 Contract Termination-Debarment (May 2014)(DEVIATION FEB 2025)63
4.1352.222-35 EQUAL OPPORTUNITY FOR VETERANS (NOV 2025) (DEVIATION)63
4.1452.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (NOV 2025) (DEVIATION)63
4.1552.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026)65
4.1652.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (OCT 2022) (DEVIATION NOV 2025)66
4.1752.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021) (DEVIATION) (SEP 2025)72
4.1852.233-1 DISPUTES (MAY 2014) (DEVIATION NOV 2025)74
4.1952.233-3 PROTEST AFTER AWARD (DEVIATION) (NOV 2025)76
4.2052.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) (DEVIATION NOV 2025)76
4.21SUPPLEMENTAL INSURANCE REQUIREMENTS77
4.2252.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (NOV 2025) (DEVIATION) ALTERNATE II (APR 1984)77
4.2352.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (DEVIATION NOV 2025)79
4.2452.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2025)93
4.2552.253-1 COMPUTER GENERATED FORMS (DEVIATION) (NOV 2025)96
4.2552.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)96
4.2652.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)97
4.27VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)101
4.28VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)101
4.29VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)104
4.30VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)104
4.31VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)106
4.32VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019)107
4.33VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)107
4.34VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)107
4.35VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)108
4.36VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)109
4.37VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)109
4.38VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)111
4.39VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)111
4.40VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020)(DEVIATION FEB 2026)111
4.41852.204-72 PERSONNEL VETTING AND CREDENTIALING (MARCH 2026)111
4.42VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (DEVIATION)(APR 2025)115
4.43VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)115
4.44VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)115
Attachment List118

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
EA
__________________
__________________

Contractor to provide all necessary materials, equipment, labor, expertise and supervision to construct 570-23-223 Renovate Fresno Acute Respiratory Clinic at the VA Central California Health Care System, Fresno Facility. Work must be done in accordance with the attached Scope of Work (SOW), documents, construction plans and specifications. The project completion is 224 calendar days after NTP. The period of performance will be established based on the issuance date of the NTP.

PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries

GRAND TOTAL
__________________

A.4 DELIVERY SCHEDULE

ITEM NUMBER
SHIPPING INFORMATION
QUANTITY
DELIVERY DATE
0001
SHIP TO:
VA Central California Health Care System

Fresno VA Medical Center 2615 E. Clinton Ave Fresno, CA 93703

USA

1.00

MARK FOR:
Bran Murphy

(559) 385-5863 bran.murphy@va.gov

Page 1 of Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

INSTRUCTIONS TO OFFERORS

1. INTRODUCTION:

a. These instructions prescribe the format of Offers. Offers are defined as consisting of both Prime Contractor’s Price Proposal and Prime Contractor’s Technical Proposal. These instructions describe the approach for the development and presentation of the required information and documentation. These instructions are designed to ensure the submission of necessary information and documentation to provide for the comprehensive evaluation of offers.

b. Offerors are cautioned to carefully review this solicitation prior to commencing preparation. For offers to receive full consideration for award, offerors shall ensure that the information and documentation furnished in support of the price proposal and the technical proposal are current, factual, complete, and accurate.

c. Offerors are strictly advised to comply with all instructions within this solicitation to ensure submission of a complete Prime Contractor Offer. Failure to furnish a complete offer with the instructions of this solicitation by the required time and date may result in the Offeror’s proposal being determined ineligible.

d. The Government intends to award without negotiations, unless negotiations are in the best interest of the Government.

e. In accordance with VAAR 836.204(f)(2), the disclosure of the magnitude of construction is between $2,000,000.00 and $5,000,000.00.

f. DBA Wage Determination No. CA20260018 dated 20260130 is applicable for this solicitation and project.

2. CONTRACT TYPE:

a. The contract awarded will be a firm fixed price (FFP) contract.

b. This solicitation is a total SDVOSB set-aside. The offeror MUST have an active Unique Entity Identification (UEI) number and be current in System for Award Management (SAM). SDVOSB firms must be Certified Veteran Eligibility (CVE) verified prior to the submission of proposals. Offerors must be certified in SBA Small Business Search the time submission offer and prior to award. SBA Small Business Search Link: https://search.certifications.sba.gov/. SBA Small Business Search will be used as the official source for SDVOSB verifications for this solicitation.

3. SUBMISSION INSTRUCTIONS:

a. Each offeror shall also provide one (1) emailed copy of the technical proposal and one (1) emailed copy of the price proposal, to arrive on or before the due date/time to daniel.jhun@va.gov.

The subject line of the email must cite RFP: 36C26126R0049. In no circumstances shall file size exceed 10MB. Multiple emails are acceptable.

b. Faxed proposals are not permitted under any circumstances.

c. Please ensure you allow time for email transmission.

d. Offerors MUST mark the subject line of the email as 36C26126R0049, Project No. 570-23-223, Renovate BLDG 1, 1st Floor Acute Respiratory Clinic at Fresno VA Medical Center.

e. Offer Due date is June 15, 2026, at 2:00 P.M. PDT.

4. QUESTIONS CONCERNING THIS RFP:

All Requests for Information (RFIs) regarding this RFP shall be submitted in writing and received no later than Thursday, May 28, 2026, at 10:00 AM PDT to allow replies to reach all prospective offerors in a timely manner. All RFIs shall be sent via email to Daniel Jhun at daniel.jhun@va.gov.

5. PRE-PROPOSAL SITE VISIT:

Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing these services. In no event shall failure to inspect the site constitute grounds for a claim after contract award. A pre-proposal site visit has been scheduled for Wednesday, May 20th, 2026, at 11:00 AM PDT, by the parking lot of Engineering Building 3 (Please refer to the photo below), Fresno VA Medical Center located at 2615 East Clinton Avenue, Fresno, CA 93703-2223.

Parking lot of Engineering Building 3 location:

6. PROPOSAL FORMAT:

a. All commitments made to the proposal may become a part of the resultant contract. The data submitted with each proposal shall be complete and concise, but not overly elaborate. Reliance on promotional brochures is discouraged.

b. The Technical Volume shall not exceed the page limits stated herein. If the page limits are exceeded, the pages in excess of the limit will not be read or considered. Page limits for entire Technical Proposal shall not exceed thirty-five (35) pages front and back. The CPARS/Past Performance questionnaires do not count as part of the 35 pages.

c. Page Limits Shall Include: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc. except as noted in the instructions. Text lines will be single-spaced.

d. Written proposals shall be prepared on standard 8.5 x 11-inch paper (charts may be landscaped but must be on 8.5 x 11-inch paper) and shall be in a legible font size (11 or 12 point). All pages of each proposal shall be appropriately numbered and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. ** The schedule sheet may be larger for legibility.

e. Email Copy: Provide one (1) email copy of the complete proposal (Volumes 1 and 2) as specified above.

f. Indexing: Each volume will contain a “Table of Contents” for that volume. The “Table of Contents” will identify major elements of technical and price proposals. Tab indexing will be used to identify Sections as appropriate. Table of Contents and Tab indexes do not count toward page limitation.

g. Offerors may, at the discretion of the Government, be asked to provide information for clarification purposes regarding their proposals in accordance with Revolutionary FAR Overhaul (RFO) FAR 15.202. Requests for such clarification information do not constitute negotiations as outlined in FAR 15.204. When a competitive range is established, the government may enter into negotiations.

h. The offeror will be held responsible for the validity of all information supplied in their proposal, including information provided by potential subcontractors. Should subsequent investigation disclose that the fact and conditions were not as stated, the proposal may be rejected and receive no further consideration.

i. If revised proposals are requested, the number of revised copies to be submitted shall be the same as those of initial proposals unless stated otherwise.

7. PROPOSAL VOLUME CONTENTS:

TECHNICAL VOLUME (BINDER - 1): Include the following information on the cover:

Company Name Project No. 570-23-223, Renovate BLDG 1, 1st Floor Acute Respiratory Clinic at Fresno VA Medical Center

RFP: 36C26126R0049

Volume 1 – Technical Proposal

BINDER INDEX:

Tab 1: Factor 1 - Technical Approach, as specified… Tab 2: Factor 2 – Project Experience, as specified ...

Tab 3: Factor 3 – Past Performance, as specified ...

a. The Technical volume shall include necessary information regarding the offeror’s ability to performance requirements outlined in the solicitation. Failure to provide a Technical Proposal in accordance with the solicitation instructions shall render an offeror’s proposal incomplete and ineligible for award.

b. Similar Scope and complexity is defined as work or activities related or closely related to that which is outlined in the Statement of Work, such as, but not limited to, the construction of new sterile processing services, the renovation of sterile processing services, including trailer swing space components, site prep, and HVAC, water processing, modernization, repair, and maintenance.

c. Similar magnitude (size), when referred to in the evaluation factors, is defined as projects that were valued over $1,000,000.00.

d. If proposed as a joint venture, a copy of the executed joint venture agreement shall be included in the proposal.

PRICE VOLUME (BINDER – 2): Include the following information on the cover:

Company Name Project No. 570-23-223, Renovate BLDG 1, 1st Floor Acute Respiratory Clinic at Fresno VA Medical Center

RFP: 36C26126R0049

Volume 2 – Price

BINDER INDEX

Tab 1: Standard Form 1442 (fully completed and signed); and acknowledgment of all amendments by either entering data in block 19 of the SF1442 or, completing blocks 15 a, b and c of the Amendment(s) (SF30’s) and returning with offer.

Tab 2: Cost Break-Out Sheet (fully completed) for each project 570-23-223 Tab 3: SF24 Bid Bond with Raised Seals, and Power of Attorney (original bid bond, fully completed/signed as required) Tab 4: Safety & Environmental Record Documentation Tab 5: Experience Modification Rate (EMR) Documentation Tab 6: Representations and Certifications as applicable along with a completed 852.219-75 (JAN 2023) (Deviation).

*Note: Offerors are responsible for insuring and verifying their offer and all required documents are received at the address designated in block 8 of the SF1442 Solicitation (and further specified directly below) by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). Offerors MUST completely fill out, and sign and submit a certification of VAAR Clause 852.219-75 (JAN 2023) (Deviation) with their proposal by solicitation due date in order to be considered for evaluation. An offer that fails to include a properly completed certification by the time proposals are due must be rejected by the agency.

Instructions to Complete VAAR Clause 852.219-75(JAN 2023)(Deviation): For the completion requirement, VAAR 852.219-75 imposes an obligation on the person executing the certification to enter the following information below the paragraph which begins with the word ‘Certification:’

Instructions to Complete VAAR Clause 852.219-75(JAN 2023) (Deviation):

Offeror’s Name: The name should match the actual legal name of the offeror as captured in SAM.gov. If the offeror’s name is ‘SDVOSB ABCD, LLC,’ the full legal name of the entity must be entered in each separate section of the certification that contains the following brackets: [Insert Name of Offeror]. It is not sufficient for the offeror’s company name to be inserted at the bottom of the certification only. The offeror’s name must be entered in the brackets referenced above.

Printed Name and Title of Signee: Enter the printed name and job title of the signee.

Signature: The certification statement must be signed by an individual who is authorized to execute the certification on behalf of the offeror.

Date: The certification must be properly dated.

Company Name and Address: The certification must include the signee’s complete business name and address. This information should match the address and legal name of the offeror as captured in SAM.gov.

PROSPECTIVE CONTRACTORS’ RESPONSIBILITY: Purchases shall be made from, and contracts shall be awarded to, responsible prospective contactors only. The presumed winning offer must be determined as “Responsible” by the Contracting Officer in accordance with FAR Part 9, Contractor Qualifications. To aid in making this determination, offerors shall provide:

1. Safety & Environmental Record information as specified below

2. Experience Modification Rate (EMR) information as specified below This information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases will be used to make the Determination of Responsibility. Failure to affirm being within the guidelines below or submit this information may result in a determination of non-Responsibility and make the offer ineligible for award. The Contracting Officer will obtain additional information as needed and specified in FAR 9.105-1 to make the Determination of Responsibility, to include, but not limited to the Federal Awardee Performance and Integrity Information System (FAPIIS), Excluded Parties List System (EPLS) and Past Performance Information Retrieval System (PPIRS).

PER VHA DIRECTIVE 7715 (06 April 2017: SAFETY & ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE (EMR): To be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an EMR of equal to or less than 1.0.

All offers shall submit the following information pertaining to their past Safety & Environmental Record and EMR with their proposal.

1. SAFETY & ENVIRONMENTAL RECORD: A self-certification on company letterhead that the Offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.

1. EMR: All offerors shall submit information regarding their current EMR. This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.

ADDITIONAL SOLICITATION INFORMATION: Please see Section 5, Pre-proposal Site Visit for details. This pre-proposal site visit will be the only opportunity for potential offerors to visit the site. All potential contractors, subcontractors, and suppliers are strongly encouraged to attend this pre-proposal site visit.

REQUEST FOR INFORMATION (RFI): To obtain clarifications and/or additional information concerning the contract requirements, submit a written RFI utilizing the RFI Form included in this RFP, and send it via email to daniel.jhun@va.gov. See RFI Form for specifics.

RFIs will be responded to as necessary in amendment format and will be posted on SAM.gov (Also known as (AKA) Contract Opportunities). Deadline for submission or RFIs for this RFP is Thursday, May 28, 2026, at 10:00 AM PDT. No questions will be answered after this date/time unless determined to be in the best interest of the Government as determined by the Contracting Officer. Telephone requests for information will not be accepted or returned.

SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://sam.gov/SAM/ and enter all mandatory information into the system. Award cannot be made until the contractor has been registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their offer. (See RFO FAR 4.304)

ADDITIONAL VET CERTIFICATION INFORMATION:

(a) Eligibility of SDVOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for SDVOSBs.

(b) At the time of submission of offer, the offeror must represent to the contracting officer that it is a—

(1) SDVOSB concern

(2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and

(3) Verified for eligibility in the Small Business Dynamic Search.

(c) A joint venture may be considered an SDVOSB or VOSB concern if

(1) At least one member of the joint venture is an SDVOSB or VOSB concern and makes the representations in paragraph (b) of this section.

(2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement.

(3) The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in FAR 19.101; and

(4) The joint venture meets the requirements of 13 CFR 125.15(b), modified to include Veteran-owned small businesses where this CFR section refers to SDVOSB concerns.

Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in FAR 19.102(f) to receive a benefit under this program.

According to 13 CFR 128.402(a), to be eligible to submit an offer on a VOSB or SDVOSB contract,

1. The joint venture should be designated as a VOSB or SDVOSB joint venture in SAM with the VOSB or SDVOSB-certified joint venture partner identified, and

2. The VOSB or SDVOSB joint venture partner must be certified.

NOTICE TO PROCEED (NTP): A notice to proceed (NTP) shall be issued after award of a fully executed contract. The NTP date and time are “to be determined” after award to a successful offeror. Primary factor in determination to issue NTP shall be the Prime Contractor submission of, and the Government review and approval of both Payment and Performance Bonds, both of which are enforceable legal documents.

SECURITY REQUIREMENTS (GENERAL):

1. All personnel employed by the contractor in the performance of work, issued under this contract, or any representative of the contract shall abide by all security instructions and directives of the Department of Veterans Affairs. Employees are responsible for safeguarding all government property provided for contractor use.

1. At the close for each work period, government facilities, equipment and materials shall be secured, lights, and all doors and windows secured.

1. The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the station/campus and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during background checks.

1. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented, or illegal aliens will be remanded to the proper authorities.

1. Contractor Badge Policies: All requests for contractor ID badges will be submitted through the station Police/Security office.

1. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the station/campus. All vehicles entering the station/campus are subject to search. Any refusal or non-consent by an employee will result in termination of their access and immediate confiscation of their ID badge.

Evaluation Procedures

1. Basis for Contract Award.

A. INTRODUCTION: A tradeoff selection will be conducted by a team of Government Technical personnel in accordance with Revolutionary FAR Overhaul (RFO) FAR 15.103.1 – a best value trade-off source selection evaluation process will undergo a trade-off evaluation, supplemented by the Department of Veterans Affairs Acquisition Regulation (VAAR). These regulations are available electronically at https://www.acquisition.gov/far-overhaul/far-part-deviation-guide and https://www.va.gov/oal/library/vaar/ The Government intends to award one contract as a result of this solicitation. In using the Tradeoff approach, the Government seeks to award the offeror who gives the Government the greatest confidence that it will best meet or exceed the requirements affordably in a way that will be advantageous to the Government. This may result in an award to a higher rated, higher priced offeror where the decision is consistent with the evaluation factors and the Source Selection Authority (SSA) reasonably determines that the technical superiority and/or overall business approach and/or superior past and present performance of the higher priced offeror outweighs the cost difference. To arrive at a best value decision, the SSA will integrate the source selection team’s evaluations of the factors described in this provision. While the Government will strive for maximum objectivity, the tradeoff process, by its nature, is subjective; therefore, professional judgment is implicit throughout the selection process. Award will be made to the offeror responsible whose proposal conforms to all solicitation requirements, such as terms and conditions, representations and certifications, technical requirements, and provides the best value to the Government based on the results of the evaluation described in paragraph B below. Contract terms and conditions consistent with customary commercial practices are specified in the solicitation/contract, with otherwise tailored terms and conditions specified in the Addendum to the solicitation/contract.

The Government reserves the right to conduct negotiations if determined necessary but intends to award without negotiations. Any negotiations will be conducted in accordance with RFO FAR 15.204-2.

If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer, with the concurrence of the Source Selection Authority, may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

B. EVALUATION: In accordance with RFO FAR 15.103-1, the best value trade-off sources selection evaluation process will undergo a trade-off evaluation.

Definitions:

Size: Similar magnitude (size), when referred to in the evaluation factors, is defined as projects that were valued over $1,000,000.00

Complexity is defined as a design-bid-build project that includes several specialty trades and some engineering.

Scope is defined as work or activities related or closely related to that which is outlined in the Statement of Work, such as, but not limited to, the construction of new Acute Respiratory Clinic including site prep, HVAC, and commissioning.

Recency is defined as a project completed in the previous five (5) calendar years.

Relevancy: For purposes of this evaluation, a relevant project is defined as new construction and/or repair, alteration and related Acute Respiratory Clinic or Airborne infection isolation (AII) services completed within the past five years of the proposal issue date of this RFP. Infrastructure is defined as: 1) construction of a healthcare facility; 2) construction for industrial buildings and warehouses; 3) non-residential buildings, other than industrial buildings and warehouses; or 4) improvements such as utilities, HVAC, and airborne infection isolation for healthcare facilities, industrial buildings, and warehouses. “New Construction” is defined as construction that provides for new or expanded facilities or infrastructure. New construction does not include repair and/or modernization of an existing facility, nor does it include replacement or upgrade to an existing infrastructure.

C. FACTORS ORDER OF IMPORTANCE: The factors are listed in descending order of importance. The relative importance of evaluation factors 1-3 is as follows: Technical factors (Factors 1 and 2) are of equal importance to each other, and when combined, are equal in importance to the past performance factor (Factor 3). When the proposal is evaluated as a whole, the technical factors (Factors 1 and 2) and past performance (Factor 3) combined (i.e., the non-price evaluation factors) are approximately equal to price. The contract resulting from this solicitation will be awarded to the responsible offeror whose offer, conforming to the solicitation, is determined to be the most advantageous to the Government considering price and non-price evaluation factors. An award may be made to other than the lowest priced offeror or other than the highest non-price rated offeror. Business judgments and tradeoffs will be used to determine the proposal offering the best value to the Government. In determining the best value to the Government, the Government need not quantify the tradeoffs that led to the best value decision. Any award will be made based on the best value proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the four (4) following evaluation factors (in accordance with RFO FAR 15.104(d)) in order of descending importance:

1. Evaluation Factor 1 – Technical Approach
2. Evaluation Factor 2 – Project Experience
3. Evaluation Factor 3 – Past Performance
4. Evaluation Factor 4 – Price

Evaluation Factor 1 – Technical Approach:

(a) Solicitation Submission Requirements:

The Offeror shall provide a narrative describing the general technical approach for accomplishing the requirements of this contract based on the General Requirements outlined in the statement of work. This is of a high level and does not require referencing specifications. The narrative shall include the roles and responsibilities of the offeror. If the offeror is made up of more than one legal entity (e.g. Joint-Venture, Limited Liability Company, Limited Partnership, etc.), the narrative shall describe the roles and responsibilities of each legal entity(s) comprising the offeror. Provide an organizational chart, clearly depicting the offeror’s hierarchical structure and the communication channel (including each legal entity comprising the offeror if a JointVenture or the offeror is made up of more than one legal entity). The narrative and organizational chart shall be limited to four (4) single-sided pages, 8.5” x 11”, 1” margin left/right/top/bottom, and 10-point font or larger.

(b) Basis of Evaluation: The offeror’s technical approach will be used as a means to assess the Offeror’s understanding of the General Requirements of the contract, the roles and responsibilities of the offeror to accomplish the requirements of the contractor.

Factor 2 – Project Experience:

(a) Solicitation Submission Requirements:

Provide information on relevant and recent experience on construction contracts of comparable size, complexity and scope within the last five calendar years as described in the below requirements. The offeror shall complete Attachment A for this factor for each project submitted. Attachment A is structured to allow for the entry of up to four (4) total projects. The use of Attachment A and all information therein is mandatory and will be used to evaluate experience. The Government will evaluate only the information provided in Attachment A and all other information provided on other than Attachment A will not be considered. The Offeror may expand individual cells on Attachment A. Attachment A submittals that do not comply with these requirement will not be evaluated.

1. Submit up to four (4) example projects demonstrating the experience and capability of the offerors in constructing Acute Respiratory Clinic projects, Airborne Infection isolation or similar healthcare related projects, including the largest construction efforts within those projects. Examples should highlight the offerors' experience, as well as their ability to coordinate and work as a team, leading to the successful completion of relevant projects that are similar in size, scope, and complexity to the requirements outlined in the RFP.

(b) Basis of Evaluation: The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing recent, relevant construction and design projects as defined in the solicitation submittal requirements of similar size, scope and complexity. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. Offeror’s projects will be rated individually and then combined to achieve an overall factor rating. Offeror’s demonstrating recent and relevant construction experience; timely project completion; recent and relevant construction of Sterile Processing Service or similar projects related to healthcare; recent and relevant examples of offeror demonstrating a successful contractor team arrangement; and recent and relevant projects completed in the NCO 21 Geographic location may be rated more favorably.

Factor 3 – Past Performance:

(a) Solicitation Submission Requirements:

The Offeror shall submit a completed Contractor Performance Assessment Report System (CPARS) evaluation for at least five (5) recent, relevant projects. If there is not a completed CPARS evaluation, then submit Past Performance Questionnaires (PPQ - Attachment B) for each project. PPQs must be completed and signed by the contracting agent and/or their representative responsible for construction contract administration. The contracting agent and/or their representative responsible for construction contract administration must submit complete PPQs via email to daniel.jhun@va.gov before the specified proposal due date.

After the solicitation closes, Offerors will not be allowed to submit additional CPARS or PPQs to replace the submitted CPARS or PPQs. Therefore, it is imperative that the Offerors only submit relevant CPARS and/or PPQ’s.

If the submitted CPARS/PPQs are determined by the Government to be irrelevant then the Government reserves the right not to replace them with an additional CPARS.

Offerors may provide any information on problems encountered and the corrective actions taken on these projects. Offerors may also address any adverse past performance issues. Explanations shall not exceed four (4) single-sided pages, 8.5” x 11”, 1” margin left/right/top/bottom, and 10-point font or larger.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the offeror’s references or the reference’s unwillingness to provide the information requested may affect the Government’s evaluation of this factor. Performance award or additional information submitted will not be considered.

Basis of Evaluation: This evaluation focuses on how well the offeror performed on the relevant projects. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance, and Integrity Information System (FAPIIS), and any other known sources not provided by the offeror.

The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.

The assessment of the offeror’s past performance will be used as a means of evaluating the offeror’s probability to successfully meet the requirements of the contract.

In rating Past Performance, the Government will evaluate recency, relevancy, and quality of contractor performance. In reference to Past Performance, offerors who do not have relevant past performance will receive a neutral rating (neither favorable nor unfavorable)(FAR Overhaul 15.104(b)(3).) However, the Offeror with favorable past performance may be considered more favorably than an offeror with Neutral rating.

Factor 4 – Price:

Solicitation Submission Requirements: All proposals must include complete SF 1442, must be signed by a person from the firm who has the authority to enter into contractual agreements, any amendments, and a completed price breakdown sheet.

Basis of Evaluation: The offerors’ price will be evaluated in accordance with FAR 15.404-1(b), Price Analysis for Commercial and Non-Commercial Items to determine price reasonableness. The offeror must complete price breakdown sheet and submit it with signed copy of SF 1442 and any amendments. The total evaluated price will be determined by the offeror’s price for all division items. Note: The VA will look at the total evaluated price and non-price factors to determine the best value. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation provides the greatest overall benefit in response to the requirements.

END OF INSTRUCTIONS TO OFFERORS

4.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a firm-fixed-price contract resulting from this solicitation.

(End of Provision)

4.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) (a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

4.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT-CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the…