About this file

This is a Price Breakdown attachment in spreadsheet format supporting a firm-fixed-price construction solicitation for renovation work at the Fresno VA Medical Center.

The solicitation (36C26126R0049, Project 570-23-223) requires renovation of the first floor Acute Respiratory Clinic at Fresno VA Medical Center located at 2615 East Clinton Avenue, Fresno, CA 93703-2223. This is a total service-disabled veteran-owned small business (SDVOSB) set-aside under NAICS Code 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45 million. The contract is firm-fixed-price with a period of performance of 224 calendar days after receipt of Notice to Proceed (NTP). The solicitation closes June 15, 2026 at 2:00 P.M. PDT, with requests for information due by May 28, 2026 at 10:00 A.M. PDT. A mandatory pre-proposal site visit is scheduled for May 20, 2026 at 11:00 A.M. PDT. Bid bonds, payment bonds, and performance bonds are required. Award decisions will be made using a best-value trade-off evaluation process conducted by Government Technical personnel in accordance with FAR 15.103.1 and the Department of Veterans Affairs Acquisition Regulation (VAAR). The procuring agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21.

View the file

Other files

File Type Posted
570-23-223-90134-Fresno ARC-Electrical-E701R 1.pdf PDF
BULLETIN NO1 3.pdf PDF
Chilled Water AS Builds.pdf PDF
Bulletin No 2 - CW HW RPM.pdf PDF
VA Fresno ARC Pre-Bid RFI Responses 6-19-26.xlsx XLSX spreadsheet
S06 - Amendment to Solicitation No. 36C26126R0049 0003.docx DOCX document
Original Stuctural.pdf PDF
570-23-223-90134-Fresno ARC-Mechanical Bulletin No 2 - 2026.06.18.pdf PDF
S06 - 36C26126R0049 0002.docx DOCX document
S06 - 36C26126R0049 0001.docx DOCX document
Sign in Sheet Fresno Arc.PDF PDF
S02 - Solicitation No. 36C26126R0049.docx DOCX document
REQUEST FOR INFORMATION FORM.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
90134 - 570-23-223 - Fresno Design to Renovate 1st floor ARC Fi.pdf PDF
Fresno Design to Renovate 1st floor ARC Final Specs 20260423.pdf PDF
ATTACHMENT A - FACTOR 2 - PROJECT EXPERIENCE.xlsx XLSX spreadsheet
DBA Wage Determination No. CA20260018 dated 20260130.docx DOCX document
ATTACHMENT B - FACTOR 3 - Past Performance Questionnaire.docx DOCX document
VAAR 852.219-75.pdf PDF
Pre-proposal Site Visit Briefing Slide.pptx PPTX presentation
90134 - 570-23-223- Final Bid Set Fresno ARC BOD - 20260407.pdf PDF
570-23-223_SOW Fresno ARC.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project Title: Fresno Renovate Building 1, 1st Floor Acute Respiratory Clinic
Project #: 570-23-223
Division Total:$0.00
Overhead:$0.00
Subtotal:$0.00
Profit:$0.00
Subtotal:$0.00
Insurance & Taxes:$0.00
Subtotal:$0.00
Bonding:$0.00
Grand Total:$0.00
Division Totals
Division 01 - General Requirements$0.00
Division 02 - Existing Conditions$0.00
Division 03 - Concrete$0.00
Division 04 - Masonry$0.00
Division 05 - Metals$0.00
Division 06 - Wood and Plastic$0.00
Division 07 - Therm/Moisture Prot.$0.00
Division 08 - Doors and Windows$0.00
Division 09 - Finishes$0.00
Division 10 - Specialties$0.00
Division 11 - Equipment$0.00
Division 12 - Furnishings$0.00
Division 13 - Special Construction$0.00
Division 14 - Conveying Equipment$0.00
Division 21 - Fire Suppression$0.00
Division 22 - Plumbing$0.00
Division 23 - HVAC$0.00
Division 25 - Integrated Automation$0.00
Division 26 - Electrical$0.00
Division 27 - Communications$0.00
Division 28 - Elect. Safety/Security$0.00
Division 31 - Earthwork$0.00
Division 32 - Exterior Improvements$0.00
Division 33 - Utilities$0.00
Division 34 - Transportation$0.00
Division 48 - Electrical Power Gen.$0.00
Division 01 - General RequirementsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 01 Total:$0.00
Division 02 - Existing ConditionsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 02 Total:$0.00
Division 03 - ConcreteLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 03 Total:$0.00
Division 04 - MasonryLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 04 Total:$0.00
Division 05 - MetalsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 05 Total:$0.00
Division 06 - Wood and PlasticLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 06 Total:$0.00
Division 07 - Therm /Moisture Prot.LaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 07 Total:$0.00
Division 08 - Doors and WindowsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 08 Total:$0.00
Division 09 - FinishesLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 09 Total:$0.00
Division 10 - SpecialtiesLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 10 Total:$0.00
Division 11 - EquipmentLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 11 Total:$0.00
Division 12 - FurnishingsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 12 Total:$0.00
Division 13 - Special ConstructionLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 13 Total:$0.00
Division 14 - Conveying EquipmentLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 14 Total:$0.00
Division 21 - Fire SuppressionLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 21 Total:$0.00
Division 22 - PlumbingLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 22 Total:$0.00
Division 23 - HVACLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 23 Total:$0.00
Division 25 - Integrated AutomationLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 25 Total:$0.00
Division 26 - ElectricalLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 26 Total:$0.00
Division 27 - CommunicationsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 27 Total:$0.00
Division 28 - Elect. Safety/SecurityLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 28 Total:$0.00
Division 31 - EarthworkLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 31 Total:$0.00
Division 32 - Exterior ImprovementsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 32 Total:$0.00
Division 33 - UtilitiesLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 33 Total:$0.00
Division 34 - TransportationLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 34 Total:$0.00
Division 48 - Electrical Power Gen.LaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 48 Total:$0.00

Sheet2

Sheet3

File details come from the government source that posted it. Updated .