About this file

This document is a bulletin amending electrical drawing E-701 to include switchboard electrical load recording tables for two main distribution switchboards designated MSS-A and MSS-B. The bulletin documents electrical load data collected during the period of April 1, 2026 through May 1, 2026, presenting existing demand loads and new anticipated loads as percentages of each switchboard's capacity. Load metering was performed at the switchboard level rather than at downstream branch panels due to safety hazards associated with installing metering equipment in corridor spaces where the downstream panels are located.

The amendment specifies that new electrical loads introduced under the project scope are distributed across four panels: panels N-C-1D, C-E-1Y, and LS-E-1E are fed from switchboard MSS-A, while panel N-E-1E is fed from switchboard MSS-B. The load values reflected in each switchboard's summary table represent only the additional load introduced by this project scope, not total facility loads. This bulletin serves as technical documentation supporting the electrical design and capacity planning for the referenced construction or renovation project.

View the file

Other files

File Type Posted
570-23-223-90134-Fresno ARC-Electrical-E701R 1.pdf PDF
Chilled Water AS Builds.pdf PDF
Bulletin No 2 - CW HW RPM.pdf PDF
VA Fresno ARC Pre-Bid RFI Responses 6-19-26.xlsx XLSX spreadsheet
S06 - Amendment to Solicitation No. 36C26126R0049 0003.docx DOCX document
Original Stuctural.pdf PDF
570-23-223-90134-Fresno ARC-Mechanical Bulletin No 2 - 2026.06.18.pdf PDF
S06 - 36C26126R0049 0002.docx DOCX document
S06 - 36C26126R0049 0001.docx DOCX document
Sign in Sheet Fresno Arc.PDF PDF
S02 - Solicitation No. 36C26126R0049.docx DOCX document
Attachment - Price Breakdown.xlsx XLSX spreadsheet
REQUEST FOR INFORMATION FORM.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
90134 - 570-23-223 - Fresno Design to Renovate 1st floor ARC Fi.pdf PDF
Fresno Design to Renovate 1st floor ARC Final Specs 20260423.pdf PDF
ATTACHMENT A - FACTOR 2 - PROJECT EXPERIENCE.xlsx XLSX spreadsheet
DBA Wage Determination No. CA20260018 dated 20260130.docx DOCX document
ATTACHMENT B - FACTOR 3 - Past Performance Questionnaire.docx DOCX document
VAAR 852.219-75.pdf PDF
Pre-proposal Site Visit Briefing Slide.pptx PPTX presentation
90134 - 570-23-223- Final Bid Set Fresno ARC BOD - 20260407.pdf PDF
570-23-223_SOW Fresno ARC.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BULLETIN NO.1-AMENDMENT TO DRAWING E-701

Bulletin NO.1 amends drawing E-701 to include switchboard electrical load recording tables for switchboards MSS-A and MSS-B. Load recordings were taken on 04/01/2026- 05/01/2026. The tables summarize the existing demand load and new anticipated load per the electrical drawings, with total load expressed as a percent of each switchboard’s capacity. Metering was performed at the switchboard level rather than at the downstream branch panels. The downstream panels serving the area of work are in corridor spaces where metering equipment installation would create a hazard. New loads added under this scope for panels N-C-1D, C-E-1Y, and LS-E-1E are fed from switchboard MSS-A. New loads for panel N-E-1E are fed from switchboard MSS-B. The new load values reflected in each switchboard’s load summary table represent only the additional load introduced by this project scope.