90134 - 570-23-223 - Fresno Design to Renovate 1st floor ARC Fi.pdf

PDF 24 MB Posted

Attached to
Z1DA--Solicitation No. 36C26126R0049 Project No. 570-23-223, Renovate First Floor for Acute Respiratory Clinic at Fresno VA Medical Center
Solicitation number
36C26126R0049
Issued by

About this file

This is a comprehensive 100% construction document package and related federal solicitation for the renovation of Building 1, 1st Floor Acute Respiratory Clinic at Fresno VA Medical Center in Fresno, California. The project (No. 570-23-223) encompasses design-to-renovate work totaling approximately 2,600 square feet across multiple disciplines including architectural, structural, mechanical, plumbing, electrical, fire protection, and hazardous materials abatement. The construction documents specify detailed demolition requirements, new wall construction with fire-rated assemblies, interior finishes including porcelain and ceramic tile, reconfigured HVAC systems with negative pressure capabilities, new plumbing fixtures with thermostatic mixing valves, and comprehensive electrical work including lighting controls with occupancy sensors, security systems, and data infrastructure. Key scope elements include removal of existing evaporators and installation of new terminal air units, provision of two N+1 redundant exhaust fans on the OPC penthouse roof discharging at 3,500 feet per minute, new interior signage with ADA compliance, and infection control measures (Class IV) requiring HEPA filtration and negative air monitoring at 0.02 inches water column.

The related federal solicitation (No. 36C26126R0049) is a firm-fixed-price construction contract with a 224-calendar-day period of performance following Notice to Proceed. This is a total service-disabled veteran-owned small business (SDVOSB) set-aside with NAICS code 236220 (Commercial and Institutional Building Construction); the small business size standard is $45 million. The solicitation closes June 15, 2026 at 2:00 P.M. PDT with Requests for Information due by May 28, 2026 at 10:00 A.M. PDT. A mandatory pre-proposal site visit is scheduled for May 20, 2026 at 11:00 A.M. PDT. Bid bonds, payment bonds, and performance bonds are required. Award will be made on a best-value trade-off basis using Department of Veterans Affairs Acquisition Regulation criteria. The procurement is managed by Daniel Jhun (daniel.jhun@va.gov) at the VA's Veterans Health Administration Veterans Integrated Service Network 21.

View the file

Other files

File Type Posted
570-23-223-90134-Fresno ARC-Electrical-E701R 1.pdf PDF
BULLETIN NO1 3.pdf PDF
Chilled Water AS Builds.pdf PDF
Bulletin No 2 - CW HW RPM.pdf PDF
VA Fresno ARC Pre-Bid RFI Responses 6-19-26.xlsx XLSX spreadsheet
S06 - Amendment to Solicitation No. 36C26126R0049 0003.docx DOCX document
Original Stuctural.pdf PDF
570-23-223-90134-Fresno ARC-Mechanical Bulletin No 2 - 2026.06.18.pdf PDF
S06 - 36C26126R0049 0002.docx DOCX document
S06 - 36C26126R0049 0001.docx DOCX document
Sign in Sheet Fresno Arc.PDF PDF
S02 - Solicitation No. 36C26126R0049.docx DOCX document
Attachment - Price Breakdown.xlsx XLSX spreadsheet
REQUEST FOR INFORMATION FORM.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
Fresno Design to Renovate 1st floor ARC Final Specs 20260423.pdf PDF
ATTACHMENT A - FACTOR 2 - PROJECT EXPERIENCE.xlsx XLSX spreadsheet
DBA Wage Determination No. CA20260018 dated 20260130.docx DOCX document
ATTACHMENT B - FACTOR 3 - Past Performance Questionnaire.docx DOCX document
VAAR 852.219-75.pdf PDF
Pre-proposal Site Visit Briefing Slide.pptx PPTX presentation
90134 - 570-23-223- Final Bid Set Fresno ARC BOD - 20260407.pdf PDF
570-23-223_SOW Fresno ARC.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

PROJECT LOCATION

DEPARTMENT OF VETERANS AFFAIRS

FRESNO, CALIFORNIA

570-23-223 DESIGN TO RENOVATE BLDG 1, 1ST FLOOR ACUTE

RESPIRATORY CLINIC

PROJECT TEAM

MECHANICAL, PLUMBING, ELECTRICAL & LOW VOLTAGE ENGINEERING:

ARCHITECTURE & INTERIOR DESIGN:

OWNER:

PHONE: 269.927.0144

SEVEN GENERATIONS A+E

KALAMAZOO, MI 49007

600 E. MICHIGAN AVENUE - SUITE B

CENTRAL CALIFORNIA HEALTH CARE SYSTEM (VACCHS)

2615 E CLINTON AVE

FRESNO, CALIFORNIA 93703

PHONE: 619.770.8552

DAVENERGY

SAN DIEGO, CA 92109

2207 GARNET AVE - SUITE 1

100% FOR CONSTRUCTION DRAWING INDEX

COR:

JAMAL KARGBO

HEALTHCARE ENGINEER

559.313.7669

FRESNO, CALIFORNIA

NORTH

VA CAMPUS MAP

SHEET DESCRIPTION

GENERAL

GI-001 COVER SHEET

GI-002 GENERAL INFORMATION & SYMBOL LEGEND

GI-003 FIRST FLOOR CODE COMPLIANCE PLAN

GC-001 INFECTION CONTROL GENERAL INFORMATION

GC-101 FIRST FLOOR INFECTION CONTROL PLAN

ARCHITECTURAL

AD-101 FIRST FLOOR DEMOLITION PLAN

AD-121 REFLECTED CEILING DEMOLITION PLANS

AE-101 FIRST FLOOR PLAN

AE-140 ROOF PLAN

AE-200 EXTERIOR ELEVATION

AE-301 VESTIBULE SECTION

AI-400 DOOR & FRAME SCHEDULE AND DOOR & FRAME TYPES

AI-500 FIRST FLOOR EQUIPMENT PLAN

AC-121 FIRST FLOOR REFLECTED CEILING PLAN

IN-001 INTERIOR FINISH KEY & DETAILS

IN-002 INTERIOR FINISH DETAILS

IN-003 CASEWORK DETAILS

IN-101 FIRST FLOOR INTERIOR FINISH PLAN

IN-420 INTERIOR ELEVATIONS

IN-421 INTERIOR ELEVATIONS

AW-001 SIGNAGE SCHEDULE & TYPES

AW-101 FIRST FLOOR SIGNAGE PLAN

ENVIRONMENTAL

HA-001 HAZMAT ABATEMENT COVER SHEET

HA-101 FIRST FLOOR ABATEMENT PLAN

STRUCTURAL

S-001 STRUCTURAL COVER SHEET & STRUCTURAL NOTES

S-002 STRUCTURAL NOTES, VERIFICATION & INSPECTION SCHEDULES

S-101 EAST WING PARTIAL 1ST FLOOR PLAN NEW WORK

S-102 OPC PENTHOUSE ROOF PLAN - NEW WORK

S-501 TYPICAL DETAILS

S-502 DETAIL

MECHANICAL

M-001 MECHANICAL COVER SHEET

MD-101 FIRST FLOOR MECHANICAL DEMOLITION PLAN

MH-101 FIRST FLOOR MECHANICAL HVAC SUPPLY PLAN

MH-102 FIRST FLOOR MECHANICAL HVAC EXHAUST PLAN

MH-103 SECOND FLOOR MECHANICAL HVAC EXHAUST PLAN

MH-104 THIRD FLOOR MECHANICAL HVAC EXHAUST PLAN

MH-105 OPC PENTHOUSE ROOF MECHANICAL HVAC EXHAUST PLAN

MH-106 MECHANICAL HVAC NEW EXHAUST PLAN ISOMETRIC

MH-107 FIRST FLOOR MECHANICAL PRESSURE RELATIONSHIPS

MP-101 FIRST FLOOR MECHANICAL CHW PIPING DEMO

MP-102 FIRST FLOOR MECHANICAL CHW PIPING NEW PLAN

MP-103 FIRST FLOOR MECHANICAL CHW PIPING DEMO/NEW PLAN - CASKET LIFT

M-401 MECHANICAL SCHEDULES

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL CONTROLS

PLUMBING

P-001 PLUMBING COVER SHEET

PD-101 BASEMENT PLUMBING DEMOLITION PLAN

PD-102 FIRST FLOOR PLUMBING DEMOLITION PLAN

P-101 BASEMENT PLUMBING PIPING PLAN

P-102 FIRST FLOOR PLUMBING PIPING PLAN

P-401 PLUMBING SCHEDULES

P-501 PLUMBING DETAILS

P-901 PLUMBING ISOMETRIC

ELECTRICAL

E-001 ELECTRICAL COVER SHEET

ED-101 FIRST FLOOR ELECTRICAL DEMO PLAN

EL-101 FIRST FLOOR NEW LIGHTING PLAN

EP-101 FIRST FLOOR POWER PLAN

EP-102 OPC ROOF POWER PLAN

ET-101 FIRST FLOOR NEW SPECIAL SYSTEMS

E-501 ELECTRICAL DETAILS

E-601 SINGLE LINE DIAGRAM

E-701 ELECTRICAL SCHEDULES

FIRE PROTECTION

FA-001 FIRE PROTECTION SYMBOLS AND GENERAL NOTES

FA-101 FIRST FLOOR FIRE ALARM

FRESNO, CALIFORNIA

NORTH

VICINITY MAP

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVENUE, SUITE B

KALAMAZOO, MI 49007

P: 269.927.0144

WWW.7GENAE.COM GI-001

570-23-223

2615 E CLINTON AVE

FRESNO, CALIFORNIA 93703

APRIL 7, 2026 MH AL

COVER SHEET DESIGN TO RENOVATE BLDG 1,

1ST FLOOR ACUTE RESPIRATORY

CLINIC

1 65

DEPARTMENT OF VETERANS AFFAIRS

STRUCTURAL ENGINEERING:

PHONE: 858.215.3660

JUNKER GONZALEZ ENGINEERING GROUP

LA MESA, CA 91942

8285 LA MESA BLVD. - SUITE C

ENVIRONMENTAL:

PHONE: 504.684.4408

VALI COOPER INTERNATIONAL

COVINGTON, LA 70433

56 LOUIS PRIMA DR, SUITE B

REVISIONS DATE

100% CONSTRUCTION DOCUMENTS 04/07/2026

ARCHITECTURAL SYMBOLS & PLAN INDICATORS

ABBREVIATIONS

BARRIER-FREE DESIGN INFORMATION

A

A

A

A

TOP OF STEEL

ELEV. 10'-0"

TYP. BARRIER FREE TOILET ROOM FIXTURES

SCALE: NONE

TYP. BARRIER FREE TOILET ROOM FIXTURES

SCALE: NONE

OBSTRUCTED REACH

UNOBSTRUCTED REACH

TYP. BARRIER FREE TRANSFER SHOWER

SCALE: NONE

TYP. CODE REGULATED MOUNTING HEIGHTS

SCALE: NONE

TYP. EQUIPMENT MOUNTING HEIGHTS

SCALE: NONE

ELEVATION INDICATION

SHEET NO.

ELEVATION NUMBER

SECTION INDICATOR

ENLARGED PLAN OR

ELEVATION

PROPOSED SPOT

EXISTING SPOT

ELEVATION

100.57'

100.57'

STRUCTURAL SPAN

ROOF TRUSSES

FLOOR JOIST OR

RAMP

@ 16" O.C.

2 x 12

1" per 12"

SLOPE UP

REVISION TAG W/

REVISION NUMBER

KEYNOTE TAG

WINDOW TAG W/

WINDOW TYPE

INDICATOR

WALL SECTION CUT

COLUMN LINE

WALL TYPES

ELEVATION

BUILDING SECTION CUT

DETAIL NUMBER TYPICAL

DIMENSIONING

SET-BACK LINE

PROPERTY LINE

EXISTING

CONTOUR

TOPOGRAPHY

CONTOUR

100'

100'

TOPOGRAPHY

PROPOSED

SECTIONS & DETAILS

TYPICAL TITLE FOR

DOOR TAG W/

DOOR NUMBER

NORTH ARROW

5'6" DIAMETER CLEAR

WHEELCHAIR TURNING

SPACE - REFER TO PLAN

- REFER TO PLAN

AND GROUND SPACE

30" x 48" CLEAR FLOOR

CEILING HEIGHT TAG

MIRROR

GRAB BARS

5'-6" ABA DIAMETER

CLEAR FLOOR SPACE

60" WIDE BY 59" DEEP

MINIMUM FLOOR AREA AT

WATER CLOSET (56" DEEP IF

WALL-HUNG WATER CLOSET).

2'-6" x 4'-0" CLEAR

FLOOR AREA AT SINK

BARRIER FREE DESIGN

GENERAL NOTES:

ACCESSIBLE CONTROLS, OPERATING

MECHANISMS & HARDWARE SHALL COMPLY

WITH ABA SECTION §407 AND SECTION 309 OF

ICC/ANSI A117.1.

ACCESSIBLE SIGNAGE FURNISHED BY

CONTRACTOR SHALL COMPLY WITH ABA

SECTION §F216.

PORTABLE FIRE EXTINGUISHERS TO BE

PROVIDED IN ACCORDANCE WITH THE

NATIONAL FIRE PROTECTION ASSOCIATION

(NFPA).

REFER TO FLOOR PLAN SHEETS FOR LOCATIONS

OF FIRE EXTINGUISHER CABINETS (FEC).

'L' SHAPE FOLDING

SHOWER SEAT

COMPLYING

WITH SECTION 610.3

OF ICC/ANSI A117.1

GRAB BAR TO BE

ACROSS CONTROL

AND MEASURE 18"

FROM CONTROL WALL

SHOWER SPRAY UNIT

W/ 59" HOSE AND 24"

ATTACHMENT BAR

GRAB

BARS

CONTROLS SHALL BE

LOCATED WITHIN 15" ON

EITHER SIDE OF SHOWER

SEAT CENTER LINE AND

PROVIDE MAX WATER TEMP

OF 120°

ACCESSIBLE SHOWER

COMPARTMENTS SHALL

COMPLY WITH SECTION

608 OF ICC/ANSI

A117.1

* DIMENSION IS TO BOTTOM

OF REFLECTIVE SURFACE

RECEPTACLE

LIGHT

SWITCH

HVAC

CONTROLS

FIRE

ALARM

FEC

LESS THAN 40#

FEC

GREATER THAN 40#

TEL

PUSH PAD

RH/CH

PT

SD

HS

MR

HRHR

WP

TP SNR

4'-4"

1. REFER TO EQUIPMENT PLAN FOR EQUIPMENT

ABBREVIATIONS AND LOCATIONS.

2. REFER TO INTERIOR ELEVATIONS FOR

ADDITIONAL INFORMATION.

3. ITEMS ON THIS SHEET ARE NOT NECESSARILY

INCLUDED IN THIS PROJECT.

4. CONTRACTOR TO VERIFY ALL EQUIPMENT

MOUNTING HEIGHTS WITH COR/AE

PRIOR TO INSTALLATION.

5. REFER TO MECHANICAL/ELECTRICAL

DRAWINGS FOR DEVICE MOUNTING

HEIGHTS.

NORTH

M

A X

M

IN

" 5

M

A X

6" 3'-0"

1'-6" 3'-6"

MIN

1'-3"

MIN

1'-6"

/6

M

IN

M

A X

/6

M

IN

3'-0"

5'-0" MIN

M

IN

6" MAX 3'-0" MIN

M A

X

3'-6" MIN

MAX

1'-0"

V E R

TI

C

A L

G R

A B

B A

R

M

IN

M

A X

M

IN

M

IN

SIDE FORWARD

M

A X

M

A X

20" - 25"

M

A X

FORWARD

M

A X

20" MAX

SIDE

SIDE FORWARD

M

IN

M

A X

M

IN

M

A X

@ AT

A/C AIR CONDITIONING/AIR CONDITIONER

ACOUS ACOUSTICAL

AD AREA DRAIN, AUTOMATIC DAMPER

ADJ ADJUST, ADJUSTABLE

ALUM ALUMINUM

AP ACCESS PANEL

ACT ACOUSTICAL CEILING

B BASE

BAR BARRIER

BD BOARD

BF BARRIER FREE

BKT BRACKET

BLDG BUILDING

BLKG BLOCKING

BOTT BOTTOM

C TO C CENTER TO CENTER

CAB CABINET

CE COLUMN ENCLOSURE

CIR CIRCLE

CIR CIRCUIT

CL CENTER LINE, CLEARANCES

CLG CEILING

CJ CONTROL JOINT

CLKG CAULKING

CLO CLOSET

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CORR CORRIDOR

CPT CARPET

CSS CLINICAL SERVICE SINK

CT CERAMIC TILE

CTR CENTER

CUH CABINET UNIT HEATER

DEMO DEMOLITION, DEMOLISH

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA, D DIAMETER

DIM DIMENSION

DN DOWN

DR DRAIN

DS DOWNSPOUT

ELECT ELECTRICAL

ELEV ELEVATION

ENTR ENTRANCE

EQ EQUAL

EP ELECTRICAL PANEL

EXH EXHAUST

EXP EXPOSED

EXIST EXISTING, EXSIST'G

EXT EXTERIOR

EW EACH WAY

FA FIRE ALARM

FD FIRE DAMPER OR FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FL, FLR FLOOR FINISH

FLG, FLRG FLOORING, FLOOR'G

FURN FURNITURE, FURNACE

FWC FABRIC WALL COVERING

FT FEET, FOOT

GALV GALVANIZE(D)

GL GLASS

GSB GYPSUM SHEATHING BOARD

GWB GYPSUM WALLBOARD

GYP. BD GYPSUM BOARD

ID INSIDE DIAMETER

INSUL INSULATION

IN INCH(ES)

JAN JANITOR'S CLOSET

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

HW HEADWALL

LAM LAMINATED

LF LINEAL FEET

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MANUF MANUFACTURED, MANUFACTURER

MIN MINIMUM

MLD'G MOLDING

MTL METAL

N NORTH

NAT NATURAL

NIC NOT IN CONTRACT

NORM NORMAL

NTS NOT TO SCALE

O.C. ON CENTER

OPN'G OPENING

O, O2 OXYGEN

PLAST PLASTIC

PNT PAINT

PREFAB PREFABRICATED

PLYWD PLYWOOD, PLYW'D

R RADIUS

RA RETURN AIR

REQ'D REQUIRED

RM ROOM

S SINK, SOUTH, SHINGLE

SA SUPPLY AIR

SAN SANITARY

SMKD SMOKE DAMPER

SECT SECTION

SHWR SHOWER

SIM SIMILAR

SPEC SPECIFICATION

SQ SQUARE

SS SERVICE SINK, STAINLESS STEEL

STD STANDARD

STOR STORAGE

SUSP SUSPEND(ED)

SYM SYMBOL, SYMMETRICAL

TOIL TOILET

TYP TYPICAL

UNFIN UNFINISHED

UTIL UTILITY

VAC VACUUM

VAV VARIABLE AIR VOLUME

VCT VINYL COMPOSITION TILE

VD VOLUME DAMPER

VERT VERTICAL

V.I.F. VERIFY IN FIELD

VT VINYL TILE

VWC VINYL WALL COVERING

W/ WITH

WC WATER CLOSET

WD WOOD

WNDW WINDOW

W. HTR WATER HEATER

W/O WITHOUT

WP WALL PROTECTION

A420

A320

17" TO 19"

IF

B A

R R

IE

R

F R

E E

DRINKING FOUNTAIN REQUIREMENTS

SCALE: NONE

HIGH LOW WATER COOLER

WITH BOTTLE FILLER

M

IN

/4 "8"

/2

EXISTING DOOR

NEW DOOR

DOOR IDENTIFICATION

DOOR TO ROOM SHALL REPEAT ROOM NUMBER

ASSIGNED TO ROOM. MULTIPLE DOORS TO ROOM

SHALL REPEAT ROOM NUMBER WITH A POSTSCRIPT

LETTER FOR EACH ADDITIONAL DOOR REQUIRED.

101/101A/101B FOR NUMBER NEEDED.

DOOR IDENTIFICATION BY FLOOR AND/OR ZONE

SHALL BE AS FOLLOWS:

BASEMENT DOORS

FIRST FLOOR DOORS

SECOND FLOOR DOORS

THIRD FLOOR DOORS

ZONE A

ZONE B

ZONE C

A101

B101

C101

CONTINUE FOR AS MANY FLOORS AS REQUIRED.

View Name

SCALE: 1/8" = 1'-0"

1.

A1.1

1.

A1.1

1.

A1.1

XX'-XX"

10" MAX

M

A X

M

A X

10-24" MAX

TO

P

O F

B A

R

TO

TO

P

O F

B A

R

TO

T.

P

.D

M

IN

M

A X

T .P

.D

GRAB

BARS

TOILET PAPER

DISPENSER

24" MIN

42" MAX

TO

S

P O

U T

TO

S

P O

U T

M

A X

15" MIN

5" MAX

EXISTING NON-FIRE RATED WALL

NEW NON-FIRE RATED WALL

1-HOUR FIRE RATED PARTITION

2-HOUR FIRE RATED PARTITION

ROOM NAME

ROOM NUMBER

ROOM AREA

PATH OF EGRESS

EXIT

OCCUPANT LOAD PER EXIT

MAXIMUM CAPACITY OF EXIT

EGRESS CORRIDOR

ROOM OCCUPANT LOAD

ROOM NAME

150 SF

XXX

AREA NOT IN SCOPE

WALL TO BE DEMOLISHED

DOOR TO BE DEMOLISHED

SIGNAGE

SIGN TYPE TAG

ROOM NAME

ROOM NUMBER

FLOOR FINISH

BASE FINISH

TYP. WALL FINISH

CEILING FINISH

ACCENT FINISH LOCATION

QTZ-1

HP-1

COUNTER FINISH

CASEWORK FINISH

OFFICE

RF-X

RB-X

PT-X

ACP-X

TRANSITION LOCATION

MOUNTING HEIGHT

GENERAL NOTES:

SCALE: NONE

S1

BG

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVENUE, SUITE B

KALAMAZOO, MI 49007

P: 269.927.0144

WWW.7GENAE.COM GI-002

570-23-223

2615 E CLINTON AVE

FRESNO, CALIFORNIA 93703

APRIL 7, 2026 MH AL

GENERAL INFORMATION &

SYMBOL LEGEND

DESIGN TO RENOVATE BLDG 1,

1ST FLOOR ACUTE RESPIRATORY

CLINIC

2 65REVISIONS DATE

FECFEC

CODE COMPLIANCE LEGEND

1-HOUR FIRE RATED PARTITION

1-HOUR SMOKE BARRIER

ROOM NAME

ROOM NUMBER

ROOM AREA

CODE ROOM TAG INFORMATION

PATH OF EGRESS

EXIT

OCCUPANT COUNT THIS EXIT

MAX. OCCUPANT CAPACITY

DENOTES AN EGRESS CORRIDOR

ROOM OCCUPANT LOAD

ROOM NAME

150 SF

XXX

1-HOUR FIRE RATED PARTITION - EXISTING

1-HOUR SMOKE BARRIER - EXISTING

CODES & REGULATIONSSEPARATIONS

FIRE RESISTIVE RATINGS

VA FACILITY SAFETY OFFICERAUTHORITY HAVING JURISDICTION

CONSTRUCTION CODE 2024 INTERNATIONAL BUILDING CODE

PATIENT CARE NON-

SLEEPING SUITE

CORRIDOR WALLS

19.3.5.7.3.3:

CODE/

REGULATION ITEM

NFPA 101, 2021

FIRE RESISTANCE

RATING FOR

BUILDING

ELEMENTS:

STRUCTURAL FRAME: 2 HRS. 1 HR SUPPORTING ROOF ONLY 4.1.1

EXTERIOR WALLS

BEARING 2 HRS. 1 HR SUPPORTING ROOF ONLY 4.1.1

NON-BEARING 0 HRS. 4.1.1

FLOOR CONSTRUCTION 2 HRS. 4.1.1

ROOF CONSTRUCTION 1 HR. 4.1.1

CODE/

REGULATION ITEM

NFPA 101

GENERAL BUILDING LIMITATIONS

CODE/

REGULATION ITEM

IBC

I-2OCCUPANCY

PLUMBING FIXTURE REQUIREMENTS

CODE/

REGULATION ITEM

INTERNATIONAL BUILDING CODE

INTERIOR FINISHES

CODE/

REGULATION ITEM

INTERNATIONAL

BUILDING CODE

CLASS A FLAME SPREAD 0-25;

SMOKE DEVELOPED 0-450

CLASS B FLAME SPREAD 26-75;

SMOKE DEVELOPED 0-450

CLASS C FLAME SPREAD 76-200;

SMOKE DEVELOPED 0-450

WALL AND

CEILING FINISHES

- REFERENCE

TABLE 803.1.2

PATIENT CARE

NON-SLEEPING

SUITE SEPARATION:

NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE PARTITIONS

BARRIERS AND DOORS THAT LIMIT THE TRANSFER OF SMOKE. 19.2.5.7.1.1

TOTAL

WC

TOTAL

LAV

TOTAL

FOUNTAIN

1 1 0

MEN'S REQUIRED

WOMEN'S REQUIRED

NOTE:

PLUMBING FIXTURE RATIO

1 WC PER 25 FOR EMPLOYEES

1 WC PER 75 FOR VISITORS

1 LAV PER 35 FOR EMPLOYEES

1 LAV PER 100 FOR VISITORS

1 DRINKING FOUNTAIN PER 100 OCCUPANTS

NFPA 101

COMPLY WITH CHAPTER 10

HEALTHCARE CODE 2022 FACILITY GUIDELINES INSTITUTE

FOR DESIGN AND CONSTRUCTION

LIFE SAFETY CODE 2024 NFPA 101, LIFE SAFETY CODE

2022 NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS

2022 NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

2023 NFPA 70, NATIONAL ELECTRIC CODE

2022 NFPA 72, NATIONAL FIRE ALARM CODE

2022 NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES

2024 NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS

2024 NFPA 99, HEALTHCARE FACILITIES CODE

2024 NFPA 220, STANDARD ON TYPES OF BUILDING CONSTRUCTION

1 SERVICE SINK

TOTAL

SERVICE

VA PUBLICATIONS

PG-18-01 MASTER CONSTRUCTION SPECIFICATIONS

PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

PG-18-4 STANDARD DETAILS

H-18-8 SEISMIC DESIGN HANDBOOK

PG-18-9 SPACE & FACILITY PLANNING

PG-18-10 DESIGN MANUALS (BY DISCIPLINE)

PG-18-12 DESIGN GUIDES

PG-18-13 BARRIER FREE DESIGN GUIDES

PG-18-15 AE SUBMISSIONS & REVIEW

PG-18-17 ENVIRONMENTAL COMPLIANCE

NFPA

EXISTING HEALTHCARE OCCUPANCY

ASHRAE 90.1

IACONSTRUCTION TYPE I (332)

YESAUTOMATIC FIRE SPRINKLER YES

DEAD END CORRIDOR 30' 19.2.5.3

TRAVEL DISTANCE 200' 19.3.5.7

NFPA 220

SHAFT ENCLOSURES 1 HR. 19.3.1.1

HAZARDOUS AREAS 1 HR. 19.3.2.1, 8-4.1.2

SMOKE TIGHT SEPARATION SMOKE RESISTING PARTITIONS 19.3.2.1

FIRE STOPPING PENETRATIONS OF FIRE AND/OR SMOKE RESISTIVE WALLS, FLOORS, AND CEILINGS

MUST BE FIRE STOPPED WITH MATERIALS APPROVED FOR SUCH USE. 6-2.3.2.4.2

FIRE SUPPRESSION SYSTEM

AUTOMATIC

SYSTEMS:

SPRINKLERS:

CODE/

REGULATION ITEM

NFPA 13

DESIGNED AND INSTALLED IN ACCORDANCE WITH NFPA 13

SPRINKLERS SYSTEM

SUPERVISION:

REQUIRED PER IBC (903.4)

METHOD OF

SUPERVISION:

ELECTRICALLY SUPERVISED PER IBC (903.4)

PORTABLE FIRE

EXTINGUISHERS:

REQUIRED TO BE INSTALLED IN ACCORDANCE w/ NFPA 10

NFPA 10

1/2 HR FIRE RESISTANCE RATING

FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE

HAZARDOUS AREA BOILER AND FURNACE ROOMS

CENTRAL LAUNDRIES

PAINT SHOP

REPAIR SHOP

SOILED LINEN EXCEEDING 64 gal.

COLLECTED TRASH ROOMS 64

gal.

ROOMS LARGER THAN 50 sq ft

INCLUDING REPAIR SHOPS,

STORAGE OF COMBUSTIBLE

SUPPLIES AND EQUIPMENT IN

QUANTITIES DEEMED HAZARDOUS

BY THE AHJ.

19.3.2.1.5:

1 HR FIRE RESISTANCE RATING

TRAVEL DISTANCE OUT OF

SUITE

100' 19.3.5.7

GENERAL NOTES

1. THE INTERSECTION BETWEEN ALL RATED WALL AND DECK SYSTEMS TO BE SEALED WITH APPROVED

UL FIRE SPRAY MATERIAL.

2. REFER TO CODE COMPLIANCE PLAN FOR RATED WALL LOCATIONS.

3. PROVIDE METAL BLOCKING WITHIN WALL CAVITY AS REQUIRED FOR WALL MOUNTED EQUIPMENT.

4. WHERE FIRE RATED SEPARATIONS ARE SHOWN IN CODE PLANS, PROVIDE STENCILING EVERY 20'-0"

HORIZONTALLY WITHIN THE CEILING PLENUM SPACE WITH THE FOLLWING TEXT:

FIRE BARRIER - PROTECT ALL OPENINGS AND PENETRATIONS

INTERSECTION OF RATED WALLS

LOWER PRIORITY WALL

HIGHER PRIORITY WALL

HIGHER PRIORITY WALL

LOWER PRIORITY WALL

HIGHER PRIORITY

WALL

LOWER PRIORITY WALL

TAPE AND SEAL BEHIND

INTERSECTING

PARTITION (TYP.)

LOWER

PRIORITY WALL

HIGHER

PRIORITY WALL

GYP. BD. ON METAL

STUDS

LOWER PRIORITY WALL

HIGHER PRIORITY WALL

HIGHER PRIORITY WALLS

TO RUN CONTINUOUS PAST

A LOWER PRIORITY WALL

LOWER

PRIORITY WALL

ABUTMENT OF DISSIMILAR WALLS

NOTE: REFER TO FLOOR PLANS FOR

LOCATION OF CONSTRUCTION

PARTITION

FIRE AND/OR SMOKE BARRIER - MARKING

SCALE: NONE

FLOOR

CEILING

FLOOR OR

ROOF DECK

CONCEALED SPACESIGN OR STENCILING AT

MAXIMUM 30-FT. INTERVALS

WITHIN 15 FT. OF END OF WALL

MINIMUM

3 IN. HIGH WITH 3/8"

STROKE LETTERING

FIRE BARRIER

PROTECT ALL OPENINGS

1/2"MAX DW JOINT

2 LAYERS FIRE

RATED DRYWALL

USG #93 CONTROL

JOINT (BOTH SIDES)

3 1/8"

1/2"MAX DW JOINT

2 LAYERS FIRE

RATED DRYWALL

USG #93 CONTROL

JOINT (BOTH SIDES)

DOUBLE JAMB

STUDS (AT DOORS)

FIRE RATED DRYWALL

9 10 11 1210.A8

G

H

F

E

1A-2

EXIST CORRIDOR

1A08

HEALTHY VET

1A10

WAITING AREA

P-2

ELEVATOR

1A07

HSKP.

1A04

INFO DESK

1A00

EXIST VESTIBULE

1A01F

WOMENS TOILET

82 SF

1A06

TOILET

61 SF

1A02

CLEAN SUPPLY

96 SF

1A09A

INTERVIEW 1

97 SF

1A09B

INTERVIEW 2

47 SF

1A09C

WARD STOCK

120 SF

1A09D

EXAM 2

122 SF

1A09E

EXAM 1

49 SF

1A11

SOILED HOLD

99 SF

1A01B

MSA CHECK IN

277 SF

1A09

CORRIDOR

389 SF

1A01A

WAITING

1B-2

CORRIDOR

1A-1

EXIST CORRIDOR

201 SF

1A002

VESTIBULE

A

A

A

A

A

B

A

1A09E

1A09D 1A09

1A01A

1A002B

1A002A

1A12

STORAGE

1A15A

DAYCARE

1A01

EXIST LOBBY

1A01C

MECHANICAL

CHASE

/2

A

C

EXIST

NEW

EXISTING 1 HOUR FIRE RATED

PARTITIONS TO REMAIN

EXIT

36 SF

1A12

HAC

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVENUE, SUITE B

KALAMAZOO, MI 49007

P: 269.927.0144

WWW.7GENAE.COM GI-003

570-23-223

2615 E CLINTON AVE

FRESNO, CALIFORNIA 93703

APRIL 7, 2026 JK AL

FIRST FLOOR CODE

COMPLIANCE PLAN

DESIGN TO RENOVATE BLDG 1,

1ST FLOOR ACUTE RESPIRATORY

CLINIC

3 65

SCALE: 1 1/2" = 1'-0"GI-003

INTERSECTION & ABUTMENT WALLS1

SCALE: 1 1/2" = 1'-0"GI-003

TYP WALL CONTROL JOINT AT NON-RATED2

SCALE: 1 1/2" = 1'-0"GI-003

TYP WALL CONTROL JOINT AT 1 HR RATED3

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR CODE COMPLIANCE PLAN

1. PATCH AND REPAIR ALL AREAS AFFECTED BY DEMO AND / OR

CONSTRUCTION TO MATCH EXISTING. PATCHED AREAS ARE TO

RECEIVE FINISHES AND TRIM TO MATCH ADJACENT AREA,

EXCEPT AS NOTED IN THE ROOM FINISH SCHEDULE. PATCH

CEILINGS AND FLOORS TO ACHIEVE A CONTINUOUS FINISHED

APPEARANCE.

2. ALL EQUIPMENT TO BE DISCONNECTED AND REMOVED BY

CONTRACTOR. OWNER TO BE NOTIFIED WHEN EQUIPMENT IS

AVAILABLE AND BE GIVEN THE OPTION TO TAKE POSSESSION OF

ALL EQUIPMENT. CONTRACTOR TO DISPOSE OF ALL EQUIPMENT

THE OWNER DOES NOT WANT AND REMOVE ALL ITEMS WITH

EXTREME CARE.

3. REMOVE, RELOCATE, STORE AND REINSTALL PORTABLE

EQUIPMENT, FURNITURE, SHELVES, CURTAIN RODS, DRAPERY,

BULLETIN BOARDS, WHICH WOULD INTERFERE WITH DEMOLITION

WORK.

4. REFER TO SPECIFICATIONS FOR SHORING REQUIREMENTS WHERE

DEMOLITION WORK AFFECTS THE STRUCTURAL INTEGRITY OF

WALLS OR FLOORS. IF NOT SO INDICATED IN SPECIFICATIONS.

CONTRACTOR SHALL SUBMIT SHORING PLAN AND SHOP

DRAWINGS SIGNED BY AN ENGINEER FOR VA APPROVAL. ALL

SHORING IS CONTRACTOR'S RESPONSIBILITY.

5. PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY

DAMAGE SURFACES SHALL BE REPLACED TO MATCH ORIGINAL

ITEM OR REPAIRED THIS CONTRACTOR FROM PERFORMING THE

WORK REQUIRED UNDER THE CONTRACT.

6. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR

TO SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT

RELIEVE THIS CONTRACTOR FROM PERFORMING THE WORK

REQUIRED UNDER THIS CONTACT.

7. ALL SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND

ATTEND A PRE-BID WALK THRU TO INSPECT THE EXISTING AREA

AND THOROUGHLY FAMILIARIZE THEMSELVES WITH THE ACTUAL

JOB CONDITIONS BEFORE SUBMITTING BID.

8. WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT

IN THE EXISTING AREA HAS BEEN INDICATED ON THE DRAWINGS

AS ACCURATELY AS POSSIBLE, CONTRACTOR SHALL ADJUST HIS

WORK AS REQUIRED TO AVOID EXISTING UTILITIES, GAS LINES,

SEWER, FIRE ALARM, ROOF DRAINS, ACCESS COVERS, AND

OTHER STRUCTURES NOT PARTICULARLY SHOWN ON THE PLAN AT

NO ADDITIONAL COST. BEFORE CONSTRUCTION, INSPECT

PREMISES MAKE A DETAILES EXAMINATION OF ALL LOCATIONS

WHERE NEW WORK IS TO BE INSTALLED. EXAMINE EXISTING

PIPING, CONDUITS, STRUCTURAL SUPPORTING BEAMS, AND

OTHER CONDITIONS.

9. DISCONNECT AT SOURCE AND REMOVE EXISTING MECHANICAL

AND ELECTRICAL MATERIALS AND EQUIPMENT WHICH ARE

RENDERED OBSOLETE BY THESE ALTERATIONS AND ADDITIONS.

OWNER TO BE GIVEN THE OPTION TO TAKE POSSESSION OF

REMOVED EQUIPMENT AND MATERIALS. ANY EQUIPMENT THAT

THE OWNER DOES NOT WANT ARE THE PROPERTY OF THE

CONTRACTOR AND SHALL BE REMOVED FROM THE SITE, NO

MECHANICAL, ELECTRICAL, PLUMBING EQUIPMENT, ETC. SHALL

BE ABANDONED IN PLACE.

10. DISCONNECT, REMOVE AND RELOCATE EXISTING MECHANICAL

AND ELECTRICAL MATERIALS AND EQUIPMENT WHICH INTERFERE

OR INTERFERED WITH OBSTRUCT OR ARE CONSTRUCTED BY THESE

ALTERATIONS AND ADDITIONS, PERMANENTLY INSTALL SUCH

ITEMS IN NEW LOCATIONS AS DIRECTED, RECONNECT SUCH

ITEMS IN PROPER OPERATING CONDITION AT NEW LOCATIONS.

11. DO NOT INTERFERE WITH EXISTING BUILDING'S MECHANICAL,

ELECTRICAL AND SECURITY SYSTEMS OPERATIONS. IF IT IS

ABSOLUTELY NECESSARY TO SHUT DOWN FACILITY SYSTEMS AT

ANY TIME CONSULT THE COR TO MAKE ARRANGEMENTS TO DO

SO ON OFF WORKING HOUR PERIODS AT THE OWNER'S

CONVENIENCE. PRIOR NOTICE SHALL BE GIVEN TO THE COR (14)

DAYS IN ADVANCE OF THE DESIRED SHUT-DOWN TIME. ANY

PREMIUM OR OVERTIME COSTS NECESSARY TO ACCOMPLISH

THE ABOVE SHALL BE INCLUDED IN THIS BID.FAILURE TO

PROCEED WITHOUT PROPER PRIOR NOTIFICATION MAY RESULT

IN THE ASSESSMENT OF A CREDIT TO THE CONTACT.

12. EXISTING FLOOR HEIGHTS, COLUMNS AND FLOOR BEAMS

SHOULD BE VERIFIED BY THE CONTRACTOR IN THE FIELD.

13. IN ALL CONSTRUCTION ZONES AND AREAS. CONTRACTOR

RESPONSIBLE FOR MAINTAINING AN ACTIVE STROBE SPEAKER

SYSTEM AT ALL TIMES TYPICAL FOR ALL CONSTRUCTION ZONES

FOR ALL BUILDINGS.

14. COORDINATE WITH THE COR A MINIMUM OF TWO WEEKS IN

ADVANCE FOR ANY SHUT DOWN OR OUTAGE THAT WILL AFFECT

ONE FLOOR/WING OR SERVICE/DEPARTMENT AT A TIME.

OUTAGE MUST BE SUBMISSED IN WRITING TO THE COR AND

APPROVED IN WRITING.

15. COORDINATE WITH THE COR A MINIMUM OF FOUR WEEKS IN

ADVANCE FOR ANY SHUT DOWN OR OUTAGE THAT WILL AFFECT

MULTIPLE FLOORS WITHIN THE BUILDING. OUTAGE MUST BE

SUBMITTED IN WRITING TO THE COR AND APPROVED IN

WRITING.

GENERAL CONSTRUCTION NOTESINFECTION CONTROL PROJECT

INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: D

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: IV

INFECTION CONTROL GENERAL

NOTES

1. REFER TO LIST OF REQUIRED INFECTION CONTROL

PRECAUTIONS OUTLINED BY CLASS IN SPECIFICATIONS FOR

MORE INFORMATION. REFER TO DRAWINGS FOR ADDITIONAL

INFORMATION AND PHASING.

2. THE INTENT OF IC ISOLATION IS TO PROTECT PATIENTS WITH

LOW IMMUNE LEVELS. THEREFORE, CONTRACTOR SHALL

ENSURE THEIR IC BARRIERS CONTAIN DUST AND PARTICULATE

MATTER TO THE CONSTRUCTION AREA.

3. PROVIDE NEGATIVE AIR ISOLATION MONITORS/MACHINES

AT 2000 CFM (MIN.): (MINIMUM (1) ONE IN AREAS LESS THAN

1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND

5000 SF, (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF,

AND (4) FOR AREAS BETWEEN 10000 SF AND 15000 SF. DURING

CLASS III OR CLASS IV CONSTRUCTION OPERATIONS THAT LAST

THREE DAYS OR MORE. EACH AREA TO BE UNDER NEGATIVE

PRESSURE (0.02" WC) DURING THESE CONSTRUCTION

OPERATIONS. MONITOR AND DOCUMENT AS DIRECTED BY THE

COR.

4. COORDINATE LOCATION OF TEMPORARY INFECTION

CONTROL (IC) BARRIER WALL CONSTRUCTION AND INFECTION

CONTROL (IC) MEASURES WITH COR AND PATIENT SAFETY/

INFECTION CONTROL REPRESENTATIVE. TEMPORARY IC BARRIER

WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO

COR AND PATIENT SAFETY/ INFECTION CONTROL

REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS

APPROVED. CONSTRUCT I.C. CONSTRUCTION BARRIER FROM

FLOOR TO DECK/FLOOR ABOVE.

5. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE

MAINTAINED AT ALL TIMES.

6. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES,

A 24"X36" STICKY WALK OFF MAT AT THE ENTRY (OUTSIDE OF

CONTAINMENT) AND EXIT (INSIDE OF CONTAINMENT), AND

HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION. MAT

SHALL BE REPLACED TO MEET MANUFACTURER'S

RECOMMENDATIONS. VERIFY REPLACEMENT SCHEDULE WITH

HOSPITAL'S INFECTION CONTROL MANAGEMENT PERSONNEL.

7. PROVIDE OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

8. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE

SHOP VAC, MULTI-PURPOSE SPILL CONTROL SORBENTS TO

ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS.

9. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE

COVERED WITH 4 MIL. POLY SHEET.

10. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE

PROJECT BOUNDARY THROUGH THE FACILITY TO DUMPSTER

ALONG APPROVED ROUTE IN ENCLOSED DUMPSTER CART

DESIGNED FOR SUCH PURPOSED WITH A LID.

11. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL

BE PROPERLY STORED IN DESIGNATED AREAS AND APPROVED

CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN

THE FACILITY.

12. PROVIDE HEPA FILTERED CONTAINMENT CART FOR ABOVE

CEILING ACCESS OUTSIDE PROJECT BOUNDARY.

13. PROVIDE HEPA FILTERED NEGATIVE AIR MACHINES WHEN

REQUIRED. THE CONTRACTOR SHALL PROVIDE ENOUGH

MACHINES TO COMPLETELY EXCHANGE THE SPACE TO

MAINTAIN 0.02" HG. A NEGATIVE AIR MONITOR SHALL BE

PROVIDED AND VISIBLE FROM EXTERIOR OF CONTAINMENT TO

ENSURE COMPLIANCE.

14. CORRIDOR REDUCTION TO ALLOW FOR CONSTRUCTION OF

A CONTAINMENT IS POSSIBLE, YET MUST MAINTAIN A MINIMUM

OF 5 FEET FOR HOSPITAL CIRCULATION, REVIEWED WITH

HOSPITAL SAFETY AND INFECTION PREVENTION AND HAVE A

POSTED ILSM, AS NEEDED.

15. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED

WALLS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE

RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION

CONTROL BARRIER TO ACT AS SMOKE BARRIER.

PHASING GENERAL NOTES

1. PROJECT AREAS TO BE OCCUPIED BY STAFF AND PATIENTS

THROUGHOUT CONSTRUCTION.

2. REFER TO SPECIFICATIONS FOR INFORMATION ON WORK

DURATION FOR EACH PHASE AND AREA OF WORK.

1. REFER TO 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION.

2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION WORK.

3. THE INTENT OF INFECTION CONTROL ISOLATION IS TO

CONTAIN DUST AND PARTICULATE MATTER FROM THE

CONSTRUCTION AREA. PERIMETER TO BE SEALED COMPLETELY

WITH SHEET PLASTIC WHEN NO TEMPORARY PARTITION IS

CALLED OUT.

4. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY

DURING WORKING HOURS. (8:00 AM - 5:00PM)

5. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

6. EXACT TEMPORARY WALL PARTITION LAYOUT AND

DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE

WITH COR FOR APPROVAL.

INFECTION CONTROL RISK

ASSESSMENT NOTES

1. NO TOOLS OR EQUIPMENT TO BE LEFT UNATTENDED

2. CONTRACTOR TO PROVIDE TEMPORARY SECURITY WALLS IN

HIGH SECURITY AREAS.

3. CONTRACTOR IDENTIFICATION TO BE DISPLAYED AT ALL TIMES

ON PERSON.

4. TOOLS AND EQUIPMENT NOT NEEDED FOR TASKS AT HAND TO

BE STORED OFF SITE.

SECURITY NOTES

FIRE AND SAFETY NOTES

1. MAINTAINING THE INTEGRITY OF THE FIRE AND SAFETY SYSTEMS

IN PLACE IN THE MEDICAL CENTER AND ALL OF ITS OUT

BUILDINGS DURING CONSTRUCTION SHALL BE THE

RESPONSIBILITY OF THE GENERAL CONTRACTOR.

2. IN ADDITION TO ALL MEDICAL CENTER POLICIES, ALL

NATIONAL STATE AND LOCAL CODES AND ORDINANCES

SHALL APPLY TO ALL OF THEIR CONTRACTORS AND SUB

CONTRACTORS.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL

PERTINENT OSHA SAFETY REQUIREMENTS.

4. PROVIDE LOCKOUT- TAGOUT AND CONFINED SPACE ENTRY

POLICIES AS APPLICABLE AND AS REQUIRED BY OSHA. THESE

POLICIES SHALL BE SUBMITTED FOR PRIOR APPROVAL BY THE

SAFETY OFFICER/ COR.

5. SUBMIT APPROPRIATE INTERIM LIFE SAFETY MEASURES. REFER

TO SPECIFICATION FOR MORE INFORMATION

6. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS OF

NON-COMBUSTIBLE MATERIALS WHICH PROVIDE A SMOKE

TIGHT SERRATION BETWEEN THE CONSTRUCTION AREAS AND

ALL OTHER OCCUPIED AREAS. MAINTAIN INTEGRITY OF THE

ENCLOSURE DURING THE CONSTRUCTION. REFER TO

SPECIFICATIONS.

7. EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM

SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER

SYSTEMS SHALL NOT BE IMPAIRED DURING CONSTRUCTION.

SMOKE DETECTOR DISABLE REQUESTS: OUTAGE REQUESTS TO

BE SUBMITTED TO FM ENGINEER OR COR FOR APPROVAL FOR

SPECIFIC DATE AND TIME. ALARMS WILL ONLY BE TURNED OFF

FOR SPECIFIC SHIFTS REQUESTED AND WHEN CONTRACTORS

ARE IN THE CONSTRUCTION AREA. ALARMS WILL BE RESTORED

AT THE END OF THE WORK DAY BY CALLING THE SAME

EXTENSION. AT NO TIME WILL ALARMS REMAIN OFF

OVERNIGHT. SMOKE DETECTORS AND OR SPRINKLERS HEADS

DO NOT COVER BY BAGS, TAPE, AND PLASTIC OR IN ANY

OTHER MANNER THAT WILL DEFEAT THEIR ABILITY TO SENSE

SMOKE OR HEAT AND OPERATE AS DESIGNED.

8. DAILY ACCUMULATIONS OF TRASH, COMBUSTIBLES

MATERIALS, PACKAGING AND DEBRIS SHALL BE REMOVED

FROM THE CONSTRUCTION AREA ON A DAILY BASIS.

FLAMMABLE MATERIALS MAY BE STORED ON SITE IN AN

APPROVED AND APPROPRIATELY MARKED FLAMMABLE

MATERIALS CABINET

9. AT ALL TIMES DURING CONSTRUCTION ONE OF THE THREE

FOLLOWING CONDITIONS SHALL BE TRUE. (1) FIRE

SUPPRESSION SYSTEM/SPRINKLERS SHALL BE ACTIVE. (2) FIRE

DETECTION/ALARM SYSTEM SHALL BE ACTIVE. (3) A FIRE

WATCH SHALL BE IN EFFECT.

10. THE CHOICE OF USING RATED TEMPORARY CONSTRUCTION

BARRIERS AND MAINTAINING SPRINKLER PROTECTION

THROUGH THE INSTALLATION OF TEMPORARY UPRIGHT

SPRINKLERS SHALL BE VERIFIED WITH THE VA COR.

INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS IV

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

LEVEL I:

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT

CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS

PANELS, ETC., UPON COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE

FACILITY MUST BE FREE OF CONTAMINANTS AND LOOSE

MATERIAL.

LEVEL II:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM

DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST

SURFACE TO CONTROL DUST (E.G., MOBILE DUST

CONTAINMENT CART OR SOME OTHER SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE

DUST BEFORE LEAVING WORK AREA

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO

PROTECT THE HVAC SYSTEM FROM DUST AND REDUCE AIR

TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER

ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER

SYSTEMS INCLUDING STAGNATION DUE TO REDUCED USAGE,

THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED

FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.

PERFORM DAILY CLEANING AND DISPOSAL OF TRASH

(COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT

ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE

WORK AREA MUST BE IN SEALED CONTAINERS AND/OR

CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM

THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH

A HARD LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS

FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST

BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS

BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF

CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY

MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY

SOILED. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS

NOT CONTAINED BY DAMP MOPPING OR HEPA VACUUMING

SURFACES AT LEAST DAILY.

10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT

CONTAINED BY DAMP MOPPING OR HEPA VACUUMING

SURFACES AT LEAST DAILY.

LEVEL III:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING

NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO THE

CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK

ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES

MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST

RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO

FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND

SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS,

INCLUDING FLOORS AND CEILING, USING APPROVED

MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR

BARRIER TYPE).

5. MAINTAIN .01 INCHES/WATER GAUGE NEGATIVE

PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA

EXHAUST AIR SYSTEMS DIRECTED OUTDOORS. THESE CONTROL

MEASURES MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR

THE DURATION OF THE PROJECT. HEPA FILTERED EXHAUST IF

DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT A

DISTANCES OF 25 FEET OR GREATER FROM ENTRANCES, AIR

INTAKES, AND OPERABLE WINDOWS. EXHAUSTING

DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC

SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.

BATHROOM EXHAUST) IS PROHIBITED.

LEVEL IV: ALL CONTROL MEASURES IN LEVELS I, II, AND III AND THE

FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO

INSTALL FINAL BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE

PRESSURE CONTROL. ANTEROOM MUST BE LARGE ENOUGH

FOR EQUIPMENT STAGING, CART CLEANING, WORKER'S PPE

AND CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR

CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK

ROOM ANTEROOM. HEPA VACUUMING OF CLOTHING OR

USE OF COVER SUITS IS ACCEPTABLE.

4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO

CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE

REMOVED PRIOR TO EXITING THE ANTEROOM TO THE

OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE

COVERS MUST BE CHANGED IMMEDIATELY.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION

PREVENTIONIST OR DESIGNEE AND ENGINEERING

REPRESENTATIVE FOR FINAL ACTIVITY/PROJECT CLOSE OUT AND

REMOVAL OF INFECTION PREVENTION AND CONTROL

MEASURES.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL

SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING

MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST

ACCUMULATION ON UPPER SURFACES AS WELL AS AIR

DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL

WORK INVOLVING DRYWALL REMOVAL, CREATION OF

DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK.

THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA

CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING

MAY BE NEEDED AFTER REMOVAL OF BARRIER.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES

MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST

RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN

REMOVING HARD BARRIERS:

A. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

B. IF DUST WILL BE GENERATED DURING SCREW REMOVAL,

USE HAND-HELD HEPA VACUUM.

C. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL

PROCESS.

D. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE

REMOVING OUTER HARD BARRIER.

E. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST

COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE

CONTAMINATES FROM THE WORK AREA.

2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT

ALL TIMES AND IN PLACE FOR A PERIOD AFTER

COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE

CONTAMINANTS FROM THE WORK AREA AND BEFORE

REMOVAL OF CRITICAL BARRIERS.

3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES

OF WATER GAUGE WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY

MONITORED WITH A DIGITAL DISPLAY, RECORDING AND

ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON

INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION,

AND MONITORED.

4. UTILIZE A DIGITAL DIFFERENTIAL PRESSURE MONITOR TIED

INTO THE BUILDING MANAGEMENT SYSTEM.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE

ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS

BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND

OPERATIONAL.

3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND

AIR EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN

USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK

IN ACCORDANCE WITH VHA DIRECTIVE 1061.

EXISTING DECK

SEAL PERIMETER: RED PLASTIC TAPE

EXISTING FINISHED

FLOOR

EXISTING FINISHED FLOOR

OCCUPIED SIDE

OF BARRIER

''WORK'' SIDE

OF BARRIER

CONTINUOUS 6 MIL POLYETHLENE

SHEE BARRIER

PROVIDE BASE PAINTERS TAPE AT ALL END

CONDITIONS WTIH RED PLASTIC TAPE TO

PROVIDE A CONTINOUS SEALED SPACE

SEAL PERIMETER: RED PLASTIC TAPE

CEILING

VA/OSHA TEMPORARY SIGNAGE

PUBLIC SIDE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER

TYPE FOR REQUIRED CONDITION

TO STRUCTURE ABOVE

DOOR AND FRAME WITH SEALS, CARD

READER, HARDWARE AND CLOSER

HAND SANITIZER

TRIATEK MONITOR

6 MIL POLY

EQUIPMENT OR

FURNISHING

6 MIL POLY

WALL OPENING

CRITICAL BARRIER

WALL PROTRUSION

SEAL WITH DUCT TAPE

ALL SIDES.

CEILING

6 MIL POLY CRITICAL

BARRIER CEILING

PENETRATION

NOTE: ALL CORNERS TO

FORM 90 DEGREE ANGLE

WITH NO RADIUS

SEAL WITH DUCT TAPE.

ALL SIDES

WINDOWDOOR

BEYOND

SEAL ALL CRACKS WITH

DUCT 6 MIL POLY

CRITICAL BARRIER

OVER WINDOWS.

SEAL ALL CRACKS WITH

DUCT 6 MIL POLY CRITICAL

BARRIER OVER WINDOWS.

FLOOR

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVENUE, SUITE B

KALAMAZOO, MI 49007

P: 269.927.0144

WWW.7GENAE.COM GC-001

570-23-223

2615 E CLINTON AVE

FRESNO, CALIFORNIA 93703

APRIL 7, 2026 JK AL

INFECTION CONTROL

GENERAL INFORMATION

DESIGN TO RENOVATE BLDG 1,

1ST FLOOR ACUTE RESPIRATORY

CLINIC

4 65

SCALE: 3/4" = 1'-0"GC-001

T1 - TEMPORARY WALL PARTITION1

SCALE: 3/8" = 1'-0"GC-001

CRITICAL BARRIER PREP INSTALLATION - PUBLIC SIDE2

SCALE: 1/4" = 1'-0"GC-001

CRITICAL BARRIER PREP INSTALLATION3

9 10 11 1210.A8

G

H

F

E

1A-2

EXIST CORRIDOR

1A08

HEALTHY VET

1A10

WAITING AREA

P-2

ELEVATOR

1A07

HSKP.

1A04

INFO DESK

1A00

EXIST VESTIBULE

1A01F

WOMENS TOILET

82 SF

1A06

TOILET

61 SF

1A02

CLEAN SUPPLY

96 SF

1A09A

INTERVIEW 1

97 SF

1A09B

INTERVIEW 2

47 SF

1A09C

WARD STOCK 120 SF

1A09D

EXAM 2

122 SF

1A09E

EXAM 149 SF

1A11

SOILED HOLD

99 SF

1A01B

MSA CHECK IN

277 SF

1A09

CORRIDOR

389 SF

1A01A

WAITING

1B-2

CORRIDOR

1A-1

EXIST CORRIDOR

201 SF

1A002

VESTIBULE

A

A

A

A

A

B

A

1A09E

1A09D 1A09

1A01A

1A002B

1A002A

1A12

STORAGE

1A15A

DAYCARE

1A01

EXIST LOBBY

22 SF

1A01C

MECHANICAL

CHASE

/2

A

C

T1 TEMPORARY

WALL PARTITION

T1 TEMPORARY

WALL PARTITION

T1 TEMPORARY

WALL PARTITION

T1 TEMPORARY

WALL PARTITION

MAT

PROVIDE STICKY WALK-

OFF MAT AT ENTRY TO

CONSTRUCTION AREA

*NOTE: PROVIDE MOBILE DUST

CONTAINMENT TO SUPPORT ALL

ABOVE CEILING WORK OUTSIDE

OF CONSTRUCTION AREA

EXISTING DOOR TO

REMAIN DURING

CONSTRUCTION, USE AS

CONSTRUCTION BARRIER.

*NOTE: DUCT ROUTING

THROUGH LOBBY SHALL BE

FIELD VERIFIED AND

COORDINATEDAND PHASED

AS NEEDED SUCH THAT

OPERATIONS ARE NOT

IMPEDED. ICRA PLAN TO BE

SUBMITTED FOR APPROVAL

BY COR

PROVIDE MOBILE DUST

CONTAINMENT TO SUPPORT

ALL

ABOVE CEILING WORK

OUTSIDE

OF CONSTRUCTION AREA

*NOTE: PROVIDE MOBILE DUST

CONTAINMENT TO SUPPORT ALL

ABOVE CEILING WORK OUTSIDE

OF CONSTRUCTION AREA

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVENUE, SUITE B

KALAMAZOO, MI 49007

P: 269.927.0144

WWW.7GENAE.COM GC-101

570-23-223

2615 E CLINTON AVE

FRESNO, CALIFORNIA 93703

APRIL 7, 2026 JK AL

FIRST FLOOR INFECTION

CONTROL PLAN

DESIGN TO RENOVATE BLDG 1,

1ST FLOOR ACUTE RESPIRATORY

CLINIC

5 65

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR INFECTION CONTROL PLAN

GENERAL DEMO NOTES

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS

SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS

AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS. IF CONDITIONS DO NOT

REFLECT WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS

TO NOTIFY THE ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING

AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO

THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF

DUMPSTERS TO BE DETERMINED BY OWNER WITH CONTRACTORS INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS.

DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES

TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL

MANNER. NO ONSITE SALE OR BURNING OF REMOVED ITEMS IS PERMITTED.

6. CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY

OF THE PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR

INJURY TO ANY PERSON ON, ABOUT OR ADJACENT TO THE PREMISES. THE

CONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND

REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF ACCIDENTS.

7. CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION,

WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR

PART OF ITEMS WHICH ARE TO REMAIN.

8. OWNER RESERVES THE RIGHT TO ANY REMOVED MATERIALS OR ITEMS.

CONTRACTOR TO COORDINATE WITH OWNER.

9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN ANY MANNER.

10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION. PREPARE

FOR NEW CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING SHALL BE

TOOTHED-IN TO MATCH EXISTING COURSING PATTERN, U.N.O.

11. WHERE WALLS AND CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITHIN

THOSE WALLS AND/OR CEILINGS ARE TO BE REMOVED OR REROUTED. REFER TO

MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL

DEMOLITION NOT SHOWN ON THIS SHEET.

12. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS

WITH A ONE-HOUR FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST BARRIER.

TEMPORARILY SEAL OFF ALL RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION

AREA. MAINTAIN NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION ZONE.

NEGATIVE PRESSURE MUST BE MAINTAINED AT .01 INCHES/WATER GAUGE.

13. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

14. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR

DAMAGED DURING DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT

TO VOID EXISTING WARRANTIES.

15. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.

16. INTERIOR WALLS TO BE REMOVED SHALL BE REMOVED THE ENTIRE HEIGHT OF THE

WALL UNLESS REQUIRED/NOTED OTHERWISE AS NEW OPENINGS IN EXISTING

WALLS TO REMAIN.

17. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED FIREPROOFING

MATERIAL IN AREAS LEFT UNPROTECTED DUE TO REMOVAL OF EXISTING

ELEMENTS OR AREAS DAMAGED DURING NEW WORK AND DEMOLITION. MATCH

EXISTING FIREPROOFING MATERIAL TYPE AND THICKNESS TO MAINTAIN EXISTING

LEVEL OF PROTECTION.

18. REFER TO ACM SURVEY REPORT FOR FURTHER INFORMATION AND ITEMS TO BE

REMOVED BY CONTRACTOR.

1A12

STORAGE

1A11

TOILET

1A09

SVC OFFICERS

1A06

TOILET

1A09A.1

CO-ORDR

CASKET LIFT

1A02

SCREENING

1A08

HEALTHY VET

1A10

WAITING AREA

P-2

ELEVATOR

1A09A

DAV

1A-1

CORRIDOR

1A01

LOBBY

1A07

HSKP.

1A12

STORAGE

1A11

TOILET

1A09

SVC OFFICERS

1A06

TOILET

1A09A.1

CO-ORDR

CASKET LIFT

1A02

SCREENING

1A01A

CHECK IN

1A-2

CORRIDOR

1A08

HEALTHY VET

1A10

WAITING AREA

P-2

ELEVATOR

1A09B

AMERICAN LEGION

1A09C

VFW

1A09D

AMVETS

1A09A

DAV

1A-1

CORRIDOR

1A01

LOBBY

1A07

HSKP.

D4

D1 D1

D1

D1

D1 D1D1

D1 D4

D4

D4

D4 D5

D10D3 D11 D12

D4

D4D3 D10 D11 D12

D4D5

D3 D6 D9

D3 D6 D9D3 D6 D9

D4

D4

D8

D8

D4

D4

D3

D6

D9

D3 D6 D9

D2

D2

D6 D9

D3 D6

D3 D6 D9

D3 D6 D9

D3 D6 D9

D4

D4D4

D3

D6

D9

1A00

VESTIBULE

EXISTING LOBBY

FLOORING TO

REMAIN.

DEMOLITION TO

END HERE.

1A12

STORAGE

1A15A

DAYCARE

1A04

INFO DESK

1A12

STORAGE

1A15A

DAYCARE

9 10 11 1210.A8

G

H

F

E

EXISTING LOBBY

FLOORING TO

REMAIN.

DEMOLITION TO

END HERE.

1B-2

CORRIDOR

D12

D14

D11

D12D12

D14D14

REMOVE EXISTING

CONCRETE

SLAB TOPPING, REFER TO

STRUCTURAL

SHEET S-101.

REMOVE AND SALVAGE

EXISTING CEILING TILE FOR

MECHANICAL WORK

ABOVE CEILING, REFER TO

SHEET MH-102 FOR NEW

HVAC WORK

D7

D2

EXISTING 1 HOUR FIRE RATED

PARTITIONS TO REMAIN

D1

REMOVE AND SALVAGE

EXISTING CEILING TILE FOR

MECHANICAL WORK

ABOVE CEILING, REFER TO

SHEET MH-102 FOR NEW

HVAC WORK

*NOTE: ALL EXTERIOR DEMO WORK

TO BE DONE AFTER HOURS,

COORDINATE WITH COR

*NOTE: ALL CASKET LIFT SHAFT

WALL DEMO WORK

TO BE DONE AFTER HOURS,

COORDINATE WITH COR

DEMOLITION PLAN LEGEND

WALL TO BE DEMOLISHED

EXISTING CONSTRUCTION TO REMAIN

AREA NOT IN SCOPE

DOOR TO BE DEMOLISHED

AREAS OF EXISTING SUSPENDED ACOUSTIC TILE TO BE

REWORKED DUE TO NEW CONSTRUCTION

DEMOLITION KEYNOTES

D1 REMOVE AND DISPOSE OF EXISTING DOOR AND FRAME AND ALL ASSOCIATED

APPURTENANCES. PREP OPENING FOR NEW WORK.

D2 REMOVE AND DISPOSE OF PORTION OF EXISTING CMU WALL FOR NEW

OPENING. SEE FLOOR PLAN/DOOR SCHEDULE FOR MORE INFORMATION.

D3 REMOVE AND DISPOSE OF ALL GYP. BD. AND EXISTING FINISHES. EXISTING

EXTERIOR METAL STUDS TO REMAIN. PATCH AND REPAIR ADJACENT FINISHES

AS REQUIRED FOR INSTALLATION OF NEW WORK. REFER TO MEP DRAWINGS

FOR ADDITIONAL DEMOLITION.

D4 REMOVE AND DISPOSE OF EXISTING GYPSUM BOARD AND METAL STUD WALL

COMPLETE FULL HEIGHT. REMOVE ALL ITEMS ATTACHED TO THE WALLS. REFER

TO MEP DRAWINGS FOR FURTHER DEMOLITION.

D5 REMOVE AND DISPOSE OF EXISTING CMU WALL IN ITS ENTIRELY. PREP AND

PATCH FLOOR AND ADJACENT WALLS FOR INSTALLATION OF NEW. REFER TO

MEP DRAWINGS FOR ADDITIONAL DEMOLITION.

D6 REMOVE AND DISPOSE OF EXISTING ACOUSTICAL CEILING TILE AND GRID

SYSTEM COMPLETE INLUDING ALL ASSOCIATED HANGERS, METAL TEE GRID,

AND EDGE ANGLES, ALL ITEMS ATTACHED TO THE CEILING INCLUDING CEILING

MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL

DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT

SIGNAGE, SAFETY MIRRORS, ETC. TO BE REMOVED. COORDINATE WITH LOW

VOLTAGE DEMO, FIRE PROTECTION DEMO, MECHANICAL DEMO AND

ELECTRICAL DEMO DRAWINGS.

D7 REMOVE AND DISPOSE OF EXISTING STOREFRONT WINDOW SYSTEM IN IT'S

ENTIRETY. REMOVE CMU BLOCK WALL AS REQUIRED TO INSTALL A NEW DOOR

AND WINDOW SYSTEM. PATCH AND PREP ADJACENT FINISHES FOR

INSTALLATION OF NEW WORK

D8 REMOVE AND DISPOSE OF EXISTING CASEWORK AND MILLWORK, AND ALL

WALL MOUNTED EQUIPMENT, TYP. IN ENTIRE ROOM. PATCH AND REPAIR

FLOOR AND WALLS FOR NEW FINISHES.

D9 REMOVE AND DISPOSE OF EXISTING WALL BASE, FLOORING AND FLOOR

FINISHES INCLUDING ALL ADHESIVE AND SETTING MATERIALS DOWN TO

EXISTING CONCRETE SUBSTRATE. PREPARE SUBSTRATE IN PREPARATION FOR

NEW FINISH AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM SURFACE

INCLUDING GRINDING OF CONCRETE FLOORS AND NEW SELF LEVELER OVER

ENTIRE FLOOR AREA WHERE REQUIRED.

D10 REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURES IN ROOM. SEE

MECHANICAL DRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION.

D11 REMOVE AND DISPOSE OF EXISTING WALL MOUNTED ACCESSORY IN IT'S

ENTIRETY. PATCH AND PREP WALL FOR INSTALLATION OF NEW WORK.

D12 REMOVE AND DISPOSE OF PORTION OF EXISTING CONCRETE SLAB. PATCH

AND PREP AS REQUIRED FOR INSTALLATION OF WORK.

D14 REMOVE EXISTING RAILING AND DISPOSE OF PROPERLY.

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

SEVEN GENERATIONS ARCHITECTURE + ENGINEERING

600 E. MICHIGAN AVENUE, SUITE B

KALAMAZOO, MI 49007

P: 269.927.0144

WWW.7GENAE.COM AD-101

570-23-223

2615 E CLINTON AVE

FRESNO, CALIFORNIA 93703

APRIL 7, 2026 MH AL

FIRST FLOOR DEMOLITION

PLAN

DESIGN TO RENOVATE BLDG 1,

1ST FLOOR ACUTE RESPIRATORY

CLINIC

6 65REVISIONS DATE

M

F

(N)WAP

(N)WAP

1A09A.1

CO-ORDR

CASKET LIFT

1A02

SCREENING

1A09A

DAV

1A-1

CORRIDOR

1A12

STORAGE

1A11

TOILET

1A09

SVC OFFICERS

1A06

TOILET

1A02

SCREENING

1A01A

CHECK IN

1A-2

CORRIDOR

1A09B

AMERICAN LEGION

1A09C

VFW

1A09D

AMVETS

1A-1

CORRIDOR

1A12

STORAGE

1A15A

DAYCARE

1A12

STORAGE

1A15A

DAYCARE

9 10 11 1210.A

G

F

D6

D6

D6

D6

D6

D6

D6

D6

D13 D13

DEMOLITION PLAN LEGEND

WALL TO BE DEMOLISHED

EXISTING CONSTRUCTION TO REMAIN

AREA NOT IN SCOPE

DOOR TO BE DEMOLISHED

AREAS OF EXISTING SUSPENDED ACOUSTIC TILE TO BE

REWORKED DUE TO NEW CONSTRUCTION

GENERAL DEMO NOTES

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS

SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS

AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.

2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS. IF CONDITIONS DO NOT

REFLECT WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS

TO NOTIFY THE ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF

CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING

AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO

THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF

DUMPSTERS TO BE DETERMINED BY OWNER WITH CONTRACTORS INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS.

DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES

TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL

MANNER. NO ONSITE SALE OR BURNING OF REMOVED ITEMS IS PERMITTED.

6. CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY

OF THE PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR

INJURY TO…

This is the start of the file's text. The full file is on GovTribe.