This is a comprehensive 100% construction document package and related federal solicitation for the renovation of Building 1, 1st Floor Acute Respiratory Clinic at Fresno VA Medical Center in Fresno, California. The project (No. 570-23-223) encompasses design-to-renovate work totaling approximately 2,600 square feet across multiple disciplines including architectural, structural, mechanical, plumbing, electrical, fire protection, and hazardous materials abatement. The construction documents specify detailed demolition requirements, new wall construction with fire-rated assemblies, interior finishes including porcelain and ceramic tile, reconfigured HVAC systems with negative pressure capabilities, new plumbing fixtures with thermostatic mixing valves, and comprehensive electrical work including lighting controls with occupancy sensors, security systems, and data infrastructure. Key scope elements include removal of existing evaporators and installation of new terminal air units, provision of two N+1 redundant exhaust fans on the OPC penthouse roof discharging at 3,500 feet per minute, new interior signage with ADA compliance, and infection control measures (Class IV) requiring HEPA filtration and negative air monitoring at 0.02 inches water column.
The related federal solicitation (No. 36C26126R0049) is a firm-fixed-price construction contract with a 224-calendar-day period of performance following Notice to Proceed. This is a total service-disabled veteran-owned small business (SDVOSB) set-aside with NAICS code 236220 (Commercial and Institutional Building Construction); the small business size standard is $45 million. The solicitation closes June 15, 2026 at 2:00 P.M. PDT with Requests for Information due by May 28, 2026 at 10:00 A.M. PDT. A mandatory pre-proposal site visit is scheduled for May 20, 2026 at 11:00 A.M. PDT. Bid bonds, payment bonds, and performance bonds are required. Award will be made on a best-value trade-off basis using Department of Veterans Affairs Acquisition Regulation criteria. The procurement is managed by Daniel Jhun (daniel.jhun@va.gov) at the VA's Veterans Health Administration Veterans Integrated Service Network 21.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
PROJECT LOCATION
DEPARTMENT OF VETERANS AFFAIRS
FRESNO, CALIFORNIA
570-23-223 DESIGN TO RENOVATE BLDG 1, 1ST FLOOR ACUTE
RESPIRATORY CLINIC
PROJECT TEAM
MECHANICAL, PLUMBING, ELECTRICAL & LOW VOLTAGE ENGINEERING:
ARCHITECTURE & INTERIOR DESIGN:
OWNER:
PHONE: 269.927.0144
SEVEN GENERATIONS A+E
KALAMAZOO, MI 49007
600 E. MICHIGAN AVENUE - SUITE B
CENTRAL CALIFORNIA HEALTH CARE SYSTEM (VACCHS)
2615 E CLINTON AVE
FRESNO, CALIFORNIA 93703
PHONE: 619.770.8552
DAVENERGY
SAN DIEGO, CA 92109
2207 GARNET AVE - SUITE 1
100% FOR CONSTRUCTION DRAWING INDEX
COR:
JAMAL KARGBO
HEALTHCARE ENGINEER
559.313.7669
FRESNO, CALIFORNIA
NORTH
VA CAMPUS MAP
SHEET DESCRIPTION
GENERAL
GI-001 COVER SHEET
GI-002 GENERAL INFORMATION & SYMBOL LEGEND
GI-003 FIRST FLOOR CODE COMPLIANCE PLAN
GC-001 INFECTION CONTROL GENERAL INFORMATION
GC-101 FIRST FLOOR INFECTION CONTROL PLAN
ARCHITECTURAL
AD-101 FIRST FLOOR DEMOLITION PLAN
AD-121 REFLECTED CEILING DEMOLITION PLANS
AE-101 FIRST FLOOR PLAN
AE-140 ROOF PLAN
AE-200 EXTERIOR ELEVATION
AE-301 VESTIBULE SECTION
AI-400 DOOR & FRAME SCHEDULE AND DOOR & FRAME TYPES
AI-500 FIRST FLOOR EQUIPMENT PLAN
AC-121 FIRST FLOOR REFLECTED CEILING PLAN
IN-001 INTERIOR FINISH KEY & DETAILS
IN-002 INTERIOR FINISH DETAILS
IN-003 CASEWORK DETAILS
IN-101 FIRST FLOOR INTERIOR FINISH PLAN
IN-420 INTERIOR ELEVATIONS
IN-421 INTERIOR ELEVATIONS
AW-001 SIGNAGE SCHEDULE & TYPES
AW-101 FIRST FLOOR SIGNAGE PLAN
ENVIRONMENTAL
HA-001 HAZMAT ABATEMENT COVER SHEET
HA-101 FIRST FLOOR ABATEMENT PLAN
STRUCTURAL
S-001 STRUCTURAL COVER SHEET & STRUCTURAL NOTES
S-002 STRUCTURAL NOTES, VERIFICATION & INSPECTION SCHEDULES
S-101 EAST WING PARTIAL 1ST FLOOR PLAN NEW WORK
S-102 OPC PENTHOUSE ROOF PLAN - NEW WORK
S-501 TYPICAL DETAILS
S-502 DETAIL
MECHANICAL
M-001 MECHANICAL COVER SHEET
MD-101 FIRST FLOOR MECHANICAL DEMOLITION PLAN
MH-101 FIRST FLOOR MECHANICAL HVAC SUPPLY PLAN
MH-102 FIRST FLOOR MECHANICAL HVAC EXHAUST PLAN
MH-103 SECOND FLOOR MECHANICAL HVAC EXHAUST PLAN
MH-104 THIRD FLOOR MECHANICAL HVAC EXHAUST PLAN
MH-105 OPC PENTHOUSE ROOF MECHANICAL HVAC EXHAUST PLAN
MH-106 MECHANICAL HVAC NEW EXHAUST PLAN ISOMETRIC
MH-107 FIRST FLOOR MECHANICAL PRESSURE RELATIONSHIPS
MP-101 FIRST FLOOR MECHANICAL CHW PIPING DEMO
MP-102 FIRST FLOOR MECHANICAL CHW PIPING NEW PLAN
MP-103 FIRST FLOOR MECHANICAL CHW PIPING DEMO/NEW PLAN - CASKET LIFT
M-401 MECHANICAL SCHEDULES
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL CONTROLS
PLUMBING
P-001 PLUMBING COVER SHEET
PD-101 BASEMENT PLUMBING DEMOLITION PLAN
PD-102 FIRST FLOOR PLUMBING DEMOLITION PLAN
P-101 BASEMENT PLUMBING PIPING PLAN
P-102 FIRST FLOOR PLUMBING PIPING PLAN
P-401 PLUMBING SCHEDULES
P-501 PLUMBING DETAILS
P-901 PLUMBING ISOMETRIC
ELECTRICAL
E-001 ELECTRICAL COVER SHEET
ED-101 FIRST FLOOR ELECTRICAL DEMO PLAN
EL-101 FIRST FLOOR NEW LIGHTING PLAN
EP-101 FIRST FLOOR POWER PLAN
EP-102 OPC ROOF POWER PLAN
ET-101 FIRST FLOOR NEW SPECIAL SYSTEMS
E-501 ELECTRICAL DETAILS
E-601 SINGLE LINE DIAGRAM
E-701 ELECTRICAL SCHEDULES
FIRE PROTECTION
FA-001 FIRE PROTECTION SYMBOLS AND GENERAL NOTES
FA-101 FIRST FLOOR FIRE ALARM
FRESNO, CALIFORNIA
NORTH
VICINITY MAP
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
6 "
Department of Veterans Affairs
STAMP
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
P: 619.770.8552
WWW.DAVENERGY.COM
CONSULTANTS
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVENUE, SUITE B
KALAMAZOO, MI 49007
P: 269.927.0144
WWW.7GENAE.COM GI-001
570-23-223
2615 E CLINTON AVE
FRESNO, CALIFORNIA 93703
APRIL 7, 2026 MH AL
COVER SHEET DESIGN TO RENOVATE BLDG 1,
1ST FLOOR ACUTE RESPIRATORY
CLINIC
1 65
DEPARTMENT OF VETERANS AFFAIRS
STRUCTURAL ENGINEERING:
PHONE: 858.215.3660
JUNKER GONZALEZ ENGINEERING GROUP
LA MESA, CA 91942
8285 LA MESA BLVD. - SUITE C
ENVIRONMENTAL:
PHONE: 504.684.4408
VALI COOPER INTERNATIONAL
COVINGTON, LA 70433
56 LOUIS PRIMA DR, SUITE B
REVISIONS DATE
100% CONSTRUCTION DOCUMENTS 04/07/2026
ARCHITECTURAL SYMBOLS & PLAN INDICATORS
ABBREVIATIONS
BARRIER-FREE DESIGN INFORMATION
A
A
A
A
TOP OF STEEL
ELEV. 10'-0"
TYP. BARRIER FREE TOILET ROOM FIXTURES
SCALE: NONE
TYP. BARRIER FREE TOILET ROOM FIXTURES
SCALE: NONE
OBSTRUCTED REACH
UNOBSTRUCTED REACH
TYP. BARRIER FREE TRANSFER SHOWER
SCALE: NONE
TYP. CODE REGULATED MOUNTING HEIGHTS
SCALE: NONE
TYP. EQUIPMENT MOUNTING HEIGHTS
SCALE: NONE
ELEVATION INDICATION
SHEET NO.
ELEVATION NUMBER
SECTION INDICATOR
ENLARGED PLAN OR
ELEVATION
PROPOSED SPOT
EXISTING SPOT
ELEVATION
100.57'
100.57'
STRUCTURAL SPAN
ROOF TRUSSES
FLOOR JOIST OR
RAMP
@ 16" O.C.
2 x 12
1" per 12"
SLOPE UP
REVISION TAG W/
REVISION NUMBER
KEYNOTE TAG
WINDOW TAG W/
WINDOW TYPE
INDICATOR
WALL SECTION CUT
COLUMN LINE
WALL TYPES
ELEVATION
BUILDING SECTION CUT
DETAIL NUMBER TYPICAL
DIMENSIONING
SET-BACK LINE
PROPERTY LINE
EXISTING
CONTOUR
TOPOGRAPHY
CONTOUR
100'
100'
TOPOGRAPHY
PROPOSED
SECTIONS & DETAILS
TYPICAL TITLE FOR
DOOR TAG W/
DOOR NUMBER
NORTH ARROW
5'6" DIAMETER CLEAR
WHEELCHAIR TURNING
SPACE - REFER TO PLAN
- REFER TO PLAN
AND GROUND SPACE
30" x 48" CLEAR FLOOR
CEILING HEIGHT TAG
MIRROR
GRAB BARS
5'-6" ABA DIAMETER
CLEAR FLOOR SPACE
60" WIDE BY 59" DEEP
MINIMUM FLOOR AREA AT
WATER CLOSET (56" DEEP IF
WALL-HUNG WATER CLOSET).
2'-6" x 4'-0" CLEAR
FLOOR AREA AT SINK
BARRIER FREE DESIGN
GENERAL NOTES:
ACCESSIBLE CONTROLS, OPERATING
MECHANISMS & HARDWARE SHALL COMPLY
WITH ABA SECTION §407 AND SECTION 309 OF
ICC/ANSI A117.1.
ACCESSIBLE SIGNAGE FURNISHED BY
CONTRACTOR SHALL COMPLY WITH ABA
SECTION §F216.
PORTABLE FIRE EXTINGUISHERS TO BE
PROVIDED IN ACCORDANCE WITH THE
NATIONAL FIRE PROTECTION ASSOCIATION
(NFPA).
REFER TO FLOOR PLAN SHEETS FOR LOCATIONS
OF FIRE EXTINGUISHER CABINETS (FEC).
'L' SHAPE FOLDING
SHOWER SEAT
COMPLYING
WITH SECTION 610.3
OF ICC/ANSI A117.1
GRAB BAR TO BE
ACROSS CONTROL
AND MEASURE 18"
FROM CONTROL WALL
SHOWER SPRAY UNIT
W/ 59" HOSE AND 24"
ATTACHMENT BAR
GRAB
BARS
CONTROLS SHALL BE
LOCATED WITHIN 15" ON
EITHER SIDE OF SHOWER
SEAT CENTER LINE AND
PROVIDE MAX WATER TEMP
OF 120°
ACCESSIBLE SHOWER
COMPARTMENTS SHALL
COMPLY WITH SECTION
608 OF ICC/ANSI
A117.1
* DIMENSION IS TO BOTTOM
OF REFLECTIVE SURFACE
RECEPTACLE
LIGHT
SWITCH
HVAC
CONTROLS
FIRE
ALARM
FEC
LESS THAN 40#
FEC
GREATER THAN 40#
TEL
PUSH PAD
RH/CH
PT
SD
HS
MR
HRHR
WP
TP SNR
4'-4"
1. REFER TO EQUIPMENT PLAN FOR EQUIPMENT
ABBREVIATIONS AND LOCATIONS.
2. REFER TO INTERIOR ELEVATIONS FOR
ADDITIONAL INFORMATION.
3. ITEMS ON THIS SHEET ARE NOT NECESSARILY
INCLUDED IN THIS PROJECT.
4. CONTRACTOR TO VERIFY ALL EQUIPMENT
MOUNTING HEIGHTS WITH COR/AE
PRIOR TO INSTALLATION.
5. REFER TO MECHANICAL/ELECTRICAL
DRAWINGS FOR DEVICE MOUNTING
HEIGHTS.
NORTH
M
A X
M
IN
" 5
M
A X
6" 3'-0"
1'-6" 3'-6"
MIN
1'-3"
MIN
1'-6"
/6
M
IN
M
A X
/6
M
IN
3'-0"
5'-0" MIN
M
IN
6" MAX 3'-0" MIN
M A
X
3'-6" MIN
MAX
1'-0"
V E R
TI
C
A L
G R
A B
B A
R
M
IN
M
A X
M
IN
M
IN
SIDE FORWARD
M
A X
M
A X
20" - 25"
M
A X
FORWARD
M
A X
20" MAX
SIDE
SIDE FORWARD
M
IN
M
A X
M
IN
M
A X
@ AT
A/C AIR CONDITIONING/AIR CONDITIONER
ACOUS ACOUSTICAL
AD AREA DRAIN, AUTOMATIC DAMPER
ADJ ADJUST, ADJUSTABLE
ALUM ALUMINUM
AP ACCESS PANEL
ACT ACOUSTICAL CEILING
B BASE
BAR BARRIER
BD BOARD
BF BARRIER FREE
BKT BRACKET
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
C TO C CENTER TO CENTER
CAB CABINET
CE COLUMN ENCLOSURE
CIR CIRCLE
CIR CIRCUIT
CL CENTER LINE, CLEARANCES
CLG CEILING
CJ CONTROL JOINT
CLKG CAULKING
CLO CLOSET
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CSS CLINICAL SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA, D DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT
ELECT ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EP ELECTRICAL PANEL
EXH EXHAUST
EXP EXPOSED
EXIST EXISTING, EXSIST'G
EXT EXTERIOR
EW EACH WAY
FA FIRE ALARM
FD FIRE DAMPER OR FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL, FLR FLOOR FINISH
FLG, FLRG FLOORING, FLOOR'G
FURN FURNITURE, FURNACE
FWC FABRIC WALL COVERING
FT FEET, FOOT
GALV GALVANIZE(D)
GL GLASS
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALLBOARD
GYP. BD GYPSUM BOARD
ID INSIDE DIAMETER
INSUL INSULATION
IN INCH(ES)
JAN JANITOR'S CLOSET
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HEADWALL
LAM LAMINATED
LF LINEAL FEET
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MANUF MANUFACTURED, MANUFACTURER
MIN MINIMUM
MLD'G MOLDING
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NORM NORMAL
NTS NOT TO SCALE
O.C. ON CENTER
OPN'G OPENING
O, O2 OXYGEN
PLAST PLASTIC
PNT PAINT
PREFAB PREFABRICATED
PLYWD PLYWOOD, PLYW'D
R RADIUS
RA RETURN AIR
REQ'D REQUIRED
RM ROOM
S SINK, SOUTH, SHINGLE
SA SUPPLY AIR
SAN SANITARY
SMKD SMOKE DAMPER
SECT SECTION
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STAINLESS STEEL
STD STANDARD
STOR STORAGE
SUSP SUSPEND(ED)
SYM SYMBOL, SYMMETRICAL
TOIL TOILET
TYP TYPICAL
UNFIN UNFINISHED
UTIL UTILITY
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
V.I.F. VERIFY IN FIELD
VT VINYL TILE
VWC VINYL WALL COVERING
W/ WITH
WC WATER CLOSET
WD WOOD
WNDW WINDOW
W. HTR WATER HEATER
W/O WITHOUT
WP WALL PROTECTION
A420
A320
17" TO 19"
IF
B A
R R
IE
R
F R
E E
DRINKING FOUNTAIN REQUIREMENTS
SCALE: NONE
HIGH LOW WATER COOLER
WITH BOTTLE FILLER
M
IN
/4 "8"
/2
EXISTING DOOR
NEW DOOR
DOOR IDENTIFICATION
DOOR TO ROOM SHALL REPEAT ROOM NUMBER
ASSIGNED TO ROOM. MULTIPLE DOORS TO ROOM
SHALL REPEAT ROOM NUMBER WITH A POSTSCRIPT
LETTER FOR EACH ADDITIONAL DOOR REQUIRED.
101/101A/101B FOR NUMBER NEEDED.
DOOR IDENTIFICATION BY FLOOR AND/OR ZONE
SHALL BE AS FOLLOWS:
BASEMENT DOORS
FIRST FLOOR DOORS
SECOND FLOOR DOORS
THIRD FLOOR DOORS
ZONE A
ZONE B
ZONE C
A101
B101
C101
CONTINUE FOR AS MANY FLOORS AS REQUIRED.
View Name
SCALE: 1/8" = 1'-0"
1.
A1.1
1.
A1.1
1.
A1.1
XX'-XX"
10" MAX
M
A X
M
A X
10-24" MAX
TO
P
O F
B A
R
TO
TO
P
O F
B A
R
TO
T.
P
.D
M
IN
M
A X
T .P
.D
GRAB
BARS
TOILET PAPER
DISPENSER
24" MIN
42" MAX
TO
S
P O
U T
TO
S
P O
U T
M
A X
15" MIN
5" MAX
EXISTING NON-FIRE RATED WALL
NEW NON-FIRE RATED WALL
1-HOUR FIRE RATED PARTITION
2-HOUR FIRE RATED PARTITION
ROOM NAME
ROOM NUMBER
ROOM AREA
PATH OF EGRESS
EXIT
OCCUPANT LOAD PER EXIT
MAXIMUM CAPACITY OF EXIT
EGRESS CORRIDOR
ROOM OCCUPANT LOAD
ROOM NAME
150 SF
XXX
AREA NOT IN SCOPE
WALL TO BE DEMOLISHED
DOOR TO BE DEMOLISHED
SIGNAGE
SIGN TYPE TAG
ROOM NAME
ROOM NUMBER
FLOOR FINISH
BASE FINISH
TYP. WALL FINISH
CEILING FINISH
ACCENT FINISH LOCATION
QTZ-1
HP-1
COUNTER FINISH
CASEWORK FINISH
OFFICE
RF-X
RB-X
PT-X
ACP-X
TRANSITION LOCATION
MOUNTING HEIGHT
GENERAL NOTES:
SCALE: NONE
S1
BG
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
6 "
Department of Veterans Affairs
STAMP
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
P: 619.770.8552
WWW.DAVENERGY.COM
CONSULTANTS
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVENUE, SUITE B
KALAMAZOO, MI 49007
P: 269.927.0144
WWW.7GENAE.COM GI-002
570-23-223
2615 E CLINTON AVE
FRESNO, CALIFORNIA 93703
APRIL 7, 2026 MH AL
GENERAL INFORMATION &
SYMBOL LEGEND
DESIGN TO RENOVATE BLDG 1,
1ST FLOOR ACUTE RESPIRATORY
CLINIC
2 65REVISIONS DATE
FECFEC
CODE COMPLIANCE LEGEND
1-HOUR FIRE RATED PARTITION
1-HOUR SMOKE BARRIER
ROOM NAME
ROOM NUMBER
ROOM AREA
CODE ROOM TAG INFORMATION
PATH OF EGRESS
EXIT
OCCUPANT COUNT THIS EXIT
MAX. OCCUPANT CAPACITY
DENOTES AN EGRESS CORRIDOR
ROOM OCCUPANT LOAD
ROOM NAME
150 SF
XXX
1-HOUR FIRE RATED PARTITION - EXISTING
1-HOUR SMOKE BARRIER - EXISTING
CODES & REGULATIONSSEPARATIONS
FIRE RESISTIVE RATINGS
VA FACILITY SAFETY OFFICERAUTHORITY HAVING JURISDICTION
CONSTRUCTION CODE 2024 INTERNATIONAL BUILDING CODE
PATIENT CARE NON-
SLEEPING SUITE
CORRIDOR WALLS
19.3.5.7.3.3:
CODE/
REGULATION ITEM
NFPA 101, 2021
FIRE RESISTANCE
RATING FOR
BUILDING
ELEMENTS:
STRUCTURAL FRAME: 2 HRS. 1 HR SUPPORTING ROOF ONLY 4.1.1
EXTERIOR WALLS
BEARING 2 HRS. 1 HR SUPPORTING ROOF ONLY 4.1.1
NON-BEARING 0 HRS. 4.1.1
FLOOR CONSTRUCTION 2 HRS. 4.1.1
ROOF CONSTRUCTION 1 HR. 4.1.1
CODE/
REGULATION ITEM
NFPA 101
GENERAL BUILDING LIMITATIONS
CODE/
REGULATION ITEM
IBC
I-2OCCUPANCY
PLUMBING FIXTURE REQUIREMENTS
CODE/
REGULATION ITEM
INTERNATIONAL BUILDING CODE
INTERIOR FINISHES
CODE/
REGULATION ITEM
INTERNATIONAL
BUILDING CODE
CLASS A FLAME SPREAD 0-25;
SMOKE DEVELOPED 0-450
CLASS B FLAME SPREAD 26-75;
SMOKE DEVELOPED 0-450
CLASS C FLAME SPREAD 76-200;
SMOKE DEVELOPED 0-450
WALL AND
CEILING FINISHES
- REFERENCE
TABLE 803.1.2
PATIENT CARE
NON-SLEEPING
SUITE SEPARATION:
NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE PARTITIONS
BARRIERS AND DOORS THAT LIMIT THE TRANSFER OF SMOKE. 19.2.5.7.1.1
TOTAL
WC
TOTAL
LAV
TOTAL
FOUNTAIN
1 1 0
MEN'S REQUIRED
WOMEN'S REQUIRED
NOTE:
PLUMBING FIXTURE RATIO
1 WC PER 25 FOR EMPLOYEES
1 WC PER 75 FOR VISITORS
1 LAV PER 35 FOR EMPLOYEES
1 LAV PER 100 FOR VISITORS
1 DRINKING FOUNTAIN PER 100 OCCUPANTS
NFPA 101
COMPLY WITH CHAPTER 10
HEALTHCARE CODE 2022 FACILITY GUIDELINES INSTITUTE
FOR DESIGN AND CONSTRUCTION
LIFE SAFETY CODE 2024 NFPA 101, LIFE SAFETY CODE
2022 NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS
2022 NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
2023 NFPA 70, NATIONAL ELECTRIC CODE
2022 NFPA 72, NATIONAL FIRE ALARM CODE
2022 NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES
2024 NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS
2024 NFPA 99, HEALTHCARE FACILITIES CODE
2024 NFPA 220, STANDARD ON TYPES OF BUILDING CONSTRUCTION
1 SERVICE SINK
TOTAL
SERVICE
VA PUBLICATIONS
PG-18-01 MASTER CONSTRUCTION SPECIFICATIONS
PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
PG-18-4 STANDARD DETAILS
H-18-8 SEISMIC DESIGN HANDBOOK
PG-18-9 SPACE & FACILITY PLANNING
PG-18-10 DESIGN MANUALS (BY DISCIPLINE)
PG-18-12 DESIGN GUIDES
PG-18-13 BARRIER FREE DESIGN GUIDES
PG-18-15 AE SUBMISSIONS & REVIEW
PG-18-17 ENVIRONMENTAL COMPLIANCE
NFPA
EXISTING HEALTHCARE OCCUPANCY
ASHRAE 90.1
IACONSTRUCTION TYPE I (332)
YESAUTOMATIC FIRE SPRINKLER YES
DEAD END CORRIDOR 30' 19.2.5.3
TRAVEL DISTANCE 200' 19.3.5.7
NFPA 220
SHAFT ENCLOSURES 1 HR. 19.3.1.1
HAZARDOUS AREAS 1 HR. 19.3.2.1, 8-4.1.2
SMOKE TIGHT SEPARATION SMOKE RESISTING PARTITIONS 19.3.2.1
FIRE STOPPING PENETRATIONS OF FIRE AND/OR SMOKE RESISTIVE WALLS, FLOORS, AND CEILINGS
MUST BE FIRE STOPPED WITH MATERIALS APPROVED FOR SUCH USE. 6-2.3.2.4.2
FIRE SUPPRESSION SYSTEM
AUTOMATIC
SYSTEMS:
SPRINKLERS:
CODE/
REGULATION ITEM
NFPA 13
DESIGNED AND INSTALLED IN ACCORDANCE WITH NFPA 13
SPRINKLERS SYSTEM
SUPERVISION:
REQUIRED PER IBC (903.4)
METHOD OF
SUPERVISION:
ELECTRICALLY SUPERVISED PER IBC (903.4)
PORTABLE FIRE
EXTINGUISHERS:
REQUIRED TO BE INSTALLED IN ACCORDANCE w/ NFPA 10
NFPA 10
1/2 HR FIRE RESISTANCE RATING
FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE
HAZARDOUS AREA BOILER AND FURNACE ROOMS
CENTRAL LAUNDRIES
PAINT SHOP
REPAIR SHOP
SOILED LINEN EXCEEDING 64 gal.
COLLECTED TRASH ROOMS 64
gal.
ROOMS LARGER THAN 50 sq ft
INCLUDING REPAIR SHOPS,
STORAGE OF COMBUSTIBLE
SUPPLIES AND EQUIPMENT IN
QUANTITIES DEEMED HAZARDOUS
BY THE AHJ.
19.3.2.1.5:
1 HR FIRE RESISTANCE RATING
TRAVEL DISTANCE OUT OF
SUITE
100' 19.3.5.7
GENERAL NOTES
1. THE INTERSECTION BETWEEN ALL RATED WALL AND DECK SYSTEMS TO BE SEALED WITH APPROVED
UL FIRE SPRAY MATERIAL.
2. REFER TO CODE COMPLIANCE PLAN FOR RATED WALL LOCATIONS.
3. PROVIDE METAL BLOCKING WITHIN WALL CAVITY AS REQUIRED FOR WALL MOUNTED EQUIPMENT.
4. WHERE FIRE RATED SEPARATIONS ARE SHOWN IN CODE PLANS, PROVIDE STENCILING EVERY 20'-0"
HORIZONTALLY WITHIN THE CEILING PLENUM SPACE WITH THE FOLLWING TEXT:
FIRE BARRIER - PROTECT ALL OPENINGS AND PENETRATIONS
INTERSECTION OF RATED WALLS
LOWER PRIORITY WALL
HIGHER PRIORITY WALL
HIGHER PRIORITY WALL
LOWER PRIORITY WALL
HIGHER PRIORITY
WALL
LOWER PRIORITY WALL
TAPE AND SEAL BEHIND
INTERSECTING
PARTITION (TYP.)
LOWER
PRIORITY WALL
HIGHER
PRIORITY WALL
GYP. BD. ON METAL
STUDS
LOWER PRIORITY WALL
HIGHER PRIORITY WALL
HIGHER PRIORITY WALLS
TO RUN CONTINUOUS PAST
A LOWER PRIORITY WALL
LOWER
PRIORITY WALL
ABUTMENT OF DISSIMILAR WALLS
NOTE: REFER TO FLOOR PLANS FOR
LOCATION OF CONSTRUCTION
PARTITION
FIRE AND/OR SMOKE BARRIER - MARKING
SCALE: NONE
FLOOR
CEILING
FLOOR OR
ROOF DECK
CONCEALED SPACESIGN OR STENCILING AT
MAXIMUM 30-FT. INTERVALS
WITHIN 15 FT. OF END OF WALL
MINIMUM
3 IN. HIGH WITH 3/8"
STROKE LETTERING
FIRE BARRIER
PROTECT ALL OPENINGS
1/2"MAX DW JOINT
2 LAYERS FIRE
RATED DRYWALL
USG #93 CONTROL
JOINT (BOTH SIDES)
3 1/8"
1/2"MAX DW JOINT
2 LAYERS FIRE
RATED DRYWALL
USG #93 CONTROL
JOINT (BOTH SIDES)
DOUBLE JAMB
STUDS (AT DOORS)
FIRE RATED DRYWALL
9 10 11 1210.A8
G
H
F
E
1A-2
EXIST CORRIDOR
1A08
HEALTHY VET
1A10
WAITING AREA
P-2
ELEVATOR
1A07
HSKP.
1A04
INFO DESK
1A00
EXIST VESTIBULE
1A01F
WOMENS TOILET
82 SF
1A06
TOILET
61 SF
1A02
CLEAN SUPPLY
96 SF
1A09A
INTERVIEW 1
97 SF
1A09B
INTERVIEW 2
47 SF
1A09C
WARD STOCK
120 SF
1A09D
EXAM 2
122 SF
1A09E
EXAM 1
49 SF
1A11
SOILED HOLD
99 SF
1A01B
MSA CHECK IN
277 SF
1A09
CORRIDOR
389 SF
1A01A
WAITING
1B-2
CORRIDOR
1A-1
EXIST CORRIDOR
201 SF
1A002
VESTIBULE
A
A
A
A
A
B
A
1A09E
1A09D 1A09
1A01A
1A002B
1A002A
1A12
STORAGE
1A15A
DAYCARE
1A01
EXIST LOBBY
1A01C
MECHANICAL
CHASE
/2
A
C
EXIST
NEW
EXISTING 1 HOUR FIRE RATED
PARTITIONS TO REMAIN
EXIT
36 SF
1A12
HAC
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
6 "
Department of Veterans Affairs
STAMP
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
P: 619.770.8552
WWW.DAVENERGY.COM
CONSULTANTS
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVENUE, SUITE B
KALAMAZOO, MI 49007
P: 269.927.0144
WWW.7GENAE.COM GI-003
570-23-223
2615 E CLINTON AVE
FRESNO, CALIFORNIA 93703
APRIL 7, 2026 JK AL
FIRST FLOOR CODE
COMPLIANCE PLAN
DESIGN TO RENOVATE BLDG 1,
1ST FLOOR ACUTE RESPIRATORY
CLINIC
3 65
SCALE: 1 1/2" = 1'-0"GI-003
INTERSECTION & ABUTMENT WALLS1
SCALE: 1 1/2" = 1'-0"GI-003
TYP WALL CONTROL JOINT AT NON-RATED2
SCALE: 1 1/2" = 1'-0"GI-003
TYP WALL CONTROL JOINT AT 1 HR RATED3
NORTH
SCALE: 1/4" = 1'-0"
FIRST FLOOR CODE COMPLIANCE PLAN
1. PATCH AND REPAIR ALL AREAS AFFECTED BY DEMO AND / OR
CONSTRUCTION TO MATCH EXISTING. PATCHED AREAS ARE TO
RECEIVE FINISHES AND TRIM TO MATCH ADJACENT AREA,
EXCEPT AS NOTED IN THE ROOM FINISH SCHEDULE. PATCH
CEILINGS AND FLOORS TO ACHIEVE A CONTINUOUS FINISHED
APPEARANCE.
2. ALL EQUIPMENT TO BE DISCONNECTED AND REMOVED BY
CONTRACTOR. OWNER TO BE NOTIFIED WHEN EQUIPMENT IS
AVAILABLE AND BE GIVEN THE OPTION TO TAKE POSSESSION OF
ALL EQUIPMENT. CONTRACTOR TO DISPOSE OF ALL EQUIPMENT
THE OWNER DOES NOT WANT AND REMOVE ALL ITEMS WITH
EXTREME CARE.
3. REMOVE, RELOCATE, STORE AND REINSTALL PORTABLE
EQUIPMENT, FURNITURE, SHELVES, CURTAIN RODS, DRAPERY,
BULLETIN BOARDS, WHICH WOULD INTERFERE WITH DEMOLITION
WORK.
4. REFER TO SPECIFICATIONS FOR SHORING REQUIREMENTS WHERE
DEMOLITION WORK AFFECTS THE STRUCTURAL INTEGRITY OF
WALLS OR FLOORS. IF NOT SO INDICATED IN SPECIFICATIONS.
CONTRACTOR SHALL SUBMIT SHORING PLAN AND SHOP
DRAWINGS SIGNED BY AN ENGINEER FOR VA APPROVAL. ALL
SHORING IS CONTRACTOR'S RESPONSIBILITY.
5. PROTECT ALL EXISTING SURFACES FROM DAMAGE. ANY
DAMAGE SURFACES SHALL BE REPLACED TO MATCH ORIGINAL
ITEM OR REPAIRED THIS CONTRACTOR FROM PERFORMING THE
WORK REQUIRED UNDER THE CONTRACT.
6. VERIFY EXISTING CONDITIONS AND LOCATIONS IN FIELD PRIOR
TO SUBMITTING PROPOSAL. FAILURE TO DO SO SHALL NOT
RELIEVE THIS CONTRACTOR FROM PERFORMING THE WORK
REQUIRED UNDER THIS CONTACT.
7. ALL SUB-CONTRACTORS ARE ENCOURAGED TO VISIT AND
ATTEND A PRE-BID WALK THRU TO INSPECT THE EXISTING AREA
AND THOROUGHLY FAMILIARIZE THEMSELVES WITH THE ACTUAL
JOB CONDITIONS BEFORE SUBMITTING BID.
8. WHILE THE SIZE AND LOCATION OF NEW WORK AND EQUIPMENT
IN THE EXISTING AREA HAS BEEN INDICATED ON THE DRAWINGS
AS ACCURATELY AS POSSIBLE, CONTRACTOR SHALL ADJUST HIS
WORK AS REQUIRED TO AVOID EXISTING UTILITIES, GAS LINES,
SEWER, FIRE ALARM, ROOF DRAINS, ACCESS COVERS, AND
OTHER STRUCTURES NOT PARTICULARLY SHOWN ON THE PLAN AT
NO ADDITIONAL COST. BEFORE CONSTRUCTION, INSPECT
PREMISES MAKE A DETAILES EXAMINATION OF ALL LOCATIONS
WHERE NEW WORK IS TO BE INSTALLED. EXAMINE EXISTING
PIPING, CONDUITS, STRUCTURAL SUPPORTING BEAMS, AND
OTHER CONDITIONS.
9. DISCONNECT AT SOURCE AND REMOVE EXISTING MECHANICAL
AND ELECTRICAL MATERIALS AND EQUIPMENT WHICH ARE
RENDERED OBSOLETE BY THESE ALTERATIONS AND ADDITIONS.
OWNER TO BE GIVEN THE OPTION TO TAKE POSSESSION OF
REMOVED EQUIPMENT AND MATERIALS. ANY EQUIPMENT THAT
THE OWNER DOES NOT WANT ARE THE PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED FROM THE SITE, NO
MECHANICAL, ELECTRICAL, PLUMBING EQUIPMENT, ETC. SHALL
BE ABANDONED IN PLACE.
10. DISCONNECT, REMOVE AND RELOCATE EXISTING MECHANICAL
AND ELECTRICAL MATERIALS AND EQUIPMENT WHICH INTERFERE
OR INTERFERED WITH OBSTRUCT OR ARE CONSTRUCTED BY THESE
ALTERATIONS AND ADDITIONS, PERMANENTLY INSTALL SUCH
ITEMS IN NEW LOCATIONS AS DIRECTED, RECONNECT SUCH
ITEMS IN PROPER OPERATING CONDITION AT NEW LOCATIONS.
11. DO NOT INTERFERE WITH EXISTING BUILDING'S MECHANICAL,
ELECTRICAL AND SECURITY SYSTEMS OPERATIONS. IF IT IS
ABSOLUTELY NECESSARY TO SHUT DOWN FACILITY SYSTEMS AT
ANY TIME CONSULT THE COR TO MAKE ARRANGEMENTS TO DO
SO ON OFF WORKING HOUR PERIODS AT THE OWNER'S
CONVENIENCE. PRIOR NOTICE SHALL BE GIVEN TO THE COR (14)
DAYS IN ADVANCE OF THE DESIRED SHUT-DOWN TIME. ANY
PREMIUM OR OVERTIME COSTS NECESSARY TO ACCOMPLISH
THE ABOVE SHALL BE INCLUDED IN THIS BID.FAILURE TO
PROCEED WITHOUT PROPER PRIOR NOTIFICATION MAY RESULT
IN THE ASSESSMENT OF A CREDIT TO THE CONTACT.
12. EXISTING FLOOR HEIGHTS, COLUMNS AND FLOOR BEAMS
SHOULD BE VERIFIED BY THE CONTRACTOR IN THE FIELD.
13. IN ALL CONSTRUCTION ZONES AND AREAS. CONTRACTOR
RESPONSIBLE FOR MAINTAINING AN ACTIVE STROBE SPEAKER
SYSTEM AT ALL TIMES TYPICAL FOR ALL CONSTRUCTION ZONES
FOR ALL BUILDINGS.
14. COORDINATE WITH THE COR A MINIMUM OF TWO WEEKS IN
ADVANCE FOR ANY SHUT DOWN OR OUTAGE THAT WILL AFFECT
ONE FLOOR/WING OR SERVICE/DEPARTMENT AT A TIME.
OUTAGE MUST BE SUBMISSED IN WRITING TO THE COR AND
APPROVED IN WRITING.
15. COORDINATE WITH THE COR A MINIMUM OF FOUR WEEKS IN
ADVANCE FOR ANY SHUT DOWN OR OUTAGE THAT WILL AFFECT
MULTIPLE FLOORS WITHIN THE BUILDING. OUTAGE MUST BE
SUBMITTED IN WRITING TO THE COR AND APPROVED IN
WRITING.
GENERAL CONSTRUCTION NOTESINFECTION CONTROL PROJECT
INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: HIGH
CLASS OF PRECAUTION MATRIX: IV
INFECTION CONTROL GENERAL
NOTES
1. REFER TO LIST OF REQUIRED INFECTION CONTROL
PRECAUTIONS OUTLINED BY CLASS IN SPECIFICATIONS FOR
MORE INFORMATION. REFER TO DRAWINGS FOR ADDITIONAL
INFORMATION AND PHASING.
2. THE INTENT OF IC ISOLATION IS TO PROTECT PATIENTS WITH
LOW IMMUNE LEVELS. THEREFORE, CONTRACTOR SHALL
ENSURE THEIR IC BARRIERS CONTAIN DUST AND PARTICULATE
MATTER TO THE CONSTRUCTION AREA.
3. PROVIDE NEGATIVE AIR ISOLATION MONITORS/MACHINES
AT 2000 CFM (MIN.): (MINIMUM (1) ONE IN AREAS LESS THAN
1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND
5000 SF, (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF,
AND (4) FOR AREAS BETWEEN 10000 SF AND 15000 SF. DURING
CLASS III OR CLASS IV CONSTRUCTION OPERATIONS THAT LAST
THREE DAYS OR MORE. EACH AREA TO BE UNDER NEGATIVE
PRESSURE (0.02" WC) DURING THESE CONSTRUCTION
OPERATIONS. MONITOR AND DOCUMENT AS DIRECTED BY THE
COR.
4. COORDINATE LOCATION OF TEMPORARY INFECTION
CONTROL (IC) BARRIER WALL CONSTRUCTION AND INFECTION
CONTROL (IC) MEASURES WITH COR AND PATIENT SAFETY/
INFECTION CONTROL REPRESENTATIVE. TEMPORARY IC BARRIER
WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO
COR AND PATIENT SAFETY/ INFECTION CONTROL
REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS
APPROVED. CONSTRUCT I.C. CONSTRUCTION BARRIER FROM
FLOOR TO DECK/FLOOR ABOVE.
5. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE
MAINTAINED AT ALL TIMES.
6. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES,
A 24"X36" STICKY WALK OFF MAT AT THE ENTRY (OUTSIDE OF
CONTAINMENT) AND EXIT (INSIDE OF CONTAINMENT), AND
HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION. MAT
SHALL BE REPLACED TO MEET MANUFACTURER'S
RECOMMENDATIONS. VERIFY REPLACEMENT SCHEDULE WITH
HOSPITAL'S INFECTION CONTROL MANAGEMENT PERSONNEL.
7. PROVIDE OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
8. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE
SHOP VAC, MULTI-PURPOSE SPILL CONTROL SORBENTS TO
ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS.
9. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE
COVERED WITH 4 MIL. POLY SHEET.
10. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE
PROJECT BOUNDARY THROUGH THE FACILITY TO DUMPSTER
ALONG APPROVED ROUTE IN ENCLOSED DUMPSTER CART
DESIGNED FOR SUCH PURPOSED WITH A LID.
11. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL
BE PROPERLY STORED IN DESIGNATED AREAS AND APPROVED
CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN
THE FACILITY.
12. PROVIDE HEPA FILTERED CONTAINMENT CART FOR ABOVE
CEILING ACCESS OUTSIDE PROJECT BOUNDARY.
13. PROVIDE HEPA FILTERED NEGATIVE AIR MACHINES WHEN
REQUIRED. THE CONTRACTOR SHALL PROVIDE ENOUGH
MACHINES TO COMPLETELY EXCHANGE THE SPACE TO
MAINTAIN 0.02" HG. A NEGATIVE AIR MONITOR SHALL BE
PROVIDED AND VISIBLE FROM EXTERIOR OF CONTAINMENT TO
ENSURE COMPLIANCE.
14. CORRIDOR REDUCTION TO ALLOW FOR CONSTRUCTION OF
A CONTAINMENT IS POSSIBLE, YET MUST MAINTAIN A MINIMUM
OF 5 FEET FOR HOSPITAL CIRCULATION, REVIEWED WITH
HOSPITAL SAFETY AND INFECTION PREVENTION AND HAVE A
POSTED ILSM, AS NEEDED.
15. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED
WALLS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE
RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION
CONTROL BARRIER TO ACT AS SMOKE BARRIER.
PHASING GENERAL NOTES
1. PROJECT AREAS TO BE OCCUPIED BY STAFF AND PATIENTS
THROUGHOUT CONSTRUCTION.
2. REFER TO SPECIFICATIONS FOR INFORMATION ON WORK
DURATION FOR EACH PHASE AND AREA OF WORK.
1. REFER TO 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION.
2. CONSTRUCT ICRA BARRIER PRIOR TO ANY DEMOLITION WORK.
3. THE INTENT OF INFECTION CONTROL ISOLATION IS TO
CONTAIN DUST AND PARTICULATE MATTER FROM THE
CONSTRUCTION AREA. PERIMETER TO BE SEALED COMPLETELY
WITH SHEET PLASTIC WHEN NO TEMPORARY PARTITION IS
CALLED OUT.
4. CONTROL BARRIERS TO BE INSTALLED AND REMOVED ONLY
DURING WORKING HOURS. (8:00 AM - 5:00PM)
5. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
6. EXACT TEMPORARY WALL PARTITION LAYOUT AND
DIMENSIONS TO BE REVIEWED AT THE CONSTRUCTION SITE
WITH COR FOR APPROVAL.
INFECTION CONTROL RISK
ASSESSMENT NOTES
1. NO TOOLS OR EQUIPMENT TO BE LEFT UNATTENDED
2. CONTRACTOR TO PROVIDE TEMPORARY SECURITY WALLS IN
HIGH SECURITY AREAS.
3. CONTRACTOR IDENTIFICATION TO BE DISPLAYED AT ALL TIMES
ON PERSON.
4. TOOLS AND EQUIPMENT NOT NEEDED FOR TASKS AT HAND TO
BE STORED OFF SITE.
SECURITY NOTES
FIRE AND SAFETY NOTES
1. MAINTAINING THE INTEGRITY OF THE FIRE AND SAFETY SYSTEMS
IN PLACE IN THE MEDICAL CENTER AND ALL OF ITS OUT
BUILDINGS DURING CONSTRUCTION SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR.
2. IN ADDITION TO ALL MEDICAL CENTER POLICIES, ALL
NATIONAL STATE AND LOCAL CODES AND ORDINANCES
SHALL APPLY TO ALL OF THEIR CONTRACTORS AND SUB
CONTRACTORS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL
PERTINENT OSHA SAFETY REQUIREMENTS.
4. PROVIDE LOCKOUT- TAGOUT AND CONFINED SPACE ENTRY
POLICIES AS APPLICABLE AND AS REQUIRED BY OSHA. THESE
POLICIES SHALL BE SUBMITTED FOR PRIOR APPROVAL BY THE
SAFETY OFFICER/ COR.
5. SUBMIT APPROPRIATE INTERIM LIFE SAFETY MEASURES. REFER
TO SPECIFICATION FOR MORE INFORMATION
6. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS OF
NON-COMBUSTIBLE MATERIALS WHICH PROVIDE A SMOKE
TIGHT SERRATION BETWEEN THE CONSTRUCTION AREAS AND
ALL OTHER OCCUPIED AREAS. MAINTAIN INTEGRITY OF THE
ENCLOSURE DURING THE CONSTRUCTION. REFER TO
SPECIFICATIONS.
7. EXISTING FIRE PROTECTION SYSTEMS, INCLUDING FIRE ALARM
SYSTEMS, SMOKE DETECTION SYSTEMS, AND SPRINKLER
SYSTEMS SHALL NOT BE IMPAIRED DURING CONSTRUCTION.
SMOKE DETECTOR DISABLE REQUESTS: OUTAGE REQUESTS TO
BE SUBMITTED TO FM ENGINEER OR COR FOR APPROVAL FOR
SPECIFIC DATE AND TIME. ALARMS WILL ONLY BE TURNED OFF
FOR SPECIFIC SHIFTS REQUESTED AND WHEN CONTRACTORS
ARE IN THE CONSTRUCTION AREA. ALARMS WILL BE RESTORED
AT THE END OF THE WORK DAY BY CALLING THE SAME
EXTENSION. AT NO TIME WILL ALARMS REMAIN OFF
OVERNIGHT. SMOKE DETECTORS AND OR SPRINKLERS HEADS
DO NOT COVER BY BAGS, TAPE, AND PLASTIC OR IN ANY
OTHER MANNER THAT WILL DEFEAT THEIR ABILITY TO SENSE
SMOKE OR HEAT AND OPERATE AS DESIGNED.
8. DAILY ACCUMULATIONS OF TRASH, COMBUSTIBLES
MATERIALS, PACKAGING AND DEBRIS SHALL BE REMOVED
FROM THE CONSTRUCTION AREA ON A DAILY BASIS.
FLAMMABLE MATERIALS MAY BE STORED ON SITE IN AN
APPROVED AND APPROPRIATELY MARKED FLAMMABLE
MATERIALS CABINET
9. AT ALL TIMES DURING CONSTRUCTION ONE OF THE THREE
FOLLOWING CONDITIONS SHALL BE TRUE. (1) FIRE
SUPPRESSION SYSTEM/SPRINKLERS SHALL BE ACTIVE. (2) FIRE
DETECTION/ALARM SYSTEM SHALL BE ACTIVE. (3) A FIRE
WATCH SHALL BE IN EFFECT.
10. THE CHOICE OF USING RATED TEMPORARY CONSTRUCTION
BARRIERS AND MAINTAINING SPRINKLER PROTECTION
THROUGH THE INSTALLATION OF TEMPORARY UPRIGHT
SPRINKLERS SHALL BE VERIFIED WITH THE VA COR.
INFECTION CONTROL RISK ASSESSMENT NOTES - CLASS IV
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
LEVEL I:
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT
CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS
PANELS, ETC., UPON COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE
FACILITY MUST BE FREE OF CONTAMINANTS AND LOOSE
MATERIAL.
LEVEL II:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM
DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST
SURFACE TO CONTROL DUST (E.G., MOBILE DUST
CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE
DUST BEFORE LEAVING WORK AREA
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO
PROTECT THE HVAC SYSTEM FROM DUST AND REDUCE AIR
TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER
ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER
SYSTEMS INCLUDING STAGNATION DUE TO REDUCED USAGE,
THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED
FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.
PERFORM DAILY CLEANING AND DISPOSAL OF TRASH
(COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT
ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE
WORK AREA MUST BE IN SEALED CONTAINERS AND/OR
CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM
THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH
A HARD LID) MUST BE USED TO TRANSPORT TRASH AND DEBRIS
FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST
BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS
BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF
CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY
MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY
SOILED. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS
NOT CONTAINED BY DAMP MOPPING OR HEPA VACUUMING
SURFACES AT LEAST DAILY.
10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT
CONTAINED BY DAMP MOPPING OR HEPA VACUUMING
SURFACES AT LEAST DAILY.
LEVEL III:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING
NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO THE
CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES
MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST
RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO
FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND
SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS,
INCLUDING FLOORS AND CEILING, USING APPROVED
MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR
BARRIER TYPE).
5. MAINTAIN .01 INCHES/WATER GAUGE NEGATIVE
PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA
EXHAUST AIR SYSTEMS DIRECTED OUTDOORS. THESE CONTROL
MEASURES MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR
THE DURATION OF THE PROJECT. HEPA FILTERED EXHAUST IF
DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE AT A
DISTANCES OF 25 FEET OR GREATER FROM ENTRANCES, AIR
INTAKES, AND OPERABLE WINDOWS. EXHAUSTING
DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC
SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.
BATHROOM EXHAUST) IS PROHIBITED.
LEVEL IV: ALL CONTROL MEASURES IN LEVELS I, II, AND III AND THE
FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO
INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE
PRESSURE CONTROL. ANTEROOM MUST BE LARGE ENOUGH
FOR EQUIPMENT STAGING, CART CLEANING, WORKER'S PPE
AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR
CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK
ROOM ANTEROOM. HEPA VACUUMING OF CLOTHING OR
USE OF COVER SUITS IS ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO
CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE
REMOVED PRIOR TO EXITING THE ANTEROOM TO THE
OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE
COVERS MUST BE CHANGED IMMEDIATELY.
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION
PREVENTIONIST OR DESIGNEE AND ENGINEERING
REPRESENTATIVE FOR FINAL ACTIVITY/PROJECT CLOSE OUT AND
REMOVAL OF INFECTION PREVENTION AND CONTROL
MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL
SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING
MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST
ACCUMULATION ON UPPER SURFACES AS WELL AS AIR
DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL
WORK INVOLVING DRYWALL REMOVAL, CREATION OF
DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK.
THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA
CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING
MAY BE NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES
MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST
RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
A. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
B. IF DUST WILL BE GENERATED DURING SCREW REMOVAL,
USE HAND-HELD HEPA VACUUM.
C. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL
PROCESS.
D. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE
REMOVING OUTER HARD BARRIER.
E. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST
COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE
CONTAMINATES FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT
ALL TIMES AND IN PLACE FOR A PERIOD AFTER
COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE
CONTAMINANTS FROM THE WORK AREA AND BEFORE
REMOVAL OF CRITICAL BARRIERS.
3. MAINTAIN MINIMUM NEGATIVE AIR PRESSURE, 0.01 INCHES
OF WATER GAUGE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY
MONITORED WITH A DIGITAL DISPLAY, RECORDING AND
ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON
INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION,
AND MONITORED.
4. UTILIZE A DIGITAL DIFFERENTIAL PRESSURE MONITOR TIED
INTO THE BUILDING MANAGEMENT SYSTEM.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE
ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND
OPERATIONAL.
3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND
AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN
USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK
IN ACCORDANCE WITH VHA DIRECTIVE 1061.
EXISTING DECK
SEAL PERIMETER: RED PLASTIC TAPE
EXISTING FINISHED
FLOOR
EXISTING FINISHED FLOOR
OCCUPIED SIDE
OF BARRIER
''WORK'' SIDE
OF BARRIER
CONTINUOUS 6 MIL POLYETHLENE
SHEE BARRIER
PROVIDE BASE PAINTERS TAPE AT ALL END
CONDITIONS WTIH RED PLASTIC TAPE TO
PROVIDE A CONTINOUS SEALED SPACE
SEAL PERIMETER: RED PLASTIC TAPE
CEILING
VA/OSHA TEMPORARY SIGNAGE
PUBLIC SIDE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER
TYPE FOR REQUIRED CONDITION
TO STRUCTURE ABOVE
DOOR AND FRAME WITH SEALS, CARD
READER, HARDWARE AND CLOSER
HAND SANITIZER
TRIATEK MONITOR
6 MIL POLY
EQUIPMENT OR
FURNISHING
6 MIL POLY
WALL OPENING
CRITICAL BARRIER
WALL PROTRUSION
SEAL WITH DUCT TAPE
ALL SIDES.
CEILING
6 MIL POLY CRITICAL
BARRIER CEILING
PENETRATION
NOTE: ALL CORNERS TO
FORM 90 DEGREE ANGLE
WITH NO RADIUS
SEAL WITH DUCT TAPE.
ALL SIDES
WINDOWDOOR
BEYOND
SEAL ALL CRACKS WITH
DUCT 6 MIL POLY
CRITICAL BARRIER
OVER WINDOWS.
SEAL ALL CRACKS WITH
DUCT 6 MIL POLY CRITICAL
BARRIER OVER WINDOWS.
FLOOR
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
6 "
Department of Veterans Affairs
STAMP
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
P: 619.770.8552
WWW.DAVENERGY.COM
CONSULTANTS
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVENUE, SUITE B
KALAMAZOO, MI 49007
P: 269.927.0144
WWW.7GENAE.COM GC-001
570-23-223
2615 E CLINTON AVE
FRESNO, CALIFORNIA 93703
APRIL 7, 2026 JK AL
INFECTION CONTROL
GENERAL INFORMATION
DESIGN TO RENOVATE BLDG 1,
1ST FLOOR ACUTE RESPIRATORY
CLINIC
4 65
SCALE: 3/4" = 1'-0"GC-001
T1 - TEMPORARY WALL PARTITION1
SCALE: 3/8" = 1'-0"GC-001
CRITICAL BARRIER PREP INSTALLATION - PUBLIC SIDE2
SCALE: 1/4" = 1'-0"GC-001
CRITICAL BARRIER PREP INSTALLATION3
9 10 11 1210.A8
G
H
F
E
1A-2
EXIST CORRIDOR
1A08
HEALTHY VET
1A10
WAITING AREA
P-2
ELEVATOR
1A07
HSKP.
1A04
INFO DESK
1A00
EXIST VESTIBULE
1A01F
WOMENS TOILET
82 SF
1A06
TOILET
61 SF
1A02
CLEAN SUPPLY
96 SF
1A09A
INTERVIEW 1
97 SF
1A09B
INTERVIEW 2
47 SF
1A09C
WARD STOCK 120 SF
1A09D
EXAM 2
122 SF
1A09E
EXAM 149 SF
1A11
SOILED HOLD
99 SF
1A01B
MSA CHECK IN
277 SF
1A09
CORRIDOR
389 SF
1A01A
WAITING
1B-2
CORRIDOR
1A-1
EXIST CORRIDOR
201 SF
1A002
VESTIBULE
A
A
A
A
A
B
A
1A09E
1A09D 1A09
1A01A
1A002B
1A002A
1A12
STORAGE
1A15A
DAYCARE
1A01
EXIST LOBBY
22 SF
1A01C
MECHANICAL
CHASE
/2
A
C
T1 TEMPORARY
WALL PARTITION
T1 TEMPORARY
WALL PARTITION
T1 TEMPORARY
WALL PARTITION
T1 TEMPORARY
WALL PARTITION
MAT
PROVIDE STICKY WALK-
OFF MAT AT ENTRY TO
CONSTRUCTION AREA
*NOTE: PROVIDE MOBILE DUST
CONTAINMENT TO SUPPORT ALL
ABOVE CEILING WORK OUTSIDE
OF CONSTRUCTION AREA
EXISTING DOOR TO
REMAIN DURING
CONSTRUCTION, USE AS
CONSTRUCTION BARRIER.
*NOTE: DUCT ROUTING
THROUGH LOBBY SHALL BE
FIELD VERIFIED AND
COORDINATEDAND PHASED
AS NEEDED SUCH THAT
OPERATIONS ARE NOT
IMPEDED. ICRA PLAN TO BE
SUBMITTED FOR APPROVAL
BY COR
PROVIDE MOBILE DUST
CONTAINMENT TO SUPPORT
ALL
ABOVE CEILING WORK
OUTSIDE
OF CONSTRUCTION AREA
*NOTE: PROVIDE MOBILE DUST
CONTAINMENT TO SUPPORT ALL
ABOVE CEILING WORK OUTSIDE
OF CONSTRUCTION AREA
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
6 "
Department of Veterans Affairs
STAMP
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
P: 619.770.8552
WWW.DAVENERGY.COM
CONSULTANTS
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVENUE, SUITE B
KALAMAZOO, MI 49007
P: 269.927.0144
WWW.7GENAE.COM GC-101
570-23-223
2615 E CLINTON AVE
FRESNO, CALIFORNIA 93703
APRIL 7, 2026 JK AL
FIRST FLOOR INFECTION
CONTROL PLAN
DESIGN TO RENOVATE BLDG 1,
1ST FLOOR ACUTE RESPIRATORY
CLINIC
5 65
NORTH
SCALE: 1/4" = 1'-0"
FIRST FLOOR INFECTION CONTROL PLAN
GENERAL DEMO NOTES
1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS
SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS
AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.
2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS. IF CONDITIONS DO NOT
REFLECT WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS
TO NOTIFY THE ARCHITECT.
3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF
CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING
AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO
THE OVERALL PROJECT.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF
DUMPSTERS TO BE DETERMINED BY OWNER WITH CONTRACTORS INPUT.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS.
DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES
TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL
MANNER. NO ONSITE SALE OR BURNING OF REMOVED ITEMS IS PERMITTED.
6. CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY
OF THE PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR
INJURY TO ANY PERSON ON, ABOUT OR ADJACENT TO THE PREMISES. THE
CONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND
REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF ACCIDENTS.
7. CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION,
WATERPROOFING, EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR
PART OF ITEMS WHICH ARE TO REMAIN.
8. OWNER RESERVES THE RIGHT TO ANY REMOVED MATERIALS OR ITEMS.
CONTRACTOR TO COORDINATE WITH OWNER.
9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN ANY MANNER.
10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION. PREPARE
FOR NEW CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING SHALL BE
TOOTHED-IN TO MATCH EXISTING COURSING PATTERN, U.N.O.
11. WHERE WALLS AND CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITHIN
THOSE WALLS AND/OR CEILINGS ARE TO BE REMOVED OR REROUTED. REFER TO
MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FOR ADDITIONAL
DEMOLITION NOT SHOWN ON THIS SHEET.
12. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS
WITH A ONE-HOUR FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST BARRIER.
TEMPORARILY SEAL OFF ALL RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION
AREA. MAINTAIN NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION ZONE.
NEGATIVE PRESSURE MUST BE MAINTAINED AT .01 INCHES/WATER GAUGE.
13. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION,
CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.
14. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR
DAMAGED DURING DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT
TO VOID EXISTING WARRANTIES.
15. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.
16. INTERIOR WALLS TO BE REMOVED SHALL BE REMOVED THE ENTIRE HEIGHT OF THE
WALL UNLESS REQUIRED/NOTED OTHERWISE AS NEW OPENINGS IN EXISTING
WALLS TO REMAIN.
17. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED FIREPROOFING
MATERIAL IN AREAS LEFT UNPROTECTED DUE TO REMOVAL OF EXISTING
ELEMENTS OR AREAS DAMAGED DURING NEW WORK AND DEMOLITION. MATCH
EXISTING FIREPROOFING MATERIAL TYPE AND THICKNESS TO MAINTAIN EXISTING
LEVEL OF PROTECTION.
18. REFER TO ACM SURVEY REPORT FOR FURTHER INFORMATION AND ITEMS TO BE
REMOVED BY CONTRACTOR.
1A12
STORAGE
1A11
TOILET
1A09
SVC OFFICERS
1A06
TOILET
1A09A.1
CO-ORDR
CASKET LIFT
1A02
SCREENING
1A08
HEALTHY VET
1A10
WAITING AREA
P-2
ELEVATOR
1A09A
DAV
1A-1
CORRIDOR
1A01
LOBBY
1A07
HSKP.
1A12
STORAGE
1A11
TOILET
1A09
SVC OFFICERS
1A06
TOILET
1A09A.1
CO-ORDR
CASKET LIFT
1A02
SCREENING
1A01A
CHECK IN
1A-2
CORRIDOR
1A08
HEALTHY VET
1A10
WAITING AREA
P-2
ELEVATOR
1A09B
AMERICAN LEGION
1A09C
VFW
1A09D
AMVETS
1A09A
DAV
1A-1
CORRIDOR
1A01
LOBBY
1A07
HSKP.
D4
D1 D1
D1
D1
D1 D1D1
D1 D4
D4
D4
D4 D5
D10D3 D11 D12
D4
D4D3 D10 D11 D12
D4D5
D3 D6 D9
D3 D6 D9D3 D6 D9
D4
D4
D8
D8
D4
D4
D3
D6
D9
D3 D6 D9
D2
D2
D6 D9
D3 D6
D3 D6 D9
D3 D6 D9
D3 D6 D9
D4
D4D4
D3
D6
D9
1A00
VESTIBULE
EXISTING LOBBY
FLOORING TO
REMAIN.
DEMOLITION TO
END HERE.
1A12
STORAGE
1A15A
DAYCARE
1A04
INFO DESK
1A12
STORAGE
1A15A
DAYCARE
9 10 11 1210.A8
G
H
F
E
EXISTING LOBBY
FLOORING TO
REMAIN.
DEMOLITION TO
END HERE.
1B-2
CORRIDOR
D12
D14
D11
D12D12
D14D14
REMOVE EXISTING
CONCRETE
SLAB TOPPING, REFER TO
STRUCTURAL
SHEET S-101.
REMOVE AND SALVAGE
EXISTING CEILING TILE FOR
MECHANICAL WORK
ABOVE CEILING, REFER TO
SHEET MH-102 FOR NEW
HVAC WORK
D7
D2
EXISTING 1 HOUR FIRE RATED
PARTITIONS TO REMAIN
D1
REMOVE AND SALVAGE
EXISTING CEILING TILE FOR
MECHANICAL WORK
ABOVE CEILING, REFER TO
SHEET MH-102 FOR NEW
HVAC WORK
*NOTE: ALL EXTERIOR DEMO WORK
TO BE DONE AFTER HOURS,
COORDINATE WITH COR
*NOTE: ALL CASKET LIFT SHAFT
WALL DEMO WORK
TO BE DONE AFTER HOURS,
COORDINATE WITH COR
DEMOLITION PLAN LEGEND
WALL TO BE DEMOLISHED
EXISTING CONSTRUCTION TO REMAIN
AREA NOT IN SCOPE
DOOR TO BE DEMOLISHED
AREAS OF EXISTING SUSPENDED ACOUSTIC TILE TO BE
REWORKED DUE TO NEW CONSTRUCTION
DEMOLITION KEYNOTES
D1 REMOVE AND DISPOSE OF EXISTING DOOR AND FRAME AND ALL ASSOCIATED
APPURTENANCES. PREP OPENING FOR NEW WORK.
D2 REMOVE AND DISPOSE OF PORTION OF EXISTING CMU WALL FOR NEW
OPENING. SEE FLOOR PLAN/DOOR SCHEDULE FOR MORE INFORMATION.
D3 REMOVE AND DISPOSE OF ALL GYP. BD. AND EXISTING FINISHES. EXISTING
EXTERIOR METAL STUDS TO REMAIN. PATCH AND REPAIR ADJACENT FINISHES
AS REQUIRED FOR INSTALLATION OF NEW WORK. REFER TO MEP DRAWINGS
FOR ADDITIONAL DEMOLITION.
D4 REMOVE AND DISPOSE OF EXISTING GYPSUM BOARD AND METAL STUD WALL
COMPLETE FULL HEIGHT. REMOVE ALL ITEMS ATTACHED TO THE WALLS. REFER
TO MEP DRAWINGS FOR FURTHER DEMOLITION.
D5 REMOVE AND DISPOSE OF EXISTING CMU WALL IN ITS ENTIRELY. PREP AND
PATCH FLOOR AND ADJACENT WALLS FOR INSTALLATION OF NEW. REFER TO
MEP DRAWINGS FOR ADDITIONAL DEMOLITION.
D6 REMOVE AND DISPOSE OF EXISTING ACOUSTICAL CEILING TILE AND GRID
SYSTEM COMPLETE INLUDING ALL ASSOCIATED HANGERS, METAL TEE GRID,
AND EDGE ANGLES, ALL ITEMS ATTACHED TO THE CEILING INCLUDING CEILING
MOUNTED LIGHT FIXTURES, SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL
DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS ACCESS POINT, EXIT
SIGNAGE, SAFETY MIRRORS, ETC. TO BE REMOVED. COORDINATE WITH LOW
VOLTAGE DEMO, FIRE PROTECTION DEMO, MECHANICAL DEMO AND
ELECTRICAL DEMO DRAWINGS.
D7 REMOVE AND DISPOSE OF EXISTING STOREFRONT WINDOW SYSTEM IN IT'S
ENTIRETY. REMOVE CMU BLOCK WALL AS REQUIRED TO INSTALL A NEW DOOR
AND WINDOW SYSTEM. PATCH AND PREP ADJACENT FINISHES FOR
INSTALLATION OF NEW WORK
D8 REMOVE AND DISPOSE OF EXISTING CASEWORK AND MILLWORK, AND ALL
WALL MOUNTED EQUIPMENT, TYP. IN ENTIRE ROOM. PATCH AND REPAIR
FLOOR AND WALLS FOR NEW FINISHES.
D9 REMOVE AND DISPOSE OF EXISTING WALL BASE, FLOORING AND FLOOR
FINISHES INCLUDING ALL ADHESIVE AND SETTING MATERIALS DOWN TO
EXISTING CONCRETE SUBSTRATE. PREPARE SUBSTRATE IN PREPARATION FOR
NEW FINISH AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM SURFACE
INCLUDING GRINDING OF CONCRETE FLOORS AND NEW SELF LEVELER OVER
ENTIRE FLOOR AREA WHERE REQUIRED.
D10 REMOVE AND DISPOSE OF EXISTING PLUMBING FIXTURES IN ROOM. SEE
MECHANICAL DRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION.
D11 REMOVE AND DISPOSE OF EXISTING WALL MOUNTED ACCESSORY IN IT'S
ENTIRETY. PATCH AND PREP WALL FOR INSTALLATION OF NEW WORK.
D12 REMOVE AND DISPOSE OF PORTION OF EXISTING CONCRETE SLAB. PATCH
AND PREP AS REQUIRED FOR INSTALLATION OF WORK.
D14 REMOVE EXISTING RAILING AND DISPOSE OF PROPERLY.
NORTH
SCALE: 1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
7GAE PROJECT NO.: 231154 FILE NAME: TITL-BLK-3042-VA.DWG
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
6 "
Department of Veterans Affairs
STAMP
DAV ENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
P: 619.770.8552
WWW.DAVENERGY.COM
CONSULTANTS
SEVEN GENERATIONS ARCHITECTURE + ENGINEERING
600 E. MICHIGAN AVENUE, SUITE B
KALAMAZOO, MI 49007
P: 269.927.0144
WWW.7GENAE.COM AD-101
570-23-223
2615 E CLINTON AVE
FRESNO, CALIFORNIA 93703
APRIL 7, 2026 MH AL
FIRST FLOOR DEMOLITION
PLAN
DESIGN TO RENOVATE BLDG 1,
1ST FLOOR ACUTE RESPIRATORY
CLINIC
6 65REVISIONS DATE
M
F
(N)WAP
(N)WAP
1A09A.1
CO-ORDR
CASKET LIFT
1A02
SCREENING
1A09A
DAV
1A-1
CORRIDOR
1A12
STORAGE
1A11
TOILET
1A09
SVC OFFICERS
1A06
TOILET
1A02
SCREENING
1A01A
CHECK IN
1A-2
CORRIDOR
1A09B
AMERICAN LEGION
1A09C
VFW
1A09D
AMVETS
1A-1
CORRIDOR
1A12
STORAGE
1A15A
DAYCARE
1A12
STORAGE
1A15A
DAYCARE
9 10 11 1210.A
G
F
D6
D6
D6
D6
D6
D6
D6
D6
D13 D13
DEMOLITION PLAN LEGEND
WALL TO BE DEMOLISHED
EXISTING CONSTRUCTION TO REMAIN
AREA NOT IN SCOPE
DOOR TO BE DEMOLISHED
AREAS OF EXISTING SUSPENDED ACOUSTIC TILE TO BE
REWORKED DUE TO NEW CONSTRUCTION
GENERAL DEMO NOTES
1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS
SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS
AND ITEMS AS REQUIRED TO FACILITATE NEW CONSTRUCTION.
2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS. IF CONDITIONS DO NOT
REFLECT WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS
TO NOTIFY THE ARCHITECT.
3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF
CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING
AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY RELATE TO
THE OVERALL PROJECT.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF
DUMPSTERS TO BE DETERMINED BY OWNER WITH CONTRACTORS INPUT.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS.
DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES
TO ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE OF IN A LEGAL
MANNER. NO ONSITE SALE OR BURNING OF REMOVED ITEMS IS PERMITTED.
6. CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY
OF THE PUBLIC AND/OR WORKERS ON THE SITE TO PREVENT ACCIDENTS OR
INJURY TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .