Bulletin No 2 - CW HW RPM.pdf
PDF 37 KB Posted
- Solicitation number
- 36C26126R0049
About this file
This document is a construction bulletin amending technical drawings for a renovation project at Fresno Veterans Affairs Medical Center (VAMC).
Bulletin No. 2 modifies drawings MP-101, MP-102, and MH-107 for the Acute Respiratory Clinic renovation (Project 570-23-223), with all revisions issued on June 18, 2026. Drawing MP-101 updates demolition notes to incorporate phasing requirements for chilled water rerouting to minimize operational downtime and specifies infection control protocols for associated work. Drawing MP-102 includes new hot water and chilled water routing specifications, establishes the tie-in location for a dedicated hot water reheat system with connection points and isolation valves, and mandates contractor responsibility for re-routing vertical chilled water lines that must remain in service while maintaining infection control requirements. The contractor must determine optimal routing locations using their own means and methods. Drawing MH-107 is amended to add room pressure monitors for exam rooms that failed to appear in the final submission. All modified sections are highlighted in the revised drawings provided on the specified date.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BULLETIN NO.2 – AMENDMENT TO DRAWING MP-101, MP 102, MH107
Fresno VAMC Renovate Acute Respiratory Clinic - 570-23-223
Bulletin No. 2 amends drawings MP-101, MP 102, and MH107 to include elements surrounding room pressure monitors and hot water/chilled water routings.
MP 101 updates the expected demolition notes to include phasing considerations for chilled water rerouting to ensure minimal downtime, as well as infection control requirements associated with necessary work.
MP 102 includes new chilled and hot water routing requirements. An updated tie in location for dedicated hot water reheat system detailed with a point of connection, isolation valves and infection control requirements for the associated work. There are chilled water risers to remain in place and continue to service other areas require phasing to minimize downtime as well as contractor responsibility to re-reroute the lines that move vertically through the space to remain in service. Contractor means and methods to identify best new location and infection control requirements above and/or below as necessary.
MH 107 is amended to include room pressure monitors for the remaining exam rooms that had not appeared to print during final submission.
All items are clouded in the revised documents provided 6/18/2026.