570-23-223-90134-Fresno ARC-Mechanical Bulletin No 2 - 2026.06.18.pdf

PDF 531 KB Posted

Attached to
Z1DA--Solicitation No. 36C26126R0049 Project No. 570-23-223, Renovate First Floor for Acute Respiratory Clinic at Fresno VA Medical Center
Solicitation number
36C26126R0049
Issued by

About this file

These are mechanical design drawings for the renovation of Building 1, First Floor at VA Central California Health Care System in Fresno, California. The project involves designing an Acute Respiratory Clinic with specific HVAC, piping, and controls requirements.

The drawings document the mechanical systems design including: (1) First Floor Mechanical Pressure Relationships (Drawing MH-107) showing room pressure requirements ranging from negative 10 ACH (air changes per hour) for soiled hold and hazardous areas to positive 4 ACH for exam and interview rooms, with CFM (cubic feet per minute) values specified for supply and exhaust air; (2) First Floor Mechanical CHW Piping Demo Plan (MP-101) indicating demolition of existing duct coil B-16 and evaporator with associated piping to be capped and sealed, and rerouting of chilled water lines to maintain service to floors above and below; (3) First Floor Mechanical Piping Plan (MP-102) showing new chilled water piping installation with 3/4-inch and 1-inch diameter lines, isolation valves at connection points, and controls network integration with existing JCI control systems; and (4) First Floor Mechanical CHW Piping New Plan (MP-102 continued) detailing hot water supply and return lines from a 2-1/2-inch SPS riser routed from the pharmacy area. Key requirements include infection control and risk assessment (ICRA) protocols, coordination with existing conditions, field verification of routing, phased construction to minimize operational impact, room pressure monitoring between exam rooms and corridors with alarms set for positive pressure exceeding 5 minutes, and weekend/extended hours work to maintain service continuity. The design is dated 04/07/2026 with Bulletin No. 2 revision dated 06/18/2026.

View the file

Other files

File Type Posted
570-23-223-90134-Fresno ARC-Electrical-E701R 1.pdf PDF
BULLETIN NO1 3.pdf PDF
Chilled Water AS Builds.pdf PDF
Bulletin No 2 - CW HW RPM.pdf PDF
VA Fresno ARC Pre-Bid RFI Responses 6-19-26.xlsx XLSX spreadsheet
S06 - Amendment to Solicitation No. 36C26126R0049 0003.docx DOCX document
Original Stuctural.pdf PDF
S06 - 36C26126R0049 0002.docx DOCX document
S06 - 36C26126R0049 0001.docx DOCX document
Sign in Sheet Fresno Arc.PDF PDF
S02 - Solicitation No. 36C26126R0049.docx DOCX document
Attachment - Price Breakdown.xlsx XLSX spreadsheet
REQUEST FOR INFORMATION FORM.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
90134 - 570-23-223 - Fresno Design to Renovate 1st floor ARC Fi.pdf PDF
Fresno Design to Renovate 1st floor ARC Final Specs 20260423.pdf PDF
ATTACHMENT A - FACTOR 2 - PROJECT EXPERIENCE.xlsx XLSX spreadsheet
DBA Wage Determination No. CA20260018 dated 20260130.docx DOCX document
ATTACHMENT B - FACTOR 3 - Past Performance Questionnaire.docx DOCX document
VAAR 852.219-75.pdf PDF
Pre-proposal Site Visit Briefing Slide.pptx PPTX presentation
90134 - 570-23-223- Final Bid Set Fresno ARC BOD - 20260407.pdf PDF
570-23-223_SOW Fresno ARC.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FECFEC

SHEET NOTES:

1. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE RESPONSIBILITY OF

THE CONTRACTOR(S) TO VERIFY EXISTING DUCTWORK, PIPING AND

EQUIPMENT LOCATIONS. REPORT ANY DISCREPANCIES BETWEEN PLANS

AND SITE CONDITIONS TO A/E. CONTRACTOR SHALL COORDINATE WITH ALL

OTHER TRADES AND EXISTING CONDITIONS.

2. ROOM ACH VALUES SHOWN ON THIS DRAWING ARE MINIMUM VALUES

REQUIRED BY THE VA TIL. ACTUAL VALUES WILL MAY BE GREATER.

3. REFER TO INFECTION CONTROL GENERAL INFORMATION SHEET GC-001 FOR

INFORMATION AND DETAILS PERTAINING TO ICRA FOR AREA.

4. ROOM PRESSURE MONITORS TO BE INSTALLED BETWEEN EXAM ROOMS

AND CORRIDOR 1A09, AS WELL AS BETWEEN WAITING 1A01A AND LOBBY

OUTSIDE OF PROJECT SCOPE.

KEY NOTES: #

KEYPLAN

1. DURING CLINIC ACTIVATION, ROOM PRESSURE MONITOR ALARM TO SOUND

AT CENTRAL PLANT IF CLINIC IS POSITIVE FOR MORE THAN 5 MINUTES.

ALARM TO BE DISABLED DURING NORMAL OPERATION WHEN CLINIC IS NOT

IN OPERATION.

S-1

110 CFM

S-1

90 CFM

E-2

165 CFM

E-3

185 CFM

S-2

180 CFM

E-1

60 CFM

S-1

60 CFM

S-2

200 CFM

E-4

275 CFM

E-3

175 CFM

S-1

100 CFM

S-1

75 CFM

E-3

185 CFM

E-2

110 CFM

S-2

180 CFM

S-1

40 CFM

E-3

170 CFM

E-1

60 CFM

S-1

60 CFM

S-2

180 CFM

E-4

250 CFM

S-1

110 CFM

S-2

200 CFM

S-1

110 CFM

E-4

250 CFM

S-1

110 CFM

TOILET

1A06

CLEAN SUPPLY

1A02

INTERVIEW 1

1A09A

INTERVIEW 2

1A09B

WARD STOCK

1A09C

EXAM 2

1A09D

EXAM 1

1A09E

SOILED HOLD

1A11

MSA CHECK IN

1A01B

CORRIDOR

1A09

WAITING

1A01A

VESTIBULE

1A002

MECHANICAL

CHASE

1A01C

0.01 in-wg

75 CFM

(o)

6 ACH

(o)

6 ACH

4 ACH

(o)

4 ACH

(o)

4 ACH

4 ACH

4 ACH

10 ACH

10 ACH

(o)

6 ACH

0.01 in-wg

75 CFM

.0 i n -w g

C

F M

.0 i n -w g

C

F M

.0 in

-w g

C

F M

.0 in

-w g

C

F M

0.03 in-wg

130 CFM

.0 in

-w g

C

F M

.0 i n -w g

C

F M

S-1

45 CFM

R P

M

10 ACH

HAC

1A12

.0 i n -w g

C

F M

0.02 in-wg

105 CFM

R P

M

R P

M

RPM

RPM RPM

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e fo o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM MH-107

570-23-223

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

2615 E CLINTON AVE, FRESNO, CA 93703

06/18/2026 DL AD

FIRST FLOOR MECHANICAL PRESSURE

RELATIONSHIPS

DESIGN TO RENOVATE BLDG 1, 1ST FLOOR

ACUTE RESPIRATORY CLINIC

39 65

1/4" = 1'-0"

FIRST FLOOR MECHANICAL PRESSURE RELATIONSHIPS

REVISIONS DATE

100% FOR CONSTRUCTION 04/07/2026

BULLETIN NO. 2 06/18/2026

SHEET NOTES:

KEY NOTES: #

KEYPLAN

1. DEMOLISH DUCT COIL B-16 AND ALL ASSOCIATED PIPING. CAP AND SEAL AS

CLOSE TO MAIN LINE AS POSSIBLE

2. DEMOLISH EVAPORATOR AND ALL ASSOCIATED PIPING. CAP AND SEAL AS

CLOSE TO MAIN LINE AS POSSIBLE.

3. CW LINES SHALL BE PHASED SUCH THAT NEW PIPE IS CONSTRUCTED IN

ADVANCE OF OUTAGE AND UTILIZING WEEKEND/EXTENDED WORK HOURS

AS NEEDED TO MINIMIZE DOWN TIME FOR UNITS BEING SERVED IN

COORDINATION WITH COR.

1. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE RESPONSIBILITY OF

THE CONTRACTOR(S) TO VERIFY EXISTING DUCTWORK, PIPING AND

EQUIPMENT LOCATIONS. REPORT ANY DISCREPANCIES BETWEEN PLANS

AND SITE CONDITIONS TO A/E. CONTRACTOR SHALL COORDINATE WITH ALL

OTHER TRADES AND EXISTING CONDITIONS.

2. REFER TO INFECTION CONTROL GENERAL INFORMATION SHEET GC-001 FOR

INFORMATION AND DETAILS PERTAINING TO ICRA FOR AREA.

3. PROVIDE ICRA IN ACCORDANCE WITH INFECTION CONTROL STAFF, SAFETY,

AND FIRE PROTECTION PROTOCOLS IN COORDINATION AND APPROVAL WITH

VA COR. CONTRACTOR IS RESPONSIBLE FOR ANY SUPPLEMENTAL

DEMOLITION, REROUTING, REMOVAL, AND REPLACEMENT OF ANY EXISTING

CEILING, ADJACENT SURFACES, OR UTILITIES AS NEEDED FOR ACCESS AND

COMPLETION OF WORK.

4. PIPE ROUTING SHALL BE FIELD VERIFIED AND COORDINATED AND PHASED

AS NEEDED SUCH THAT OPERATIONS ARE NOT IMPEDED. ICRA PLAN TO BE

SUBMITTED FOR APPROVAL BY COR.

5. REROUTE OF CHILLED WATER LINES FOR EXISTING SERVICE TO REMAIN

SERVING FLOORS ABOVE AND BELOW. CONTRACTOR TO FIELD VERFIY AND

ROUTE TO CHASE AS NEEDED FOR CONTINUED OPERATION. PIPE ROUTING

SHALL BE FIELD VERIFIED AND COORDINATED AND PHASED AS NEEDED

SUCH THAT OPERATIONS ARE NOT IMPEDED. ICRA PLAN TO BE SUBMITTED

FOR APPROVAL BY COR. INCLUDE FOR LEVEL BELOW AS NECESSARY BASED

ON ROUTING.

9 10 11 1210.A8

G

H

F

E

OUT OF SCOPE

OUT OF SCOPE

OUT OF SCOPE

(E) COIL B-16

MP-103

MP-103

WR13

WR18

WR17

D

D

WR19

WR20W18

W17

B-17

(E) EVAP

B-18

D

W14

W16

WR15

WR16

D

W16

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM MP-101

570-23-223

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

2615 E CLINTON AVE, FRESNO, CA 93703

06/18/2026 DL AD

FIRST FLOOR MECHANICAL CHW PIPING DEMO DESIGN TO RENOVATE BLDG 1, 1ST FLOOR

ACUTE RESPIRATORY CLINIC

40 65

1/4" = 1'-0"

FIRST FLOOR MECHANICAL PIPING DEMO PLAN

REVISIONS DATE

100% FOR CONSTRUCTION 04/07/2026

BULLETIN NO. 2 06/18/2026

9 10 11 1210.A8

G

H

F

E

CV-1A09

OUT OF SCOPE

OUT OF SCOPE

OUT OF SCOPE

TOILET

1A06

CLEAN SUPPLY

1A02

INTERVIEW 1

1A09A

INTERVIEW 2

1A09B

WARD STOCK

1A09C

EXAM 2

1A09D

EXAM 1

1A09E

SOILED HOLD

1A11

MSA CHECK IN

1A01B

CORRIDOR

1A09

WAITING

1A01A

VESTIBULE

1A002

MECHANICAL

CHASE

1A01C

CV-1A09B

CV-1A09D

CV-1A09E

CV-1A09A

CV-1A02

MP-103

MP-103

CV-1A09C

2"ø 2"ø

3/4"ø 3/4"ø

/4

"ø

3/4"ø 3/4"ø

3/4"ø

3/4"ø

"ø

"ø

/4

"ø

/4

"ø

H-1A002 3/4"ø

3/4"ø

/4

"ø

3/4"ø3/4"ø

CV-1A01A

CV-1A01B

1"ø

1"ø3/4"ø 3/4"ø

3/4"ø 3/4"ø 3/4"ø3/4"ø

/4

"ø /4

"ø

SHEET NOTES:

KEY NOTES: #

KEYPLAN

1. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE RESPONSIBILITY OF

THE CONTRACTOR(S) TO VERIFY EXISTING DUCTWORK, PIPING AND

EQUIPMENT LOCATIONS. REPORT ANY DISCREPANCIES BETWEEN PLANS

AND SITE CONDITIONS TO A/E. CONTRACTOR SHALL COORDINATE WITH ALL

OTHER TRADES AND EXISTING CONDITIONS.

2. REFER TO INFECTION CONTROL GENERAL INFORMATION SHEET GC-001 FOR

INFORMATION AND DETAILS PERTAINING TO ICRA FOR AREA.

3. CONTRACTOR TO PROVIDE NEW CONTROLS NETWORK ENGINES TO ALLOW

ALL NEW TERMINAL UNIT CONTROLLERS, ROOM PRESSURE MONITORS, AND

OTHER DEVICES TO CONNECT TO THE EXISTING JCI CONTROL SYSTEM.

4. PROVIDE ICRA IN ACCORDANCE WITH INFECTION CONTROL STAFF, SAFETY,

AND FIRE PROTECTION PROTOCOLS IN COORDINATION AND APPROVAL WITH

VA COR. CONTRACTOR IS RESPONSIBLE FOR ANY SUPPLEMENTAL

DEMOLITION, REROUTING, REMOVAL, AND REPLACEMENT OF ANY EXISTING

CEILING, ADJACENT SURFACES, OR UTILITIES AS NEEDED FOR ACCESS AND

COMPLETION OF WORK.

1. HOT WATER SUPPLY AND RETURN LINES 2-1/2" SPS RISER. PROVIDE

ISOLATION VALVES AT NEW WATER LINE CONNECTION POINTS.

2. CW LINES SHALL BE PHASED SUCH THAT NEW PIPE IS CONSTRUCTED IN

ADVANCE OF OUTAGE AND UTILIZING WEEKEND/EXTENDED WORK HOURS

AS NEEDED TO MINIMIZE DOWN TIME FOR UNITS BEING SERVED IN

COORDINATION WITH COR.

3. PIPE ROUTING SHALL BE FIELD VERIFIED AND COORDINATED AND PHASED

AS NEEDED SUCH THAT OPERATIONS ARE NOT IMPEDED. DEDICATED

HEATING HOT WATER LINE TO BE ROUTED FROM PHARMACY AREA.

4. REROUTE OF CHILLED WATER LINES FOR EXISTING SERVICE TO REMAIN

SERVING FLOORS ABOVE AND BELOW. CONTRACTOR TO FIELD VERFIY AND

ROUTE TO CHASE AS NEEDED FOR CONTINUED OPERATION. PIPE ROUTING

SHALL BE FIELD VERIFIED AND COORDINATED AND PHASED AS NEEDED

SUCH THAT OPERATIONS ARE NOT IMPEDED. ICRA PLAN TO BE SUBMITTED

FOR APPROVAL BY COR. INCLUDE FOR LEVEL BELOW AS NECESSARY BASED

ON ROUTING.

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

6 "

Department of Veterans Affairs

STAMP

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM

CONSULTANTS

DAV ENERGY SOLUTIONS

2207 GARNET AVE, SUITE I

SAN DIEGO, CA 92109

P: 619.770.8552

WWW.DAVENERGY.COM MP-102

570-23-223

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

2615 E CLINTON AVE, FRESNO, CA 93703

06/18/2026 DL AD

FIRST FLOOR MECHANICAL CHW PIPING NEW

PLAN

DESIGN TO RENOVATE BLDG 1, 1ST FLOOR

ACUTE RESPIRATORY CLINIC

41 65

1/4" = 1'-0"

FIRST FLOOR MECHANICAL PIPING PLAN

REVISIONS DATE

100% FOR CONSTRUCTION 04/07/2026

BULLETIN NO. 2 06/18/2026

Sheets
M-001 - MECHANICAL COVER SHEET
M-401 - MECHANICAL SCHEDULES
M-501 - MECHANICAL DETAILS
M-502 - MECHANICAL DETAILS
M-503 - MECHANICAL CONTROLS
MD-101 - FIRST FLOOR MECHANICAL DEMOLITION PLAN
MH-101 - FIRST FLOOR MECHANICAL HVAC SUPPLY PLAN
MH-102 - FIRST FLOOR MECHANICAL HVAC EXHAUST PLAN
MH-103 - SECOND FLOOR MECHANICAL HVAC EXHAUST PLAN
MH-104 - THIRD FLOOR MECHANICAL HVAC EXHAUST PLAN
MH-105 - OPC PENTHOUSE ROOF MECHANICAL HVAC EXHAUST PLAN
MH-106 - MECHANICAL HVAC NEW EXHAUST PLAN ISOMETRIC
MH-107 - FIRST FLOOR MECHANICAL PRESSURE RELATIONSHIPS
MP-101 - FIRST FLOOR MECHANICAL CHW PIPING DEMO
MP-102 - FIRST FLOOR MECHANICAL CHW PIPING NEW PLAN
MP-103 - FIRST FLOOR MECHANICAL CHW PIPING DEMO/NEW PLAN - CASKET LIFT