Amendment 0007 Attachment 1 RFI Question Answer MATOC Solicitation.pdf PDF
Amendment 0007 Solicitation 36C26222R0044.pdf PDF
Amendment 0006 Solicitation 36C26222R0044.pdf PDF
Amendment 0005 Attachment 7 RFI Questions 28-51-119 B162 Geotechnical Evaluation Report.pdf PDF
Amendment 0005 Attachment 8 RFI Questions 28-51-119 Lab Pharmacy Soils Report.pdf PDF
Amendment 0005 Attachment 12 RFI 125 SF 24.pdf PDF
Amendment 0005 Attachment 5 RFI 24 Specification 32 12 16 Asphalt Paving.pdf PDF
Amendment 0005 Solicitation 36C26222R0044.pdf PDF
Amendment 0005 Attachment 15 Earthwork Fill Material Lab Rpt.pdf PDF
Amendment 0005 Attachment 10 RFI Questions 104-107 B162 Elevator Airflow.pdf PDF
Amendment 0005 Attachment 19 Testing_and_Inspection_Plans_Elevator_Pit_Footing_17.09.21_(28)_Day_Bre_14167911.pdf PDF
Amendment 0005 Attachment 2 RFI 11 Seed Project.pdf PDF
Amendment 0005 Attachment 17 GTI New Lab Pharmacy As Builts.pdf PDF
Amendment 0005 Attachment 1 RFI 2 Seed Project Physical_Access_Control__Data.pdf PDF
Amendment 0005 Attachment 9 RFI 34 EPDM Submittal.pdf PDF
Amendment 0005 Attachment 3 RFI Questions 20-104-107 B162 Elevator Drawings.pdf PDF
Amendment 0005 Attachment 6 RFI Questions 28-30-51-81-82 119 ED Soils Report.pdf PDF
Amendment 0005 Attachment 20 Testing_and_Inspection_Plans_Elevator_Pit_Walls_17.09.28_(7)_Day_Break_14167948.pdf PDF
Amendment 0005 Attachment 4 RFI Questions 20-104-107 B164 Elevator Drawings.pdf PDF
Amendment 0005 Attachment 13 RFI Questions 23-25-54-84 Additional Civil Specs.pdf PDF
Amendment 0005 FAR 52.216-22.pdf PDF
Amendment 0005 Seed Project RFI Questions and Answers.pdf PDF
Amendment 0005 Attachment 14 Earthwork Base Course Lab Rpt.pdf PDF
Amendment 0005 Attachment 11 RFI Questions 104 and 107 B162 Elevator Pit.pdf PDF
Amendment 0005 Attachment 16 ED Drainage Details.pdf PDF
Amendment 0005 Attachment 18 Proposed Lab_Pharmacy Bldg Plans_Hole locations.pdf PDF
Amendment 0004 Solicitation 36C26222R0044.pdf PDF
Amendment 0003 Solicitation 36C26222R0044.pdf PDF
Amendment 0002 Attachment 1 Site Visit Sign-In Sheet.pdf PDF
Amendment 0002 Solicitation 36C26222R0044.pdf PDF
Amendment 0001 Attachment 1 Site Visit Map - Bldg. 19.pdf PDF
Amendment 0001 Solicitation 36C26222R0044.pdf PDF
S02 Solicitation Attachment 2 Technical Proposal Data.docx DOCX document
Amendment 0001 Attachment 2 Seed Project Site Visit Information.pdf PDF
S02 Solicitation Attachment 3 Evaluation Ratings and Definitions.pdf PDF
S02 Solicitation Attachment 6 Contractor Surety Limitations.docx DOCX document
S02 Solicitation Attachment 4 Subcontractor Information And Consent.docx DOCX document
S02 Solicitation Attachment 1 Past Performance Questionnaire.docx DOCX document
S02 Solicitation Attachment 13 Seed Project Specifications.pdf PDF
S02 Solicitation Attachment 5 Bid Schedule - MATOC SEED Project.docx DOCX document
S02 Solicitation Attachment 9 Contractor Safety and EMR Info.docx DOCX document
S02 Solicitation Attachment 14 Seed Project Structural Calculations.pdf PDF
S02 Solicitation Attachment 7 Financial Disclosure Questionnaire.docx DOCX document
S02 Solicitation Attachment 2 Technical Proposal Data.docx DOCX document
S02 Solicitation Attachment 10 Seed Project Wage Determination.pdf PDF
S02 Solicitation Attachment 8 Location Capabilities Questionnaire.docx DOCX document
S02 Solicitation Attachment 11 Prescott Facility Map.pdf PDF
S02 Solicitation Attachment 15 Seed Project Statement of Work.pdf PDF
S02 Solicitation 36C26222R0044.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLC

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

KEY PLAN NTS NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Install Elevators and Complete Space Build-out for B162 and B164

Location:

Final - Bid Set

June 3, 2022 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

649-22-136

Northern Arizona VA Health Care System

500 AZ-89, Prescott, AZ 86301

AESUS

B162 and B164

G-001

COVER SHEET

DX

A3-301

X

XX

X

DETAIL FLAG NUMBER

DOOR NUMBER

AE-501

BUILDING SECTION CUT

OTHER SECTION CUT

SHEET WHERE APPEARS (TYPICAL)

AE-301

AA

SHEET WHERE APPEARS

ELEVATION NUMBER

SHEET WHERE APPEARS

x x x x

EXISTING COLUMN CENTER LINEA

X

WINDOW TAG

AE-301

AA

AE-301

AA

ELEVATION NUMBER

AE-710

4 2

DASHED LINE

AROUND

AREA DETAILED

PLAN OR DETAIL NUMBERX

NOTE: IN ADDITION TO THE FOLLOWING INFECTION CONTROL MEASURES OF ICRA

CLASS & PERMIT LEVEL IV, THE CONTRACTOR SHALL REVIEW THE VA SAFETY-QUALITY

CONTROL-INFECTION CONTROL DOCUMENTS IN THE SPECIFICATIONS. THE AE WILL

PROVIDE A FORM FOR THE CONTRACTOR TO FILL OUT

DURING CONSTRUCTION:

A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

B. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC,

TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE

METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS.

C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS. PROVIDE NEGATIVE AIR PRESSURE

MONITOR.

D. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

E. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH

THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER

BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER

COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.

F. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT

IS INSPECTED BY A SAFETY OFFICER AND INFECTION CONTROL

COORDINATOR AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL

MANAGEMENT SERVICES.

UPON COMPLETION OF PROJECT:

A. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT

AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY

COVERED CONTAINERS.

C. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS

SOLID LID.

D. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

E. WET MOP AREA WITH DISINFECTANT.

F. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

Approved: Associate Director

Approved: Chief Facilities Management

Approved: Manager / Engineer

Approved: Director

Approved: Union representative

Approved: Safety Officer

A

EQ-X

CPT1

W-X

E

EA EACH

E EAST

EWC ELECTRIC WATER COOLER

ELEC ELECTRIC (AL)

EL ELEVATION

ELEV ELEVATOR

EMER EMERGENCY

ENGR ENGINEER

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

ETR EXISTING TO REMAIN

EXP EXPANSION

EXP BT EXPANSION BOLT

EJ EXPANSION JOINT

EXP EXPOSED

EXT EXTERIOR

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

F

FWC FABRIC WALL COVERING

FT FEET, FOOT

FGL FIBERGLASS

FIN FINISH

FIN GR FINISH GRADE

FDV FIRE DEPARTMENT VALVE

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FHC FIRE HOSE CABINET

FP FIREPROOF

FIXT FIXTURE

FLASH FLASHING

FLEX FLEXIBLE

FLR FLOOR

FD FLOOR DRAIN

FLUOR FLUORESCENT

FTG FOOTING

FDTN FOUNDATION

FRMG FRAMING

FURN FURNACE, FURNITURE

G

GA GAGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GL GLASS

GL BLK GLASS BLOCK

GB GRAB BAR

GR GRADE

GRAN GRANITE

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GUT GUTTER

GYP BD GYPSUM BOARD

H

HNDRL HANDRAIL

HDW HARDWARE

HDWD HARDWOOD

HD HEAD

HVAC HEATING, VENTILATING, AIR CONDITIONING

HT HEIGHT

HPT HIGH POINT

HC HOLLOW CORE

HM HOLLOW METAL

HORIZ HORIZONTAL

HB HOSE BIBB

HOSP HOSPITAL

HR HOUR

I

IN INCH

INFO INFORMATION

ID INSIDE DIAMETER

INSUL INSULATED,INSULATION

INT INTERIOR

J

JAN JANITOR

JT JOINT

K

KPL KICKPLATE

KIT KITCHEN

KB KNEE BRACE

L

LAB LABORATORY

LAM LAMINATE

LC LAUNDRY CHUTE

LV LAVATORY

LT LIGHT

LD LINEAR DIFFUSER

L CL LINEN CLOSET

LL LIVE LOAD

LLV LONG LEG VERTICAL

LPT LOW POINT

M

MACH MACHINE

MH MANHOLE

MFD MANUFACTURED

MFR MANUFACTURER

MRB MARBLE BASE

MRF MARBLE FLOOR

MKR BD MARKER BOARD

MO MASONRY OPENING

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MED MEDICAL

MC MEDICINE CABINET

MEMB MEMBRANE

MTL METAL

MIN MINIMUM, MINUTE

MISC MISCELLANEOUS

MOD MODIFIED

MLDG MOLDING

N

NAT FIN NATURAL FINISH

NOM NOMINAL

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NO NUMBER

O

OFF OFFICE

OC ON CENTER

OPNG OPENING

OPP OPPOSITE

OPH OPPOSITE HAND

ORCH ORCHESTRA

ORN ORNAMENTAL

OD OUTSIDE DIAMETER

OH OVERHANG, OVERHEAD

OF/CI OWNER FURNISHED/

CONTRACTOR INSTALLED

O OXYGEN

P

P PAINT

PR PAIR

PNL PANEL

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PERF PERFORATED

PC PIECE

PLAM PLASTIC LAMINATE

PLAS PLASTIC, PLASTER

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PCC PRECAST CONCRETE

PREFAB PREFABRICATE

PREFIN PREFINISH

PROD PRODUCTION

Q

QTY QUANTITY

QT QUARRY TILE

A

AFF ABOVE FINISHED FLOOR

ACST ACOUSTIC (AL)

ACT ACOUSTICAL CEILING TILE

APC ACOUSTICAL PANEL CEILING

AWP ACOUSTICAL WALL PANEL

AWT ACOUSTICAL WALL

ADJ ADJUSTABLE

A/C AIR CONDITIONING

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

AB ANCHOR BOLT

AL ANGLE

APPROX APPROXIMATE

ARCH ARCHITECT (URAL)

ASPH ASPHALT

ASSY ASSEMBLY

AUTO AUTOMATIC

AWN AWNING

B

BALC BALCONY

BSMT BASEMENT

BM BEAM, BENCHMARK

BR BEDROOM

BLKG BLOCKING

BD BOARD

BOT BOTTOM

BRKT BRACKET

BRK BRICK

B CL BROOM CLOSET

BLDG BUILDING

BLT IN BUILT-IN

BUR BUILT-UP ROOFING

C

CAB CABINET

CPT CARPET

CSMT CASEMENT

CI CAST IRON

CB CATCH BASIN

CLG CEILING

CEM CEMENT

CL CENTER LINE

CER CERAMIC

CT CERAMIC TILE

CO CLEANOUT, CASED OPENING

CLR CLEAR, COLOR

CLO CLOSET

COL COLUMN

CMPST COMPOSITE

CONC CONCRETE

CMU CONCRETE MASONRY UNIT

CONSTR CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

COTR CONTRACTING OFFICER

CJ CONTROL JOINT

COP COPING

CU COPPER

CG CORNER GUARD

CORR CORRIDOR

CNTR COUNTER

CSK COUNTER SUNK

D

DMPF DAMPPROOFING

DL DEAD LOAD

DEMO DEMOLITION

DET DETAIL

DIA DIAMETER

DIFF DIFFUSER

DIM DIMENSION

DR DOOR, DRAIN

DH DOUBLE HUNG

DN DOWN

DS DOWNSPOUT

DWR DRAWER

DWG DRAWING

DF DRINKING FOUNTAIN

DUPL DUPLICATE

R

R RADIUS, RISER

RWD REDWOOD

REF REFERENCE, REFRIGERATOR

REINF REINFORCE

REQD REQUIRED

RB RESILIENT BASE

RF RESILIENT FLOORING

RA RETURN AIR

REV REVISION

RD ROOF DRAIN

RM ROOM

RO ROUGH OPENING

RS ROUGH SAWN

S

SCHED SCHEDULE

SECT SECTION

SHTHG SHEATHING

SHT SHEET

SHV SHELVING

SIM SIMILAR

S SOUTH

SP FIN SPECIAL FINISH

SPEC SPECIFICATION

SQ SQUARE

SF SQUARE FEET

SST STAINLESS STEEL

STD STANDARD

STL STEEL

STL JST STEEL JOIST

STOR STORAGE

STRUCT STRUCTURAL

S4S SURFACED FOUR SIDES

SUSP SUSPEND

SW SWITCH

SYMM SYMMETRICAL

T

TK BD TACKBOARD

TEL TELEPHONE

TV TELEVISION

TMPD TEMPERED

TEMP TEMPORARY

TER TERRAZZO

THK THICKNESS

TPD TOILET PAPER DISPENSER

T&G TONGUE AND GROOVE

TOS TOP OF SLAB, STEEL

T TREAD

TYP TYPICAL

U

UC UNDERCUT

UNFIN UNFINISH

UNO UNLESS NOTED OTHERWISE

V

VAC VACUUM

VR VAPOR RETARDER

VNR VENEER

VP VENEER PLASTER

VIF VERIFY IN FIELD

VERT VERTICAL

VEST VESTIBULE

VCT VINYL COMPOSITION TILE

VWC VINYL WALL COVERING

W

W CAB WALL CABINETS

WC WALL COVERING, WATER CLOSET

WP WATERPROOFING, WEATHER

PROOF, WORKING POINT

WT WEIGHT

WWF WELDED WIRE FABRIC

W WEST

WF WIDE FLANGE

WDW WINDOW

W/ WITH

W/O WITHOUT

WD WOOD

WDP WOOD PANELING

500 N. State Hwy. 89

Department of Veterans Affairs

KEYED NOTE

WALL TYPE

X

WINDOW TYPE

GLASS TYPE1

X WINDOW TREATMENT TYPE

EQUIPMENT

INTERIOR FINISH TYPE

FURNITURE, FIXTURE, EQUIPMENT

CONTRACT LIMIT LINE

COLUMN CENTER LINE

NEW WALL

DEMOLITION

EXISTING WALL

NORTH

NAVAHCS

APPROVED FOR CONSTRUCTION

Project No: 649-22-136

Contract No: 36C25819D0035

Prescott, Arizona 86313

DESIGN TEAM

ABBREVIATIONS OWNER

CODE REFERENCES

BUILDING CODE:

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL ENERGY CODE

2018 INTERNATIONAL FIRE CODE

ACCESSIBILITY CODE & GUIDELINES:

ABAAS & BFDG

MECHANICAL CODE:

2018 INTERNATIONAL MECHANICAL CODE

PLUMBING CODE:

2018 INTERNATIONAL PLUMBING CODE

ELECTRICAL CODE:

2017 NATIONAL ELECTRIC CODE

PROJECT DESCRIPTION

FACILITY MAP

SYMBOL LEGEND

BUILDING INFORMATION

BUILDING 162 & 164 IS A FULLY SPRINKLED 2 STORY BUILDINGS WITH

MIXED USE OCCUPANCIES.

NO LIFE SAFETY WILL BE AFFECTED BY THIS PROJECT OR THE

CONSTRUCTION OPERATION

GENERAL NOTES

VICINITY MAP

INFECTION CONTROL MEASURES

THIS SCOPE OF WORK SHALL BE A TENANT IMPROVEMENT AT THE NORTHERN

ARIZONA VA HEALTHCARE SYSTEM IN PRESCOTT, AZ. THE SCOPE OF WORK IS

LOCATED IN BUILDING 162 / 164. THIS PROJECT IS A TENANT IMPROVEMENT TO

INSTALL (2) ELEVATORS IN EXISTING SHAFTS, MODIFY THE COMPOUNDING ROOMS

TO MEET USP800 AND USP797, PROVIDE A DESIGN FOR THE BREAK ROOM 007, AND

ADD OFFICE, CHASHE, AND STORAGE SPACE FOR PHARMACY.

THIS WORK SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL, STRUCTURAL,

MECHANICAL, PLUMBING, & ELECTRICAL.

DESCRIPTIONSYMBOL

500 N. State Hwy. 89, Prescott, Arizona 86313

(NAVAHCS) Northern Arizona VA Health Care System Department of Veterans Affairs

Architect

MPE Engineers

1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282

AESUS Design Group

1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282

AESUS Design Group

Orlando Gonzales (ogonzales@aesusdesign.com)

480-454-2861

David Combs (dcombs@aesusdesign.com)

480-454-2861

Structural Engineers

6868 N 7th Ave, Suite 203

Phoenix, Arizona 85013

Pangolin Structural

Pam Singleton (psingleton@pangolinstr.com)

602-888-0336

NORTH

PROJECT AREA

BUILDING OCCUPANCY: EXISTING MIXED USE

CONSTRUCTION TYPE: IIB - NONCOMBUSTIBLE MATERIALS

FIRE RESISTANCE IN ACCORDANCE WITH IBC TABLES 601 & 602

FULLY SPRINKLERED

BUILDING AREA: EXISTING

BUILDING HEIGHT: EXISTING

PROJECT SITE

NFPA

NFPA 101 LIFE SAFETY CODE

NFPA NATIONAL FIRE CODES

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF

MECHANICAL ENGINEERS (ASME) A 17.1.

2018 INTERNATIONAL FUEL GAS CODE

VA DIRECTORIES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION

GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION

LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/)

PO No: 649-C10395

VHA PROGRAM GUIDE PG-18-3

Local Codes: As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc.). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notified about planned projects and given opportunity to review drawings provided that VA does not pay for review or inspection fees.

NOTES:

1. NFPA 101 primarily addresses life safety and fire protection features while the IBC addresses a wide range of considerations, including, but not limited to, structural strength, seismic stability, sanitation, adequate light and ventilation, and energy conservation. VA buildings must meet the requirements of NFPA 101 and documents referenced by NFPA 101 in order to comply with the accreditation requirements of The Joint Commission.

Therefore, designs shall comply with the requirements of the latest edition of NFPA 101 and documents referenced therein. Design features not addressed by NFPA 101 or documents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise addressed above in this Program Guide. For design features that are addressed by both the IBC as well as NFPA 101 or a document referenced by NFPA 101, the requirements of NFPA 101 or the document referenced by NFPA 101 shall be used exclusively (this applies even if the IBC requirements are different).

2. Conflicts between Nationally Recognized Codes and Standards and VA Requirements - Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure a consistency system wide.

1. NOTE, NOT ALL KEYNOTES ARE ON ALL SHEETS.

2. PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE

CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEM" TO

LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.

3. ALL PENETRATIONS ARE TO BE SEALED TO MATCH EXISTING

CONSTRUCTION AND RATING REQUIREMENTS.

4. PLEASE SEE MECHANICAL DRAWINGS FOR EXACT LOCATION AND TYPE OF

SEAL REQUIRED.

5. PROTECT ALL FURNISHINGS AND EQUIPMENT DURING CONSTRUCTION

FROM DAMAGE AND CONSTRUCTION DEBRIS.

6. COMPROMISES IN FIRE RATED BARRIERS SHALL BE CORRECTED/REPAIRED

ON THE SAME DAY OF COMPROMISE. NO EXCEPTIONS.

7. THE CONTRACTOR SHALL NOT LEAVE ANY PAINTS, CAULKS, AND/OR GLUES

ON SITE.

8. ALL SMOKE OR FIRE DAMPERS TO BE CERTIFIED BEFORE VA SIGN OFF.

9. THE CONTRACTOR SHALL COORDINATE ALL SHUT DOWNS 4 WEEKS IN

ADVANCE WITH COR.

10. CONTRACTOR TO REFER TO THE VA COR AND ASBESTOS REMEDIATION

STUDY FOR ACTIONS CONCERNING THE POSSIBLE PRESENCE OF

ASBESTOS.

SHEET INDEX

NUMBER SHEET NAME

[08] ELEC

E-001 ELECTRICAL GENERAL INFORMATION

E-100 ELECTRICAL LEVEL 00 PLAN

E-101 ELECTRICAL LEVEL 01 PLAN

E-102 ELECTRICAL LEVEL 02 PLAN

E-103 ELECTRICAL ROOF PLAN

E-201 ELECTRICAL LEVEL 01 ENLARGED PLANS

E-202 ELECTRICAL LEVEL 02 ENLARGED PLANS

E-301 ELECTRICAL DETAILS

E-401 ELECTRICAL ONE-LINE

E-501 ELECTRICAL SCHEDULES

SHEET INDEX

NUMBER SHEET NAME

[00] GENERAL

G-001 COVER SHEET

G-010 LEVEL 00 & 01 SCOPE OF WORK

G-011 LEVEL 02 SCOPE OF WORK

[01] DEMO

AD-101 DEMO PLAN

AD-102 DEMO PLAN

[02] ARCHITECTURAL

A-200 FLOOR PLANS

A-201 FLOOR PLANS

A-202 FLOOR PLANS

A-203 BLDG 162 ELEVATOR PLANS

A-204 BLDG 164 ELEVATOR PLANS

A-205 ELEVATIONS

A-301 REFLECTED CEILING PLANS

A-501 PARTITION TYPES & HEAD DETAILS

A-502 PARTITION FRAMING DETAILS

A-503 GYP BD DETAILS

A-504 METAL FABRICATIONS

A-505 LAVATORY, ACCESSORIES, WALL PROT, EQUIP

A-506 DOOR, SAFETY GLAZING AND LOUVER INFORMATION

A-507 FINISHES & FLOORING TRANSITIONS

A-510 CABINET DETAILS

A-511 DETAILS

[03] CIVIL

C-101 EXISTING SITE PLAN W/ UTILITIES

C-102 PROPOSED SITE PLAN W/ UTILITIES

C-103 DEMO PLAN

[04] STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES

S-203 BLDG 162 ELEVATOR PLANS

S-204 BLDG 164 ELEVATOR PLANS

S-301 FRAMING DETAILS 101-120

[05] MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION

MD-201 MECHANICAL LEVEL 01 DEMOLITION PLAN

M-201 MECHANICAL LEVEL 01 PLAN - HVAC - B164

M-202 MECHANICAL LEVEL 02 PLAN - B164

M-203 MECHANICAL PLAN - B162

M-204 MECHANICAL ROOF PLAN

M-301 MECHANICAL LEVEL 01 PLAN - PIPING

M-501 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-801 MECHANICAL CONTROLS

[06] PLUMBING

P-001 PLUMBING GENERAL INFORMATION

P-101 PLUMBING LEVEL 01 PLAN - WASTE

P-201 PLUMBING LEVEL 01 PLAN - WATER

P-202 PLUMBING LEVEL 02 PLAN

F-301 FIRE PLAN - SPRINKLER

CONSTRUCTION

LAY DOWN AREA

6.3 .2

Exp: 9.30.2023

B

B.3

B

B.3

G

G.3

A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY

ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING

REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF

REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.

B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR

COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE

PROTECTED FROM ELEMENTS - COORDINATE WITH COR.

C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2011-36

SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA

DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .

D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE

TO ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL

FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION

AND OUTAGE REQUIREMENTS.

E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING

CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO

CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING

ANY DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO

IMMEDIATE ATTENTION OF CONTRACTING OFFICER

REPRESENTATIVE.

F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL

MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION

SPECIFICATIONS, WHICH CAN BE FOUND AT

HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND

THE MORE STRINGENT SHALL APPLY.

GENERAL NOTES

A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND

MATERIAL TRAFFIC AND STORAGE WITH COR.

B. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,

PLUMBING ELECTRICAL, AND FIRE PROTECTION.

C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION

PHASING SHALL BE APPROVED BY COR.

D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST

REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT

ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM

CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.

E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND

ROOF REPAIRS WITH THE COR.

GENERAL PHASING NOTES

A. THE CONTRACTOR SHALL USE THE FOLLOWING AS A GUIDE FOR ALL

ICRA BARRIERS. TEMPORARY INFECTION CONTROL BARRIERS

SHALL BE CONSTRUCTED AS FOLLOWS DEPENDING UPON LENGTH

OF NEED:

A. 1 DAY MAXIMUM - PLASTIC

B. 1 WEEK MAXIMUM - FLAME-RETARDANT PLASTIC

C. GREATER THAN 1 WEEK - SEE NOTE B AND C.

B. TEMPORARY CONSTRUCTION BARRIERS SHALL BE 3 5/8" METAL

STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH SIDE. BARRIERS

ARE TO EXTEND TO THE BOTTOM OF EXISTING CEILINGS. PROVIDE

NON-DAMAGING SEAL AT INTERSECTION WITH CEILING. PROVIDE

PLASTIC SHEET BARRIER SEAL BETWEEN TOP OF WALL AND

STRUCTURE ABOVE. TAPE ALL SEAMS AND PENETRATION

OPENINGS TO PREVENT CONTAMINATION FROM PASSING OVER THE

TOP OR UNDERNEATH THE WALL FROM CONSTRUCTION AREAS.

C. TEMPORARY CONSTRUCTION BARRIERS SHALL BE EITHER TYPE I

OR TYPE II. TYPE I BARRIERS SHALL BE ANCHORED TO THE

FLOORING SURFACE (WHICH IS INTENDED TO BE REPLACED) WITH

POWER ACTUATED FASTENERS. TYPE II BARRIERS SHALL BE

ANCHORED TO THE FLOORING SURFACE (WHICH IS INTENDED TO

REMAIN) BY TAPING BOTTOM STUD TRACK TO FLOOR SURFACE OR

BY OTHER METHODS WHICH WILL NOT HARM FLOOR SURFACE.

D. TEMPORARY PARTITIONS SHALL NOT CONSTRICT WALKWAYS TO

LESS THAN 42" CLEAR. ANY EXITS CHANGED OR BLOCKED SIGNAGE

NEEDS TO BE POSTED FOR THE MODIFICATIONS.

E. PROVIDE TEMPORARY RATED DOOR AND FRAME IN CONSTRUCTION

BARRIER AT ENTRY POINTS TO THE CONSTRUCTION AREAS.

DOORS ARE TO REMAIN LOCKED AT ALL TIMES. CONSTRUCTION

CORES WILL BE PROVIDED BY THE VA.

TEMPORARY CONSTRUCTION

FLOOR PLAN LEGEND

INCLUDED IN SCOPE OF WORK

A-201

A-200

ELEVATOR

MACHINE ROOM

164 -008

BREAK ROOM

164 - 007

NEW OFFICE SPACE

SERVICE ELEVATOR

C1 -101

ELEVATOR EQUIPMENT

1E -105

H.9 J J.4H.3HG.3G

KFD

E.3

0.5

0.1

002 ? 004

S-1

E-001

A

4 3 2 1

B

D

E

A.7

B.3

3.5

C

SEISMIC JOINT

1E-130

1E-126

1E-131 1E-127

1E-129B

106-00002 1E-129A

C1-104

1E-1321E-1241E-129

1E-123 1E-136

1E-1361E-128B

1E-121A

1E-101

1E-102 1E-101A

C1-103

1E-131B

1E-103 1E-104B-003

1E-106J

1E-120

1E-114

1E-120A

1E-1151E-119

1E-111A 1E-117

1E-105 1E-111

C1-102 1E-134

1E-133

1E-135

1E-131A

1E-1101E-1071E-1091E-106F

1E-106H 1E-112

1E-106B1E-106A

1E-106C

1E-106D

1E-106E

S-7

RECEIVING / BREAKOUT &

PHARMACY STORAGE

PHARMACY CACHE

CLC

A

4 3 2 1

B

D

A.7

B.3

3.5

C

CORRIDOR

B001

SERVICE

ELEVATOR

EXISTING PIPE BASEMENT

A-200

SERVICE ELEVATOR

CRAWLSPACE

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

KEY PLAN NTS NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Install Elevators and Complete Space Build-out for B162 and B164

Location:

Final - Bid Set

June 3, 2022 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

649-22-136

Northern Arizona VA Health Care System

500 AZ-89, Prescott, AZ 86301

AESUS

B162 and B164

G-010

LEVEL 00 & 01 SCOPE OF WORK

SCALE: 1/16" = 1'-0"

LEVEL 01 SCOPE OF WORK

SCALE: 1/16" = 1'-0"

B162-PIPE LEVEL - SCOPE OF WORK

G

G.3

A-202

A-200

PHARMACY

164 -124

SERVICE ELEVATOR

C2-001

ELEVATOR

H.9 J J.4H.3HG.3G

KFD

E.3

0.5

0.1

164-124B

-1

-1

164-010

-1

A

S-2

118117

113 112

137 138

133134135

110139111

A

4 3 2 1

B

D

E

A.7

B.3

3.5

C

4.5 0.40.30.2

C2-105

C2-106

2E-222B

2E-222A

2E-220

2E-221

2E-224

2E-225

2E-227

2E-240

B-003

2E-121A 2E-1202E-121B2E-123 2E-119

2E-117

2E-115

2E-113

2E-111 2E-109

2E-110 2E-108 2E-103

2E-102 2E-101 2E-241

2E-242

C2-104

2E-230A

2E-230

2E-230C 106-00003

2E-230B2E-228

2E-229A

2E-229

2E-226 2E-221

2E-1182E-1052E-116

2E-114

2E-112 2E-104

2E-106

2E-107

C2-001

C2-100

S - 6

/ A

-2

A-202

5 / A-205

A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY

ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING

REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF

REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.

B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR

COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE

PROTECTED FROM ELEMENTS - COORDINATE WITH COR.

C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2011-36

SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA

DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .

D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE

TO ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL

FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION

AND OUTAGE REQUIREMENTS.

E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING

CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO

CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING

ANY DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO

IMMEDIATE ATTENTION OF CONTRACTING OFFICER

REPRESENTATIVE.

F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL

MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION

SPECIFICATIONS, WHICH CAN BE FOUND AT

HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND

THE MORE STRINGENT SHALL APPLY.

GENERAL NOTES

A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND

MATERIAL TRAFFIC AND STORAGE WITH COR.

B. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,

PLUMBING ELECTRICAL, AND FIRE PROTECTION.

C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION

PHASING SHALL BE APPROVED BY COR.

D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST

REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT

ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM

CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.

E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND

ROOF REPAIRS WITH THE COR.

GENERAL PHASING NOTES

A. THE CONTRACTOR SHALL USE THE FOLLOWING AS A GUIDE FOR ALL

ICRA BARRIERS. TEMPORARY INFECTION CONTROL BARRIERS

SHALL BE CONSTRUCTED AS FOLLOWS DEPENDING UPON LENGTH

OF NEED:

A. 1 DAY MAXIMUM - PLASTIC

B. 1 WEEK MAXIMUM - FLAME-RETARDANT PLASTIC

C. GREATER THAN 1 WEEK - SEE NOTE B AND C.

B. TEMPORARY CONSTRUCTION BARRIERS SHALL BE 3 5/8" METAL

STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH SIDE. BARRIERS

ARE TO EXTEND TO THE BOTTOM OF EXISTING CEILINGS. PROVIDE

NON-DAMAGING SEAL AT INTERSECTION WITH CEILING. PROVIDE

PLASTIC SHEET BARRIER SEAL BETWEEN TOP OF WALL AND

STRUCTURE ABOVE. TAPE ALL SEAMS AND PENETRATION

OPENINGS TO PREVENT CONTAMINATION FROM PASSING OVER THE

TOP OR UNDERNEATH THE WALL FROM CONSTRUCTION AREAS.

C. TEMPORARY CONSTRUCTION BARRIERS SHALL BE EITHER TYPE I

OR TYPE II. TYPE I BARRIERS SHALL BE ANCHORED TO THE

FLOORING SURFACE (WHICH IS INTENDED TO BE REPLACED) WITH

POWER ACTUATED FASTENERS. TYPE II BARRIERS SHALL BE

ANCHORED TO THE FLOORING SURFACE (WHICH IS INTENDED TO

REMAIN) BY TAPING BOTTOM STUD TRACK TO FLOOR SURFACE OR

BY OTHER METHODS WHICH WILL NOT HARM FLOOR SURFACE.

D. TEMPORARY PARTITIONS SHALL NOT CONSTRICT WALKWAYS TO

LESS THAN 42" CLEAR. ANY EXITS CHANGED OR BLOCKED SIGNAGE

NEEDS TO BE POSTED FOR THE MODIFICATIONS.

E. PROVIDE TEMPORARY RATED DOOR AND FRAME IN CONSTRUCTION

BARRIER AT ENTRY POINTS TO THE CONSTRUCTION AREAS.

DOORS ARE TO REMAIN LOCKED AT ALL TIMES. CONSTRUCTION

CORES WILL BE PROVIDED BY THE VA.

TEMPORARY CONSTRUCTION

FLOOR PLAN LEGEND

INCLUDED IN SCOPE OF WORK

CLC

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

KEY PLAN NTS NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Install Elevators and Complete Space Build-out for B162 and B164

Location:

Final - Bid Set

June 3, 2022 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

649-22-136

Northern Arizona VA Health Care System

500 AZ-89, Prescott, AZ 86301

AESUS

B162 and B164

G-011

LEVEL 02 SCOPE OF WORK

SCALE: 1/16" = 1'-0"

LEVEL 02 SCOPE OF WORK

H.9 J J.4

K

6 CHEMO

CHEMO AIR LOCK

AIR LOCK

STERILE PREP

CLOSET

PRIVATE

CONSULTATION

CHEMO

CHEMO AIR LOCK

AIR LOCK

STERILE PREP

CLOSET

H.9 J J.4

K

/ A

-2

3' -4

1'

-0

10'-6"2'-4 1/2"

DEMOLITION SYMBOLS

ITEMS SHOWN DASHED ARE TO BE REMOVED.

ITEMS SHOWN SCREENED ARE TO REMAIN.

ITEMS SHOWN SOLID ARE NEW CONSTRUCTION.

DEMOLITION KEYNOTE

EXTENTS OF DEMOLITION

CONSTRUCTION BARRIER

SPRINKLER

XX

DEMOLITION GENERAL NOTES

REFER TO SHEET G-001 FOR ARCH DWG REFERENCE AND

MATERIAL SYMBOLS AS WELL AS ABBREVIATIONS USED ON

THIS SET OF DRAWINGS.

AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH

MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE

HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR

TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO

SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN

PROCEDURES.

DEMOLITION OPERATIONS ARE TO PROCEED WITH NECESSARY

PREPARATIONS AND PRECAUTIONS TAKEN TO PROTECT ITEMS

AND FINISHES TO REMAIN. THE CONTRACTOR SHALL

COORDINATE DEMOLITION OPERATIONS WITH THE VA AND

EACH SPECIFIC DEPARTMENTS PRIOR TO ANY DEMO WORK.

REMOVE AND DISPOSE ALL DEMOLISHED MATERIALS OFF SITE

WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED, OR

BECOME THE PROPERTY OF THE OWNER.

PIPES NO LONGER IN USE WITHIN DEMOLITION AREA ARE TO

BE REMOVED BACK TO SOURCE

DO NOT PENETRATE THE FLOOR SLAB WITHOUT COORDINATING

WITH STRUCTURAL REQUIREMENTS.

UNLESS SPECIFICALLY NOTED OTHERWISE, EXISTING FLOOR

AND CEILING MATERIALS SHALL REMAIN IN PLACE. PROTECT

FLOORS AND CEILINGS FROM DAMAGE DURING DEMOLITION

AND RENOVATION WORK.

EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD

DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR

SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE

VA OF ANY DISCREPANCIES.

DEMO WORK SHALL BE DONE IN A MANNER WHICH WILL NOT

CAUSE UNNECESSARY INCONVENIENCE OR DANGER TO USERS

OF THE PREMISES AND ADJACENT AREAS AND NOT INTERFERE

WITH ITS OPERATION. ANY DEMO WORK TO BE PERFORMED

MUST BE PLANNED IN ADVANCE AND APPROVED BY THE COR.

ANY EQUIPMENT, MATERIALS AND SUPPLIES TEMPORARILY

REMOVED FOR THE PURPOSE OF PROTECTION SHALL BE

REPLACED IN ORIGINAL LOCATIONS AND CONDITIONS. ANY

MATERIAL DAMAGED SHALL BE REPLACED WITH NEW

MATERIALS OF LIKE AND QUALITY.

REFER TO AND COORDINATE WITH MECHANICAL AND

ELECTRICAL DWGS. FOR ADDITIONAL DEMOLITION

INFORMATION.

ALL MATERIALS INDICATED TO BE REMOVED SHALL BE

DISPOSED OF AND REMOVED FROM THE SITE. COORDINATE

WITH THE COR, THE REMOVAL AND FINAL DISPOSAL

LOCATION/DESTINATION(S) OF DEMOLITION. THE GC SHALL

PROVIDE MONTHLY NEMA TRACKING REPORTS.

ALL REMOVED MATERIALS AND EQUIPMENT WHICH ARE

SALVAGEABLE SHALL REMAIN THE PROPERTY OF THE OWNER.

DELIVER SUCH SALVAGED MATERIALS AND EQUIPMENT ON THE

PREMISES AS DIRECTED BY THE COR AND NEATLY STORE

THEM AND PROTECT FROM DAMAGE. ALL OTHER MATERIAL AND

EQUIPMENT SHALL BE REMOVED FROM THE PROJECT SITE AT

THE CONTRACTOR'S EXPENSE. OWNER WILL IDENTIFY

LOCATION TO PUT SALVAGED MATERIAL AT CONTRACTOR KICK

OFF MEETING.

PATCH/REPAIR ALL ELEMENTS THAT ARE TO REMAIN AND ARE

DAMAGED FROM THE DEMO WORK, BACK WITH CONSTRUCTION

TO MATCH EXISTING CONDITIONS.

IN WALLS TO BE REMOVED, STRIP ALL EXISTING ELECTRICAL

WIRING TO NEAREST ACTIVE J-BOX & CONDUIT.

INTERIM LIFE SAFETY MEASURES APPLY. COORDINATE

WITH HOSPITAL'S SAFETY OFFICER AND COR.

MATERIALS AND EQUIPMENT ACCRUING FROM WORK REMOVED

AND FROM DEMOLITION OF BUILDING OR STRUCTURES, OR

PARTS THEREOF, SHALL BE DISPOSED PER SPECIFICATION SECTION 01 74 19

REMOVE ALL EXISTING ABANDONED CONDUITS, WIRES, AND

PIPES ASSOCIATED WITH THIS CONTRACT.

DIMENSIONS ON DEMO PLANS TO BE VERIFIED WITH

CONDITIONS ON SITE BY G.C.

AT EXISTING CEILINGS TO REMAIN, REMOVE AND SALVAGE

TILES AS REQUIRED FOR MECHANICAL, ELECTRICAL, AND

PLUMBING WORK ABOVE.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY

SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE GOVERNMENT TO

REMOVE PERSONAL BELONGINGS AND DESIGNATE ALL MEDICAL

EQUIPMENT, FURNITURE, AND OTHER ITEMS TO BE SALVAGED AND

STORED BY THE CONTRACTOR. ALL ITEMS NOT DESIGNATED AS

"SALVAGED" BY THE GOVERNMENT AFTER THIS TIME SHALL BE DISPOSED

OF BY THE CONTRACTOR. REFER TO SPECIFICATION FOR NOTIFICATION

REQUIREMENTS.

R. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS

TO VA FOR REVIEW AND APPROVAL PRIOR TO THE

INSTALLATION.

S. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED

AREAS AS REQUIRED AND/OR AS DIRECTED BY VA AT NO

ADDITIONAL COST TO VA.

T. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS

PER THE IBC AND VA GUIDELINES. ALL EGRESS PATHS

SHALL REMAIN CLEAR AT ALL TIMES.

U. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL

MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING

WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS

SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.

PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE

TO THE PUBLIC.

V. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL

COLUMNS AND CHASES PRIOR TO DEMOLITION

W. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT

COMPLETION OF EACH PHASE AND EACH PROJECT'S

CONSTRUCTION WORK, U.O.N.

CLC

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

KEY PLAN NTS NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Install Elevators and Complete Space Build-out for B162 and B164

Location:

Final - Bid Set

June 3, 2022 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

649-22-136

Northern Arizona VA Health Care System

500 AZ-89, Prescott, AZ 86301

AESUS

B162 and B164

AD-101

DEMO PLAN

SCALE: 1/4" = 1'-0"

B164-LEVEL 02 DEMO RCP

2 SCALE: 1/4" = 1'-0"

B164-LEVEL 2 DEMO

DEMO PLAN KEYNOTES

1 DEMOLISH EXISTING WALL AND BASE.

2 DEMOLISH EXISTING DOOR AND FRAME.

3 DEMOLISH EXISTING FLOOR FINISH AND BASE, TYPICAL.

4 CUT, REMOVE, AND PREP WALL FOR NEW DOOR.

5 DEMOLISH EXISTING CEILING, SEE NEW WORK PLANS FOR ADDITIONAL INFO.

6 REMOVE EXISTING LIGHT FIXTURES AND HVAC GRILLES, TYPICAL.

7 EXISIGN SPRINKLER TO BE RELOCATED

8 EXISTING SPRINKLER TO REMAIN

9 EXISTING CEILING TO REMAIN, TYP.

10 REMOVE AND RELOCATE LOW VOLTAGE EQUIPMENT AS NECESSARY

CLC

HG.3G

F

0.5

STAIR

S-1

MACHINE

ROOM

008ELEVATOR

E-001

CORRIDOR

LAB STORAGE

DELIVERY

BREAK ROOM

3' -7

6'

-5

6' -2

7'

-1

8 8 8

PHARMACY

STORAGE

OFFICE

IT CLOSET

WOMEN'S

TOILET

HAC

BREAK ROOM

CORRIDOR

MEN'S TOILET

H

G.3G

F

0.5

STAIR

S-1

MACHINE

ROOM

ELEVATOR

E-001

CORRIDOR

LAB STORAGE

TYP.

TYP.

6 7

TYP.

OFFICE

OPEN TO

STRUCTURE

6' -6

/4

3'

-0

OPEN TO

STRUCTURE

BREAK ROOM

HAC

CORRIDOR

WOMEN'S

TOILET

DEMOLITION SYMBOLS

ITEMS SHOWN DASHED ARE TO BE REMOVED.

ITEMS SHOWN SCREENED ARE TO REMAIN.

ITEMS SHOWN SOLID ARE NEW CONSTRUCTION.

DEMOLITION KEYNOTE

EXTENTS OF DEMOLITION

CONSTRUCTION BARRIER

SPRINKLER

XX

DEMOLITION GENERAL NOTES

REFER TO SHEET G-001 FOR ARCH DWG REFERENCE AND

MATERIAL SYMBOLS AS WELL AS ABBREVIATIONS USED ON

THIS SET OF DRAWINGS.

AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH

MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE

HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR

TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO

SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN

PROCEDURES.

DEMOLITION OPERATIONS ARE TO PROCEED WITH NECESSARY

PREPARATIONS AND PRECAUTIONS TAKEN TO PROTECT ITEMS

AND FINISHES TO REMAIN. THE CONTRACTOR SHALL

COORDINATE DEMOLITION OPERATIONS WITH THE VA AND

EACH SPECIFIC DEPARTMENTS PRIOR TO ANY DEMO WORK.

REMOVE AND DISPOSE ALL DEMOLISHED MATERIALS OFF SITE

WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED, OR

BECOME THE PROPERTY OF THE OWNER.

PIPES NO LONGER IN USE WITHIN DEMOLITION AREA ARE TO

BE REMOVED BACK TO SOURCE

DO NOT PENETRATE THE FLOOR SLAB WITHOUT COORDINATING

WITH STRUCTURAL REQUIREMENTS.

UNLESS SPECIFICALLY NOTED OTHERWISE, EXISTING FLOOR

AND CEILING MATERIALS SHALL REMAIN IN PLACE. PROTECT

FLOORS AND CEILINGS FROM DAMAGE DURING DEMOLITION

AND RENOVATION WORK.

EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD

DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR

SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE

VA OF ANY DISCREPANCIES.

DEMO WORK SHALL BE DONE IN A MANNER WHICH WILL NOT

CAUSE UNNECESSARY INCONVENIENCE OR DANGER TO USERS

OF THE PREMISES AND ADJACENT AREAS AND NOT INTERFERE

WITH ITS OPERATION. ANY DEMO WORK TO BE PERFORMED

MUST BE PLANNED IN ADVANCE AND APPROVED BY THE COR.

ANY EQUIPMENT, MATERIALS AND SUPPLIES TEMPORARILY

REMOVED FOR THE PURPOSE OF PROTECTION SHALL BE

REPLACED IN ORIGINAL LOCATIONS AND CONDITIONS. ANY

MATERIAL DAMAGED SHALL BE REPLACED WITH NEW

MATERIALS OF LIKE AND QUALITY.

REFER TO AND COORDINATE WITH MECHANICAL AND

ELECTRICAL DWGS. FOR ADDITIONAL DEMOLITION

INFORMATION.

ALL MATERIALS INDICATED TO BE REMOVED SHALL BE

DISPOSED OF AND REMOVED FROM THE SITE. COORDINATE

WITH THE COR, THE REMOVAL AND FINAL DISPOSAL

LOCATION/DESTINATION(S) OF DEMOLITION. THE GC SHALL

PROVIDE MONTHLY NEMA TRACKING REPORTS.

ALL REMOVED MATERIALS AND EQUIPMENT WHICH ARE

SALVAGEABLE SHALL REMAIN THE PROPERTY OF THE OWNER.

DELIVER SUCH SALVAGED MATERIALS AND EQUIPMENT ON THE

PREMISES AS DIRECTED BY THE COR AND NEATLY STORE

THEM AND PROTECT FROM DAMAGE. ALL OTHER MATERIAL AND

EQUIPMENT SHALL BE REMOVED FROM THE PROJECT SITE AT

THE CONTRACTOR'S EXPENSE. OWNER WILL IDENTIFY

LOCATION TO PUT SALVAGED MATERIAL AT CONTRACTOR KICK

OFF MEETING.

PATCH/REPAIR ALL ELEMENTS THAT ARE TO REMAIN AND ARE

DAMAGED FROM THE DEMO WORK, BACK WITH CONSTRUCTION

TO MATCH EXISTING CONDITIONS.

IN WALLS TO BE REMOVED, STRIP ALL EXISTING ELECTRICAL

WIRING TO NEAREST ACTIVE J-BOX & CONDUIT.

INTERIM LIFE SAFETY MEASURES APPLY. COORDINATE

WITH HOSPITAL'S SAFETY OFFICER AND COR.

MATERIALS AND EQUIPMENT ACCRUING FROM WORK REMOVED

AND FROM DEMOLITION OF BUILDING OR STRUCTURES, OR

PARTS THEREOF, SHALL BE DISPOSED PER SPECIFICATION SECTION 01 74 19

REMOVE ALL EXISTING ABANDONED CONDUITS, WIRES, AND

PIPES ASSOCIATED WITH THIS CONTRACT.

DIMENSIONS ON DEMO PLANS TO BE VERIFIED WITH

CONDITIONS ON SITE BY G.C.

AT EXISTING CEILINGS TO REMAIN, REMOVE AND SALVAGE

TILES AS REQUIRED FOR MECHANICAL, ELECTRICAL, AND

PLUMBING WORK ABOVE.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

T.

U.

THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY

SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE GOVERNMENT TO

REMOVE PERSONAL BELONGINGS AND DESIGNATE ALL MEDICAL

EQUIPMENT, FURNITURE, AND OTHER ITEMS TO BE SALVAGED AND

STORED BY THE CONTRACTOR. ALL ITEMS NOT DESIGNATED AS

"SALVAGED" BY THE GOVERNMENT AFTER THIS TIME SHALL BE DISPOSED

OF BY THE CONTRACTOR. REFER TO SPECIFICATION FOR NOTIFICATION

REQUIREMENTS.

R. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS

TO VA FOR REVIEW AND APPROVAL PRIOR TO THE

INSTALLATION.

S. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED

AREAS AS REQUIRED AND/OR AS DIRECTED BY VA AT NO

ADDITIONAL COST TO VA.

T. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS

PER THE IBC AND VA GUIDELINES. ALL EGRESS PATHS

SHALL REMAIN CLEAR AT ALL TIMES.

U. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL

MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING

WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS

SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.

PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE

TO THE PUBLIC.

V. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL

COLUMNS AND CHASES PRIOR TO DEMOLITION

W. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT

COMPLETION OF EACH PHASE AND EACH PROJECT'S

CONSTRUCTION WORK, U.O.N.

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

KEY PLAN NTS NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Install Elevators and Complete Space Build-out for B162 and B164

Location:

Final - Bid Set

June 3, 2022 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

649-22-136

Northern Arizona VA Health Care System

500 AZ-89, Prescott, AZ 86301

AESUS

B162 and B164

AD-102

DEMO PLAN

SCALE: 3/16" = 1'-0"

B164-LEVEL 01 Demo

1SCALE: 3/16" = 1'-0"

B164-LEVEL 01 DEMO RCP

DEMO PLAN KEYNOTES

1 EXISTING CEILING TO REMAIN, TYP.

2 PREP SHAFT WALL FOR NEW ELEVATOR DOOR, SEE DETAILS ON SHEET A-511.

3 EXISTING DOOR, TYPICAL.

4 CUT, REMOVE, AND PREP WALL FOR NEW DOOR.

5 EXISTING SPRINKLER TO REMAIN

6 DEMOLISH EXISTING CEILING, SEE NEW WORK PLANS FOR ADDITIONAL INFO.

7 REMOVE EXISTING LIGHT FIXTURES AND HVAC GRILLES, TYPICAL.

8 SAWCUT CUT, REMOVE, AND PREP CONCRETE WALL FOR NEW OPENING.

9 REMOVE EXISTING CONCRETE AND ASPHALT PAVING AS REQ'D FOR NEW OPENING.

PREP SUBGRADE TO ALLOW POSITVE SLOPE AWAY FROM BUILDING.

10 EXISTING SOFFIT TO REMAIN, PATCH, REPAIR, & FINISH

11 DEMOLISH EXISTING FLOOR FINISH AND BASE, TYPICAL.

12 REMOVE AND RELOCATE EXISTING FIRE ALARM ANNUNCIATOR. PATCH, REPAIR,

AND PAINT DRYWALL AS REQ'D.

A

4 3 2 1

B

D

A.7

B.3

3.5

C

CORRIDOR

B001

A-203

SERVICE

ELEVATOR

EXISTING PIPE BASEMENT

8'-6" 9'-3 1/2"

8' -6

4'

-3

A-504

A

4 3 2

B

A.7

B.3

3.5

C

TELECOMM

1E-134

ELECTRICAL

1E-133

FIRE RISER

1E-135

LOBBY

C1-102

CORRIDOR

C1-103

SERVICE

ELEVATOR

C1-101

SPEC. TREAT

1E-110

PT OFFICE

1E-111

ELEVATOR

EQUIPMENT

1E-105

FEC

A-203

-0

A

4 3 2

B

A.7

B.3

3.5

C

TELECOMM

2E-241

ELECTRICAL

2E-242

STERILIZATION

EQUIPMENT

2E-230A

CORRIDOR

C2-107

SERVICE

ELEVATOR

C2-001

EXAM ROOM

2E-107

CORRIDOR

C2-101

WAITING

2E-101

LOBBY

C2-100

A-203

162-103

-1

162-102CORRIDOR

C2-102

EXAM ROOM

2E-106

RECEPTION

2E-102

EXAM ROOM

2E-104

CR

CR

CR

A3

A3

17 17

CLC

FIRE RATED WALL SYMBOLS:

1 HOUR FIRE

2 HOUR SHAFT

1 HOUR FIRE / SMOKE

2 HOUR FIRE / SMOKE

1 HOUR SMOKE

CONSTRUCTION BARRIER

FLOOR PLAN GENERAL NOTES

1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.

LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER

SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY

DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION

OF THE WORK.

2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL

TRAFFIC AND STORAGE WITH COR.

3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,

ELECTRICAL, AND FIRE PROTECTION.

4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING

SHALL BE APPROVED BY COR.

5. REFER AND ADHERE TO THE INFECTION PREVENTION MEASURE

REQUIREMENTS IN SPECIFICATION SECTION 01 35 26 17

TEMPORARY ICRA BARRIER SHALL BE PROVIDED AT ALL

PATIENT RELATED AREAS AND COMPLETED PRIOR TO THE START OF ANY

WORK.

6. NO KNOWN ASBESTOS IN SCOPE. IF ASBESTOS CONTAINING MATERIALS ARE

SUSPECTED, STOP WORK IN THE AREA AND CONTACT COR.

7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, STORING AND RELOCATING ALL

EQUIPMENT & FURNITURE TO BE SALVAGED. ALL EXISTING CEILING MOUNTED

8. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO

VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE

EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS

MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND

MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING

AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER

INFORMATION.

9. THE CONTRACTOR SHALL VERIFY ALL ITEMS AND/OR MATERIALS AND/OR

EQUIPMENT TO BE SALVAGED, PRIOR TO THE START OF DEMOLITION WORK.

10. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS.

11. BEFORE DEMOLITION, CONTRACTOR TO VERIFY WITH THE COR THE

SIGNAGE TO BE SALVAGED AND STORED FOR FUTURE USE. EXISTING AND

NEW SIGNAGE TO MATCH EXISTING WHN ADJACENT TO EXISTING

SIGNAGE. ALL OTHER NEW SIGNAGE TO MATCH FACILITY STANDARDS.

12. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST REMAIN

ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT ALL PHASES OF

DEMOLITION AND CONSTRUCTION. SHORT-TERM CLOSURE MAY BE

ACCEPTABLE AS COORDINATED WITH COR. SEE ILSM REQUIREMENTS ON AD-101.

13. THE CONTRACTOR SHALL PATCH AND REPAIR ALL FIREPROOFING DAMAGED

DURING CONSTRUCTION. ALL NEW FIREPROOFING TO MEET CURRENT CODES.

14. ALL EXISTING PENETRATIONS, WITHIN LIMIT OF WORK AND NEW

CONSTRUCTION, ARE TO BE SEALED TO MATCH EXISTING CONSTRUCTION

AND RATING.

15. PROTECT ALL EXISITNG CONDITIONS & EQUIPMENT DURING

CONSTRUCTION.

16. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK WITH COR

AND EXISTING WARRANTY INFORMATION. INDEPENDENT INSPECTOR TO VERIFY

ROOF TOP WORK.

17. PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE

CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEMS" TO

LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.

18. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND

RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS

BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF

PROTECTING THE OPENINGS.

POWER/DATA SYMBOL LEGEND

PLAN ELEV.

DESCRIPTION

DUPLEX, E2N

QUAD, E4N

DUPLEX EMERGENCY, E2E

QUAD EMERGENCY, E4E

JUNCTION BOX, J

SWITCH, LS

THERMOSTAT, T

DATA PORT, D1

NURSE CALL, NC

TELEPHONE PORT, TELE

TELEVISION COAX, TV

T

J

TV

CODE BLUE, CB /

TELEPHONE/DATA PORT, D1

HAND WAVE SENSOR AUTO DOOR OPERATOR, HSHS

PUSH BUTTON AUTO DOOR OPERATOR, PBPB

CARD READER ELECTRONIC SECURITY DEVICE, CRCR

POWER / DATA / FF&E GENERAL NOTES

1. DEVICES SHOWN ARE ARCHITECTURALLY SIGNIFICANT. REFER TO IT/AV AND

ELECTRICAL DRAWINGS FOR COMPLETE DOCUMENTATION.

2. ALL OUTLET DIMENSIONS SHOWN TO CENTERLINE OF OUTLET/BOX.

3. ALL OUTLETS SHALL BE 18" ABOVE FINISH FLOOR, U.N.O.

4. ALL SWITCHES SHALL BE 48" ABOVE FINISH FLOOR, U.N.O.

5 IN CASE OF MINOR DISCREPANCIES BETWEEN ARCHITECTURAL AND

ELECTRICAL/IT DOCUMENTS, THE ARCHITECTURAL POWER/DATA PLAN

SHALL GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT

SHALL BE NOTIFIED AS SOON AS THE DISCREPANCY IS DISCOVERED PRIOR

TO PROCEEDING WITH THE WORK.

6. REFER TO SHEET A-503 FOR OUTLET INSTALLATION DETAILS IN RATED AND

ACOUSTICAL WALL ASSEMBLIES.

7. REFER TO SHEET A-205 ELEVATION DRAWINGS FOR ADDITIONAL

INFORMATION AND MOUNTING HEIGHTS.

8. FF&E SHOWN IS FOR OUTLET LOCATION COORDINATION ONLY.

9. ALL OUTLETS AND COVER PLATES SHALL MATCH THE ADJACENT WALL

FINISH AS BEST POSSIBLE. THE ARCHITECT SHALL BE NOTIFIED FOR UNIQUE

FINISHES TO APPROVE THE COVER PLATE COLOR SELECTION.

10. REFER TO MILLWORK DETAIL DRAWINGS FOR OUTLETS OR SWITCHES

MOUNTED IN SPECIALTY CONSTRUCTION.

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

KEY PLAN NTS NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Install Elevators and Complete Space Build-out for B162 and B164

Location:

Final - Bid Set

June 3, 2022 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

649-22-136

Northern Arizona VA Health Care System

500 AZ-89, Prescott, AZ 86301

AESUS

B162 and B164

A-200

FLOOR PLANS

SCALE: 1/8" = 1'-0"

B162-PIPE LEVEL

FLOOR PLAN KEYNOTES

1 EXISTING WALL, TYPICAL.

2 EXISTING STAIRS TO REMAIN, EGRESS SHALL NOT BE BLOCKED DURING

CONSTRUCTION ACTIVITY.

3 REMOVE AND REINSTALL THE EXISTING SHAFTLINER AT THE PIPE BASEMENT

LEVEL TO GAIN ACCESS AND INSTALL ELEVATOR.

4 EXISTING SUMP PIT TO REMAIN, MODIFY AS REQUIRED FOR NEW EQUIPMENT.

5 EXISITNG CONCRETE PAD FOR ELEVATOR PIT TO REMAIN.

6 PREP SHAFT WALL FOR NEW ELEVATOR DOOR, SEE DETAILS ON SHEET A-511.

7 NEW ELEVATOR IN EXISTING SHAFT, SEE ENLARGED PLAN.

8 NEW ELEVATOR EQUIPMENT, TYPCIAL.

9 EXISTING DOOR, TYPICAL.

10 CONCRETE EQUIPMENT PAD, VERIFY SIZE WITH EQUIPMENT SHOP DRAWINGS.

11 ADD ELECTRONIC ADA PUSH BUTTON AND DOOR OPENER TO THE EXISTING DOOR.

VERIFY EXACT LOCATION WITH OWNER. PATCH, REPAIR, AND PAINT WALLS AS

REQ'D FOR INSTALLATION.

12 PATCH AND REPAIR WALLS AS REQ'D FOR EQUIPMENT INSTALLATION, MATCH

EXISTING ADJACENT.

13 NEW DOOR AND FRAME WITH ELECTRONIC CARD READER. SEE DOOR HARDWARE

SCHEDULE.

14 NEW 3-5/8" METAL STUD WALL W/ 5/8" GYPSUM BOARD AT EACH SIDE (FULL

HEIGHT). MODIFY THE EXISTING CEILING AND/OR HEAD CONDITION AS REQ'D FOR

THE NEW DOOR. MATCH EXISTING ADJACENT TEXTURE AND FINISH.

15 REMOVE AND REPLACE THE EXISTING RUBBER BASE, WALL PROTECTION, AND

HANDRAIL/GUARDRAIL AS REQ'D (EACH SIDE OF DOOR/WALL) FOR THE NEW WALL

AND DOOR INSTALLATION.

16 REMOVE AND RELOCATE EXISTING LIGHT FIXTURES & DIFFUSERS AS REQ'D FOR

WALL INSTALLATION.

17 CONTRACTOR TO CONFIRM EXISTING DOOR CLOSER DOES NOT EXCEED 5LBS AND

REPORT INFORMATION TO THE COR

SCALE: 1/8" = 1'-0"

B162-LEVEL 01

SCALE: 1/8" = 1'-0"

B162-LEVEL 02

ELECTRICAL

ROOM

MEN'S TOILET

WOMEN'S

TOILET

HAC

CORRIDOR

LAB STORAGE

BREAK ROOM

CORRIDOR

STAIR

S-1

DELIVERY

IT CLOSET

MECHANICAL

ROOM

BUILDING 160

473 SF

PHARMACY

STORAGE

H.9H.3HG.3G

F

D

E.3

0.5

0.1

MACHINE

ROOM

CORRIDOR

E-01

CR

-0

ELEVATOR

E-001

5'-0" 15'-11"

3' -0

1'

-0

A-504

FEC

A-204

701 SF

PHARMACY

CHACHE

BREAKOUT

AREA

24'-11"

'-0

10'-0"

5' -6

A-201

(12) 30x60 Cart(s)

(6) 48x48 Pallets, 2 high on a rack

(18) 24x48 Wire Racks

Work Space for (2) stations

8'-5"

E Power

E Power

4' -8

4'

-8 "(6) 48x48 Pallets, 2 high on a rack

12 1212

OFFICE

OFFICE

164-012

164-015

164-007

164-013

CR

W2 W2 W2

-0

CR

CR

CR

CR

A3

A3

4 / A-205

5 / A-205

H2H2

H2

STORAGE

002B

CR

-0

B

A3

A3

PHARM

REF RXXXX

HELMBER

REF RYXXX

SAFE,

(S1000)

DESK,

(E0078)DESK,

(E0078)

DESK,

(E0078)

DESK,

(E0078)

DESK,

(E0078)

MFP,

(M1825)

COMPUTER,

(M1801)

WASTE,

(F2000)

6' -2

POWER/DATA SYMBOL LEGEND

PLAN ELEV.

DESCRIPTION

DUPLEX, E2N

QUAD, E4N

DUPLEX EMERGENCY, E2E

QUAD EMERGENCY, E4E

JUNCTION BOX, J

SWITCH, LS

THERMOSTAT, T

DATA PORT, D1

NURSE CALL, NC

TELEPHONE PORT, TELE

TELEVISION COAX, TV

T

J

TV

CODE BLUE, CB /

TELEPHONE/DATA PORT, D1

HAND WAVE SENSOR AUTO DOOR OPERATOR, HSHS

PUSH BUTTON AUTO DOOR OPERATOR, PBPB

CARD READER ELECTRONIC SECURITY DEVICE, CRCR

CLC

FIRE RATED WALL SYMBOLS:

1 HOUR FIRE

2 HOUR SHAFT

1 HOUR FIRE / SMOKE

2 HOUR FIRE / SMOKE

1 HOUR SMOKE

CONSTRUCTION BARRIER

FLOOR PLAN GENERAL NOTES

1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.

LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER

SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY

DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION

OF THE WORK.

2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL

TRAFFIC AND STORAGE WITH COR.

3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,

ELECTRICAL, AND FIRE PROTECTION.

4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING

SHALL BE APPROVED BY COR.

5. REFER AND ADHERE TO THE INFECTION PREVENTION MEASURE

REQUIREMENTS IN SPECIFICATION SECTION 01 35 26 17

TEMPORARY ICRA BARRIER SHALL BE PROVIDED AT ALL

PATIENT RELATED AREAS AND COMPLETED PRIOR TO THE START OF ANY

WORK.

6. NO KNOWN ASBESTOS IN SCOPE. IF ASBESTOS CONTAINING MATERIALS ARE

SUSPECTED, STOP WORK IN THE AREA AND CONTACT COR.

7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, STORING AND RELOCATING ALL

EQUIPMENT & FURNITURE TO BE SALVAGED. ALL EXISTING CEILING MOUNTED

8. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO

VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE

EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS

MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND

MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING

AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER

INFORMATION.

9. THE CONTRACTOR SHALL VERIFY ALL ITEMS AND/OR MATERIALS AND/OR

EQUIPMENT TO BE SALVAGED, PRIOR TO THE START OF DEMOLITION WORK.

10. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS.

11. BEFORE DEMOLITION, CONTRACTOR TO VERIFY WITH THE COR THE

SIGNAGE TO BE SALVAGED AND STORED FOR FUTURE USE. EXISTING AND

NEW SIGNAGE TO MATCH EXISTING WHN ADJACENT TO EXISTING

SIGNAGE. ALL OTHER NEW SIGNAGE TO MATCH FACILITY STANDARDS.

12. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST REMAIN

ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT ALL PHASES OF

DEMOLITION AND CONSTRUCTION. SHORT-TERM CLOSURE MAY BE

ACCEPTABLE AS COORDINATED WITH COR. SEE ILSM REQUIREMENTS ON AD-101.

13. THE CONTRACTOR SHALL PATCH AND REPAIR ALL FIREPROOFING DAMAGED

DURING CONSTRUCTION. ALL NEW FIREPROOFING TO MEET CURRENT CODES.

14. ALL EXISTING PENETRATIONS, WITHIN LIMIT OF WORK AND NEW

CONSTRUCTION, ARE TO BE SEALED TO MATCH EXISTING CONSTRUCTION

AND RATING.

15. PROTECT ALL EXISITNG CONDITIONS & EQUIPMENT DURING

CONSTRUCTION.

16. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK WITH COR

AND EXISTING WARRANTY INFORMATION. INDEPENDENT INSPECTOR TO VERIFY

ROOF TOP WORK.

17. PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE

CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEMS" TO

LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.

18. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND

RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS

BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF

PROTECTING THE OPENINGS.

G.3G

0.5

3 / A-205

BREAK ROOM

COFFEE,

(K1552)

TOWEL,

(A5080)

SOAP,

(A5075)

MICROWAVE,

(K4665)

REFRIG

(R7250)

REFRIG

(R7250)

WASTE,

(F2015)

CR

-0

164-007

SOLID SURFACE

COUNTERTOP

UNDERMOUNT

STAINLESS STEEL

SINK

FEC

/ A

-2

CR

POWER / DATA / FF&E GENERAL NOTES

1. DEVICES SHOWN ARE ARCHITECTURALLY SIGNIFICANT. REFER TO IT/AV AND

ELECTRICAL DRAWINGS FOR COMPLETE DOCUMENTATION.

2. ALL OUTLET DIMENSIONS SHOWN TO CENTERLINE OF OUTLET/BOX.

3. ALL OUTLETS SHALL BE 18" ABOVE FINISH FLOOR, U.N.O.

4. ALL SWITCHES SHALL BE 48" ABOVE FINISH FLOOR, U.N.O.

5 IN CASE OF MINOR DISCREPANCIES BETWEEN ARCHITECTURAL AND

ELECTRICAL/IT DOCUMENTS, THE ARCHITECTURAL POWER/DATA PLAN

SHALL GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT

SHALL BE NOTIFIED AS…