CLC
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Install Elevators and Complete Space Build-out for B162 and B164
Location:
Final - Bid Set
June 3, 2022 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
649-22-136
Northern Arizona VA Health Care System
500 AZ-89, Prescott, AZ 86301
AESUS
B162 and B164
G-001
COVER SHEET
DX
A3-301
X
XX
X
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
x x x x
EXISTING COLUMN CENTER LINEA
X
WINDOW TAG
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
PLAN OR DETAIL NUMBERX
NOTE: IN ADDITION TO THE FOLLOWING INFECTION CONTROL MEASURES OF ICRA
CLASS & PERMIT LEVEL IV, THE CONTRACTOR SHALL REVIEW THE VA SAFETY-QUALITY
CONTROL-INFECTION CONTROL DOCUMENTS IN THE SPECIFICATIONS. THE AE WILL
PROVIDE A FORM FOR THE CONTRACTOR TO FILL OUT
DURING CONSTRUCTION:
A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
B. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC,
TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS. PROVIDE NEGATIVE AIR PRESSURE
MONITOR.
D. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
E. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
F. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS INSPECTED BY A SAFETY OFFICER AND INFECTION CONTROL
COORDINATOR AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL
MANAGEMENT SERVICES.
UPON COMPLETION OF PROJECT:
A. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
C. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
D. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
E. WET MOP AREA WITH DISINFECTANT.
F. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
Approved: Associate Director
Approved: Chief Facilities Management
Approved: Manager / Engineer
Approved: Director
Approved: Union representative
Approved: Safety Officer
A
EQ-X
CPT1
W-X
E
EA EACH
E EAST
EWC ELECTRIC WATER COOLER
ELEC ELECTRIC (AL)
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
ETR EXISTING TO REMAIN
EXP EXPANSION
EXP BT EXPANSION BOLT
EJ EXPANSION JOINT
EXP EXPOSED
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
F
FWC FABRIC WALL COVERING
FT FEET, FOOT
FGL FIBERGLASS
FIN FINISH
FIN GR FINISH GRADE
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FHC FIRE HOSE CABINET
FP FIREPROOF
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDTN FOUNDATION
FRMG FRAMING
FURN FURNACE, FURNITURE
G
GA GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GL GLASS
GL BLK GLASS BLOCK
GB GRAB BAR
GR GRADE
GRAN GRANITE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GUT GUTTER
GYP BD GYPSUM BOARD
H
HNDRL HANDRAIL
HDW HARDWARE
HDWD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AIR CONDITIONING
HT HEIGHT
HPT HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HR HOUR
I
IN INCH
INFO INFORMATION
ID INSIDE DIAMETER
INSUL INSULATED,INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
K
KPL KICKPLATE
KIT KITCHEN
KB KNEE BRACE
L
LAB LABORATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LV LAVATORY
LT LIGHT
LD LINEAR DIFFUSER
L CL LINEN CLOSET
LL LIVE LOAD
LLV LONG LEG VERTICAL
LPT LOW POINT
M
MACH MACHINE
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MRB MARBLE BASE
MRF MARBLE FLOOR
MKR BD MARKER BOARD
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDICAL
MC MEDICINE CABINET
MEMB MEMBRANE
MTL METAL
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
N
NAT FIN NATURAL FINISH
NOM NOMINAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
O
OFF OFFICE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
ORCH ORCHESTRA
ORN ORNAMENTAL
OD OUTSIDE DIAMETER
OH OVERHANG, OVERHEAD
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
O OXYGEN
P
P PAINT
PR PAIR
PNL PANEL
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PERF PERFORATED
PC PIECE
PLAM PLASTIC LAMINATE
PLAS PLASTIC, PLASTER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PCC PRECAST CONCRETE
PREFAB PREFABRICATE
PREFIN PREFINISH
PROD PRODUCTION
Q
QTY QUANTITY
QT QUARRY TILE
A
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
APC ACOUSTICAL PANEL CEILING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AB ANCHOR BOLT
AL ANGLE
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
B
BALC BALCONY
BSMT BASEMENT
BM BEAM, BENCHMARK
BR BEDROOM
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BRKT BRACKET
BRK BRICK
B CL BROOM CLOSET
BLDG BUILDING
BLT IN BUILT-IN
BUR BUILT-UP ROOFING
C
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEANOUT, CASED OPENING
CLR CLEAR, COLOR
CLO CLOSET
COL COLUMN
CMPST COMPOSITE
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COTR CONTRACTING OFFICER
CJ CONTROL JOINT
COP COPING
CU COPPER
CG CORNER GUARD
CORR CORRIDOR
CNTR COUNTER
CSK COUNTER SUNK
D
DMPF DAMPPROOFING
DL DEAD LOAD
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DR DOOR, DRAIN
DH DOUBLE HUNG
DN DOWN
DS DOWNSPOUT
DWR DRAWER
DWG DRAWING
DF DRINKING FOUNTAIN
DUPL DUPLICATE
R
R RADIUS, RISER
RWD REDWOOD
REF REFERENCE, REFRIGERATOR
REINF REINFORCE
REQD REQUIRED
RB RESILIENT BASE
RF RESILIENT FLOORING
RA RETURN AIR
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
S
SCHED SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SHV SHELVING
SIM SIMILAR
S SOUTH
SP FIN SPECIAL FINISH
SPEC SPECIFICATION
SQ SQUARE
SF SQUARE FEET
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
S4S SURFACED FOUR SIDES
SUSP SUSPEND
SW SWITCH
SYMM SYMMETRICAL
T
TK BD TACKBOARD
TEL TELEPHONE
TV TELEVISION
TMPD TEMPERED
TEMP TEMPORARY
TER TERRAZZO
THK THICKNESS
TPD TOILET PAPER DISPENSER
T&G TONGUE AND GROOVE
TOS TOP OF SLAB, STEEL
T TREAD
TYP TYPICAL
U
UC UNDERCUT
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
V
VAC VACUUM
VR VAPOR RETARDER
VNR VENEER
VP VENEER PLASTER
VIF VERIFY IN FIELD
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W
W CAB WALL CABINETS
WC WALL COVERING, WATER CLOSET
WP WATERPROOFING, WEATHER
PROOF, WORKING POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
W WEST
WF WIDE FLANGE
WDW WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
WDP WOOD PANELING
500 N. State Hwy. 89
Department of Veterans Affairs
KEYED NOTE
WALL TYPE
X
WINDOW TYPE
GLASS TYPE1
X WINDOW TREATMENT TYPE
EQUIPMENT
INTERIOR FINISH TYPE
FURNITURE, FIXTURE, EQUIPMENT
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
NORTH
NAVAHCS
APPROVED FOR CONSTRUCTION
Project No: 649-22-136
Contract No: 36C25819D0035
Prescott, Arizona 86313
DESIGN TEAM
ABBREVIATIONS OWNER
CODE REFERENCES
BUILDING CODE:
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL ENERGY CODE
2018 INTERNATIONAL FIRE CODE
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2018 INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2018 INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2017 NATIONAL ELECTRIC CODE
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
BUILDING 162 & 164 IS A FULLY SPRINKLED 2 STORY BUILDINGS WITH
MIXED USE OCCUPANCIES.
NO LIFE SAFETY WILL BE AFFECTED BY THIS PROJECT OR THE
CONSTRUCTION OPERATION
GENERAL NOTES
VICINITY MAP
INFECTION CONTROL MEASURES
THIS SCOPE OF WORK SHALL BE A TENANT IMPROVEMENT AT THE NORTHERN
ARIZONA VA HEALTHCARE SYSTEM IN PRESCOTT, AZ. THE SCOPE OF WORK IS
LOCATED IN BUILDING 162 / 164. THIS PROJECT IS A TENANT IMPROVEMENT TO
INSTALL (2) ELEVATORS IN EXISTING SHAFTS, MODIFY THE COMPOUNDING ROOMS
TO MEET USP800 AND USP797, PROVIDE A DESIGN FOR THE BREAK ROOM 007, AND
ADD OFFICE, CHASHE, AND STORAGE SPACE FOR PHARMACY.
THIS WORK SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL, STRUCTURAL,
MECHANICAL, PLUMBING, & ELECTRICAL.
DESCRIPTIONSYMBOL
500 N. State Hwy. 89, Prescott, Arizona 86313
(NAVAHCS) Northern Arizona VA Health Care System Department of Veterans Affairs
Architect
MPE Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Orlando Gonzales (ogonzales@aesusdesign.com)
480-454-2861
David Combs (dcombs@aesusdesign.com)
480-454-2861
Structural Engineers
6868 N 7th Ave, Suite 203
Phoenix, Arizona 85013
Pangolin Structural
Pam Singleton (psingleton@pangolinstr.com)
602-888-0336
NORTH
PROJECT AREA
BUILDING OCCUPANCY: EXISTING MIXED USE
CONSTRUCTION TYPE: IIB - NONCOMBUSTIBLE MATERIALS
FIRE RESISTANCE IN ACCORDANCE WITH IBC TABLES 601 & 602
FULLY SPRINKLERED
BUILDING AREA: EXISTING
BUILDING HEIGHT: EXISTING
PROJECT SITE
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF
MECHANICAL ENGINEERS (ASME) A 17.1.
2018 INTERNATIONAL FUEL GAS CODE
VA DIRECTORIES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION
GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION
LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/)
PO No: 649-C10395
VHA PROGRAM GUIDE PG-18-3
Local Codes: As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc.). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notified about planned projects and given opportunity to review drawings provided that VA does not pay for review or inspection fees.
NOTES:
1. NFPA 101 primarily addresses life safety and fire protection features while the IBC addresses a wide range of considerations, including, but not limited to, structural strength, seismic stability, sanitation, adequate light and ventilation, and energy conservation. VA buildings must meet the requirements of NFPA 101 and documents referenced by NFPA 101 in order to comply with the accreditation requirements of The Joint Commission.
Therefore, designs shall comply with the requirements of the latest edition of NFPA 101 and documents referenced therein. Design features not addressed by NFPA 101 or documents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise addressed above in this Program Guide. For design features that are addressed by both the IBC as well as NFPA 101 or a document referenced by NFPA 101, the requirements of NFPA 101 or the document referenced by NFPA 101 shall be used exclusively (this applies even if the IBC requirements are different).
2. Conflicts between Nationally Recognized Codes and Standards and VA Requirements - Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure a consistency system wide.
1. NOTE, NOT ALL KEYNOTES ARE ON ALL SHEETS.
2. PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE
CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEM" TO
LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.
3. ALL PENETRATIONS ARE TO BE SEALED TO MATCH EXISTING
CONSTRUCTION AND RATING REQUIREMENTS.
4. PLEASE SEE MECHANICAL DRAWINGS FOR EXACT LOCATION AND TYPE OF
SEAL REQUIRED.
5. PROTECT ALL FURNISHINGS AND EQUIPMENT DURING CONSTRUCTION
FROM DAMAGE AND CONSTRUCTION DEBRIS.
6. COMPROMISES IN FIRE RATED BARRIERS SHALL BE CORRECTED/REPAIRED
ON THE SAME DAY OF COMPROMISE. NO EXCEPTIONS.
7. THE CONTRACTOR SHALL NOT LEAVE ANY PAINTS, CAULKS, AND/OR GLUES
ON SITE.
8. ALL SMOKE OR FIRE DAMPERS TO BE CERTIFIED BEFORE VA SIGN OFF.
9. THE CONTRACTOR SHALL COORDINATE ALL SHUT DOWNS 4 WEEKS IN
ADVANCE WITH COR.
10. CONTRACTOR TO REFER TO THE VA COR AND ASBESTOS REMEDIATION
STUDY FOR ACTIONS CONCERNING THE POSSIBLE PRESENCE OF
ASBESTOS.
SHEET INDEX
NUMBER SHEET NAME
[08] ELEC
E-001 ELECTRICAL GENERAL INFORMATION
E-100 ELECTRICAL LEVEL 00 PLAN
E-101 ELECTRICAL LEVEL 01 PLAN
E-102 ELECTRICAL LEVEL 02 PLAN
E-103 ELECTRICAL ROOF PLAN
E-201 ELECTRICAL LEVEL 01 ENLARGED PLANS
E-202 ELECTRICAL LEVEL 02 ENLARGED PLANS
E-301 ELECTRICAL DETAILS
E-401 ELECTRICAL ONE-LINE
E-501 ELECTRICAL SCHEDULES
SHEET INDEX
NUMBER SHEET NAME
[00] GENERAL
G-001 COVER SHEET
G-010 LEVEL 00 & 01 SCOPE OF WORK
G-011 LEVEL 02 SCOPE OF WORK
[01] DEMO
AD-101 DEMO PLAN
AD-102 DEMO PLAN
[02] ARCHITECTURAL
A-200 FLOOR PLANS
A-201 FLOOR PLANS
A-202 FLOOR PLANS
A-203 BLDG 162 ELEVATOR PLANS
A-204 BLDG 164 ELEVATOR PLANS
A-205 ELEVATIONS
A-301 REFLECTED CEILING PLANS
A-501 PARTITION TYPES & HEAD DETAILS
A-502 PARTITION FRAMING DETAILS
A-503 GYP BD DETAILS
A-504 METAL FABRICATIONS
A-505 LAVATORY, ACCESSORIES, WALL PROT, EQUIP
A-506 DOOR, SAFETY GLAZING AND LOUVER INFORMATION
A-507 FINISHES & FLOORING TRANSITIONS
A-510 CABINET DETAILS
A-511 DETAILS
[03] CIVIL
C-101 EXISTING SITE PLAN W/ UTILITIES
C-102 PROPOSED SITE PLAN W/ UTILITIES
C-103 DEMO PLAN
[04] STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-203 BLDG 162 ELEVATOR PLANS
S-204 BLDG 164 ELEVATOR PLANS
S-301 FRAMING DETAILS 101-120
[05] MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION
MD-201 MECHANICAL LEVEL 01 DEMOLITION PLAN
M-201 MECHANICAL LEVEL 01 PLAN - HVAC - B164
M-202 MECHANICAL LEVEL 02 PLAN - B164
M-203 MECHANICAL PLAN - B162
M-204 MECHANICAL ROOF PLAN
M-301 MECHANICAL LEVEL 01 PLAN - PIPING
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-801 MECHANICAL CONTROLS
[06] PLUMBING
P-001 PLUMBING GENERAL INFORMATION
P-101 PLUMBING LEVEL 01 PLAN - WASTE
P-201 PLUMBING LEVEL 01 PLAN - WATER
P-202 PLUMBING LEVEL 02 PLAN
F-301 FIRE PLAN - SPRINKLER
CONSTRUCTION
LAY DOWN AREA
6.3 .2
Exp: 9.30.2023
B
B.3
B
B.3
G
G.3
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2011-36
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE
TO ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING
ANY DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
GENERAL NOTES
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH COR.
B. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING ELECTRICAL, AND FIRE PROTECTION.
C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY COR.
D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST
REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT
ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM
CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND
ROOF REPAIRS WITH THE COR.
GENERAL PHASING NOTES
A. THE CONTRACTOR SHALL USE THE FOLLOWING AS A GUIDE FOR ALL
ICRA BARRIERS. TEMPORARY INFECTION CONTROL BARRIERS
SHALL BE CONSTRUCTED AS FOLLOWS DEPENDING UPON LENGTH
OF NEED:
A. 1 DAY MAXIMUM - PLASTIC
B. 1 WEEK MAXIMUM - FLAME-RETARDANT PLASTIC
C. GREATER THAN 1 WEEK - SEE NOTE B AND C.
B. TEMPORARY CONSTRUCTION BARRIERS SHALL BE 3 5/8" METAL
STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH SIDE. BARRIERS
ARE TO EXTEND TO THE BOTTOM OF EXISTING CEILINGS. PROVIDE
NON-DAMAGING SEAL AT INTERSECTION WITH CEILING. PROVIDE
PLASTIC SHEET BARRIER SEAL BETWEEN TOP OF WALL AND
STRUCTURE ABOVE. TAPE ALL SEAMS AND PENETRATION
OPENINGS TO PREVENT CONTAMINATION FROM PASSING OVER THE
TOP OR UNDERNEATH THE WALL FROM CONSTRUCTION AREAS.
C. TEMPORARY CONSTRUCTION BARRIERS SHALL BE EITHER TYPE I
OR TYPE II. TYPE I BARRIERS SHALL BE ANCHORED TO THE
FLOORING SURFACE (WHICH IS INTENDED TO BE REPLACED) WITH
POWER ACTUATED FASTENERS. TYPE II BARRIERS SHALL BE
ANCHORED TO THE FLOORING SURFACE (WHICH IS INTENDED TO
REMAIN) BY TAPING BOTTOM STUD TRACK TO FLOOR SURFACE OR
BY OTHER METHODS WHICH WILL NOT HARM FLOOR SURFACE.
D. TEMPORARY PARTITIONS SHALL NOT CONSTRICT WALKWAYS TO
LESS THAN 42" CLEAR. ANY EXITS CHANGED OR BLOCKED SIGNAGE
NEEDS TO BE POSTED FOR THE MODIFICATIONS.
E. PROVIDE TEMPORARY RATED DOOR AND FRAME IN CONSTRUCTION
BARRIER AT ENTRY POINTS TO THE CONSTRUCTION AREAS.
DOORS ARE TO REMAIN LOCKED AT ALL TIMES. CONSTRUCTION
CORES WILL BE PROVIDED BY THE VA.
TEMPORARY CONSTRUCTION
FLOOR PLAN LEGEND
INCLUDED IN SCOPE OF WORK
A-201
A-200
ELEVATOR
MACHINE ROOM
164 -008
BREAK ROOM
164 - 007
NEW OFFICE SPACE
SERVICE ELEVATOR
C1 -101
ELEVATOR EQUIPMENT
1E -105
H.9 J J.4H.3HG.3G
KFD
E.3
0.5
0.1
002 ? 004
S-1
E-001
A
4 3 2 1
B
D
E
A.7
B.3
3.5
C
SEISMIC JOINT
1E-130
1E-126
1E-131 1E-127
1E-129B
106-00002 1E-129A
C1-104
1E-1321E-1241E-129
1E-123 1E-136
1E-1361E-128B
1E-121A
1E-101
1E-102 1E-101A
C1-103
1E-131B
1E-103 1E-104B-003
1E-106J
1E-120
1E-114
1E-120A
1E-1151E-119
1E-111A 1E-117
1E-105 1E-111
C1-102 1E-134
1E-133
1E-135
1E-131A
1E-1101E-1071E-1091E-106F
1E-106H 1E-112
1E-106B1E-106A
1E-106C
1E-106D
1E-106E
S-7
RECEIVING / BREAKOUT &
PHARMACY STORAGE
PHARMACY CACHE
CLC
A
4 3 2 1
B
D
A.7
B.3
3.5
C
CORRIDOR
B001
SERVICE
ELEVATOR
EXISTING PIPE BASEMENT
A-200
SERVICE ELEVATOR
CRAWLSPACE
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Install Elevators and Complete Space Build-out for B162 and B164
Location:
Final - Bid Set
June 3, 2022 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
649-22-136
Northern Arizona VA Health Care System
500 AZ-89, Prescott, AZ 86301
AESUS
B162 and B164
G-010
LEVEL 00 & 01 SCOPE OF WORK
SCALE: 1/16" = 1'-0"
LEVEL 01 SCOPE OF WORK
SCALE: 1/16" = 1'-0"
B162-PIPE LEVEL - SCOPE OF WORK
G
G.3
A-202
A-200
PHARMACY
164 -124
SERVICE ELEVATOR
C2-001
ELEVATOR
H.9 J J.4H.3HG.3G
KFD
E.3
0.5
0.1
164-124B
-1
-1
164-010
-1
A
S-2
118117
113 112
137 138
133134135
110139111
A
4 3 2 1
B
D
E
A.7
B.3
3.5
C
4.5 0.40.30.2
C2-105
C2-106
2E-222B
2E-222A
2E-220
2E-221
2E-224
2E-225
2E-227
2E-240
B-003
2E-121A 2E-1202E-121B2E-123 2E-119
2E-117
2E-115
2E-113
2E-111 2E-109
2E-110 2E-108 2E-103
2E-102 2E-101 2E-241
2E-242
C2-104
2E-230A
2E-230
2E-230C 106-00003
2E-230B2E-228
2E-229A
2E-229
2E-226 2E-221
2E-1182E-1052E-116
2E-114
2E-112 2E-104
2E-106
2E-107
C2-001
C2-100
S - 6
/ A
-2
A-202
5 / A-205
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2011-36
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE
TO ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING
ANY DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
GENERAL NOTES
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH COR.
B. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING ELECTRICAL, AND FIRE PROTECTION.
C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY COR.
D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST
REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT
ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM
CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND
ROOF REPAIRS WITH THE COR.
GENERAL PHASING NOTES
A. THE CONTRACTOR SHALL USE THE FOLLOWING AS A GUIDE FOR ALL
ICRA BARRIERS. TEMPORARY INFECTION CONTROL BARRIERS
SHALL BE CONSTRUCTED AS FOLLOWS DEPENDING UPON LENGTH
OF NEED:
A. 1 DAY MAXIMUM - PLASTIC
B. 1 WEEK MAXIMUM - FLAME-RETARDANT PLASTIC
C. GREATER THAN 1 WEEK - SEE NOTE B AND C.
B. TEMPORARY CONSTRUCTION BARRIERS SHALL BE 3 5/8" METAL
STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH SIDE. BARRIERS
ARE TO EXTEND TO THE BOTTOM OF EXISTING CEILINGS. PROVIDE
NON-DAMAGING SEAL AT INTERSECTION WITH CEILING. PROVIDE
PLASTIC SHEET BARRIER SEAL BETWEEN TOP OF WALL AND
STRUCTURE ABOVE. TAPE ALL SEAMS AND PENETRATION
OPENINGS TO PREVENT CONTAMINATION FROM PASSING OVER THE
TOP OR UNDERNEATH THE WALL FROM CONSTRUCTION AREAS.
C. TEMPORARY CONSTRUCTION BARRIERS SHALL BE EITHER TYPE I
OR TYPE II. TYPE I BARRIERS SHALL BE ANCHORED TO THE
FLOORING SURFACE (WHICH IS INTENDED TO BE REPLACED) WITH
POWER ACTUATED FASTENERS. TYPE II BARRIERS SHALL BE
ANCHORED TO THE FLOORING SURFACE (WHICH IS INTENDED TO
REMAIN) BY TAPING BOTTOM STUD TRACK TO FLOOR SURFACE OR
BY OTHER METHODS WHICH WILL NOT HARM FLOOR SURFACE.
D. TEMPORARY PARTITIONS SHALL NOT CONSTRICT WALKWAYS TO
LESS THAN 42" CLEAR. ANY EXITS CHANGED OR BLOCKED SIGNAGE
NEEDS TO BE POSTED FOR THE MODIFICATIONS.
E. PROVIDE TEMPORARY RATED DOOR AND FRAME IN CONSTRUCTION
BARRIER AT ENTRY POINTS TO THE CONSTRUCTION AREAS.
DOORS ARE TO REMAIN LOCKED AT ALL TIMES. CONSTRUCTION
CORES WILL BE PROVIDED BY THE VA.
TEMPORARY CONSTRUCTION
FLOOR PLAN LEGEND
INCLUDED IN SCOPE OF WORK
CLC
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Install Elevators and Complete Space Build-out for B162 and B164
Location:
Final - Bid Set
June 3, 2022 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
649-22-136
Northern Arizona VA Health Care System
500 AZ-89, Prescott, AZ 86301
AESUS
B162 and B164
G-011
LEVEL 02 SCOPE OF WORK
SCALE: 1/16" = 1'-0"
LEVEL 02 SCOPE OF WORK
H.9 J J.4
K
6 CHEMO
CHEMO AIR LOCK
AIR LOCK
STERILE PREP
CLOSET
PRIVATE
CONSULTATION
CHEMO
CHEMO AIR LOCK
AIR LOCK
STERILE PREP
CLOSET
H.9 J J.4
K
/ A
-2
3' -4
1'
-0
10'-6"2'-4 1/2"
DEMOLITION SYMBOLS
ITEMS SHOWN DASHED ARE TO BE REMOVED.
ITEMS SHOWN SCREENED ARE TO REMAIN.
ITEMS SHOWN SOLID ARE NEW CONSTRUCTION.
DEMOLITION KEYNOTE
EXTENTS OF DEMOLITION
CONSTRUCTION BARRIER
SPRINKLER
XX
DEMOLITION GENERAL NOTES
REFER TO SHEET G-001 FOR ARCH DWG REFERENCE AND
MATERIAL SYMBOLS AS WELL AS ABBREVIATIONS USED ON
THIS SET OF DRAWINGS.
AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH
MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE
HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR
TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO
SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN
PROCEDURES.
DEMOLITION OPERATIONS ARE TO PROCEED WITH NECESSARY
PREPARATIONS AND PRECAUTIONS TAKEN TO PROTECT ITEMS
AND FINISHES TO REMAIN. THE CONTRACTOR SHALL
COORDINATE DEMOLITION OPERATIONS WITH THE VA AND
EACH SPECIFIC DEPARTMENTS PRIOR TO ANY DEMO WORK.
REMOVE AND DISPOSE ALL DEMOLISHED MATERIALS OFF SITE
WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED, OR
BECOME THE PROPERTY OF THE OWNER.
PIPES NO LONGER IN USE WITHIN DEMOLITION AREA ARE TO
BE REMOVED BACK TO SOURCE
DO NOT PENETRATE THE FLOOR SLAB WITHOUT COORDINATING
WITH STRUCTURAL REQUIREMENTS.
UNLESS SPECIFICALLY NOTED OTHERWISE, EXISTING FLOOR
AND CEILING MATERIALS SHALL REMAIN IN PLACE. PROTECT
FLOORS AND CEILINGS FROM DAMAGE DURING DEMOLITION
AND RENOVATION WORK.
EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD
DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR
SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE
VA OF ANY DISCREPANCIES.
DEMO WORK SHALL BE DONE IN A MANNER WHICH WILL NOT
CAUSE UNNECESSARY INCONVENIENCE OR DANGER TO USERS
OF THE PREMISES AND ADJACENT AREAS AND NOT INTERFERE
WITH ITS OPERATION. ANY DEMO WORK TO BE PERFORMED
MUST BE PLANNED IN ADVANCE AND APPROVED BY THE COR.
ANY EQUIPMENT, MATERIALS AND SUPPLIES TEMPORARILY
REMOVED FOR THE PURPOSE OF PROTECTION SHALL BE
REPLACED IN ORIGINAL LOCATIONS AND CONDITIONS. ANY
MATERIAL DAMAGED SHALL BE REPLACED WITH NEW
MATERIALS OF LIKE AND QUALITY.
REFER TO AND COORDINATE WITH MECHANICAL AND
ELECTRICAL DWGS. FOR ADDITIONAL DEMOLITION
INFORMATION.
ALL MATERIALS INDICATED TO BE REMOVED SHALL BE
DISPOSED OF AND REMOVED FROM THE SITE. COORDINATE
WITH THE COR, THE REMOVAL AND FINAL DISPOSAL
LOCATION/DESTINATION(S) OF DEMOLITION. THE GC SHALL
PROVIDE MONTHLY NEMA TRACKING REPORTS.
ALL REMOVED MATERIALS AND EQUIPMENT WHICH ARE
SALVAGEABLE SHALL REMAIN THE PROPERTY OF THE OWNER.
DELIVER SUCH SALVAGED MATERIALS AND EQUIPMENT ON THE
PREMISES AS DIRECTED BY THE COR AND NEATLY STORE
THEM AND PROTECT FROM DAMAGE. ALL OTHER MATERIAL AND
EQUIPMENT SHALL BE REMOVED FROM THE PROJECT SITE AT
THE CONTRACTOR'S EXPENSE. OWNER WILL IDENTIFY
LOCATION TO PUT SALVAGED MATERIAL AT CONTRACTOR KICK
OFF MEETING.
PATCH/REPAIR ALL ELEMENTS THAT ARE TO REMAIN AND ARE
DAMAGED FROM THE DEMO WORK, BACK WITH CONSTRUCTION
TO MATCH EXISTING CONDITIONS.
IN WALLS TO BE REMOVED, STRIP ALL EXISTING ELECTRICAL
WIRING TO NEAREST ACTIVE J-BOX & CONDUIT.
INTERIM LIFE SAFETY MEASURES APPLY. COORDINATE
WITH HOSPITAL'S SAFETY OFFICER AND COR.
MATERIALS AND EQUIPMENT ACCRUING FROM WORK REMOVED
AND FROM DEMOLITION OF BUILDING OR STRUCTURES, OR
PARTS THEREOF, SHALL BE DISPOSED PER SPECIFICATION SECTION 01 74 19
REMOVE ALL EXISTING ABANDONED CONDUITS, WIRES, AND
PIPES ASSOCIATED WITH THIS CONTRACT.
DIMENSIONS ON DEMO PLANS TO BE VERIFIED WITH
CONDITIONS ON SITE BY G.C.
AT EXISTING CEILINGS TO REMAIN, REMOVE AND SALVAGE
TILES AS REQUIRED FOR MECHANICAL, ELECTRICAL, AND
PLUMBING WORK ABOVE.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY
SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE GOVERNMENT TO
REMOVE PERSONAL BELONGINGS AND DESIGNATE ALL MEDICAL
EQUIPMENT, FURNITURE, AND OTHER ITEMS TO BE SALVAGED AND
STORED BY THE CONTRACTOR. ALL ITEMS NOT DESIGNATED AS
"SALVAGED" BY THE GOVERNMENT AFTER THIS TIME SHALL BE DISPOSED
OF BY THE CONTRACTOR. REFER TO SPECIFICATION FOR NOTIFICATION
REQUIREMENTS.
R. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS
TO VA FOR REVIEW AND APPROVAL PRIOR TO THE
INSTALLATION.
S. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED
AREAS AS REQUIRED AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
T. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS
PER THE IBC AND VA GUIDELINES. ALL EGRESS PATHS
SHALL REMAIN CLEAR AT ALL TIMES.
U. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL
MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING
WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS
SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.
PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE
TO THE PUBLIC.
V. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL
COLUMNS AND CHASES PRIOR TO DEMOLITION
W. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT
COMPLETION OF EACH PHASE AND EACH PROJECT'S
CONSTRUCTION WORK, U.O.N.
CLC
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Install Elevators and Complete Space Build-out for B162 and B164
Location:
Final - Bid Set
June 3, 2022 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
649-22-136
Northern Arizona VA Health Care System
500 AZ-89, Prescott, AZ 86301
AESUS
B162 and B164
AD-101
DEMO PLAN
SCALE: 1/4" = 1'-0"
B164-LEVEL 02 DEMO RCP
2 SCALE: 1/4" = 1'-0"
B164-LEVEL 2 DEMO
DEMO PLAN KEYNOTES
1 DEMOLISH EXISTING WALL AND BASE.
2 DEMOLISH EXISTING DOOR AND FRAME.
3 DEMOLISH EXISTING FLOOR FINISH AND BASE, TYPICAL.
4 CUT, REMOVE, AND PREP WALL FOR NEW DOOR.
5 DEMOLISH EXISTING CEILING, SEE NEW WORK PLANS FOR ADDITIONAL INFO.
6 REMOVE EXISTING LIGHT FIXTURES AND HVAC GRILLES, TYPICAL.
7 EXISIGN SPRINKLER TO BE RELOCATED
8 EXISTING SPRINKLER TO REMAIN
9 EXISTING CEILING TO REMAIN, TYP.
10 REMOVE AND RELOCATE LOW VOLTAGE EQUIPMENT AS NECESSARY
CLC
HG.3G
F
0.5
STAIR
S-1
MACHINE
ROOM
008ELEVATOR
E-001
CORRIDOR
LAB STORAGE
DELIVERY
BREAK ROOM
3' -7
6'
-5
6' -2
7'
-1
8 8 8
PHARMACY
STORAGE
OFFICE
IT CLOSET
WOMEN'S
TOILET
HAC
BREAK ROOM
CORRIDOR
MEN'S TOILET
H
G.3G
F
0.5
STAIR
S-1
MACHINE
ROOM
ELEVATOR
E-001
CORRIDOR
LAB STORAGE
TYP.
TYP.
6 7
TYP.
OFFICE
OPEN TO
STRUCTURE
6' -6
/4
3'
-0
OPEN TO
STRUCTURE
BREAK ROOM
HAC
CORRIDOR
WOMEN'S
TOILET
DEMOLITION SYMBOLS
ITEMS SHOWN DASHED ARE TO BE REMOVED.
ITEMS SHOWN SCREENED ARE TO REMAIN.
ITEMS SHOWN SOLID ARE NEW CONSTRUCTION.
DEMOLITION KEYNOTE
EXTENTS OF DEMOLITION
CONSTRUCTION BARRIER
SPRINKLER
XX
DEMOLITION GENERAL NOTES
REFER TO SHEET G-001 FOR ARCH DWG REFERENCE AND
MATERIAL SYMBOLS AS WELL AS ABBREVIATIONS USED ON
THIS SET OF DRAWINGS.
AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH
MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE
HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR
TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO
SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN
PROCEDURES.
DEMOLITION OPERATIONS ARE TO PROCEED WITH NECESSARY
PREPARATIONS AND PRECAUTIONS TAKEN TO PROTECT ITEMS
AND FINISHES TO REMAIN. THE CONTRACTOR SHALL
COORDINATE DEMOLITION OPERATIONS WITH THE VA AND
EACH SPECIFIC DEPARTMENTS PRIOR TO ANY DEMO WORK.
REMOVE AND DISPOSE ALL DEMOLISHED MATERIALS OFF SITE
WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED, OR
BECOME THE PROPERTY OF THE OWNER.
PIPES NO LONGER IN USE WITHIN DEMOLITION AREA ARE TO
BE REMOVED BACK TO SOURCE
DO NOT PENETRATE THE FLOOR SLAB WITHOUT COORDINATING
WITH STRUCTURAL REQUIREMENTS.
UNLESS SPECIFICALLY NOTED OTHERWISE, EXISTING FLOOR
AND CEILING MATERIALS SHALL REMAIN IN PLACE. PROTECT
FLOORS AND CEILINGS FROM DAMAGE DURING DEMOLITION
AND RENOVATION WORK.
EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD
DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR
SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE
VA OF ANY DISCREPANCIES.
DEMO WORK SHALL BE DONE IN A MANNER WHICH WILL NOT
CAUSE UNNECESSARY INCONVENIENCE OR DANGER TO USERS
OF THE PREMISES AND ADJACENT AREAS AND NOT INTERFERE
WITH ITS OPERATION. ANY DEMO WORK TO BE PERFORMED
MUST BE PLANNED IN ADVANCE AND APPROVED BY THE COR.
ANY EQUIPMENT, MATERIALS AND SUPPLIES TEMPORARILY
REMOVED FOR THE PURPOSE OF PROTECTION SHALL BE
REPLACED IN ORIGINAL LOCATIONS AND CONDITIONS. ANY
MATERIAL DAMAGED SHALL BE REPLACED WITH NEW
MATERIALS OF LIKE AND QUALITY.
REFER TO AND COORDINATE WITH MECHANICAL AND
ELECTRICAL DWGS. FOR ADDITIONAL DEMOLITION
INFORMATION.
ALL MATERIALS INDICATED TO BE REMOVED SHALL BE
DISPOSED OF AND REMOVED FROM THE SITE. COORDINATE
WITH THE COR, THE REMOVAL AND FINAL DISPOSAL
LOCATION/DESTINATION(S) OF DEMOLITION. THE GC SHALL
PROVIDE MONTHLY NEMA TRACKING REPORTS.
ALL REMOVED MATERIALS AND EQUIPMENT WHICH ARE
SALVAGEABLE SHALL REMAIN THE PROPERTY OF THE OWNER.
DELIVER SUCH SALVAGED MATERIALS AND EQUIPMENT ON THE
PREMISES AS DIRECTED BY THE COR AND NEATLY STORE
THEM AND PROTECT FROM DAMAGE. ALL OTHER MATERIAL AND
EQUIPMENT SHALL BE REMOVED FROM THE PROJECT SITE AT
THE CONTRACTOR'S EXPENSE. OWNER WILL IDENTIFY
LOCATION TO PUT SALVAGED MATERIAL AT CONTRACTOR KICK
OFF MEETING.
PATCH/REPAIR ALL ELEMENTS THAT ARE TO REMAIN AND ARE
DAMAGED FROM THE DEMO WORK, BACK WITH CONSTRUCTION
TO MATCH EXISTING CONDITIONS.
IN WALLS TO BE REMOVED, STRIP ALL EXISTING ELECTRICAL
WIRING TO NEAREST ACTIVE J-BOX & CONDUIT.
INTERIM LIFE SAFETY MEASURES APPLY. COORDINATE
WITH HOSPITAL'S SAFETY OFFICER AND COR.
MATERIALS AND EQUIPMENT ACCRUING FROM WORK REMOVED
AND FROM DEMOLITION OF BUILDING OR STRUCTURES, OR
PARTS THEREOF, SHALL BE DISPOSED PER SPECIFICATION SECTION 01 74 19
REMOVE ALL EXISTING ABANDONED CONDUITS, WIRES, AND
PIPES ASSOCIATED WITH THIS CONTRACT.
DIMENSIONS ON DEMO PLANS TO BE VERIFIED WITH
CONDITIONS ON SITE BY G.C.
AT EXISTING CEILINGS TO REMAIN, REMOVE AND SALVAGE
TILES AS REQUIRED FOR MECHANICAL, ELECTRICAL, AND
PLUMBING WORK ABOVE.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY
SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE GOVERNMENT TO
REMOVE PERSONAL BELONGINGS AND DESIGNATE ALL MEDICAL
EQUIPMENT, FURNITURE, AND OTHER ITEMS TO BE SALVAGED AND
STORED BY THE CONTRACTOR. ALL ITEMS NOT DESIGNATED AS
"SALVAGED" BY THE GOVERNMENT AFTER THIS TIME SHALL BE DISPOSED
OF BY THE CONTRACTOR. REFER TO SPECIFICATION FOR NOTIFICATION
REQUIREMENTS.
R. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS
TO VA FOR REVIEW AND APPROVAL PRIOR TO THE
INSTALLATION.
S. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED
AREAS AS REQUIRED AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
T. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS
PER THE IBC AND VA GUIDELINES. ALL EGRESS PATHS
SHALL REMAIN CLEAR AT ALL TIMES.
U. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL
MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING
WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS
SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.
PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE
TO THE PUBLIC.
V. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL
COLUMNS AND CHASES PRIOR TO DEMOLITION
W. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT
COMPLETION OF EACH PHASE AND EACH PROJECT'S
CONSTRUCTION WORK, U.O.N.
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Install Elevators and Complete Space Build-out for B162 and B164
Location:
Final - Bid Set
June 3, 2022 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
649-22-136
Northern Arizona VA Health Care System
500 AZ-89, Prescott, AZ 86301
AESUS
B162 and B164
AD-102
DEMO PLAN
SCALE: 3/16" = 1'-0"
B164-LEVEL 01 Demo
1SCALE: 3/16" = 1'-0"
B164-LEVEL 01 DEMO RCP
DEMO PLAN KEYNOTES
1 EXISTING CEILING TO REMAIN, TYP.
2 PREP SHAFT WALL FOR NEW ELEVATOR DOOR, SEE DETAILS ON SHEET A-511.
3 EXISTING DOOR, TYPICAL.
4 CUT, REMOVE, AND PREP WALL FOR NEW DOOR.
5 EXISTING SPRINKLER TO REMAIN
6 DEMOLISH EXISTING CEILING, SEE NEW WORK PLANS FOR ADDITIONAL INFO.
7 REMOVE EXISTING LIGHT FIXTURES AND HVAC GRILLES, TYPICAL.
8 SAWCUT CUT, REMOVE, AND PREP CONCRETE WALL FOR NEW OPENING.
9 REMOVE EXISTING CONCRETE AND ASPHALT PAVING AS REQ'D FOR NEW OPENING.
PREP SUBGRADE TO ALLOW POSITVE SLOPE AWAY FROM BUILDING.
10 EXISTING SOFFIT TO REMAIN, PATCH, REPAIR, & FINISH
11 DEMOLISH EXISTING FLOOR FINISH AND BASE, TYPICAL.
12 REMOVE AND RELOCATE EXISTING FIRE ALARM ANNUNCIATOR. PATCH, REPAIR,
AND PAINT DRYWALL AS REQ'D.
A
4 3 2 1
B
D
A.7
B.3
3.5
C
CORRIDOR
B001
A-203
SERVICE
ELEVATOR
EXISTING PIPE BASEMENT
8'-6" 9'-3 1/2"
8' -6
4'
-3
A-504
A
4 3 2
B
A.7
B.3
3.5
C
TELECOMM
1E-134
ELECTRICAL
1E-133
FIRE RISER
1E-135
LOBBY
C1-102
CORRIDOR
C1-103
SERVICE
ELEVATOR
C1-101
SPEC. TREAT
1E-110
PT OFFICE
1E-111
ELEVATOR
EQUIPMENT
1E-105
FEC
A-203
-0
A
4 3 2
B
A.7
B.3
3.5
C
TELECOMM
2E-241
ELECTRICAL
2E-242
STERILIZATION
EQUIPMENT
2E-230A
CORRIDOR
C2-107
SERVICE
ELEVATOR
C2-001
EXAM ROOM
2E-107
CORRIDOR
C2-101
WAITING
2E-101
LOBBY
C2-100
A-203
162-103
-1
162-102CORRIDOR
C2-102
EXAM ROOM
2E-106
RECEPTION
2E-102
EXAM ROOM
2E-104
CR
CR
CR
A3
A3
17 17
CLC
FIRE RATED WALL SYMBOLS:
1 HOUR FIRE
2 HOUR SHAFT
1 HOUR FIRE / SMOKE
2 HOUR FIRE / SMOKE
1 HOUR SMOKE
CONSTRUCTION BARRIER
FLOOR PLAN GENERAL NOTES
1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.
LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER
SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION
OF THE WORK.
2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL
TRAFFIC AND STORAGE WITH COR.
3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,
ELECTRICAL, AND FIRE PROTECTION.
4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING
SHALL BE APPROVED BY COR.
5. REFER AND ADHERE TO THE INFECTION PREVENTION MEASURE
REQUIREMENTS IN SPECIFICATION SECTION 01 35 26 17
TEMPORARY ICRA BARRIER SHALL BE PROVIDED AT ALL
PATIENT RELATED AREAS AND COMPLETED PRIOR TO THE START OF ANY
WORK.
6. NO KNOWN ASBESTOS IN SCOPE. IF ASBESTOS CONTAINING MATERIALS ARE
SUSPECTED, STOP WORK IN THE AREA AND CONTACT COR.
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, STORING AND RELOCATING ALL
EQUIPMENT & FURNITURE TO BE SALVAGED. ALL EXISTING CEILING MOUNTED
8. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO
VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS
MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND
MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING
AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
9. THE CONTRACTOR SHALL VERIFY ALL ITEMS AND/OR MATERIALS AND/OR
EQUIPMENT TO BE SALVAGED, PRIOR TO THE START OF DEMOLITION WORK.
10. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS.
11. BEFORE DEMOLITION, CONTRACTOR TO VERIFY WITH THE COR THE
SIGNAGE TO BE SALVAGED AND STORED FOR FUTURE USE. EXISTING AND
NEW SIGNAGE TO MATCH EXISTING WHN ADJACENT TO EXISTING
SIGNAGE. ALL OTHER NEW SIGNAGE TO MATCH FACILITY STANDARDS.
12. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST REMAIN
ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT ALL PHASES OF
DEMOLITION AND CONSTRUCTION. SHORT-TERM CLOSURE MAY BE
ACCEPTABLE AS COORDINATED WITH COR. SEE ILSM REQUIREMENTS ON AD-101.
13. THE CONTRACTOR SHALL PATCH AND REPAIR ALL FIREPROOFING DAMAGED
DURING CONSTRUCTION. ALL NEW FIREPROOFING TO MEET CURRENT CODES.
14. ALL EXISTING PENETRATIONS, WITHIN LIMIT OF WORK AND NEW
CONSTRUCTION, ARE TO BE SEALED TO MATCH EXISTING CONSTRUCTION
AND RATING.
15. PROTECT ALL EXISITNG CONDITIONS & EQUIPMENT DURING
CONSTRUCTION.
16. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK WITH COR
AND EXISTING WARRANTY INFORMATION. INDEPENDENT INSPECTOR TO VERIFY
ROOF TOP WORK.
17. PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE
CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEMS" TO
LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.
18. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND
RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS
BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF
PROTECTING THE OPENINGS.
POWER/DATA SYMBOL LEGEND
PLAN ELEV.
DESCRIPTION
DUPLEX, E2N
QUAD, E4N
DUPLEX EMERGENCY, E2E
QUAD EMERGENCY, E4E
JUNCTION BOX, J
SWITCH, LS
THERMOSTAT, T
DATA PORT, D1
NURSE CALL, NC
TELEPHONE PORT, TELE
TELEVISION COAX, TV
T
J
TV
CODE BLUE, CB /
TELEPHONE/DATA PORT, D1
HAND WAVE SENSOR AUTO DOOR OPERATOR, HSHS
PUSH BUTTON AUTO DOOR OPERATOR, PBPB
CARD READER ELECTRONIC SECURITY DEVICE, CRCR
POWER / DATA / FF&E GENERAL NOTES
1. DEVICES SHOWN ARE ARCHITECTURALLY SIGNIFICANT. REFER TO IT/AV AND
ELECTRICAL DRAWINGS FOR COMPLETE DOCUMENTATION.
2. ALL OUTLET DIMENSIONS SHOWN TO CENTERLINE OF OUTLET/BOX.
3. ALL OUTLETS SHALL BE 18" ABOVE FINISH FLOOR, U.N.O.
4. ALL SWITCHES SHALL BE 48" ABOVE FINISH FLOOR, U.N.O.
5 IN CASE OF MINOR DISCREPANCIES BETWEEN ARCHITECTURAL AND
ELECTRICAL/IT DOCUMENTS, THE ARCHITECTURAL POWER/DATA PLAN
SHALL GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT
SHALL BE NOTIFIED AS SOON AS THE DISCREPANCY IS DISCOVERED PRIOR
TO PROCEEDING WITH THE WORK.
6. REFER TO SHEET A-503 FOR OUTLET INSTALLATION DETAILS IN RATED AND
ACOUSTICAL WALL ASSEMBLIES.
7. REFER TO SHEET A-205 ELEVATION DRAWINGS FOR ADDITIONAL
INFORMATION AND MOUNTING HEIGHTS.
8. FF&E SHOWN IS FOR OUTLET LOCATION COORDINATION ONLY.
9. ALL OUTLETS AND COVER PLATES SHALL MATCH THE ADJACENT WALL
FINISH AS BEST POSSIBLE. THE ARCHITECT SHALL BE NOTIFIED FOR UNIQUE
FINISHES TO APPROVE THE COVER PLATE COLOR SELECTION.
10. REFER TO MILLWORK DETAIL DRAWINGS FOR OUTLETS OR SWITCHES
MOUNTED IN SPECIALTY CONSTRUCTION.
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Install Elevators and Complete Space Build-out for B162 and B164
Location:
Final - Bid Set
June 3, 2022 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
649-22-136
Northern Arizona VA Health Care System
500 AZ-89, Prescott, AZ 86301
AESUS
B162 and B164
A-200
FLOOR PLANS
SCALE: 1/8" = 1'-0"
B162-PIPE LEVEL
FLOOR PLAN KEYNOTES
1 EXISTING WALL, TYPICAL.
2 EXISTING STAIRS TO REMAIN, EGRESS SHALL NOT BE BLOCKED DURING
CONSTRUCTION ACTIVITY.
3 REMOVE AND REINSTALL THE EXISTING SHAFTLINER AT THE PIPE BASEMENT
LEVEL TO GAIN ACCESS AND INSTALL ELEVATOR.
4 EXISTING SUMP PIT TO REMAIN, MODIFY AS REQUIRED FOR NEW EQUIPMENT.
5 EXISITNG CONCRETE PAD FOR ELEVATOR PIT TO REMAIN.
6 PREP SHAFT WALL FOR NEW ELEVATOR DOOR, SEE DETAILS ON SHEET A-511.
7 NEW ELEVATOR IN EXISTING SHAFT, SEE ENLARGED PLAN.
8 NEW ELEVATOR EQUIPMENT, TYPCIAL.
9 EXISTING DOOR, TYPICAL.
10 CONCRETE EQUIPMENT PAD, VERIFY SIZE WITH EQUIPMENT SHOP DRAWINGS.
11 ADD ELECTRONIC ADA PUSH BUTTON AND DOOR OPENER TO THE EXISTING DOOR.
VERIFY EXACT LOCATION WITH OWNER. PATCH, REPAIR, AND PAINT WALLS AS
REQ'D FOR INSTALLATION.
12 PATCH AND REPAIR WALLS AS REQ'D FOR EQUIPMENT INSTALLATION, MATCH
EXISTING ADJACENT.
13 NEW DOOR AND FRAME WITH ELECTRONIC CARD READER. SEE DOOR HARDWARE
SCHEDULE.
14 NEW 3-5/8" METAL STUD WALL W/ 5/8" GYPSUM BOARD AT EACH SIDE (FULL
HEIGHT). MODIFY THE EXISTING CEILING AND/OR HEAD CONDITION AS REQ'D FOR
THE NEW DOOR. MATCH EXISTING ADJACENT TEXTURE AND FINISH.
15 REMOVE AND REPLACE THE EXISTING RUBBER BASE, WALL PROTECTION, AND
HANDRAIL/GUARDRAIL AS REQ'D (EACH SIDE OF DOOR/WALL) FOR THE NEW WALL
AND DOOR INSTALLATION.
16 REMOVE AND RELOCATE EXISTING LIGHT FIXTURES & DIFFUSERS AS REQ'D FOR
WALL INSTALLATION.
17 CONTRACTOR TO CONFIRM EXISTING DOOR CLOSER DOES NOT EXCEED 5LBS AND
REPORT INFORMATION TO THE COR
SCALE: 1/8" = 1'-0"
B162-LEVEL 01
SCALE: 1/8" = 1'-0"
B162-LEVEL 02
ELECTRICAL
ROOM
MEN'S TOILET
WOMEN'S
TOILET
HAC
CORRIDOR
LAB STORAGE
BREAK ROOM
CORRIDOR
STAIR
S-1
DELIVERY
IT CLOSET
MECHANICAL
ROOM
BUILDING 160
473 SF
PHARMACY
STORAGE
H.9H.3HG.3G
F
D
E.3
0.5
0.1
MACHINE
ROOM
CORRIDOR
E-01
CR
-0
ELEVATOR
E-001
5'-0" 15'-11"
3' -0
1'
-0
A-504
FEC
A-204
701 SF
PHARMACY
CHACHE
BREAKOUT
AREA
24'-11"
'-0
10'-0"
5' -6
A-201
(12) 30x60 Cart(s)
(6) 48x48 Pallets, 2 high on a rack
(18) 24x48 Wire Racks
Work Space for (2) stations
8'-5"
E Power
E Power
4' -8
4'
-8 "(6) 48x48 Pallets, 2 high on a rack
12 1212
OFFICE
OFFICE
164-012
164-015
164-007
164-013
CR
W2 W2 W2
-0
CR
CR
CR
CR
A3
A3
4 / A-205
5 / A-205
H2H2
H2
STORAGE
002B
CR
-0
B
A3
A3
PHARM
REF RXXXX
HELMBER
REF RYXXX
SAFE,
(S1000)
DESK,
(E0078)DESK,
(E0078)
DESK,
(E0078)
DESK,
(E0078)
DESK,
(E0078)
MFP,
(M1825)
COMPUTER,
(M1801)
WASTE,
(F2000)
6' -2
POWER/DATA SYMBOL LEGEND
PLAN ELEV.
DESCRIPTION
DUPLEX, E2N
QUAD, E4N
DUPLEX EMERGENCY, E2E
QUAD EMERGENCY, E4E
JUNCTION BOX, J
SWITCH, LS
THERMOSTAT, T
DATA PORT, D1
NURSE CALL, NC
TELEPHONE PORT, TELE
TELEVISION COAX, TV
T
J
TV
CODE BLUE, CB /
TELEPHONE/DATA PORT, D1
HAND WAVE SENSOR AUTO DOOR OPERATOR, HSHS
PUSH BUTTON AUTO DOOR OPERATOR, PBPB
CARD READER ELECTRONIC SECURITY DEVICE, CRCR
CLC
FIRE RATED WALL SYMBOLS:
1 HOUR FIRE
2 HOUR SHAFT
1 HOUR FIRE / SMOKE
2 HOUR FIRE / SMOKE
1 HOUR SMOKE
CONSTRUCTION BARRIER
FLOOR PLAN GENERAL NOTES
1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.
LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER
SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION
OF THE WORK.
2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL
TRAFFIC AND STORAGE WITH COR.
3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,
ELECTRICAL, AND FIRE PROTECTION.
4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING
SHALL BE APPROVED BY COR.
5. REFER AND ADHERE TO THE INFECTION PREVENTION MEASURE
REQUIREMENTS IN SPECIFICATION SECTION 01 35 26 17
TEMPORARY ICRA BARRIER SHALL BE PROVIDED AT ALL
PATIENT RELATED AREAS AND COMPLETED PRIOR TO THE START OF ANY
WORK.
6. NO KNOWN ASBESTOS IN SCOPE. IF ASBESTOS CONTAINING MATERIALS ARE
SUSPECTED, STOP WORK IN THE AREA AND CONTACT COR.
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, STORING AND RELOCATING ALL
EQUIPMENT & FURNITURE TO BE SALVAGED. ALL EXISTING CEILING MOUNTED
8. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO
VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS
MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND
MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING
AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
9. THE CONTRACTOR SHALL VERIFY ALL ITEMS AND/OR MATERIALS AND/OR
EQUIPMENT TO BE SALVAGED, PRIOR TO THE START OF DEMOLITION WORK.
10. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS.
11. BEFORE DEMOLITION, CONTRACTOR TO VERIFY WITH THE COR THE
SIGNAGE TO BE SALVAGED AND STORED FOR FUTURE USE. EXISTING AND
NEW SIGNAGE TO MATCH EXISTING WHN ADJACENT TO EXISTING
SIGNAGE. ALL OTHER NEW SIGNAGE TO MATCH FACILITY STANDARDS.
12. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST REMAIN
ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT ALL PHASES OF
DEMOLITION AND CONSTRUCTION. SHORT-TERM CLOSURE MAY BE
ACCEPTABLE AS COORDINATED WITH COR. SEE ILSM REQUIREMENTS ON AD-101.
13. THE CONTRACTOR SHALL PATCH AND REPAIR ALL FIREPROOFING DAMAGED
DURING CONSTRUCTION. ALL NEW FIREPROOFING TO MEET CURRENT CODES.
14. ALL EXISTING PENETRATIONS, WITHIN LIMIT OF WORK AND NEW
CONSTRUCTION, ARE TO BE SEALED TO MATCH EXISTING CONSTRUCTION
AND RATING.
15. PROTECT ALL EXISITNG CONDITIONS & EQUIPMENT DURING
CONSTRUCTION.
16. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK WITH COR
AND EXISTING WARRANTY INFORMATION. INDEPENDENT INSPECTOR TO VERIFY
ROOF TOP WORK.
17. PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE
CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEMS" TO
LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.
18. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND
RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS
BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF
PROTECTING THE OPENINGS.
G.3G
0.5
3 / A-205
BREAK ROOM
COFFEE,
(K1552)
TOWEL,
(A5080)
SOAP,
(A5075)
MICROWAVE,
(K4665)
REFRIG
(R7250)
REFRIG
(R7250)
WASTE,
(F2015)
CR
-0
164-007
SOLID SURFACE
COUNTERTOP
UNDERMOUNT
STAINLESS STEEL
SINK
FEC
/ A
-2
CR
POWER / DATA / FF&E GENERAL NOTES
1. DEVICES SHOWN ARE ARCHITECTURALLY SIGNIFICANT. REFER TO IT/AV AND
ELECTRICAL DRAWINGS FOR COMPLETE DOCUMENTATION.
2. ALL OUTLET DIMENSIONS SHOWN TO CENTERLINE OF OUTLET/BOX.
3. ALL OUTLETS SHALL BE 18" ABOVE FINISH FLOOR, U.N.O.
4. ALL SWITCHES SHALL BE 48" ABOVE FINISH FLOOR, U.N.O.
5 IN CASE OF MINOR DISCREPANCIES BETWEEN ARCHITECTURAL AND
ELECTRICAL/IT DOCUMENTS, THE ARCHITECTURAL POWER/DATA PLAN
SHALL GOVERN. IN THE CASE OF MAJOR DISCREPANCIES, THE ARCHITECT
SHALL BE NOTIFIED AS…