Amendment 0005 Attachment 11 RFI Questions 104 and 107 B162 Elevator Pit.pdf
PDF 294 KB Posted
- Solicitation number
- 36C26222R0044
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
A
4 3 2 1
B
D
E
A.7
B.3
3.5
PIPE BASEMENT
B000
C
CORRIDOR
B001
4.5
D.3
EXISTING BLDG 148
148-A413 F8
PAINT EXPOSED STEEL BEAMS & COLUMNS
IN PIPE BASEMENT
3' -5
/4
'-1
7/
8"
'-8
/4
6' -2
2'
-0
41'-1 1/4" 60'-6 3/4"
LV-2 58" X 58"
ACCESS DOOR
F7 148-A311
05C
05C
05C 05C
AIRWAY 1
B-003
EQUIP HOISTWAY
B004
SERVICE CRAWL
WAY
B002
1/ 8"
1/8" / 12" 91' - 0"
90' - 10 1/2"
91' - 0"
92' - 0"
92' - 0"
92' - 0"
87' - 9"
85' - 9"
PIT FLOOR
SUMP
FLOOR
CJ
CJ
91' - 0"
94' - 0"
ELEVATOR
PIT FLOOR
148-A131 E1
148-A131 E3
1'-2" 6 3/4"
3/
4"
TUNNELUTILITY
37'-4" 23'-10" 16'-5 3/8" 24'-0 5/8"
101'-8"
6'-5 1/2" 15'-4 1/2" 2'-0"
7'-5"
2'-0"17'-2" 1'-5 3/8"
5'-8 5/8"
1'-6" 24'-0" 25'-4" 25'-4" 24'-0" 1'-6"
'-9
7"
'-0
/2
5' -5
/2
5' -2
/2
FOR ADDITIONAL
DIMENSIONAL CONTROLS SEE
/C1 148-A112
'-4
/2
'-0
'-1
0"
6' -8
5'-4 1/4"
2' -0
4' -1
1/
2"
'-0
/2
'-1
1/ 4"
'-5
/8
1' -5
/4
1' -0
'-4
/4
9' -0
'-0
'-0
'-0
'-3
'-9
3' -1
0"
8' -1
1/
2"
'-4
91' - 0"
91' - 0"
90' - 11"
90' - 11"
91' - 0"
91' - 0"
1/8" / 12" 1/8" / 12"
148-A502
A4
148-A502
C4 148-A502
D4
148-A502F4 F2
148-A212
F1
A
4 3 2 1
B
D
E
A.7
B.3
3.5
C
SLOPE 1/2" / 12"
R4
R1
R2
(E) ROOF
(E) ROOF
BLDG 148
SL
O
PE
2"
ALT #7
LOADING DOCK
CANOPY
SLOPE 5" / 12"
1/2" / 12"
1/
2"
2 1
/4"
2' - 9 1/2"
F7 148-A311
1/ 2"
1/2" / 12" 1/2" / 12"
1/2" / 12" 1/2" / 12"
R4
2' -1
1"
'-1
3/ 4"
3' -2
1/ 2"
1/
2"
RIDGE
1/2 " / 1 2"
148-A131
5 FOR STAIR
DETAIL
131' - 7 1/4"
135' - 4"
2' x 7' OPNG IN (E)
ROOF DECK BELOW
SEE - /F6 148-A313
TPO MEMBRANE
PERLITE OR CELLULOSE
FIBER MIN. 1 1/2"
MTL. DECK - DECK
SLOPES
TAPERED TRIGID
INSULATION MIN. R-
5/8" GYP. OR 1/2"
COVER BD.
LEVEL MTL. DECK
VAPOR BARRIER3/4" COVER BOARD
TPO MEMBRANE
COMPOSITE NAIL BASE
SHTG.: 5/8" OSB+3 1/2"
RIGID INSULATION
5/8" GYP. OR 1/2"
COVER BD.
1 1/2" MTL. DECK
UNDERLAYMENT
ASHPHALT SHINGLES
12" 5"
TAPERED RIGID
INSULATION MIN. 2"
THICK
CONC. ON LEVEL MTL. DECK
VAPOR BARRIER
3/4" COVER BOARD
TPO MEMBRANE
A.7
3.5
F7 148-A311
F7
148-A311UP
UP
LANDING
5'-3 1/4"
10R@6.75" / 9T@11" 8'-3"
6'-9 7/8" 6R@6.75" / 5T@11"
4'-7"
FOR ADDITIONAL
INFO. SEE
/C1 148-A112
1'-1 1/2"
3/
4" C
LR
3'
-0
/8
3/
4"
8' -1
TO LEVEL 1
SLAB LIMITS ABV.
1'-1 1/2"
A8
148-A503
A6
148-A503
Sim
A3
148-A503
A.7
F1 148-A313
TUNNEL
UTILITY
3' -1
0"
3'-6"
1'-6"
1' -6
PIT FLOOR
SUMP FLOOR
COORD PIT LOCATION
TO EQ. LAP UTILITY
TUNNEL OPENING
E4
148-A131 (N) PIPE
BASEMENT LEVEL
92' - 0"
A.7
F1 148-A313
90' - 10 1/2"
88' - 8 7/8"
87' - 9"
85' - 9"
TU
N
N
EL
UT
IL
ITY
PIT FLOOR
SUMP FLOOR
A.7
3.5
F7 148-A311
F7 148-A3111'-1 1/2"
STAIR
S - 6
3E -S
-6
ROOF
132' - 3"
120' - 2 1/8" 127' - 7 3/4"
FACE OF BULKHEAD.
OMITTED FOR CLARITY
LANDING
LANDING
LANDING
5'-6 5/8" 13R@6.898" / 12T@11'
11'-0" 6'-1 3/4"
8R@6.898" / 7T@11" 6'-5" 5'-3"
4'-8 1/8" 9R@6.898" / 8T@11"
7'-4"
TO LEVEL 2
BELOW
LANDING
LANDING
GUARDRAIL
HANDRAIL
(TYP)
3/
4" C
LR
3' -8
/2
3/ 4"
DN
DN
DN
LANDING
1'-3 1/2"1'-3 1/2"
7/
8"
C
LR
3' -8
/8
3/
4"
1'-1 1/2"
1'-3 1/2"
5'-8"
LANDING
ROOF OH
LIMIT
2939 E. Broadway Blvd. Tucson, AZ. 85716 T 520.881.4546 F 520.795.1822 GLHN.comRevision:
ARCHITECTS & ENGINEERS, INC
2 3 4 5 6 7 8 9
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Drawing Title:
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
NAVAHCS Prescott, AZ
Office of Construction and Facilities Management
GLHN PROJECT# 0855.08
FULLY SPRINKLED
649-409
RJNCK5 OCT, 2016
148-A131
100% CONSTRUCTION DOCUMENTS
EXPANDED REHAB
MEDICINE AND SPS
PIPE BASEMENT FLOOR PLAN & ROOF
PLAN
16 38
SCALE: 3/32" = 1'-0"D1 PIPE BASEMENT LEVEL
SCALE: 1/16" = 1'-0"C4 ROOF PLAN
KEYNOTES
1 ELEVATOR PIT
2 WASTE SLAB. ALT #7 SEE STRUCTURAL
3 AREAWAY
4 ALUM LOUVER
6 FORM CRICKET FROM TAPERED RIGID INSULATION
7 PRE FINISHED COPING. TYPICAL
8 PRE FINISHED MTL GUTTER & DOWN SPOUT
9 ROOF EXPANSION JOINT COVER
10 BUILD CRICKET AT ROOF W/ C.F. METAL STUD FRAMING & PLYWOOD SHEATHING
11 STEEL LADDER
ROOF SYSTEMS
R1 - TPO MEMBRANE ON COVER BOARD ON METAL DECK
R2 - TPO MEMBRANE ON TAPERED RIGID INSULATION ON METAL
DECK.
R3 - TPD MEMBRANE ON TAPERED RIGID INSULATION ON CONCRETE
ON METAL DECK.
R4 - ASPHALT SHINGLES ON COMPOSITE NAIL BASE.
NORTH
NORTH
R1 - ROOFING SYSTEM DETAIL
R2 - ROOFING SYSTEM DETAIL
R4 - ROOFING SYSTEM DETAIL
R3 - ROOFING SYSTEM DETAIL
NORTH
SCALE: 1/4" = 1'-0"E1 BASEMENT - STAIR DIMENSION PLAN
SCALE: 1/4" = 1'-0"E3 BASEMENT - UTILITY TUNNEL PIT
SCALE: 1/4" = 1'-0"E4 SECTION @ UTILITY TUNNEL PIT
SCALE: 1/4" = 1'-0"5 5-ROOF LEVEL - STAIR NORTH
File details come from the government source that posted it. Updated .