View the file

Other files

File Type Posted
Amendment 0007 Attachment 1 RFI Question Answer MATOC Solicitation.pdf PDF
Amendment 0007 Solicitation 36C26222R0044.pdf PDF
Amendment 0006 Solicitation 36C26222R0044.pdf PDF
Amendment 0005 Attachment 7 RFI Questions 28-51-119 B162 Geotechnical Evaluation Report.pdf PDF
Amendment 0005 Attachment 8 RFI Questions 28-51-119 Lab Pharmacy Soils Report.pdf PDF
Amendment 0005 Attachment 12 RFI 125 SF 24.pdf PDF
Amendment 0005 Solicitation 36C26222R0044.pdf PDF
Amendment 0005 Attachment 15 Earthwork Fill Material Lab Rpt.pdf PDF
Amendment 0005 Attachment 10 RFI Questions 104-107 B162 Elevator Airflow.pdf PDF
Amendment 0005 Attachment 19 Testing_and_Inspection_Plans_Elevator_Pit_Footing_17.09.21_(28)_Day_Bre_14167911.pdf PDF
Amendment 0005 Attachment 2 RFI 11 Seed Project.pdf PDF
Amendment 0005 Attachment 17 GTI New Lab Pharmacy As Builts.pdf PDF
Amendment 0005 Attachment 1 RFI 2 Seed Project Physical_Access_Control__Data.pdf PDF
Amendment 0005 Attachment 9 RFI 34 EPDM Submittal.pdf PDF
Amendment 0005 Attachment 3 RFI Questions 20-104-107 B162 Elevator Drawings.pdf PDF
Amendment 0005 Attachment 6 RFI Questions 28-30-51-81-82 119 ED Soils Report.pdf PDF
Amendment 0005 Attachment 20 Testing_and_Inspection_Plans_Elevator_Pit_Walls_17.09.28_(7)_Day_Break_14167948.pdf PDF
Amendment 0005 Attachment 4 RFI Questions 20-104-107 B164 Elevator Drawings.pdf PDF
Amendment 0005 Attachment 13 RFI Questions 23-25-54-84 Additional Civil Specs.pdf PDF
Amendment 0005 FAR 52.216-22.pdf PDF
Amendment 0005 Seed Project RFI Questions and Answers.pdf PDF
Amendment 0005 Attachment 14 Earthwork Base Course Lab Rpt.pdf PDF
Amendment 0005 Attachment 11 RFI Questions 104 and 107 B162 Elevator Pit.pdf PDF
Amendment 0005 Attachment 16 ED Drainage Details.pdf PDF
Amendment 0005 Attachment 18 Proposed Lab_Pharmacy Bldg Plans_Hole locations.pdf PDF
Amendment 0004 Solicitation 36C26222R0044.pdf PDF
Amendment 0003 Solicitation 36C26222R0044.pdf PDF
Amendment 0002 Attachment 1 Site Visit Sign-In Sheet.pdf PDF
Amendment 0002 Solicitation 36C26222R0044.pdf PDF
Amendment 0001 Attachment 1 Site Visit Map - Bldg. 19.pdf PDF
Amendment 0001 Solicitation 36C26222R0044.pdf PDF
S02 Solicitation Attachment 2 Technical Proposal Data.docx DOCX document
Amendment 0001 Attachment 2 Seed Project Site Visit Information.pdf PDF
S02 Solicitation Attachment 3 Evaluation Ratings and Definitions.pdf PDF
S02 Solicitation Attachment 6 Contractor Surety Limitations.docx DOCX document
S02 Solicitation Attachment 4 Subcontractor Information And Consent.docx DOCX document
S02 Solicitation Attachment 1 Past Performance Questionnaire.docx DOCX document
S02 Solicitation Attachment 13 Seed Project Specifications.pdf PDF
S02 Solicitation Attachment 5 Bid Schedule - MATOC SEED Project.docx DOCX document
S02 Solicitation Attachment 12 Seed Project Drawings.pdf PDF
S02 Solicitation Attachment 9 Contractor Safety and EMR Info.docx DOCX document
S02 Solicitation Attachment 14 Seed Project Structural Calculations.pdf PDF
S02 Solicitation Attachment 7 Financial Disclosure Questionnaire.docx DOCX document
S02 Solicitation Attachment 2 Technical Proposal Data.docx DOCX document
S02 Solicitation Attachment 10 Seed Project Wage Determination.pdf PDF
S02 Solicitation Attachment 8 Location Capabilities Questionnaire.docx DOCX document
S02 Solicitation Attachment 11 Prescott Facility Map.pdf PDF
S02 Solicitation Attachment 15 Seed Project Statement of Work.pdf PDF
S02 Solicitation 36C26222R0044.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOB STUMP VA MEDICAL CENTER PROJECT #649-407

EMERGENCY DEPARTMENT

32 12 16 - 1

ASPHALT PAVING

SECTION 32 12 16

PART 1 - GENERAL

1.1 DESCRIPTION

This work shall cover the composition, mixing, construction upon the prepared subgrade, and the protection of hot asphalt concrete pavement.

The hot asphalt concrete pavement shall consist of an aggregate or asphalt base course and asphalt surface course constructed in conformity with the lines, grades, thickness, and cross sections as shown. Each course shall be constructed to the depth, section, or elevation required by the drawings and shall be rolled, finished, and approved before the placement of the next course.

1.2 RELATED WORK

A. Laboratory and field testing requirements: Section 01 45 29, TESTING

LABORATORY SERVICES.

B. Subgrade Preparation: Paragraph 3.3 and Section 31 20 00, EARTH MOVING.

C. Pavement Markings: Section 32 17 23, PAVEMENT MARKINGS.

1.3 INSPECTION OF PLANT AND EQUIPMENT

The Resident Engineer shall have access at all times to all parts of the material producing plants for checking the mixing operations and materials and the adequacy of the equipment in use.

1.4 ALIGNMENT AND GRADE CONTROL

The Contractor’s Registered Professional Land Surveyor shall establish and control the pavement (aggregate or asphalt base course and asphalt surface course) alignments, grades, elevations, and cross sections as shown on the Drawings.

1.5 SUBMITTALS

A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES, furnish the following:

B. Data and Test Reports:

1. Aggregate Base Course: Sources, gradation, liquid limit, plasticity index, percentage of wear, and other tests required by State Highway

Department.

2. Asphalt Base/Surface Course: Aggregate source, gradation, soundness loss, percentage of wear, and other tests required by State Highway

Department.

3. Job-mix formula.

C. Certifications:

32 12 16 - 2

1. Asphalt prime and tack coat material certificate of conformance to

State Highway Department requirements.

2. Asphalt cement certificate of conformance to State Highway Department requirements.

3. Job-mix certification - Submit plant mix certification that mix equals or exceeds the State Highway Specification. The Contractor shall retain and reimburse a laboratory to perform said duties; or to obtain a certification from the authorized representative of the

State; or to obtain certification from the asphalt paving producer.

Certificate of compliance shall cover quality and gradation of aggregate base, quality and grades of asphalt course materials, and that the job-mixture meets or exceeds the State requirements.

D. One copy of State Highway Department Specifications.

E. Provide MSDS (Material Safety Data Sheets) for all chemicals used on ground.

PART 2 - PRODUCTS

2.1 GENERAL

A. Aggregate base and asphalt concrete materials shall conform to the requirements of the following and other appropriate sections of the latest version of the State Highway Material Specifications, including amendments, addenda and errata. Where the term "Engineer" or

"Commission" is referenced in the State Highway Specifications, it shall mean the VA Resident Engineer or VA Contracting Officer.

2.2 AGGREGATES

A. Provide aggregates consisting of crushed stone, gravel, sand, or other sound, durable mineral materials processed and blended, and naturally combined.

B. Subbase aggregate (where required) maximum size: 38mm(1-1/2").

C. Base aggregate maximum size:

1. Base course over 152mm(6") thick: 38mm(1-1/2");

2. Other base courses: 19mm(3/4").

D. Asphaltic base course:

1. Maximum particle size not to exceed 25.4mm(1”).

2. Where conflicts arise between this specification and the requirements in the latest version of the State Highway Specifications, the State

Specifications shall control.

E. Aggregates for asphaltic concrete paving: Provide a mixture of sand, mineral aggregate, and liquid asphalt mixed in such proportions that the percentage by weight will be within:

32 12 16 - 3

Sieve Sizes

19mm(3/4")

Percentage Passing

9.5mm(3/8") 67 to 85

6.4mm(1/4") 50 to 65

2.4mm(No. 8 mesh) 37 to 50

600µm(No. 30 mesh) 15 to 25

75µm(No. 200 mesh) 3 to 8 plus 50/60 penetration liquid asphalt at 5 percent to 6-1/2 percent of the combined dry aggregates.

2.3 ASPHALTS

A. Comply with provisions of Asphalt Institute Specification SS2:

1. Asphalt cement: Penetration grade 50/60

2. Prime coat: Cut-back type, grade MC-250

3. Tack coat: Uniformly emulsified, grade SS-1H

2.4 SEALER

A. Provide a sealer consisting of suitable fibrated chemical type asphalt base binders and fillers having a container consistency suitable for troweling after thorough stirring, and containing no clay or other deleterious substance.

B. Where conflicts arise between this specification and the requirements in the latest version of the State Highway Specifications, the State

Specifications shall control.

PART 3 - EXECUTION

3.1 GENERAL

The Asphalt Concrete Paving equipment, weather limitations, job-mix formula, mixing, construction methods, compaction, finishing, tolerance, and protection shall conform to the requirements of the appropriate sections of the State Highway Specifications for the type of material specified.

3.2 MIXING ASPHALTIC CONCRETE MATERIALS

A. Provide hot plant-mixed asphaltic concrete paving materials.

1. Temperature leaving the plant: 143 degrees C(290 degrees F) minimum, 160 degrees C(320 degrees F) maximum.

2. Temperature at time of placing: 138 degrees C(280 degrees F) minimum.

3.3 SUBGRADE

A. Shape to line and grade and compact with self-propelled rollers.

B. All depressions that develop under rolling shall be filled with acceptable material and the area re-rolled.

32 12 16 - 4

C. Soft areas shall be removed and filled with acceptable materials and the area re-rolled.

D. Should the subgrade become rutted or displaced prior to the placing of the subbase, it shall be reworked to bring to line and grade.

E. Proof-roll the subgrade with maximum 45 tonne (50 ton) gross weight dump truck as directed by VA Resident Engineer or VA Contracting Officer. If pumping, pushing, or other movement is observed, rework the area to provide a stable and compacted subgrade.

3.4 BASE COURSES

A. Subbase (when required)

1. Spread and compact to the thickness shown on the drawings.

2. Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the roller.

3. After completion of the subbase rolling there shall be no hauling over the subbase other than the delivery of material for the top course.

B. Base

1. Spread and compact to the thickness shown on the drawings.

2. Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the roller.

3. After completion of the base rolling there shall be no hauling over the base other than the delivery of material for the top course.

C. Thickness tolerance: Provide the compacted thicknesses shown on the

Drawings within a tolerance of minus 0.0mm (0.0") to plus 12.7mm (0.5").

D. Smoothness tolerance: Provide the lines and grades shown on the Drawings within a tolerance of 5mm in 3m (3/16 inch in ten feet).

E. Moisture content: Use only the amount of moisture needed to achieve the specified compaction.

3.5 PLACEMENT OF ASPHALTIC CONCRETE PAVING

A. Remove all loose materials from the compacted base.

B. Apply the specified prime coat, and tack coat where required, and allow to dry in accordance with the manufacturer’s recommendations as approved by the Architect or Engineer.

C. Receipt of asphaltic concrete materials:

1. Do not accept material unless it is covered with a tarpaulin until unloaded, and unless the material has a temperature of not less than

130 degrees C(280 degrees F).

2. Do not commence placement of asphaltic concrete materials when the atmospheric temperature is below 10 degrees C (50 degrees F), not during fog, rain, or other unsuitable conditions.

D. Spreading:

32 12 16 - 5

1. Spread material in a manner that requires the least handling.

2. Where thickness of finished paving will be 76mm (3") or less, spread in one layer.

E. Rolling:

1. After the material has been spread to the proper depth, roll until the surface is hard, smooth, unyielding, and true to the thickness and elevations shown own the drawings.

2. Roll in at least two directions until no roller marks are visible.

3. Finished paving smoothness tolerance:

a. No depressions which will retain standing water.

b. No deviation greater than 3mm in 1.8m (1/8" in six feet).

3.6 APPLICATION OF SEAL COAT

A. Prepare the surfaces, mix the seal coat material, and apply in accordance with the manufacturer’s recommendations as approved by the

Architect or Engineer.

B. Apply one coat of the specified sealer.

C. Achieve a finished surface seal which, when dry and thoroughly set, is smooth, tough, resilient, of uniform black color, and free from coarse textured areas, lap marks, ridges, and other surface irregularities.

3.7 PROTECTION

Protect the asphaltic concrete paved areas from traffic until the sealer is set and cured and does not pick up under foot or wheeled traffic.

3.8 FINAL CLEAN-UP

Remove all debris, rubbish, and excess material from the work area.

- - - E N D - - -