This document is a VA Rendition of Engineer Form 4288-R, which serves as a comprehensive submittal schedule for a federal construction contract. The form establishes a detailed tracking system for all contractor submissions organized by specification section, including the type of submittal (data, drawings, instructions, schedules, statements, reports, certifications, samples, work plans, or other records), classification status (government approved, submission required, approval needed, or material needed), and contractor schedule dates with corresponding government action dates and approval codes.

The submittal schedule covers an extensive range of construction work encompassing general requirements, project scheduling (CPM schedules for both small projects and design-build deliverables), safety requirements, quality control, waste management, sustainable construction, commissioning of multiple building systems, asbestos abatement (both traditional and glovebag methods), and detailed specifications for metal fabrications, thermal insulation, firestopping, joint sealants, doors and frames, hardware, glazing, interior finishes, flooring systems, ceilings, plumbing systems, HVAC systems, electrical installations, communications infrastructure, and electronic safety and security systems. Each specification section identifies specific submittals required with notation indicating whether items require government approval prior to material procurement or construction, approval before a specified date, or are informational only. The form establishes a formal control mechanism for contractor submissions and government reviews, ensuring compliance with design specifications and federal contracting requirements throughout all phases of construction and commissioning.

View the file

Other files

File Type Posted
36C24826Q0459 0003.docx DOCX document
Bay Pines PET-CT Room 2025.07.24 - Shielding Report.pdf PDF
S02_36C24826Q0459 0002.docx DOCX document
S05_Site visit Sign in sheet 05262026 .jpg JPG image
516-CSI-144_Install New PETCT_100 percent IFC Specs.pdf PDF
516-CSI-134_Bay Pines PET CT_IFC Change Summary.pdf PDF
S05_RFIs Prepare Site PET.xlsx XLSX spreadsheet
516-CSI-144_Submittal_Log.xlsx XLSX spreadsheet
Change Summary.docx DOCX document
516-CSI-144_Submittal_Log.pdf PDF
Amendment 0001.pdf PDF
H4247213 - Bay Pines VA Hospital CT Update - ACM LBP Report Revised Final Signed.pdf PDF
516-CSI-134_Bay Pines PET-CT_100 percent IFC Drawings.pdf PDF
H4247213 Bay Pines PET-CT Mold Sampling Final - signed.pdf PDF
S02_RFP Attachment H4247213 Bay Pines PET-CT Mold Sampling Final 23 pages.pdf PDF
S02_RFP Attachment Specialized Experience Form 3 pages.pdf PDF
S02_RFP Attachment Divisional Price Breakdown.xlsx XLSX spreadsheet
S02_RFP Attachment WD FL20250222 01022026_Pinellas 10 pages.pdf PDF
S02_RFP Attachment 07a-516-CSI-134_BayPines_PET-CT_100percent_IFB_Drawings_REV31MAR2026 104 pages.pdf PDF
S02_Solicitation 36C24826R0112 FINAL.pdf PDF
S02_RFP Attachment Past Performance Questionnaire 4 pages.pdf PDF
S02_RFP Attachment H4247213-BayPinesVA_CT_Update-ACM_LBP_Report_Revised 41 pages.pdf PDF
S02_RFP Attachment NARA 3 pages Bay Pines 2026.pdf PDF
S02_RFP Attachment 07b-516-CSI-144_New_PET-CT_100percent_IFB_Specs_REV_30MAR2026 945 pages.pdf PDF
S02_RFP Attachment SOW-516-CSI-134_2026-04-02 4 pages.pdf PDF
S02_RFP Attachment EMR 1 page.pdf PDF
S02_RFP Attachment LOS 2 pages.pdf PDF
S02_RFP Attachment Price Schedule 1 page.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D ata

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

01 00 00 General Requirements Electronic Security Memorandum X

01 00 00 General Requirements Vehicle Authorization Request X

01 00 00 General Requirements Warranty Management Plan X

01 00 00 General Requirements Warranty Item Report X

01 00 00 General Requirements Warranty Tag Record Copy X

01 00 00 General Requirements Acceptance Report X

01 00 00 General Requirements Equipment Maintenance Schedule and

Procedures X

01 00 00 General Requirements Elevator Safety Report X

01 00 00 General Requirements Testing and Commissioning Plan X

01 00 00 General Requirements Test Results X

01 00 00 General Requirements Course Outline X

01 32 16.01 AE CPM Schedules CPM Developer Information X

01 32 16.01 AE CPM Schedules Reports X

01 32 16.01 AE CPM Schedules Project Schedule X

01 32 16.01 AE CPM Schedules CPM Data X

01 32 16.01 AE CPM Schedules CPM Schedule X

01 32 16.01 AE CPM Schedules Activity/Event ID Schedule X

01 32 16.01 AE CPM Schedules Drawings X

01 32 16.01 AE CPM Schedules AIA Application and Certificate X

01 32 16.01 AE CPM Schedules Narrative Report X

01 32 16.01 AE CPM Schedules Risk Analysis Software, Methods, and

Format X

01 32 16.01 AE CPM Schedules Risk Analysis Results X

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) Qualification Proposal X

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) Schedules X

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) CPM Data X

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) Activity/Event ID Schedule X

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) Activity/Event Date Constraints X

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

x

CONTRACTOR:

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

CONTRACT NO:

SOLICITATION:

REMARKS

SPECIFICATION SECTION:

CONTRACTOR ACTION GOVERNMENT

ACTION

VA Rendition, Engineer Form 4288-R

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) Shop Drawings X

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) CD Requirements and CPM Activity/Event

Record Specs X

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) Application and Certificate for Payment X

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) Schedule Data X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Consultant Information X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Prior Construction Project Information X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Activity/Event Date Constraints X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Shop Drawings X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Cost Loading X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Manpower Loading X

01 32 16.16 Network Analysis Schedules (Design-Build Only) CD Requirements and CPM Activity/Event

Record Specs

01 32 16.16 Network Analysis Schedules (Design-Build Only) Risk Analysis Results, Procedures, and

Reports X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Schedules X

01 32 16.16 Network Analysis Schedules (Design-Build Only) CPM Consultant Qualifications X

01 32 16.16 Network Analysis Schedules (Design-Build Only) AIA Application and Certificate for

Payment X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Fragnets X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Narrative Report X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Schedule Reports X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Network Diagram X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Change Requests X

01 32 16.16 Network Analysis Schedules (Design-Build Only) Weather Delay Analysis X

01 33 23 Shop Drawings, Product Data, and Samples Shop Drawings X

01 33 23 Shop Drawings, Product Data, and Samples Product Data X

01 33 23 Shop Drawings, Product Data, and Samples Samples X

01 35 26 Safety Requirements Matters of Interpretation of Standards X X

01 35 26 Safety Requirements Reports X X

01 35 26 Safety Requirements Work Plans X X

01 35 26 Safety Requirements Certificates X X

01 35 26 Safety Requirements APP X

01 35 26 Safety Requirements AHAs X

01 35 26 Safety Requirements Listing of Designated SSHO X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

01 35 26 Safety Requirements Training Records X

01 35 26 Safety Requirements Fire Safety Measures Report X

01 35 26 Safety Requirements Lift Plan X

01 35 26 Safety Requirements Confined Space Entry Plan X

01 42 19 Reference Standards NONE

01 45 00 Quality Control Preconstruction Contractor Quality Control X X

01 45 00 Quality Control Design Data X

01 45 00 Quality Control Test Reports X

01 45 00 Quality Control CQC Plan X

01 45 00 Quality Control Procedures X

01 45 00 Quality Control DQC Plan X

01 45 00 Quality Control Schedule X

01 45 00 Quality Control Shop Drawings X

01 45 00 Quality Control Materials and Equipment X

01 45 00 Quality Control Test Reports X

01 57 19 Temporary Environmental Controls Environmental Protection Plan X X

01 58 16 Temporary Interior Signage NONE

01 74 19 Construction Waste Management Daily Report X X

01 74 19 Construction Waste Management Demolition Management Plan X X

01 74 19 Construction Waste Management Designated Construction Waste Manager X X

01 74 19 Construction Waste Management Monthly debris diversion report X X

01 74 19 Construction Waste Management Final Construction Waste Management

Report X X X

01 81 13 Sustainable Construction Requirements Sustainability Action Plan X

01 81 13 Sustainable Construction Requirements Low Pollutant-Emitting Materials Tracking

Spreadsheet X

01 81 13 Sustainable Construction Requirements Construction Indoor Air Quality (IAQ)

Management Plan X

01 81 13 Sustainable Construction Requirements Product Submittals X

01 81 13 Sustainable Construction Requirements Closeout Submittals X

01 81 13 Sustainable Construction Requirements Sustainable Construction Progress Reports X

01 91 00 General Commissioning Requirements Operation and Maintenance Data Schedule X X

01 91 00 General Commissioning Requirements Pre-Functional Checklists X

01 91 00 General Commissioning Requirements System Manuals X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

01 91 00 General Commissioning Requirements Operation and Maintenance Data X

01 91 00 General Commissioning Requirements Preliminary Commissioning Plan X

01 91 00 General Commissioning Requirements Final Commissioning Plan X

01 91 00 General Commissioning Requirements Systems Functional Performance Test

Procedire X

01 91 00 General Commissioning Requirements Test and Inspection Reports X

01 91 00 General Commissioning Requirements Corrective Action Documents X

01 91 00 General Commissioning Requirements Preliminary Commissioning Report X

01 91 00 General Commissioning Requirements Final Commissioning Report X

01 91 00 General Commissioning Requirements Data for Commissioning X

01 91 00 General Commissioning Requirements Startup Plan X

01 91 00 General Commissioning Requirements Graphical Reports X

01 91 00 General Commissioning Requirements Calibration Requirements X

01 91 00 General Commissioning Requirements Loop Tuning Documentation X

01 91 00 General Commissioning Requirements Development of Systems Functional

Performance Test Procedures X

01 91 00 General Commissioning Requirements Shop Drawings X

01 91 00 General Commissioning Requirements Commissioning Field Report X

01 91 00 General Commissioning Requirements Instructional Program X

01 91 00 General Commissioning Requirements Qualification Data X

01 91 00 General Commissioning Requirements Attendance Record X

01 91 00 General Commissioning Requirements Evaluations X

01 91 00 General Commissioning Requirements Demonstration and Training Recording X

01 91 00 General Commissioning Requirements Transcript X

02 41 00 Demolition NONE

02 82 11 Traditional Asbestos Abatement Asbestos Work Procedures X

02 82 11 Traditional Asbestos Abatement Copies of Notifications X

02 82 11 Traditional Asbestos Abatement Background Air Sampling Results X

02 82 11 Traditional Asbestos Abatement Bulk Material Analysis and Air Sampling

Data Collection Results X

02 82 11 Traditional Asbestos Abatement Employment Approval Request X

02 82 11 Traditional Asbestos Abatement Certifications X

02 82 11 Traditional Asbestos Abatement RPPC Signed Statement X

02 82 11 Traditional Asbestos Abatement Procedure for Selection and Use of

Respirators X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

02 82 11 Traditional Asbestos Abatement 29 CFR 1910.134 Compliance

Documentation and Evidence X

02 82 11 Traditional Asbestos Abatement AHAP X

02 82 11 Traditional Asbestos Abatement Work Schedule X

02 82 11 Traditional Asbestos Abatement Staff Organization Chart X

02 82 11 Traditional Asbestos Abatement Asbestos Hazard Abatement Plan X

02 82 11 Traditional Asbestos Abatement Materials and Equipment X

02 82 11 Traditional Asbestos Abatement Approved Landfill Information X

02 82 11 Traditional Asbestos Abatement Notifications and Arrangements with

Regulatory Agencies X

02 82 11 Traditional Asbestos Abatement Laboratory Personell Information X

02 82 11 Traditional Asbestos Abatement Qualifications Verification X

02 82 11 Traditional Asbestos Abatement State License for Asbestos Abatement X

02 82 11 Traditional Asbestos Abatement Rented Equipment Documentation X

02 82 11 Traditional Asbestos Abatement Manufacturer's Technical Data X

02 82 11 Traditional Asbestos Abatement Daily Log X

02 82 11 Traditional Asbestos Abatement Inspection and Approval Documentation X

02 82 11 Traditional Asbestos Abatement Project Report X

02 82 11 Traditional Asbestos Abatement Design and Layout of Regulated Area and

Negative Air Machines X

02 82 11 Traditional Asbestos Abatement Wetting Agent Documentation X

02 82 13.13 Glovebag Asbestos Abatement Copies of Notifications x

02 82 13.13 Glovebag Asbestos Abatement Sampling Results x

02 82 13.13 Glovebag Asbestos Abatement Certifications x

02 82 13.13 Glovebag Asbestos Abatement Procedure for Selection and Use of

Respirators x

02 82 13.13 Glovebag Asbestos Abatement Evidence and Documentation x

02 82 13.13 Glovebag Asbestos Abatement Accredation x

02 82 13.13 Glovebag Asbestos Abatement AHAP x

02 82 13.13 Glovebag Asbestos Abatement Pre Start Meeting Submittals x x

02 82 13.13 Glovebag Asbestos Abatement Submittals During Abatement x x

02 82 13.13 Glovebag Asbestos Abatement Submittals at Completetion of Abatement x x

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

02 82 13.13 Glovebag Asbestos Abatement Alternative Methods x

02 82 13.13 Glovebag Asbestos Abatement Daily Report Data x

02 82 13.13 Glovebag Asbestos Abatement Requests for Approval x

05 50 00 Metal Fabrications Metal fabricationss manufacturer literature X X

05 50 00 Metal Fabrications Metal fabrications shop drawings X X

05 50 00 Metal Fabrications Certificates X

05 50 00 Metal Fabrications Metal fabrications design calculations X X

05 50 00 Metal Fabrications Setting drawings and instructions X

07 21 13 Thermal Insulation Thermal Insulation Submittal Drawings X X

07 21 13 Thermal Insulation Manufacturer literature and data X X

07 21 13 Thermal Insulation Sustainable design construction requirements X

07 84 00 Firestopping Firestopping sustainable design submittals X

07 84 00 Firestopping Qualifications X

07 84 00 Firestopping Manufacturer literature and data X X

07 84 00 Firestopping Test reports X

07 84 00 Firestopping Manufacturer Certificates X

07 92 00 Joint Sealants Joint Sealants Contractor Certification X

07 92 00 Joint Sealants Joint Sealant sustainable design submittlals X

07 92 00 Joint Sealants Qualifications X

07 92 00 Joint Sealants Contractor certifications X

07 92 00 Joint Sealants Manufacturer Instructions X

07 92 00 Joint Sealants Samples X

07 92 00 Joint Sealants Manufacturer literature and data X X

07 92 00 Joint Sealants Warranty X X

08 11 13 Hollow Metal Doors and Frames Hollow metal doors and frames submittal drawings X X X

08 11 13 Hollow Metal Doors and Frames Manufacturer literature and data X X

08 11 13 Hollow Metal Doors and Frames Sustainable design construction requirements X

08 11 13 Hollow Metal Doors and Frames Test reports X

08 11 13 Hollow Metal Doors and Frames Manufacturer Certificates X

08 11 13 Hollow Metal Doors and Frames Blast design calculations X X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

08 14 00 Interior Wood Doors Interior Wood Door Submittal Drawings X X X

08 14 00 Interior Wood Doors Manufacturer literature and data X X

08 14 00 Interior Wood Doors Samples X

08 14 00 Interior Wood Doors Sustainable design construction requirements X

08 14 00 Interior Wood Doors Test reports X

08 14 00 Interior Wood Doors Operation and maintenance data X X

08 31 13 Access Doors and Frames Access doors and frames submittal drawings X X X

08 31 13 Access Doors and Frames Manufacturer literature and data X X

08 31 13 Access Doors and Frames Sustainable design construction requirements X

08 42 29.23 Sliding Automatic Entrances Product Data x

08 42 29.23 Sliding Automatic Entrances Shop drawings and details x

08 42 29.23 Sliding Automatic Entrances Samples x

08 42 29.23 Sliding Automatic Entrances Informational Submittals x

08 42 29.23 Sliding Automatic Entrances Manufacturer's Field Reports x

08 42 29.23 Sliding Automatic Entrances Operating and Maintenance Manuals x

08 56 19 Pass Windows Warranties and Maintenance x

08 71 00 Door Hardware Hardware Schedule x X

08 71 00 Door Hardware Samples and Manfacturer Literature X X

08 71 00 Door Hardware Test reports X

08 71 13 Automatic Door Operators Submittal Drawings x

08 71 13 Automatic Door Operators Manufacturer Literature and Data x

08 71 13 Automatic Door Operators Test Reports x

08 71 13 Automatic Door Operators Qualifications x

08 71 13 Automatic Door Operators Operation and Maintenance Data x

08 71 13.11 Low Energy Power Assist Door Operators Submittal Drawings x

08 71 13.11 Low Energy Power Assist Door Operators Manufacturer's Literature and Data x

08 71 13.11 Low Energy Power Assist Door Operators Certifications x

08 71 13.11 Low Energy Power Assist Door Operators Operations and Maintenance Data x

08 80 00 Glazing Shop drawings and details X X

08 80 00 Glazing Manufacturer's Certificates X

08 80 00 Glazing Manufacturer's Warranty X

08 80 00 Glazing Manufacturer's Literature and Data X X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

08 87 00 Window Film Product Data x

08 87 00 Window Film Performance Submittals x

09 05 16 Subsurface Preparation for Floor Finishes Shop drawings and details X X

09 05 16 Subsurface Preparation for Floor Finishes Written approval X

09 05 16 Subsurface Preparation for Floor Finishes Product Data X

09 05 16 Subsurface Preparation for Floor Finishes Test Data X

09 06 00 Schedule for Finishes Material finishes and samples X

09 22 16 Non-Structural Metal Framing Manufacturer literature and data X X

09 22 16 Non-Structural Metal Framing Shop drawings and details X X

09 22 16 Non-Structural Metal Framing Test results X

09 29 00 Gypsum Board Manufacturer literature and data X X

09 29 00 Gypsum Board Shop drawings and details X X

09 29 00 Gypsum Board Samples X

09 29 00 Gypsum Board Test results X

09 29 00 Gypsum Board Certificates X

09 29 53 Partition Gap Closures Submittal Drawings X

09 29 53 Partition Gap Closures Manufacturer's Literature and Data X X

09 29 53 Partition Gap Closures Samples X

09 29 53 Partition Gap Closures Sustainable Construction Submittals X

09 29 53 Partition Gap Closures Qualifications X

09 29 53 Partition Gap Closures Certificates X

09 29 53 Partition Gap Closures Operation and maintenance data X X

09 30 13 Ceramic/Porcelain Tiling Samples X

09 30 13 Ceramic/Porcelain Tiling Product Data X

09 30 13 Ceramic/Porcelain Tiling Certification X

09 30 13 Ceramic/Porcelain Tiling Qualifications X

09 51 00 Acoustical Ceilings Preinstallation Meeting X X

09 51 00 Acoustical Ceilings Shop drawings and details X X

09 51 00 Acoustical Ceilings Manufacturer literature and data X X

09 51 00 Acoustical Ceilings Samples X

09 51 00 Acoustical Ceilings Certificates X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

09 51 00 Acoustical Ceilings Qualifications X

09 51 00 Acoustical Ceilings Operation and maintenance data X X

09 65 13 Resilient Base and Accessories Manufacturer's Literature and Data X X

09 65 13 Resilient Base and Accessories Samples X

09 65 13 Resilient Base and Accessories Sustainable Construction Submittals X

09 65 13 Resilient Base and Accessories Operation and maintenance data X X

09 65 16 Resilient Sheet Flooring Manufacturer literature and data X X

09 65 16 Resilient Sheet Flooring Samples X

09 65 16 Resilient Sheet Flooring Sustainable design construction requirements X

09 65 16 Resilient Sheet Flooring Certificates X

09 65 19 Resilient Tile Flooring Sustainable design construction requirements X

09 65 19 Resilient Tile Flooring Manufacturer literature and data X X

09 65 19 Resilient Tile Flooring Samples X

09 65 19 Resilient Tile Flooring Shop drawings and details X X

09 65 19 Resilient Tile Flooring Test Reports X

09 67 23.30 Resinous (Epoxy Base) High Performance Decorative

Mortar Flooring (RES-3) Data, Samples x x

09 91 00 Painting Data, Samples x x

10 14 00 Signage Data, Inspections x x

10 21 23 Cubicle Curtain Tracks Data, Drawings, Samples x x

10 26 00 Wall and Door Protection Data, Drawings, Samples x x x

10 28 00 Toilet, Bath, and Laundry Accessories Data, Drawings x x

10 44 13 Fire Extinguisher Cabinets Data, Drawings x x

11 73 00 Ceiling Mounted Patient Lift System Data, Drawings x x

12 24 00 Window Shades Data, Drawings, Samples x x x

12 32 00 Manufactured Wood Casework Data, Drawings, Samples x x x

23 36 61.16 Solid Surfaces Product Data x

23 36 61.16 Solid Surfaces Sustainable Design Submittals x

23 36 61.16 Solid Surfaces Shop Drawings x

23 36 61.16 Solid Surfaces Samples x

23 36 61.16 Solid Surfaces Qualification Data x

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

23 36 61.16 Solid Surfaces Maintanence Data x

23 36 61.16 Solid Surfaces Certificates x

13 49 00 Radiation Protection Data x

21 13 13 Wet-Pipe Sprinkler Systems Drawings x

22 05 11 Common Work Results for Plumbing Shop Drawings X

22 05 11 Common Work Results for Plumbing Common material manufacturer literature X

22 05 11 Common Work Results for Plumbing Coordination / Shop drawings X

22 05 11 Common Work Results for Plumbing Rigging Plan X X

22 05 11 Common Work Results for Plumbing Operation and Maintenance Data X

22 05 19 Meters and Gages for Plumbing Piping Manufacturer literature X

22 05 19 Meters and Gages for Plumbing Piping Operation and Maintenance Data X

22 05 19 Meters and Gages for Plumbing Piping Training Plnas X

22 05 23 General-Duty Valves for Plumbing Piping Manufacturer literature X

22 05 23 General-Duty Valves for Plumbing Piping Test and balance reports X

22 05 23 General-Duty Valves for Plumbing Piping Operation and Maintenance Data X

22 05 23 General-Duty Valves for Plumbing Piping Training Plans X

22 07 11 Plumbing Insulation Operation and Maintenance Data X

22 07 11 Plumbing Insulation Shop Drawings X

22 07 11 Plumbing Insulation Samples X

22 07 11 Plumbing Insulation Training Plans X

22 08 00 Commissioning of Plumbing Systems Training Agendas x

22 08 00 Commissioning of Plumbing Systems Checklists x

22 11 00 Facility Water Distribution Manufacturer's Literature and Data x x

22 11 00 Facility Water Distribution Operating and Maintenance Manuals x

22 11 00 Facility Water Distribution System Readiness Checklist x

22 11 00 Facility Water Distribution Training Plans and Instructor

Qualifications x

22 11 00 Facility Water Distribution Certificates x

22 11 00 Facility Water Distribution Testing Plan x

22 13 00 Facility Sanitary and Vent Piping Manufacturer literature X

22 13 00 Facility Sanitary and Vent Piping Shop Drawings X

22 13 00 Facility Sanitary and Vent Piping Operation and Maintenance Data X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

22 13 00 Facility Sanitary and Vent Piping Training Plans X

22 40 00 Plumbing Fixtures Manufacturer literature X

22 40 00 Plumbing Fixtures Operation and Maintenance Data X

22 40 00 Plumbing Fixtures Training Plans X

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities Manufacturer's Literature and Data x

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities Station Inlets x

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities Certifcation x

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities Notarized Affadavit x x

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities System Readiness Checklist x

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities Training Plans and Instructor

Qualifications x

22 63 00 Gas Systems for Laboratory and Healthcare Facilities Med Gas Partnering and QC Plan x

22 63 00 Gas Systems for Laboratory and Healthcare Facilities Manufacturer's Literature and Data x

22 63 00 Gas Systems for Laboratory and Healthcare Facilities Station Outlets x

22 63 00 Gas Systems for Laboratory and Healthcare Facilities Certification x

22 63 00 Gas Systems for Laboratory and Healthcare Facilities System Readiness Checklist x

22 63 00 Gas Systems for Laboratory and Healthcare Facilities Training Plans and Instructor

Qualifications x

22 63 00 Gas Systems for Laboratory and Healthcare Facilities Conditions Documentation x

22 63 00 Gas Systems for Laboratory and Healthcare Facilities Physical Sample x

23 05 11 Common Work Results for HVAC Phasing Plan/Schedule X

23 05 11 Common Work Results for HVAC Equivalence Performance, Design

Standards, and Drawings X X

23 05 11 Common Work Results for HVAC Coordination/Shop Drawings X

23 05 11 Common Work Results for HVAC Manufacturer's Literature and Data X

23 05 11 Common Work Results for HVAC Rigging Plan X

23 05 11 Common Work Results for HVAC HVAC Maintenance Data and Operating

Instructions X X

23 05 11 Common Work Results for HVAC Approved HVAC Equipment Submittals X

23 05 11 Common Work Results for HVAC System Readiness Checklist X

23 05 11 Common Work Results for HVAC Training Plans and Instructor

Qualifications X X

23 05 11 Common Work Results for HVAC HVAC Equipment Service Providers X

23 05 11 Common Work Results for HVAC HVAC Mechanical Systems Welding X

23 05 11 Common Work Results for HVAC Manufacturer's Recommendations X

23 05 11 Common Work Results for HVAC Execution Quality X X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

23 05 11 Common Work Results for HVAC Certification Documentation X

23 05 11 Common Work Results for HVAC Test Reports and Records X X

23 05 12General Motor Requirements for HVAC and Steam Generation EquipmentMotor Submittals X

23 05 12General Motor Requirements for HVAC and Steam Generation EquipmentShop Drawings X

23 05 12General Motor Requirements for HVAC and Steam Generation EquipmentManufacturer's Literature and Data X

23 05 12General Motor Requirements for HVAC and Steam Generation EquipmentOperating and Maintenance Manuals X

23 05 12General Motor Requirements for HVAC and Steam Generation EquipmentCertification X

23 05 12General Motor Requirements for HVAC and Steam Generation EquipmentSystem Readiness Checklist X

23 05 12General Motor Requirements for HVAC and Steam Generation Equipment Training Plans and Instructor

Qualifications X X

23 05 41 Noise and Vibration Control for HVAC Piping and EquipmentManufacturer's Literature and Data x

23 05 41 Noise and Vibration Control for HVAC Piping and EquipmentCalculations x

23 05 93 Testing, Adjusting, and Balancing for HVAC TAB Names and Qualifications X

23 05 93 Testing, Adjusting, and Balancing for HVAC AABC, NEBB, TABB Publications X X X

23 05 93 Testing, Adjusting, and Balancing for HVAC Design Review Report X

23 05 93 Testing, Adjusting, and Balancing for HVAC Systems Inspection Report X

23 05 93 Testing, Adjusting, and Balancing for HVAC Duct Air Leakage Test Report X

23 05 93 Testing, Adjusting, and Balancing for HVAC Systems Readiness Report X

23 05 93 Testing, Adjusting, and Balancing for HVAC Intermediate and Final TAB Reports X

23 05 93 Testing, Adjusting, and Balancing for HVAC Installation Deficiencies Noted X X X

23 05 93 Testing, Adjusting, and Balancing for HVAC Critical Path for Each Balanced Branch X

23 05 93 Testing, Adjusting, and Balancing for HVAC Test and Balance Report X

23 05 93 Testing, Adjusting, and Balancing for HVAC TAB Firm for Approval X

23 05 93 Testing, Adjusting, and Balancing for HVAC TAB Specialist for Approval X

23 05 93 Testing, Adjusting, and Balancing for HVAC Vibration Testing X X

23 07 11 HVAC and Boiler Plant Insulation Shop Drawings X

23 07 11 HVAC and Boiler Plant Insulation Samples X

23 08 00 Commissioning of HVAC Systems Pre-Functional Checklists X

23 08 00 Commissioning of HVAC Systems Training Agendas and Trainer Resumes X X X

23 09 23 Direct-Digital Control System for HVAC Manufacturer's Literature and Data X

23 09 23 Direct-Digital Control System for HVAC Product Certificates X

23 09 23 Direct-Digital Control System for HVAC Validation Test Plan X

23 09 23 Direct-Digital Control System for HVAC Licenses X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

23 09 23 Direct-Digital Control System for HVAC As Built Control Drawings X

23 09 23 Direct-Digital Control System for HVAC Operation and Maintenance Manuals X

23 09 23 Direct-Digital Control System for HVAC Performance Report X

23 09 23 Direct-Digital Control System for HVAC Device PICS X

23 09 23 Direct-Digital Control System for HVAC Test Check List X

23 09 23 Direct-Digital Control System for HVAC Training Plans and Instructor

Qualifications X X

23 21 13 Hydronic Piping Manufacturer's Literature and Data x

23 21 13 Hydronic Piping Welder's Qualifications x

23 21 13 Hydronic Piping Coordination Drawings x

23 21 13 Hydronic Piping As Built Piping Diagrams x

23 21 13 Hydronic Piping Operating and Maintenance Manuals x

23 21 13 Hydronic Piping System Readiness Checklist x

23 21 13 Hydronic Piping Training Plans and Instructor

Qualifications x x

23 21 23 Hydronic Pumps Manufacturer's Literature and Data x

23 21 23 Hydronic Pumps Characteristic Curves x

23 21 23 Hydronic Pumps Operating and Maintenance Manuals x

23 21 23 Hydronic Pumps System Readiness Checklist x

23 21 23 Hydronic Pumps Training Plans and Instructor

Qualifications x x

23 25 00 HVAC Water Treatment Manufacturer's Literature and Data x

23 25 00 HVAC Water Treatment Water Analysis Verification x

23 25 00 HVAC Water Treatment Materials Safety Data Sheet x

23 25 00 HVAC Water Treatment Operating and Maintenance Manuals x

23 25 00 HVAC Water Treatment System Readiness Checklist x

23 25 00 HVAC Water Treatment Training Plans and Instructor

Qualifications x x

23 31 00 HVAC Ducts and Casings Manufacturer's Literature and Data X

23 31 00 HVAC Ducts and Casings Coordination Drawings X

23 31 00 HVAC Ducts and Casings Operting and Maintenance Manuals X

23 36 00 Air Terminal Units Manufacturer's Literature and Data

23 36 00 Air Terminal Units Samples x

23 36 00 Air Terminal Units Operating and Maintenance Manuals x

23 36 00 Air Terminal Units System Readiness Checklist x

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

23 36 00 Air Terminal Units Training Plans and Instructor

Qualifications x x

23 37 00 Air Outlets and Inlets Manufacturer's Literature and Data x

23 37 00 Air Outlets and Inlets Operating and Maintenance Manuals x

23 81 23 Computer-Room Air-Conditioners Equipment Assemblies x

23 81 23 Computer-Room Air-Conditioners Wiring Diagrams x

23 81 23 Computer-Room Air-Conditioners Certifications x

23 81 23 Computer-Room Air-Conditioners System Readiness Checklist x

23 81 23 Computer-Room Air-Conditioners Training Plans and Instructor

Qualifications x x

26 05 11 Requirements for Electrical Installations List of Previously Operating Installations X X

26 05 11 Requirements for Electrical Installations Service Organizations Name and Address X X

26 05 11 Requirements for Electrical Installations Job Specific Work Plan X

26 05 11 Requirements for Electrical Installations Energized Electrical Work Request X

26 05 11 Requirements for Electrical Installations Catalog Cuts X

26 05 11 Requirements for Electrical Installations Individual Systems and Equipment

Assemblies X X

26 05 11 Requirements for Electrical Installations Maintenance and Operation Manuals X

26 05 11 Requirements for Electrical Installations Training Schedule X

26 05 19 Low-Voltage Electrical Power Conductors and Cables Shop Drawings X

26 05 19 Low-Voltage Electrical Power Conductors and Cables Certifications X

26 05 26 Grounding and Bonding for Electrical Systems Shop Drawings X

26 05 26 Grounding and Bonding for Electrical Systems Test Reports X

26 05 26 Grounding and Bonding for Electrical Systems Certifications X

26 05 33 Raceway and Boxes for Electrical Systems Shop Drawings X

26 05 33 Raceway and Boxes for Electrical Systems Test Reports X

26 05 33 Raceway and Boxes for Electrical Systems Certifications X

26 05 33 Raceway and Boxes for Electrical Systems Layout and Homerun Deviations X

26 05 36 Wireways for Radiology Equipment Shop Drawings x

26 05 36 Wireways for Radiology Equipment Certifications x

26 08 00 Commissioning of Electrical Systems None

26 09 23 Lighting Controls Shop Drawings x

26 09 23 Lighting Controls Manuals x

26 09 23 Lighting Controls Certifications x

26 24 16 Panelboards Shop Drawings X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

26 27 26 Wiring Devices Shop Drawings x

26 27 26 Wiring Devices Manuals x

26 27 26 Wiring Devices Certifications x

26 29 21 Enclosed Switches and Circuit Breakers Shop Drawings X

26 29 21 Enclosed Switches and Circuit Breakers Manuals X

26 29 21 Enclosed Switches and Circuit Breakers Certifications X

26 29 21 Enclosed Switches and Circuit Breakers Shop Drawings X

26 29 21 Enclosed Switches and Circuit Breakers Manuals X

26 29 21 Enclosed Switches and Circuit Breakers Certifications X

26 43 13 Surge Protective Devices Shop Drawings x

26 43 13 Surge Protective Devices Manuals x

26 43 13 Surge Protective Devices Certifications x

26 51 00 Interior Lighting Shop Drawings x

26 51 00 Interior Lighting Manuals x

26 51 00 Interior Lighting Certifications x

27 05 11 Requirements for Communications Installations Parts List: Including Quantity of spare parts X X

27 05 11 Requirements for Communications Installations Maintenance Material Submittals X X

27 05 11 Requirements for Communications Installations Source Quality Control Submittal X X

27 05 11 Requirements for Communications Installations Installer Qualifications X X

27 05 11 Requirements for Communications Installations Delegated Design Submittals X X

27 05 11 Requirements for Communications Installations Equipment anchors & supports X X

27 05 11 Requirements for Communications Installations Closeout Submittals X X

27 05 26 Grounding & Bonding for Communication Systems

Plan indicating location of system grounding electrode connections and routing of aboveground and underground grounding electrode conductors

X X

27 05 26 Grounding & Bonding for Communication Systems Closeout Submittals X

27 05 33 Raceway & Boxes for Communication Systems Size and location of cabinets, splice boxes and pull boxes X X

27 05 33 Raceway & Boxes for Communication Systems Layout of required conduit penetrations through structural elements.

X X

27 05 33 Raceway & Boxes for Communication Systems Catalog cuts marked with specific item proposed and area of application identified.

X X

27 05 33 Raceway & Boxes for Communication Systems

Certification: Provide letter prior to final inspection, certifying material is in accordance with construction documents and properly installed

X X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

27 10 00 Control, Comm., and Signal Wiring written certification from OEM X X

27 10 00 Control, Comm., and Signal Wiring

Environmental specifications on technical submittals; identify requirements for installation.

X X

27 10 00 Control, Comm., and Signal Wiring Power: Provide specific voltage, amperage, phases, and quantities of circuits.

X X

27 10 00 Control, Comm., and Signal Wiring Provide conduit size requirements X X

27 10 00 Control, Comm., and Signal Wiring Closeout Submittals X X

27 15 00 Communication Structured Cabling List of test equipment X X

27 15 00 Communication Structured Cabling Certifications X X

27 15 00 Communication Structured Cabling Closeout Submittal X X

28 05 00 Common Work Results for Electronic Safety & Security Calculations & Analysis to support design and engineering decisions as specified X X

28 05 00 Common Work Results for Electronic Safety & Security necessary maintenance and troubleshooting manuals X X

28 05 00 Common Work Results for Electronic Safety & Security list of installations where the products have been in operation before approval X X

28 05 00 Common Work Results for Electronic Safety & Security Service Qualifications X X

28 05 00 Common Work Results for Electronic Safety & Security Maintenance and Operation Manuals X X

28 05 00 Common Work Results for Electronic Safety & Security Certifications X X

28 05 00 Common Work Results for Electronic Safety & Security Data Gathering Panel (DGP) X X

28 05 00 Common Work Results for Electronic Safety & Security Camera Schedule X X

28 05 00 Common Work Results for Electronic Safety & Security Group 1, II, IV, V Technical Data Package X X

28 05 00 Common Work Results for Electronic Safety & Security Equipment List Submittal X X

28 05 00 Common Work Results for Electronic Safety & Security Training schedule, plans, and instructor qualifications X X X

28 05 13 Conductors and Cables for Electronic Safety and Security Manufacturer's Literature and Data X X

28 05 13 Conductors and Cables for Electronic Safety and Security Certificates X X

28 05 13 Conductors and Cables for Electronic Safety and Security Shop Drawings X X

28 05 13 Conductors and Cables for Electronic Safety and Security Document data for each measurement X X

28 05 26 Grounding and Bonding for Electronic Safety and Security Shop Drawings X X

28 05 26 Grounding and Bonding for Electronic Safety and Security Test Reports X X

28 05 26 Grounding and Bonding for Electronic Safety and Security Certifications X X

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security Shop Drawings X X

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security Certification X X

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security Completed System Readiness Checklists X X

D raw in g s

In stru ctio n s

S ch ed u les

S tatem en ts

R ep o rts

C ertificatio n

S am p les

W o rk

P lan

O th er

R eco rd s

In fo

O n ly

G o v t A p p ro v ed

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

CODE DATE

SUBMIT TO

GOVERNME

NT

CODE DATE

CLASSI

FICATI

ON'

CONTRACTOR SCHEDULE

DATES

R e v i e w e r

ITEM

NO.

SPEC

NAME

DESCRIPTION OF ITEM SUBMITTED

TYPE OF SUBMITTAL

SPEC.

SECTION

REMARKS

CONTRACTOR ACTION GOVERNMENT

ACTION

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security Product Data X X

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security Shop Drawings X X

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security Coordination Drawings: X X

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security Manufacturer Seismic Qualification

Certification X X

28 13 00 Physical Access Control System Manufacturer, Product, Service, and

Contractor Qualifications X X

28 13 00 Physical Access Control System pre-installation and as-built design package X X

28 13 00 Physical Access Control System Manufacturer security system product cut-sheets X X

28 13 00 Physical Access Control System Completed System Readiness Checklists X X

28 13 00 Physical Access Control System Group 1, II, III, V Technical Data Package X X

28 13 00 Physical Access Control System Training Plans and Instructor

Qualifications X X

28 31 00 Fire Detection & Alarm Drawings X X

28 31 00 Fire Detection & Alarm Manuals X X

28 31 00 Fire Detection & Alarm Certifications X X

28 31 00 Fire Detection & Alarm Spare and replacement parts in original packaging X X

28 31 00 Fire Detection & Alarm Report listing all water flow switch operations and their retard time in seconds X X

28 31 00 Fire Detection & Alarm typewritten "Sequence of Operation" including a trouble shooting guide of the entire system