516-CSI-134_Bay Pines PET CT_IFC Change Summary.pdf
PDF 142 KB Posted
- Solicitation number
- 36C24826Q0459
About this file
This is a Change Bulletin for the Bay Pines Prepare Site for Installation of a New PET/CT project (Project Number 516-CSI-134) issued by Above Group on June 16, 2026. The bulletin is designated as "100% ISSUE FOR CONSTRUCTION" and provides clarifications to the Issued for Construction (IFC) drawing set. This bulletin is not a change order; any work involving changes to time or contract sum requires submission of a separate Change of Work Proposal with itemized labor, material, overhead, and profit pricing in accordance with specifications. Lump sum pricing will not be accepted, and subcontractor or supplier quotations must be provided if included in the prime contractor's proposal. Non-responding contractors will be deemed unaffected by the changes and waive any rights to increased compensation or time extensions.
The bulletin includes one specification change and five drawing changes. The specification change modifies section 02 82 13.13 – 1.1.B.1 to provide additional quantities for abatement work. The drawing changes primarily involve post-installed anchors specified as DeWalt for Building America (BA) compliance across multiple details on sheets S-001 and S-301 (Drop-In Anchor Detail 2, Clip Angle & Expansion Bolt Detail 4, and Anchor Plate & Expansion Bolt Detail 5). Additionally, General Demolition Notes J through N have been added to drawing sheet AD101.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(321) 345-9026
305 East Drive Suite H
Melbourne, FL 32904 abovegroup@abovegroupinc.com
Change Summary
6/16/2026
Project Name: Bay Pines Prepare Site for Installation of a New PET/CT
Project Number: 516-CSI-134
Addendum/Change Bulletin Designation: 100% ISSUE FOR CONSTRUCTION
Subject: Change list for IFC Set
This Bulletin is not a change order. If work described in this Bulletin involves a change in time or contract sum, provide on Change of Work Proposal for each line item, itemizing labor and material, overhead and profit price breakdown in accordance with the Specifications. Also include any time extensions, if required. Lump sum labor and material prices will not be accepted. If sub-contractors’ or suppliers’ prices are included in the prime contractor’s proposal, provide a copy of their quotation. then the non-responding Contractor will be determined to not be affected by the change and any rights for increased compensation or time extensions shall be waived.
Specification Changes:
02 82 13.13 – 1.1.B.1 – additional quantities provided for abatement
Drawing Changes:
S-001 – Post-Installed General Notes 7 & 8 – post-installed anchors to be DeWalt for BA compliance
S-301- Detail 2 – Drop-In Anchor – post-installed anchors to be DeWalt for BA compliance
S-301 – Detail 4 – Clip Angle & Expansion Bolt – post-installed anchors to be DeWalt for BA compliance
S-301 – Detail 5 – Anchor Plate & Expansion Bolt – post-installed anchors to be DeWalt for BA compliance
AD101 – General Demolition Notes J – N added.
File details come from the government source that posted it. Updated .