This is a Submittal Registry for a construction project at Bay Pines Veterans Affairs Medical Center (VAMC) in Bay Pines, Florida, for the installation of a new PET/CT imaging system. The document tracks all required submittals across 28 CSI divisions with Contract No. 36C24824N0806, Project No. 516-CSI-144, executed by Above Group, Inc.

The registry catalogues approximately 700+ individual submittal items organized by construction division, including General Requirements (Division 01), Existing Conditions (Division 02), Metals (Division 05), Thermal and Moisture Protection (Division 07), Openings (Division 08), Finishes (Division 09), Specialties (Division 10), Equipment (Division 11), Furnishings (Division 12), Special Construction including Radiation Protection (Division 13), Fire Suppression (Division 21), Plumbing (Division 22), HVAC (Division 23), Electrical (Division 26), Communications (Division 27), and Electronic Safety and Security (Division 28). Each submittal line item specifies the required submittal type—including calculations, certifications, product data, operations and maintenance manuals, shop drawings, samples, schedules, test reports, warranty documents, and as-built drawings. As of the registry date of November 21, 2025, all listed submittal items show a status of "Not Submitted," with no dates currently populated for submission, required-by dates, or return dates. The document serves as a baseline tracking tool for contractor compliance with specification requirements throughout the project execution phase.

View the file

Other files

File Type Posted
36C24826Q0459 0003.docx DOCX document
Bay Pines PET-CT Room 2025.07.24 - Shielding Report.pdf PDF
S02_36C24826Q0459 0002.docx DOCX document
S05_Site visit Sign in sheet 05262026 .jpg JPG image
Change Summary.docx DOCX document
516-CSI-144_Install New PETCT_100 percent IFC Specs.pdf PDF
516-CSI-134_Bay Pines PET CT_IFC Change Summary.pdf PDF
S05_RFIs Prepare Site PET.xlsx XLSX spreadsheet
516-CSI-144_Submittal_Log.xlsx XLSX spreadsheet
Amendment 0001.pdf PDF
H4247213 - Bay Pines VA Hospital CT Update - ACM LBP Report Revised Final Signed.pdf PDF
516-CSI-134_Bay Pines PET-CT_100 percent IFC Drawings.pdf PDF
H4247213 Bay Pines PET-CT Mold Sampling Final - signed.pdf PDF
S02_RFP Attachment Past Performance Questionnaire 4 pages.pdf PDF
S02_RFP Attachment H4247213-BayPinesVA_CT_Update-ACM_LBP_Report_Revised 41 pages.pdf PDF
S02_RFP Attachment NARA 3 pages Bay Pines 2026.pdf PDF
S02_RFP Attachment 07b-516-CSI-144_New_PET-CT_100percent_IFB_Specs_REV_30MAR2026 945 pages.pdf PDF
S02_RFP Attachment SOW-516-CSI-134_2026-04-02 4 pages.pdf PDF
S02_RFP Attachment H4247213 Bay Pines PET-CT Mold Sampling Final 23 pages.pdf PDF
S02_RFP Attachment Specialized Experience Form 3 pages.pdf PDF
S02_RFP Attachment Divisional Price Breakdown.xlsx XLSX spreadsheet
S02_RFP Attachment WD FL20250222 01022026_Pinellas 10 pages.pdf PDF
S02_RFP Attachment 07a-516-CSI-134_BayPines_PET-CT_100percent_IFB_Drawings_REV31MAR2026 104 pages.pdf PDF
S02_Solicitation 36C24826R0112 FINAL.pdf PDF
S02_RFP Attachment EMR 1 page.pdf PDF
S02_RFP Attachment LOS 2 pages.pdf PDF
S02_RFP Attachment Price Schedule 1 page.pdf PDF
S02_RFP Attachment VA_Submittal_Register 17 pages.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Submittal Registry | Project 529-22-105

Item # Spec Section Division Section Title Type Code Submittal Type Status Date Submitted Required By Date Returned Subcontractor / Supplier Notes / Comments

01-00-00-01 01 00 00 Division 01 — General Requirements General Requirements AB As-Built Drawings Not Submitted

01-00-00-02 01 00 00 Division 01 — General Requirements General Requirements WS Warranty/Submittals Not Submitted

01-32-16.15-01 01 32 16.15 Division 01 — General Requirements Project Schedules (Small Projects –

Design/Bid/Build) SC Schedule Not Submitted

01-35-26-01 01 35 26 Division 01 — General Requirements Safety Requirements for Major Projects CE Certifications Not Submitted

01-35-26-02 01 35 26 Division 01 — General Requirements Safety Requirements for Major Projects PL Plans/Procedures Not Submitted

01-35-26-03 01 35 26 Division 01 — General Requirements Safety Requirements for Major Projects TR Test Reports Not Submitted

01-45-00-01 01 45 00 Division 01 — General Requirements Quality Control PL Plans/Procedures Not Submitted

01-45-00-02 01 45 00 Division 01 — General Requirements Quality Control TR Test Reports Not Submitted

01-57-19-01 01 57 19 Division 01 — General Requirements Temporary Environmental Controls PD Product Data Not Submitted

01-57-19-02 01 57 19 Division 01 — General Requirements Temporary Environmental Controls PL Plans/Procedures Not Submitted

01-58-16-01 01 58 16 Division 01 — General Requirements Temporary Interior Signage PD Product Data Not Submitted

01-58-16-02 01 58 16 Division 01 — General Requirements Temporary Interior Signage SA Samples Not Submitted

01-58-16-03 01 58 16 Division 01 — General Requirements Temporary Interior Signage SD Shop Drawings Not Submitted

01-74-19-01 01 74 19 Division 01 — General Requirements Construction Waste Management and Disposal PD Product Data Not Submitted

01-74-19-02 01 74 19 Division 01 — General Requirements Construction Waste Management and Disposal PL Plans/Procedures Not Submitted

01-81-13-01 01 81 13 Division 01 — General Requirements Sustainable Design Requirements CE Certifications Not Submitted

01-81-13-02 01 81 13 Division 01 — General Requirements Sustainable Design Requirements PD Product Data Not Submitted

01-81-13-03 01 81 13 Division 01 — General Requirements Sustainable Design Requirements PL Plans/Procedures Not Submitted

01-81-13-04 01 81 13 Division 01 — General Requirements Sustainable Design Requirements SC Schedule Not Submitted

01-91-00-01 01 91 00 Division 01 — General Requirements Commissioning PL Plans/Procedures Not Submitted

01-91-00-02 01 91 00 Division 01 — General Requirements Commissioning SC Schedule Not Submitted

02-82-13.13-01 02 82 13.13 Division 02 — Existing Conditions Asbestos Abatement CE Certifications Not Submitted

02-82-13.13-02 02 82 13.13 Division 02 — Existing Conditions Asbestos Abatement PD Product Data Not Submitted

02-82-13.13-03 02 82 13.13 Division 02 — Existing Conditions Asbestos Abatement PL Plans/Procedures Not Submitted

02-82-13.13-05 02 82 13.13 Division 02 — Existing Conditions Asbestos Abatement SC Schedule Not Submitted

02-82-13.13-06 02 82 13.13 Division 02 — Existing Conditions Asbestos Abatement TR Test Reports Not Submitted

05-50-00-01 05 50 00 Division 05 — Metals Metal Fabrications CA Calculations Not Submitted

05-50-00-02 05 50 00 Division 05 — Metals Metal Fabrications CE Certifications Not Submitted

05-50-00-03 05 50 00 Division 05 — Metals Metal Fabrications PD Product Data Not Submitted

05-50-00-04 05 50 00 Division 05 — Metals Metal Fabrications SA Samples Not Submitted

05-50-00-05 05 50 00 Division 05 — Metals Metal Fabrications SD Shop Drawings Not Submitted

07-21-13-01 07 21 13 Division 07 — Thermal & Moisture Protection Board Insulation PD Product Data Not Submitted

07-21-13-02 07 21 13 Division 07 — Thermal & Moisture Protection Board Insulation SA Samples Not Submitted

07-21-13-03 07 21 13 Division 07 — Thermal & Moisture Protection Board Insulation SD Shop Drawings Not Submitted

07-84-00-01 07 84 00 Division 07 — Thermal & Moisture Protection Firestopping CE Certifications Not Submitted

07-84-00-02 07 84 00 Division 07 — Thermal & Moisture Protection Firestopping PD Product Data Not Submitted

07-84-00-03 07 84 00 Division 07 — Thermal & Moisture Protection Firestopping SA Samples Not Submitted

07-84-00-04 07 84 00 Division 07 — Thermal & Moisture Protection Firestopping SD Shop Drawings Not Submitted

07-84-00-05 07 84 00 Division 07 — Thermal & Moisture Protection Firestopping TR Test Reports Not Submitted

07-92-00-01 07 92 00 Division 07 — Thermal & Moisture Protection Joint Sealants PD Product Data Not Submitted

07-92-00-02 07 92 00 Division 07 — Thermal & Moisture Protection Joint Sealants WS Warranty/Submittals Not Submitted

Department of Veterans Affairs | Bay Pines VAMC, 10000 Bay Pines Blvd., Bay Pines, FL 33744

Division 05 — Metals

Division 01 — General Requirements

IFB Specifications | 11/21/2025

SUBMITTAL REGISTRY — INSTALLATION OF A NEW PET/CT

Division 07 — Thermal & Moisture Protection

Bay Pines VAMC | Contract No. 36C24824N0806 | Project No. 516-CSI-144 | Above Group, Inc.

Division 02 — Existing Conditions

Item # Spec Section Division Section Title Type Code Submittal Type Status Date Submitted Required By Date Returned Subcontractor / Supplier Notes / Comments

Department of Veterans Affairs | Bay Pines VAMC, 10000 Bay Pines Blvd., Bay Pines, FL 33744 IFB Specifications | 11/21/2025

SUBMITTAL REGISTRY — INSTALLATION OF A NEW PET/CT

Bay Pines VAMC | Contract No. 36C24824N0806 | Project No. 516-CSI-144 | Above Group, Inc.

08-11-13-01 08 11 13 Division 08 — Openings Hollow Metal Doors and Frames CE Certifications Not Submitted

08-11-13-02 08 11 13 Division 08 — Openings Hollow Metal Doors and Frames PD Product Data Not Submitted

08-11-13-03 08 11 13 Division 08 — Openings Hollow Metal Doors and Frames SA Samples Not Submitted

08-11-13-04 08 11 13 Division 08 — Openings Hollow Metal Doors and Frames SC Schedule Not Submitted

08-11-13-05 08 11 13 Division 08 — Openings Hollow Metal Doors and Frames SD Shop Drawings Not Submitted

08-11-13-06 08 11 13 Division 08 — Openings Hollow Metal Doors and Frames TR Test Reports Not Submitted

08-14-00-01 08 14 00 Division 08 — Openings Wood Doors PD Product Data Not Submitted

08-14-00-02 08 14 00 Division 08 — Openings Wood Doors SA Samples Not Submitted

08-14-00-03 08 14 00 Division 08 — Openings Wood Doors SD Shop Drawings Not Submitted

08-31-13-01 08 31 13 Division 08 — Openings Access Doors and Frames PD Product Data Not Submitted

08-31-13-02 08 31 13 Division 08 — Openings Access Doors and Frames SA Samples Not Submitted

08-31-13-03 08 31 13 Division 08 — Openings Access Doors and Frames SD Shop Drawings Not Submitted

08-42-29.23-01 08 42 29.23 Division 08 — Openings Sliding Automatic Entrances CE Certifications Not Submitted

08-42-29.23-02 08 42 29.23 Division 08 — Openings Sliding Automatic Entrances OM O&M Manuals Not Submitted

08-42-29.23-03 08 42 29.23 Division 08 — Openings Sliding Automatic Entrances PD Product Data Not Submitted

08-42-29.23-04 08 42 29.23 Division 08 — Openings Sliding Automatic Entrances SA Samples Not Submitted

08-42-29.23-05 08 42 29.23 Division 08 — Openings Sliding Automatic Entrances SD Shop Drawings Not Submitted

08-42-29.23-06 08 42 29.23 Division 08 — Openings Sliding Automatic Entrances WS Warranty/Submittals Not Submitted

08-56-19-01 08 56 19 Division 08 — Openings Pass Windows PD Product Data Not Submitted

08-56-19-02 08 56 19 Division 08 — Openings Pass Windows SA Samples Not Submitted

08-56-19-03 08 56 19 Division 08 — Openings Pass Windows SD Shop Drawings Not Submitted

08-71-00-01 08 71 00 Division 08 — Openings Door Hardware CE Certifications Not Submitted

08-71-00-02 08 71 00 Division 08 — Openings Door Hardware PD Product Data Not Submitted

08-71-00-03 08 71 00 Division 08 — Openings Door Hardware SA Samples Not Submitted

08-71-00-04 08 71 00 Division 08 — Openings Door Hardware SC Schedule Not Submitted

08-71-00-05 08 71 00 Division 08 — Openings Door Hardware SD Shop Drawings Not Submitted

08-71-00-06 08 71 00 Division 08 — Openings Door Hardware TR Test Reports Not Submitted

08-71-13-01 08 71 13 Division 08 — Openings Automatic Door Operators CE Certifications Not Submitted

08-71-13-02 08 71 13 Division 08 — Openings Automatic Door Operators OM O&M Manuals Not Submitted

08-71-13-03 08 71 13 Division 08 — Openings Automatic Door Operators PD Product Data Not Submitted

08-71-13-04 08 71 13 Division 08 — Openings Automatic Door Operators SA Samples Not Submitted

08-71-13-05 08 71 13 Division 08 — Openings Automatic Door Operators SD Shop Drawings Not Submitted

08-71-13-06 08 71 13 Division 08 — Openings Automatic Door Operators TR Test Reports Not Submitted

08-71-13-07 08 71 13 Division 08 — Openings Automatic Door Operators WS Warranty/Submittals Not Submitted

08-71-13.11-01 08 71 13.11 Division 08 — Openings Automatic Sliding Door Operators CE Certifications Not Submitted

08-71-13.11-02 08 71 13.11 Division 08 — Openings Automatic Sliding Door Operators OM O&M Manuals Not Submitted

08-71-13.11-03 08 71 13.11 Division 08 — Openings Automatic Sliding Door Operators PD Product Data Not Submitted

08-71-13.11-04 08 71 13.11 Division 08 — Openings Automatic Sliding Door Operators SA Samples Not Submitted

08-71-13.11-05 08 71 13.11 Division 08 — Openings Automatic Sliding Door Operators SD Shop Drawings Not Submitted

08-71-13.11-06 08 71 13.11 Division 08 — Openings Automatic Sliding Door Operators WS Warranty/Submittals Not Submitted

08-80-00-01 08 80 00 Division 08 — Openings Glazing CE Certifications Not Submitted

08-80-00-02 08 80 00 Division 08 — Openings Glazing PD Product Data Not Submitted

08-80-00-03 08 80 00 Division 08 — Openings Glazing SA Samples Not Submitted

08-80-00-04 08 80 00 Division 08 — Openings Glazing SD Shop Drawings Not Submitted

08-80-00-05 08 80 00 Division 08 — Openings Glazing WS Warranty/Submittals Not Submitted

08-87-00-01 08 87 00 Division 08 — Openings Mirror Glazing CA Calculations Not Submitted

08-87-00-02 08 87 00 Division 08 — Openings Mirror Glazing PD Product Data Not Submitted

08-87-00-03 08 87 00 Division 08 — Openings Mirror Glazing PL Plans/Procedures Not Submitted

Division 08 — Openings

Item # Spec Section Division Section Title Type Code Submittal Type Status Date Submitted Required By Date Returned Subcontractor / Supplier Notes / Comments

Department of Veterans Affairs | Bay Pines VAMC, 10000 Bay Pines Blvd., Bay Pines, FL 33744 IFB Specifications | 11/21/2025

SUBMITTAL REGISTRY — INSTALLATION OF A NEW PET/CT

Bay Pines VAMC | Contract No. 36C24824N0806 | Project No. 516-CSI-144 | Above Group, Inc.

09-05-16-01 09 05 16 Division 09 — Finishes Subsurface Preparation for Floor Finishes PD Product Data Not Submitted

09-05-16-02 09 05 16 Division 09 — Finishes Subsurface Preparation for Floor Finishes SD Shop Drawings Not Submitted

09-05-16-03 09 05 16 Division 09 — Finishes Subsurface Preparation for Floor Finishes TR Test Reports Not Submitted

09-05-16-04 09 05 16 Division 09 — Finishes Subsurface Preparation for Floor Finishes WS Warranty/Submittals Not Submitted

09-06-00-01 09 06 00 Division 09 — Finishes Schedule for Finishes PD Product Data Not Submitted

09-06-00-02 09 06 00 Division 09 — Finishes Schedule for Finishes SA Samples Not Submitted

09-22-16-01 09 22 16 Division 09 — Finishes Non-Structural Metal Framing PD Product Data Not Submitted

09-22-16-02 09 22 16 Division 09 — Finishes Non-Structural Metal Framing SD Shop Drawings Not Submitted

09-22-16-03 09 22 16 Division 09 — Finishes Non-Structural Metal Framing TR Test Reports Not Submitted

09-29-00-01 09 29 00 Division 09 — Finishes Gypsum Board CE Certifications Not Submitted

09-29-00-02 09 29 00 Division 09 — Finishes Gypsum Board PD Product Data Not Submitted

09-29-00-03 09 29 00 Division 09 — Finishes Gypsum Board SA Samples Not Submitted

09-29-00-04 09 29 00 Division 09 — Finishes Gypsum Board SD Shop Drawings Not Submitted

09-29-00-05 09 29 00 Division 09 — Finishes Gypsum Board TR Test Reports Not Submitted

09-29-53-01 09 29 53 Division 09 — Finishes Partition Gap Closures CE Certifications Not Submitted

09-29-53-02 09 29 53 Division 09 — Finishes Partition Gap Closures OM O&M Manuals Not Submitted

09-29-53-03 09 29 53 Division 09 — Finishes Partition Gap Closures PD Product Data Not Submitted

09-29-53-04 09 29 53 Division 09 — Finishes Partition Gap Closures SA Samples Not Submitted

09-29-53-05 09 29 53 Division 09 — Finishes Partition Gap Closures SD Shop Drawings Not Submitted

09-30-13-01 09 30 13 Division 09 — Finishes Ceramic/Porcelain Tiling CE Certifications Not Submitted

09-30-13-02 09 30 13 Division 09 — Finishes Ceramic/Porcelain Tiling PD Product Data Not Submitted

09-30-13-03 09 30 13 Division 09 — Finishes Ceramic/Porcelain Tiling SA Samples Not Submitted

09-30-13-04 09 30 13 Division 09 — Finishes Ceramic/Porcelain Tiling SD Shop Drawings Not Submitted

09-51-00-01 09 51 00 Division 09 — Finishes Acoustical Ceilings CE Certifications Not Submitted

09-51-00-02 09 51 00 Division 09 — Finishes Acoustical Ceilings OM O&M Manuals Not Submitted

09-51-00-03 09 51 00 Division 09 — Finishes Acoustical Ceilings PD Product Data Not Submitted

09-51-00-04 09 51 00 Division 09 — Finishes Acoustical Ceilings SA Samples Not Submitted

09-51-00-05 09 51 00 Division 09 — Finishes Acoustical Ceilings SD Shop Drawings Not Submitted

09-51-00-06 09 51 00 Division 09 — Finishes Acoustical Ceilings WS Warranty/Submittals Not Submitted

09-65-13-01 09 65 13 Division 09 — Finishes Resilient Base and Accessories OM O&M Manuals Not Submitted

09-65-13-02 09 65 13 Division 09 — Finishes Resilient Base and Accessories PD Product Data Not Submitted

09-65-13-03 09 65 13 Division 09 — Finishes Resilient Base and Accessories SA Samples Not Submitted

09-65-13-04 09 65 13 Division 09 — Finishes Resilient Base and Accessories SD Shop Drawings Not Submitted

09-65-16-01 09 65 16 Division 09 — Finishes Resilient Sheet Flooring CE Certifications Not Submitted

09-65-16-02 09 65 16 Division 09 — Finishes Resilient Sheet Flooring PD Product Data Not Submitted

09-65-16-03 09 65 16 Division 09 — Finishes Resilient Sheet Flooring SA Samples Not Submitted

09-65-16-04 09 65 16 Division 09 — Finishes Resilient Sheet Flooring SD Shop Drawings Not Submitted

09-65-16-05 09 65 16 Division 09 — Finishes Resilient Sheet Flooring WS Warranty/Submittals Not Submitted

09-65-19-01 09 65 19 Division 09 — Finishes Resilient Tile Flooring PD Product Data Not Submitted

09-65-19-02 09 65 19 Division 09 — Finishes Resilient Tile Flooring SA Samples Not Submitted

09-65-19-03 09 65 19 Division 09 — Finishes Resilient Tile Flooring SD Shop Drawings Not Submitted

09-65-19-04 09 65 19 Division 09 — Finishes Resilient Tile Flooring TR Test Reports Not Submitted

09-67-23.30-01 09 67 23.30 Division 09 — Finishes Polyurethane Floor Coatings CE Certifications Not Submitted

09-67-23.30-02 09 67 23.30 Division 09 — Finishes Polyurethane Floor Coatings PD Product Data Not Submitted

09-67-23.30-03 09 67 23.30 Division 09 — Finishes Polyurethane Floor Coatings SA Samples Not Submitted

09-67-23.30-04 09 67 23.30 Division 09 — Finishes Polyurethane Floor Coatings SD Shop Drawings Not Submitted

09-67-23.30-05 09 67 23.30 Division 09 — Finishes Polyurethane Floor Coatings WS Warranty/Submittals Not Submitted

09-91-00-01 09 91 00 Division 09 — Finishes Paints and Coatings CE Certifications Not Submitted

09-91-00-02 09 91 00 Division 09 — Finishes Paints and Coatings PD Product Data Not Submitted

09-91-00-03 09 91 00 Division 09 — Finishes Paints and Coatings PL Plans/Procedures Not Submitted

09-91-00-04 09 91 00 Division 09 — Finishes Paints and Coatings SA Samples Not Submitted

09-91-00-05 09 91 00 Division 09 — Finishes Paints and Coatings SC Schedule Not Submitted

09-91-00-06 09 91 00 Division 09 — Finishes Paints and Coatings SD Shop Drawings Not Submitted

Division 09 — Finishes

Item # Spec Section Division Section Title Type Code Submittal Type Status Date Submitted Required By Date Returned Subcontractor / Supplier Notes / Comments

Department of Veterans Affairs | Bay Pines VAMC, 10000 Bay Pines Blvd., Bay Pines, FL 33744 IFB Specifications | 11/21/2025

SUBMITTAL REGISTRY — INSTALLATION OF A NEW PET/CT

Bay Pines VAMC | Contract No. 36C24824N0806 | Project No. 516-CSI-144 | Above Group, Inc.

10-14-00-01 10 14 00 Division 10 — Specialties Signage PD Product Data Not Submitted

10-14-00-02 10 14 00 Division 10 — Specialties Signage PL Plans/Procedures Not Submitted

10-14-00-03 10 14 00 Division 10 — Specialties Signage SA Samples Not Submitted

10-14-00-04 10 14 00 Division 10 — Specialties Signage SD Shop Drawings Not Submitted

10-21-23-01 10 21 23 Division 10 — Specialties Cubicle Curtains and Track PD Product Data Not Submitted

10-21-23-02 10 21 23 Division 10 — Specialties Cubicle Curtains and Track SA Samples Not Submitted

10-21-23-03 10 21 23 Division 10 — Specialties Cubicle Curtains and Track SD Shop Drawings Not Submitted

10-26-00-01 10 26 00 Division 10 — Specialties Wall and Door Protection PD Product Data Not Submitted

10-26-00-02 10 26 00 Division 10 — Specialties Wall and Door Protection SA Samples Not Submitted

10-26-00-03 10 26 00 Division 10 — Specialties Wall and Door Protection SD Shop Drawings Not Submitted

10-26-00-04 10 26 00 Division 10 — Specialties Wall and Door Protection TR Test Reports Not Submitted

10-26-00-05 10 26 00 Division 10 — Specialties Wall and Door Protection WS Warranty/Submittals Not Submitted

10-28-00-01 10 28 00 Division 10 — Specialties Toilet, Bath, and Laundry Accessories CE Certifications Not Submitted

10-28-00-02 10 28 00 Division 10 — Specialties Toilet, Bath, and Laundry Accessories OM O&M Manuals Not Submitted

10-28-00-03 10 28 00 Division 10 — Specialties Toilet, Bath, and Laundry Accessories PD Product Data Not Submitted

10-28-00-04 10 28 00 Division 10 — Specialties Toilet, Bath, and Laundry Accessories SA Samples Not Submitted

10-28-00-05 10 28 00 Division 10 — Specialties Toilet, Bath, and Laundry Accessories SD Shop Drawings Not Submitted

10-44-13-01 10 44 13 Division 10 — Specialties Fire Extinguisher Cabinets PD Product Data Not Submitted

10-44-13-02 10 44 13 Division 10 — Specialties Fire Extinguisher Cabinets SA Samples Not Submitted

10-44-13-03 10 44 13 Division 10 — Specialties Fire Extinguisher Cabinets SD Shop Drawings Not Submitted

11-73-00-01 11 73 00 Division 11 — Equipment Medical Vacuum Producers CA Calculations Not Submitted

11-73-00-02 11 73 00 Division 11 — Equipment Medical Vacuum Producers CE Certifications Not Submitted

11-73-00-03 11 73 00 Division 11 — Equipment Medical Vacuum Producers PD Product Data Not Submitted

11-73-00-04 11 73 00 Division 11 — Equipment Medical Vacuum Producers SA Samples Not Submitted

11-73-00-05 11 73 00 Division 11 — Equipment Medical Vacuum Producers SD Shop Drawings Not Submitted

12-24-00-01 12 24 00 Division 12 — Furnishings Window Blinds PD Product Data Not Submitted

12-24-00-02 12 24 00 Division 12 — Furnishings Window Blinds SA Samples Not Submitted

12-24-00-03 12 24 00 Division 12 — Furnishings Window Blinds SD Shop Drawings Not Submitted

12-24-00-04 12 24 00 Division 12 — Furnishings Window Blinds TR Test Reports Not Submitted

12-24-00-05 12 24 00 Division 12 — Furnishings Window Blinds WS Warranty/Submittals Not Submitted

12-31-00-01 12 31 00 Division 12 — Furnishings Manufactured Metal Casework CE Certifications Not Submitted

12-31-00-02 12 31 00 Division 12 — Furnishings Manufactured Metal Casework PD Product Data Not Submitted

12-31-00-03 12 31 00 Division 12 — Furnishings Manufactured Metal Casework SA Samples Not Submitted

12-31-00-04 12 31 00 Division 12 — Furnishings Manufactured Metal Casework SD Shop Drawings Not Submitted

12-31-00-05 12 31 00 Division 12 — Furnishings Manufactured Metal Casework WS Warranty/Submittals Not Submitted

12-32-00-01 12 32 00 Division 12 — Furnishings Manufactured Wood Casework CE Certifications Not Submitted

12-32-00-02 12 32 00 Division 12 — Furnishings Manufactured Wood Casework PD Product Data Not Submitted

12-32-00-03 12 32 00 Division 12 — Furnishings Manufactured Wood Casework SA Samples Not Submitted

12-32-00-04 12 32 00 Division 12 — Furnishings Manufactured Wood Casework SD Shop Drawings Not Submitted

12-36-61.16-01 12 36 61.16 Division 12 — Furnishings Quartz Agglomerate Countertops CE Certifications Not Submitted

12-36-61.16-02 12 36 61.16 Division 12 — Furnishings Quartz Agglomerate Countertops OM O&M Manuals Not Submitted

12-36-61.16-03 12 36 61.16 Division 12 — Furnishings Quartz Agglomerate Countertops PD Product Data Not Submitted

12-36-61.16-04 12 36 61.16 Division 12 — Furnishings Quartz Agglomerate Countertops SA Samples Not Submitted

12-36-61.16-05 12 36 61.16 Division 12 — Furnishings Quartz Agglomerate Countertops SD Shop Drawings Not Submitted

12-36-61.16-06 12 36 61.16 Division 12 — Furnishings Quartz Agglomerate Countertops TR Test Reports Not Submitted

13-49-00-01 13 49 00 Division 13 — Special Construction Radiation Protection CA Calculations Not Submitted

13-49-00-02 13 49 00 Division 13 — Special Construction Radiation Protection CE Certifications Not Submitted

13-49-00-03 13 49 00 Division 13 — Special Construction Radiation Protection OM O&M Manuals Not Submitted

13-49-00-04 13 49 00 Division 13 — Special Construction Radiation Protection PD Product Data Not Submitted

13-49-00-05 13 49 00 Division 13 — Special Construction Radiation Protection SA Samples Not Submitted

13-49-00-06 13 49 00 Division 13 — Special Construction Radiation Protection SD Shop Drawings Not Submitted

13-49-00-07 13 49 00 Division 13 — Special Construction Radiation Protection TR Test Reports Not Submitted

13-49-00-08 13 49 00 Division 13 — Special Construction Radiation Protection WS Warranty/Submittals Not Submitted

Division 10 — Specialties

Division 12 — Furnishings

Division 11 — Equipment

Division 13 — Special Construction

Item # Spec Section Division Section Title Type Code Submittal Type Status Date Submitted Required By Date Returned Subcontractor / Supplier Notes / Comments

Department of Veterans Affairs | Bay Pines VAMC, 10000 Bay Pines Blvd., Bay Pines, FL 33744 IFB Specifications | 11/21/2025

SUBMITTAL REGISTRY — INSTALLATION OF A NEW PET/CT

Bay Pines VAMC | Contract No. 36C24824N0806 | Project No. 516-CSI-144 | Above Group, Inc.

21-13-13-01 21 13 13 Division 21 — Fire Suppression Wet-Pipe Sprinkler Systems AB As-Built Drawings Not Submitted

21-13-13-02 21 13 13 Division 21 — Fire Suppression Wet-Pipe Sprinkler Systems CA Calculations Not Submitted

21-13-13-03 21 13 13 Division 21 — Fire Suppression Wet-Pipe Sprinkler Systems CE Certifications Not Submitted

21-13-13-04 21 13 13 Division 21 — Fire Suppression Wet-Pipe Sprinkler Systems OM O&M Manuals Not Submitted

21-13-13-05 21 13 13 Division 21 — Fire Suppression Wet-Pipe Sprinkler Systems PD Product Data Not Submitted

21-13-13-06 21 13 13 Division 21 — Fire Suppression Wet-Pipe Sprinkler Systems PL Plans/Procedures Not Submitted

21-13-13-07 21 13 13 Division 21 — Fire Suppression Wet-Pipe Sprinkler Systems SA Samples Not Submitted

21-13-13-08 21 13 13 Division 21 — Fire Suppression Wet-Pipe Sprinkler Systems SD Shop Drawings Not Submitted

22-05-11-01 22 05 11 Division 22 — Plumbing Common Work Results for Plumbing CA Calculations Not Submitted

22-05-11-02 22 05 11 Division 22 — Plumbing Common Work Results for Plumbing CE Certifications Not Submitted

22-05-11-03 22 05 11 Division 22 — Plumbing Common Work Results for Plumbing OM O&M Manuals Not Submitted

22-05-11-04 22 05 11 Division 22 — Plumbing Common Work Results for Plumbing PD Product Data Not Submitted

22-05-11-05 22 05 11 Division 22 — Plumbing Common Work Results for Plumbing PL Plans/Procedures Not Submitted

22-05-11-06 22 05 11 Division 22 — Plumbing Common Work Results for Plumbing SA Samples Not Submitted

22-05-11-07 22 05 11 Division 22 — Plumbing Common Work Results for Plumbing SC Schedule Not Submitted

22-05-11-08 22 05 11 Division 22 — Plumbing Common Work Results for Plumbing SD Shop Drawings Not Submitted

22-05-19-01 22 05 19 Division 22 — Plumbing Meters and Gages for Plumbing Piping CE Certifications Not Submitted

22-05-19-02 22 05 19 Division 22 — Plumbing Meters and Gages for Plumbing Piping OM O&M Manuals Not Submitted

22-05-19-03 22 05 19 Division 22 — Plumbing Meters and Gages for Plumbing Piping PD Product Data Not Submitted

22-05-19-04 22 05 19 Division 22 — Plumbing Meters and Gages for Plumbing Piping SA Samples Not Submitted

22-05-19-05 22 05 19 Division 22 — Plumbing Meters and Gages for Plumbing Piping SD Shop Drawings Not Submitted

22-05-23-01 22 05 23 Division 22 — Plumbing General-Duty Valves for Plumbing Piping OM O&M Manuals Not Submitted

22-05-23-02 22 05 23 Division 22 — Plumbing General-Duty Valves for Plumbing Piping PD Product Data Not Submitted

22-05-23-03 22 05 23 Division 22 — Plumbing General-Duty Valves for Plumbing Piping SA Samples Not Submitted

22-05-23-04 22 05 23 Division 22 — Plumbing General-Duty Valves for Plumbing Piping SD Shop Drawings Not Submitted

22-07-11-01 22 07 11 Division 22 — Plumbing Plumbing Insulation PD Product Data Not Submitted

22-07-11-02 22 07 11 Division 22 — Plumbing Plumbing Insulation SA Samples Not Submitted

22-07-11-03 22 07 11 Division 22 — Plumbing Plumbing Insulation SD Shop Drawings Not Submitted

22-08-00-01 22 08 00 Division 22 — Plumbing Commissioning of Plumbing Systems PL Plans/Procedures Not Submitted

22-08-00-02 22 08 00 Division 22 — Plumbing Commissioning of Plumbing Systems TR Test Reports Not Submitted

22-11-00-01 22 11 00 Division 22 — Plumbing Facility Water Distribution OM O&M Manuals Not Submitted

22-11-00-02 22 11 00 Division 22 — Plumbing Facility Water Distribution PD Product Data Not Submitted

22-11-00-03 22 11 00 Division 22 — Plumbing Facility Water Distribution SA Samples Not Submitted

22-11-00-04 22 11 00 Division 22 — Plumbing Facility Water Distribution SD Shop Drawings Not Submitted

22-13-00-01 22 13 00 Division 22 — Plumbing Facility Sanitary and Vent Piping OM O&M Manuals Not Submitted

22-13-00-02 22 13 00 Division 22 — Plumbing Facility Sanitary and Vent Piping PD Product Data Not Submitted

22-13-00-03 22 13 00 Division 22 — Plumbing Facility Sanitary and Vent Piping SA Samples Not Submitted

22-13-00-04 22 13 00 Division 22 — Plumbing Facility Sanitary and Vent Piping SD Shop Drawings Not Submitted

22-40-00-01 22 40 00 Division 22 — Plumbing Plumbing Fixtures PD Product Data Not Submitted

22-40-00-02 22 40 00 Division 22 — Plumbing Plumbing Fixtures SA Samples Not Submitted

22-40-00-03 22 40 00 Division 22 — Plumbing Plumbing Fixtures SD Shop Drawings Not Submitted

22-62-00-01 22 62 00 Division 22 — Plumbing Vacuum Systems for Laboratory and Healthcare

Facilities AB As-Built Drawings Not Submitted

22-62-00-02 22 62 00 Division 22 — Plumbing Vacuum Systems for Laboratory and Healthcare

Facilities CE Certifications Not Submitted

22-62-00-03 22 62 00 Division 22 — Plumbing Vacuum Systems for Laboratory and Healthcare

Facilities OM O&M Manuals Not Submitted

22-62-00-04 22 62 00 Division 22 — Plumbing Vacuum Systems for Laboratory and Healthcare

Facilities PD Product Data Not Submitted

22-62-00-05 22 62 00 Division 22 — Plumbing Vacuum Systems for Laboratory and Healthcare

Facilities PL Plans/Procedures Not Submitted

22-62-00-06 22 62 00 Division 22 — Plumbing Vacuum Systems for Laboratory and Healthcare

Facilities SA Samples Not Submitted

22-62-00-07 22 62 00 Division 22 — Plumbing Vacuum Systems for Laboratory and Healthcare

Facilities SD Shop Drawings Not Submitted

22-63-00-01 22 63 00 Division 22 — Plumbing Gas Systems for Laboratory and Healthcare Facilities CE Certifications Not Submitted

22-63-00-02 22 63 00 Division 22 — Plumbing Gas Systems for Laboratory and Healthcare Facilities PD Product Data Not Submitted

22-63-00-03 22 63 00 Division 22 — Plumbing Gas Systems for Laboratory and Healthcare Facilities PL Plans/Procedures Not Submitted

22-63-00-04 22 63 00 Division 22 — Plumbing Gas Systems for Laboratory and Healthcare Facilities SA Samples Not Submitted

22-63-00-05 22 63 00 Division 22 — Plumbing Gas Systems for Laboratory and Healthcare Facilities SD Shop Drawings Not Submitted

Division 21 — Fire Suppression

Division 22 — Plumbing

Item # Spec Section Division Section Title Type Code Submittal Type Status Date Submitted Required By Date Returned Subcontractor / Supplier Notes / Comments

Department of Veterans Affairs | Bay Pines VAMC, 10000 Bay Pines Blvd., Bay Pines, FL 33744 IFB Specifications | 11/21/2025

SUBMITTAL REGISTRY — INSTALLATION OF A NEW PET/CT

Bay Pines VAMC | Contract No. 36C24824N0806 | Project No. 516-CSI-144 | Above Group, Inc.

23-05-11-01 23 05 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Common Work Results for HVAC CE Certifications Not Submitted

23-05-11-02 23 05 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Common Work Results for HVAC OM O&M Manuals Not Submitted

23-05-11-03 23 05 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Common Work Results for HVAC PD Product Data Not Submitted

23-05-11-04 23 05 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Common Work Results for HVAC PL Plans/Procedures Not Submitted

23-05-11-05 23 05 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Common Work Results for HVAC SA Samples Not Submitted

23-05-11-06 23 05 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Common Work Results for HVAC SC Schedule Not Submitted

23-05-11-07 23 05 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Common Work Results for HVAC SD Shop Drawings Not Submitted

23-05-12-01 23 05 12 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) General Motor Requirements for HVAC and Steam

Generation Equipment CE Certifications Not Submitted

23-05-12-02 23 05 12 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) General Motor Requirements for HVAC and Steam

Generation Equipment OM O&M Manuals Not Submitted

23-05-12-03 23 05 12 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) General Motor Requirements for HVAC and Steam

Generation Equipment PD Product Data Not Submitted

23-05-12-04 23 05 12 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) General Motor Requirements for HVAC and Steam

Generation Equipment SA Samples Not Submitted

23-05-12-05 23 05 12 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) General Motor Requirements for HVAC and Steam

Generation Equipment SD Shop Drawings Not Submitted

23-05-41-01 23 05 41 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Noise and Vibration Control for HVAC Piping and

Equipment CA Calculations Not Submitted

23-05-41-02 23 05 41 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Noise and Vibration Control for HVAC Piping and

Equipment PD Product Data Not Submitted

23-05-41-03 23 05 41 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Noise and Vibration Control for HVAC Piping and

Equipment SA Samples Not Submitted

23-05-41-04 23 05 41 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Noise and Vibration Control for HVAC Piping and

Equipment SD Shop Drawings Not Submitted

23-05-93-01 23 05 93 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Testing, Adjusting, and Balancing for HVAC PD Product Data Not Submitted

23-05-93-02 23 05 93 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Testing, Adjusting, and Balancing for HVAC SA Samples Not Submitted

23-05-93-03 23 05 93 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Testing, Adjusting, and Balancing for HVAC SD Shop Drawings Not Submitted

23-05-93-04 23 05 93 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Testing, Adjusting, and Balancing for HVAC TR Test Reports Not Submitted

23-07-11-01 23 07 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Insulation PD Product Data Not Submitted

23-07-11-02 23 07 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Insulation SA Samples Not Submitted

23-07-11-03 23 07 11 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Insulation SD Shop Drawings Not Submitted

23-08-00-01 23 08 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Commissioning of HVAC Systems PL Plans/Procedures Not Submitted

23-08-00-02 23 08 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Commissioning of HVAC Systems TR Test Reports Not Submitted

23-09-23-01 23 09 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Direct Digital Control System for HVAC AB As-Built Drawings Not Submitted

23-09-23-02 23 09 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Direct Digital Control System for HVAC CE Certifications Not Submitted

23-09-23-03 23 09 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Direct Digital Control System for HVAC OM O&M Manuals Not Submitted

23-09-23-04 23 09 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Direct Digital Control System for HVAC PD Product Data Not Submitted

23-09-23-05 23 09 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Direct Digital Control System for HVAC PL Plans/Procedures Not Submitted

23-09-23-06 23 09 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Direct Digital Control System for HVAC SA Samples Not Submitted

23-09-23-07 23 09 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Direct Digital Control System for HVAC SC Schedule Not Submitted

23-09-23-08 23 09 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Direct Digital Control System for HVAC SD Shop Drawings Not Submitted

23-21-13-01 23 21 13 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Piping AB As-Built Drawings Not Submitted

23-21-13-02 23 21 13 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Piping CE Certifications Not Submitted

23-21-13-03 23 21 13 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Piping OM O&M Manuals Not Submitted

23-21-13-04 23 21 13 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Piping PD Product Data Not Submitted

23-21-13-05 23 21 13 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Piping SA Samples Not Submitted

23-21-13-06 23 21 13 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Piping SC Schedule Not Submitted

23-21-13-07 23 21 13 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Piping SD Shop Drawings Not Submitted

23-21-23-01 23 21 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Pumps OM O&M Manuals Not Submitted

23-21-23-02 23 21 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Pumps PD Product Data Not Submitted

23-21-23-03 23 21 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Pumps SA Samples Not Submitted

23-21-23-04 23 21 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Hydronic Pumps SD Shop Drawings Not Submitted

23-25-00-01 23 25 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Water Treatment OM O&M Manuals Not Submitted

23-25-00-02 23 25 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Water Treatment PD Product Data Not Submitted

23-25-00-03 23 25 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Water Treatment SA Samples Not Submitted

23-25-00-04 23 25 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Water Treatment SD Shop Drawings Not Submitted

23-31-00-01 23 31 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Ducts and Casings OM O&M Manuals Not Submitted

23-31-00-02 23 31 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Ducts and Casings PD Product Data Not Submitted

23-31-00-03 23 31 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Ducts and Casings SA Samples Not Submitted

23-31-00-04 23 31 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) HVAC Ducts and Casings SD Shop Drawings Not Submitted

23-36-00-01 23 36 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Air Terminal Units OM O&M Manuals Not Submitted

23-36-00-02 23 36 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Air Terminal Units PD Product Data Not Submitted

23-36-00-03 23 36 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Air Terminal Units SA Samples Not Submitted

23-36-00-04 23 36 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Air Terminal Units SD Shop Drawings Not Submitted

23-37-00-01 23 37 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Air Outlets and Inlets OM O&M Manuals Not Submitted

23-37-00-02 23 37 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Air Outlets and Inlets PD Product Data Not Submitted

23-37-00-03 23 37 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Air Outlets and Inlets SA Samples Not Submitted

23-37-00-04 23 37 00 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Air Outlets and Inlets SD Shop Drawings Not Submitted

23-81-23-01 23 81 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Computer Room Air Conditioning Units CE Certifications Not Submitted

23-81-23-02 23 81 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Computer Room Air Conditioning Units PD Product Data Not Submitted

23-81-23-03 23 81 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Computer Room Air Conditioning Units SA Samples Not Submitted

23-81-23-04 23 81 23 Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) Computer Room Air Conditioning Units SD Shop Drawings Not Submitted

Division 23 — Heating, Ventilating, and Air Conditioning (HVAC)

Item # Spec Section Division Section Title Type Code Submittal Type Status Date Submitted Required By Date Returned Subcontractor / Supplier Notes / Comments

Department of Veterans Affairs | Bay Pines VAMC, 10000 Bay Pines Blvd., Bay Pines, FL 33744 IFB Specifications | 11/21/2025

SUBMITTAL REGISTRY — INSTALLATION OF A NEW PET/CT

Bay Pines VAMC | Contract No. 36C24824N0806 | Project No. 516-CSI-144 | Above Group, Inc.

26-05-11-01 26 05 11 Division 26 — Electrical Requirements for Electrical Installations CE Certifications Not Submitted

26-05-11-02 26 05 11 Division 26 — Electrical Requirements for Electrical Installations OM O&M Manuals Not Submitted

26-05-11-03 26 05 11 Division 26 — Electrical Requirements for Electrical Installations PD Product Data Not Submitted

26-05-11-04 26 05 11 Division 26 — Electrical Requirements for Electrical Installations SA Samples Not Submitted

26-05-11-05 26 05 11 Division 26 — Electrical Requirements for Electrical Installations SD Shop Drawings Not Submitted

26-05-11-06 26 05 11 Division 26 — Electrical Requirements for Electrical Installations TR Test Reports Not Submitted

26-05-19-01 26 05 19 Division 26 — Electrical Low-Voltage Electrical Power Conductors and Cables CE Certifications Not Submitted

26-05-19-02 26 05 19 Division 26 — Electrical Low-Voltage Electrical Power Conductors and Cables SD Shop Drawings Not Submitted

26-05-26-01 26 05 26 Division 26 — Electrical Grounding and Bonding for Electrical Systems CE Certifications Not Submitted

26-05-26-02 26 05 26 Division 26 — Electrical Grounding and Bonding for Electrical Systems SD Shop Drawings Not Submitted

26-05-26-03 26 05 26 Division 26 — Electrical Grounding and Bonding for Electrical Systems TR Test Reports Not Submitted

26-05-33-01 26 05 33 Division 26 — Electrical Raceways and Boxes for Electrical Systems CE Certifications Not Submitted

26-05-33-02 26 05 33 Division 26 — Electrical Raceways and Boxes for Electrical Systems SD Shop Drawings Not Submitted

26-05-36.26-01 26 05 36.26 Division 26 — Electrical Cable Trays for Electrical Systems CE Certifications Not Submitted

26-05-36.26-02 26 05 36.26 Division 26 — Electrical Cable Trays for Electrical Systems SD Shop Drawings Not Submitted

26-08-00-01 26 08 00 Division 26 — Electrical Commissioning of Electrical Systems PL Plans/Procedures Not Submitted

26-08-00-02 26 08 00 Division 26 — Electrical Commissioning of Electrical Systems TR Test Reports Not Submitted

26-09-23-01 26 09 23 Division 26 — Electrical Lighting Control Devices CE Certifications Not Submitted

26-09-23-02 26 09 23 Division 26 — Electrical Lighting Control Devices OM O&M Manuals Not Submitted

26-09-23-03 26 09 23 Division 26 — Electrical Lighting Control Devices SD Shop Drawings Not Submitted

26-24-16-01 26 24 16 Division 26 — Electrical Panelboards CE Certifications Not Submitted

26-24-16-02 26 24 16 Division 26 — Electrical Panelboards OM O&M Manuals Not Submitted

26-24-16-03 26 24 16 Division 26 — Electrical Panelboards SD Shop Drawings Not Submitted

26-27-26-01 26 27 26 Division 26 — Electrical Wiring Devices CE Certifications Not Submitted

26-27-26-02 26 27 26 Division 26 — Electrical Wiring Devices OM O&M Manuals Not Submitted

26-27-26-03 26 27 26 Division 26 — Electrical Wiring Devices SD Shop Drawings Not Submitted

26-29-21-01 26 29 21 Division 26 — Electrical Variable Frequency Motor Controllers CE Certifications Not Submitted

26-29-21-02 26 29 21 Division 26 — Electrical Variable Frequency Motor Controllers OM O&M Manuals Not Submitted

26-29-21-03 26 29 21 Division 26 — Electrical Variable Frequency Motor Controllers SD Shop Drawings Not Submitted

26-43-13-01 26 43 13 Division 26 — Electrical Surge Protective Devices (SPDs) CE Certifications Not Submitted

26-43-13-02 26 43 13 Division 26 — Electrical Surge Protective Devices (SPDs) OM O&M Manuals Not Submitted

26-43-13-03 26 43 13 Division 26 — Electrical Surge Protective Devices (SPDs) SD Shop Drawings Not Submitted

26-51-00-01 26 51 00 Division 26 — Electrical Interior Lighting CA Calculations Not Submitted

26-51-00-02 26 51 00 Division 26 — Electrical Interior Lighting CE Certifications Not Submitted

26-51-00-03 26 51 00 Division 26 — Electrical Interior Lighting OM O&M Manuals Not Submitted

26-51-00-04 26 51 00 Division 26 — Electrical Interior Lighting SC Schedule Not Submitted

26-51-00-05 26 51 00 Division 26 — Electrical Interior Lighting SD Shop Drawings Not Submitted

27-05-11-01 27 05 11 Division 27 — Communications Requirements for Communications Installations CE Certifications Not Submitted

27-05-11-02 27 05 11 Division 27 — Communications Requirements for Communications Installations PD Product Data Not Submitted

27-05-11-03 27 05 11 Division 27 — Communications Requirements for Communications Installations PL Plans/Procedures Not Submitted

27-05-11-04 27 05 11 Division 27 — Communications Requirements for Communications Installations SA Samples Not Submitted

27-05-11-05 27 05 11 Division 27 — Communications Requirements for Communications Installations SC Schedule Not Submitted

27-05-11-06 27 05 11 Division 27 — Communications Requirements for Communications Installations SD Shop Drawings Not Submitted

27-05-11-07 27 05 11 Division 27 — Communications Requirements for Communications Installations TR Test Reports Not Submitted

27-05-11-08 27 05 11 Division 27 — Communications Requirements for Communications Installations WS Warranty/Submittals Not Submitted

27-05-26-01 27 05 26 Division 27 — Communications Grounding and Bonding for Communications Systems CE Certifications Not Submitted

27-05-26-02 27 05 26 Division 27 — Communications Grounding and Bonding for Communications Systems PL Plans/Procedures Not Submitted

27-05-26-03 27 05 26 Division 27 — Communications Grounding and Bonding for Communications Systems TR Test Reports Not Submitted

27-05-33-01 27 05 33 Division 27 — Communications Conduits and Backboxes for Communications

Systems CE Certifications Not Submitted

27-10-00-01 27 10 00 Division 27 — Communications Structured Cabling CE Certifications Not Submitted

27-10-00-02 27 10 00 Division 27 — Communications Structured Cabling WS Warranty/Submittals Not Submitted

27-15-00-01 27 15 00 Division 27 — Communications Communications Horizontal Cabling CE Certifications Not Submitted

27-15-00-02 27 15 00 Division 27 — Communications Communications Horizontal Cabling WS Warranty/Submittals Not Submitted

Division 27 — Communications

Division 26 — Electrical

Item # Spec Section Division Section Title Type Code Submittal Type Status Date Submitted Required By Date Returned Subcontractor / Supplier Notes / Comments

Department of Veterans Affairs | Bay Pines VAMC, 10000 Bay Pines Blvd., Bay Pines, FL 33744 IFB Specifications | 11/21/2025

SUBMITTAL REGISTRY — INSTALLATION OF A NEW PET/CT

Bay Pines VAMC | Contract No. 36C24824N0806 | Project No. 516-CSI-144 | Above Group, Inc.

28-05-00-01 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security AB As-Built Drawings Not Submitted

28-05-00-02 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security CA Calculations Not Submitted

28-05-00-03 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security CE Certifications Not Submitted

28-05-00-04 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security OM O&M Manuals Not Submitted

28-05-00-05 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security PD Product Data Not Submitted

28-05-00-06 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security PL Plans/Procedures Not Submitted

28-05-00-07 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security SA Samples Not Submitted

28-05-00-08 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security SC Schedule Not Submitted

28-05-00-09 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security SD Shop Drawings Not Submitted

28-05-00-10 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security TR Test Reports Not Submitted

28-05-00-11 28 05 00 Division 28 — Electronic Safety and Security Common Work Results for Electronic Safety and

Security WS Warranty/Submittals Not Submitted

28-05-13-01 28 05 13 Division 28 — Electronic Safety and Security Conductors and Cables for Electronic Safety and

Security CE Certifications Not Submitted

28-05-13-02 28 05 13 Division 28 — Electronic Safety and Security Conductors and Cables for Electronic Safety and

Security SD Shop Drawings Not Submitted

28-05-13-03 28 05 13 Division 28 — Electronic Safety and Security Conductors and Cables for Electronic Safety and

Security TR Test Reports Not Submitted

28-05-26-01 28 05 26 Division 28 — Electronic Safety and Security Grounding and Bonding for Electronic Safety and

Security CE Certifications Not Submitted

28-05-26-02 28 05 26 Division 28 — Electronic Safety and Security Grounding and Bonding for Electronic Safety and

Security SD Shop Drawings Not Submitted

28-05-26-03 28 05 26 Division 28 — Electronic Safety and Security Grounding and Bonding for Electronic Safety and

Security TR Test Reports Not Submitted

28-05-28.33-01 28 05 28.33 Division 28 — Electronic Safety and Security Conduits and Backboxes for Electronic Safety and

Security CE Certifications Not Submitted

28-05-28.33-02 28 05 28.33 Division 28 — Electronic Safety and Security Conduits and Backboxes for Electronic Safety and

Security PD Product Data Not Submitted

28-05-28.33-03 28 05 28.33 Division 28 — Electronic Safety and Security Conduits and Backboxes for Electronic Safety and

Security SA Samples Not Submitted

28-05-28.33-04 28 05 28.33 Division 28 — Electronic Safety and Security Conduits and Backboxes for Electronic Safety and

Security SD Shop Drawings Not Submitted

28-05-28.33-05 28 05 28.33 Division 28 — Electronic Safety and Security Conduits and Backboxes for Electronic Safety and

Security TR Test Reports Not Submitted

28-13-00-01 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System AB As-Built Drawings Not Submitted

28-13-00-02 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System CA Calculations Not Submitted

28-13-00-03 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System CE Certifications Not Submitted

28-13-00-04 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System OM O&M Manuals Not Submitted

28-13-00-05 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System PD Product Data Not Submitted

28-13-00-06 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System PL Plans/Procedures Not Submitted

28-13-00-07 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System SC Schedule Not Submitted

28-13-00-08 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System SD Shop Drawings Not Submitted

28-13-00-09 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System TR Test Reports Not Submitted

28-13-00-10 28 13 00 Division 28 — Electronic Safety and Security Physical Access Control System WS Warranty/Submittals Not Submitted

28-31-00-01 28 31 00 Division 28 — Electronic Safety and Security Fire Detection and Alarm AB As-Built Drawings Not Submitted

28-31-00-02 28 31 00 Division 28 — Electronic Safety and Security Fire Detection and Alarm CA Calculations Not Submitted

28-31-00-03 28 31 00 Division 28 — Electronic Safety and Security Fire Detection and Alarm CE Certifications Not Submitted

28-31-00-04 28 31 00 Division 28 — Electronic Safety and Security Fire Detection and Alarm OM O&M Manuals Not Submitted

28-31-00-05 28 31 00 Division 28 — Electronic Safety and Security Fire Detection and Alarm PD Product Data Not Submitted

28-31-00-06 28 31 00 Division 28 — Electronic Safety and Security Fire Detection and Alarm SA Samples Not Submitted