S02 Past Performance Questionnaire 36C10F23R0013.docx

DOCX document 23 KB Posted

Attached to
Y1PC--Ft. Logan National Cemetery - Phase 1A Expansion (Construction FY23 Re-procurement)
Solicitation number
36C10F23R0013
Issued by

About this file

This past performance questionnaire and solicitation provide details for a construction project at Fort Logan National Cemetery in Denver, Colorado. The Department of Veterans Affairs seeks to award a firm-fixed-price contract for Phase 1A expansion valued between $20-50 million. The project scope involves providing all labor, materials, and equipment for construction according to the plans, drawings, and specifications. Responses are due by May 16, 2023. This is a 100% set-aside for service-disabled veteran-owned small businesses. The questionnaire requests references to evaluate a bidder's past performance on quality, schedule, cost control and other factors for relevant prior projects. The pre-proposal site visit schedule and NAICS code of 237990 for other heavy and civil engineering construction are also noted.

View the file

Other files

File Type Posted
S06 - 36C10F23R0013 0001 Amendment -PPI Response.pdf PDF
S06 - DOL Wage Determination CO20230002 04-07-2023.pdf PDF
S06 - Pre-Proposal Conference slides FLNC 4-19.pdf PDF
S06 - Ft. Logan Sign-in 4-19-23.pdf PDF
Bid Docs - Reports - Phase 1 Expansion Geotechnical Report.pdf PDF
S06 - 36C10F23R0013 Pre-Proposal Inquiry Responses.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(5 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (4of5).pdf PDF
S02 FT LOGAN NC PHASE 1A SPECIFICATIONS - 2023 02 21.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(4 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(1 of 2).pdf PDF
S02 - DOL Wage Determination CO20230002 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(2 of 5).pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (6 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (3of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(1 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (4 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (5 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (5of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(1 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(3 of 5).pdf PDF
S02 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certification.pdf PDF
S02 - DOL Wage Determination CO20230009 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (3 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (1of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (2 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (1 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (2of5).pdf PDF
S02 - 36C10F23R0013 - Final - RFP - Ft Logan Phase 1A.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F23R0013 | PAST PERFORMANCE QUESTIONNAIRE (PPQ)

PAST PERFORMANCE QUESTIONNAIRE (PPQ) FOR 36C10F23R0013

Your assistance is requested in support of a source selection for this solicitation.

Please complete this Questionnaire and return it via email to by the closing date and time listed in the solicitation:

SUBJECT: FT. LOGAN PHASE 1A | 36C10F23R0013 | PPQ

TO: CONTRACT SPECIALIST, RACHEL BEASON AT RACHEL.BEASON@VA.GOV AND CONTRACTING OFFICER, DAVID BULLERWELL AT DAVID.BULLERWELL@VA.GOV

When complete, the information on this form is SOURCE SELECTION SENSITIVE INFORMATION (41 U.S.C. 423) and shall be protected accordingly.

TO BE COMPLETED BY OFFEROR

1a. CONTRACTOR NAME & ADDRESS:
2. CONTRACT NO. & DUNS/SAM UNIQUE ENTITY IDENTIFIER (UEI):

3. CONTRACT AWARD DATE:

4. COMPLETION DATE:

5. CONTRACT VALUE (with options): $

1b. NAME OF PRIME CONTRACTOR (If this questionnaire is for a team member)

6. TYPE OF CONTRACT:

7. PROJECT TITLE, LOCATION, AND DESCRIPTION (AND TOTAL CONSTRUCTION VALUE AT PROJECT COMPLETION):

Please add a continuation page if additional space necessary.

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE

8. EVALUATION

a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER:

c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor and provide a brief description.

E = Exceptional
S = Satisfactory
U = Unsatisfactory
V/G = Very Good
M = Marginal
N/O = Not Observed

A. Quality of Products and Services – Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

E V/G S M U N/O

Note:

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

E V/G S M U N/O

Note:

C. Schedule – Assess the timeliness of contractor against the schedule of activities.

E V/G S M U N/O

Note:

D. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

E V/G S M U N/O

Note:

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

E V/G S M U N/O

Note:

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”.

E V/G S M U N/O

Note:

G. Overall Assessment.

E V/G S M U N/O

Note:

Please provide any additional comments to support the ratings above: (for any ratings of E, V/G, S, M, or U, please provide some brief comments about strengths & weaknesses you observed in this contractor that help us understand your rating. Feel free to provide additional pages if necessary):

Signature:

File details come from the government source that posted it. Updated .