S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (3 of 6).pdf

PDF 15 MB Posted

Attached to
Y1PC--Ft. Logan National Cemetery - Phase 1A Expansion (Construction FY23 Re-procurement)
Solicitation number
36C10F23R0013
Issued by

About this file

This document summarizes a federal construction contract solicitation. The Department of Veterans Affairs is seeking a firm-fixed-price construction contract for Phase 1A expansion of Ft. Logan National Cemetery in Denver, Colorado. The contractor will provide all labor, materials, and equipment to complete the construction project depicted in the plans, drawings, and specifications for an estimated cost between $20-50 million. This is a 100% set-aside opportunity for Service-Disabled Veteran Owned Small Businesses. The North American Industry Classification code is 237990 for other heavy and civil engineering construction with a size standard of $45 million. The pre-proposal site visit is scheduled and proposals are due by May 16, 2023 at 3:00 PM Eastern Time. The solicitation number is 36C10F23R0013.

View the file

Other files

File Type Posted
S06 - 36C10F23R0013 0001 Amendment -PPI Response.pdf PDF
S06 - DOL Wage Determination CO20230002 04-07-2023.pdf PDF
S06 - Pre-Proposal Conference slides FLNC 4-19.pdf PDF
S06 - Ft. Logan Sign-in 4-19-23.pdf PDF
Bid Docs - Reports - Phase 1 Expansion Geotechnical Report.pdf PDF
S06 - 36C10F23R0013 Pre-Proposal Inquiry Responses.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(5 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (4of5).pdf PDF
S02 FT LOGAN NC PHASE 1A SPECIFICATIONS - 2023 02 21.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(4 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(1 of 2).pdf PDF
S02 - DOL Wage Determination CO20230002 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(2 of 5).pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (6 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (3of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(1 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (4 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (5 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (5of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(1 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(3 of 5).pdf PDF
S02 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certification.pdf PDF
S02 - DOL Wage Determination CO20230009 2-24-2023.pdf PDF
S02 Past Performance Questionnaire 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (1of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (2 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (1 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (2of5).pdf PDF
S02 - 36C10F23R0013 - Final - RFP - Ft Logan Phase 1A.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOGAN BLVD

L O

G A

N B

LV

D

M

M

M

M

M

MM

M

M

M

M

M

M

M

M

M

M

M

M

M

W

SHEET CG105

SHEET CG107SHEET CG108SHEET CG109

SHEET CG103

SHEET CG110

SHEET CG102

SHEET CG104

SHEET CG101

SHEET CG106

QUINCY AVE

NEW

PARKING AREA

PROJECT

BOUNDARY

ROAD B

ROAD A

R O

A D

B

RO

AD

B

ACCESS ROAD

PROJECT

BOUNDARY

PROJECT

BOUNDARY

PROJECT

BOUNDARY

PROJECT

BOUNDARY

G R

A V

E L

A C

C E

S S

R O

A D

OKLAHOMA ST

DENVER DR

DE

NV

ER

D

R

OMAHA DR

O M

A H

A D

R

K A

N S

A S

S T

W Y

O M

IN

G

S T

MONTANA ST

DENVER DRDENVER DR

UTAH ST

MEMORIAL

LAKE

COLORADO ST

COLORADO ST

COLORADO ST

S . S

H E

R

ID

A N

B

LV

D

KENYON AVE

S . S

H E

R

ID

A N

B

LV

D

VETERANS

LAKE

OMAHA DR

U T

A H

S T

R E

E T

COMITTAL

SHELTER

C

COMITTAL C

PARKING

COMITTAL

SHELTER B

COMITTAL

SHELTER A

LO

W

E

LL

B

LV

D

SHEET CG111

SHEET CG112

SHEET CG113

SHEET CG121

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

OVERALL GRADING PLAN

ETG JDS

CG100

11 / 03 / 2022

85 217

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

NOTES:

11 / 03 / 202201 / 31 / 2023 BASH02 / 10 / 2023

A

EXISTING

DETENTION POND

(SOUTH POND)

G R

A V

E L

A C

C E

S S

R O

A D

OMAHA DR

ROAD B

SECTION

SECTION

SECTION

SECTION

SECTION

SECTION

SECTION

SECTION

SECTION

SECTION

92 SECTION

S.B.

S.B.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

DETAILED GRADING

SECTIONS 89-92

ETG JDS

CG101

82 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

NORTH

RO

AD

B

EXISTING

DETENTION POND

(SOUTH POND)

ROAD B

ACCESS ROAD

SECTION

SECTION

SECTION

SECTION

DENVER DR

S.B.

S.B.

S.B.

S.B.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

DETAILED GRADING

ETG JDS

CG102

83 161

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

NORTH

GRAVITY WALL SECTION DETAIL

217SECTIONS 86-89

11 / 03 / 2022

01 / 31 / 2023 BASH02 / 10 / 2023

DENVER D

RIV

E

G R

A V

E L

A C

C E

S S

R O

A D

R O

A D

B R

O A

D A

SECTION 5

SECTION 5

SECTION 4

SECTIONS 6

SECTIONS 6

SECTION 7

SECTION

SECTION

SECTION

EX R.B.

S.B.

S.B.

S.B.

S.B.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

DETAILED GRADING

SECTIONS 96, 97, & 103

ETG JDS

CG103

88 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

ROAD B

R O

A D

B

SECTION

SECTION

SECTION

SECTION

SECTION

SECTION

SECTION

S.B.

S.B.

S.B.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

DETAILED GRADING

SECTIONS 93-95 & 98-101

ETG JDS

CG104

89 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

R O

A D

A

SECTIONS 6

SECTION

SECTION

SECTION

SECTION 7

ROAD B

MAINTENANCE ACCESS RD

TEMPORARY

MATERIAL

STORAGE YARD

S.B.

S.B.

S.B.

S.B.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

DETAILED GRADING

SECTIONS 93-95 & 98-101

ETG RLB

CG105

90 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

NORTH

11 / 03 / 202201 / 31 / 202302 / 10 / 2023

SECTION

SECTION

SECTION

SECTION

R O

A D

B

S.B.

S.B.

S.B.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

DETAILED GRADING

SECTIONS 102-105

ETG JDS

CG106

91 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

W

S . S

H E

R

ID

A N

B

LV

D

VETERANS LAKE

N.W.S. 5429.85

SECTION 15-18

OKLAHOMA ST

VETERANS LAKE

COLUMBARIUM 5 / COURT B

(3,000 NICHES, 600 COLUMNS)

COLUMBARIUM 5 / COURT B

(1,080 NICHES, 216 COLUMNS)

COLUMBARIUM 5 / COURT A

(1,080 NICHES, 216 COLUMNS)

PINEHURST ESTATES

COLUMBARIUM 5 / COURT C

S.B.

S.B.

40COLUMBARIUM 5 / COURT B

(3,000 NICHES, 600 COLUMNS)

S.B.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

DETAILED GRADING

COLUMBARIUM 4 COURTS A AND B

ETG JDS

CG107

92 215

COLUMBARIUM COURT C - ENLARGEMENT

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

OKLAHOMA ST

SECTION 13

SECTION 14

SECTION 12

SECTION 13

SECTION 14

COLUMBARIUM 5 / COURT D

(1,080 NICHES, 216 COLUMNS)

COLUMBARIUM 5 / COURT C

(1,080 NICHES, 216 COLUMNS)

DENVER DR.

COLUMBARIUM 5 / COURT E

(1,080 NICHES, 216 COLUMNS)

PINEHURST ESTATES

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

DETAILED GRADING

COLUMBARIUM 4 COURTS C, D, AND E

ETG JDS

CG108

93 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

DENVER DR

SECTION 11

SECTION 9

COLUMBARIUM 5 / COURT B

(960 NICHES, 192 COLUMNS)

COLUMBARIUM 4 / COURT A

(1,200 NICHES, 240 COLUMNS)

MAINTENANCE ACCESS ROAD

S.B.

PINEHURST ESTATES

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

DETAILED GRADING

COLUMBARIUM 5 COURTS A AND B

ETG RLB

CG109

94 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

OMAHA DR

EXISTING

DETENTION POND

(SOUTH POND)

OMAHA DR

N E

B R

A S

K A

S T

SECTION

92 SECTION

EX R.B.

EX R.B.

A

EX R.B.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

DETAILED GRADING

ETG JDS

CG113

91 161

OVERFLOW WEIR

SECTION A

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

NORTH

OMAHA / NEBRASKA

IMPROVEMENTS DETAIL

RE: CP123 FOR STREET REHABILITATION.

OVERFLOW WEIR

OKLAHOMA ST.

OKLAHOMA ST.

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

DETAILED GRADING

ACCESSIBLE RAMPS

ETG RLB

CG114

96 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

RAMP 3B DETAILRAMP 3A DETAIL

RAMP 2A DETAIL

RAMP 4B DETAIL

RAMP 4A DETAIL

RAMPS 1A & 1B DETAIL RAMP 2B DETAIL

RAMP 5A AND 5B DETAIL

NORTH

NORTH

NORTH NORTH

NORTH

NORTH

NORTH

SIDEWALK CONNECTION DETAIL

NORTH

O M

A H

A D

R

O M

A H

A D

R

NORTH

OF

DETAILED GRADING

ACCESSIBLE RAMPS

ETG RLB

CG115

97 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

RAMP 6 DETAIL

OMAHA DRIVE SIDEWALK CONNECTION DETAIL

NORTH TYPICAL RAMP DETAIL

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 217

C

B

OKLAHOMA ST

SECTION 15-18

PINEHURST ESTATES

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

COLUMBARIUM WALL

OVER-EXCAVATION PLAN

ETG JDS

CG130

98 215

COLUMBARIUM 5 / COURT A, B

NORTH

NOTES:

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

D

OKLAHOMA ST

SECTION 14

SECTION 12

SECTION 14

PINEHURST

ESTATES

COLUMBARIUM 5 / COURT D

(1,080 NICHES, 216 COLUMNS)

COLUMBARIUM 5 / COURT C

(1,080 NICHES, 216 COLUMNS)

COLUMBARIUM 5 / COURT E

(1,080 NICHES, 216 COLUMNS)

PINEHURST ESTATES

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

COLUMBARIUM WALL

OVER-EXCAVATION PLAN

ETG RLB

CG131

99 215

COLUMBARIUM 4 / COURT C, D, E

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

NORTH

NOTES:

DENVER DR

SECTION 11

SECTION 9

COLUMBARIUM 5 / COURT B

(960 NICHES, 192 COLUMNS)

COLUMBARIUM 4 / COURT A

(1,200 NICHES, 240 COLUMNS)

PINEHURST ESTATES

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

COLUMBARIUM WALL

OVER-EXCAVATION PLAN

ETG RLB

CG132

100 215

COLUMBARIUM 4 / COURT A, B

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

NORTH

NOTES:

0+00 0+50 1+00 1+50 2+00 2+50 3+00

3+50 4+00 4+50 5+00 5+50 6+00 6+50

7+00 7+50 8+00 8+50 9+00 9+50 10+00

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

COLUMBARIUM WALL

OVER EXCAVATION SECTIONS

ETG RLB

CG133

101 215217

10+50 11+00 11+50 12+00 12+50 13+00 13+50

14+00 14+50 15+00 15+50 16+00 16+50 17+00

17+50 18+00 18+50 19+00 19+50

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

COLUMBARIUM WALL

OVER-EXCAVATION SECTIONS

ETG RLB

CG134

102 215217

SECTION A SECTION B

SECTION DSECTION C

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

COLUMBARIUM WALL

OVER-EXCAVATION DETAILS

ETG JDS

CG135

103 215

NORTH

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

CONSTRUCTION ACCESS ROAD

DE

N

VE

R

DR

IV

E

EXITING

STOCK PILE

NORTH

OF

STOCK PILE REMOVAL

EXISTING STOCKPILE

ETG JDS

CG136

104 215

LEGEND

KEYMAP

ENGINEER NOTES:

1-800-922-1987

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 217

Sheets and Views
1 COVER SHEET
2 SHEET INDEX
3 GENERAL NOTES
4 GENERAL NOTES
5 CONSTRUCTION PHASE PLAN
6 CONSTRUCTION ACCESS PLAN
7 CONSTRUCTION TRAILER PLAN
21 SOIL BORING KEY MAP
22 SOIL BORING LOGS
23 SOIL BORING LOGS
24 SOIL BORING LOGS
25 PAVEMENT CORE KEY MAP
26 SOIL BORING LOGS
27 SOIL BORING LOGS
28 SOIL BORING LOGS
29 SOIL BORING LOGS
30 OVERALL DEMOLITION PLAN
31 DEMOLITION PLAN
32 DEMOLITION PLAN
33 DEMOLITION PLAN
34 DEMOLITION PLAN
35 DEMOLITION PLAN
36 DEMOLITION PLAN
37 DEMOLITION PLAN
38 DEMOLITION PLAN
39 DEMOLITION PLAN
40 DEMOLITION PLAN
41 DEMOLITION PLAN
42 DEMOLITION PLAN
43 DEMOLITION PLAN
44 OVERALL SITE PLAN
45 SITE PLAN
46 SITE PLAN
47 SITE PLAN
48 SITE PLAN
49 SITE PLAN
50 SITE PLAN
51 SITE PLAN
52 SITE PLAN
53 SITE PLAN
54 SITE PLAN
55 OVERALL SITE SECTION
56 SECTION MARKER PLAN
57 SECTION MARKER PLAN
58 SECTION MARKER PLAN
59 SECTION MARKER PLAN
60 SECTION MARKER PLAN
61 SECTION MARKER PLAN
62 SECTION MARKER PLAN
63 SECTION MARKER PLAN
64 OVERALL SITE ADDRESSING
65 SECTION ADDRESSING
66 SECTION ADDRESSING
67 SECTION ADDRESSING
68 SECTION ADDRESSING
69 SECTION ADDRESSING
70 SECTION ADDRESSING
71 SECTION ADDRESSING
72 SECTION ADDRESSING
83 CRYPT DETAILS
84 CRYPT DETAILS
85 OVERALL GRADING PLAN
86 DETAILED GRADING
87 DETAILED GRADING
88 DETAILED GRADING
89 DETAILED GRADING
90 DETAILED GRADING
91 DETAILED GRADING
92 DETAILED GRADING
93 DETAILED GRADING
94 DETAILED GRADING
95 DETAILED GRADING
96 DETAILED GRADING
97 DETAILED GRADING
98 COLUMBARIUM WALL
99 COLUMBARIUM WALL
100 COLUMBARIUM WALL
101 COLUMBARIUM WALL
102 COLUMBARIUM WALL
103 COLUMBARIUM WALL
104 STOCK PILE REMOVAL
105 OVERALL EROSION CONTROL
106 DETAILED INITIAL
107 DETAILED INITIAL
108 DETAILED INITIAL
109 DETAILED INITIAL
110 DETAILED INITIAL
111 DETAILED INITIAL
112 DETAILED INITIAL
113 DETAILED INITIAL
114 DETAILED INITIAL
115 DETAILED INITIAL
116 DETAILED INITIAL
117 EXISTING ROADS INITIAL
118 EXISTING ROADS INITIAL
119 DETAILED INTERIM
120 DETAILED INTERIM
121 DETAILED INTERIM
122 DETAILED INTERIM
123 DETAILED INTERIM
124 DETAILED INTERIM
125 DETAILED INTERIM
126 DETAILED INTERIM
127 DETAILED INTERIM
128 DETAILED INTERIM
129 DETAILED INTERIM
130 EXISTING ROADS INTERIM
131 DETAILED FINAL
132 DETAILED FINAL
133 DETAILED FINAL
134 DETAILED FINAL
135 DETAILED FINAL
136 DETAILED FINAL
137 DETAILED FINAL
138 DETAILED FINAL
139 DETAILED FINAL
140 DETAILED FINAL
141 DETAILED FINAL
142 EXISTING ROADS FINAL
143 EXISTING ROADS FINAL
144 EROSION CONTROL DETAILS
145 EROSION CONTROL DETAILS
146 EROSION CONTROL DETAILS
147 OVERALL ROAD PLAN
148 ROAD A PLAN AND PROFILE
149 ROAD B PLAN AND PROFILE
150 ROAD B PLAN AND PROFILE
151 ROAD B PLAN AND PROFILE
152 ROAD B PLAN AND PROFILE
153 MAINTENANCE ACCESS ROAD
154 EXISTING REPAVING PLAN
155 EXISTING REPAVING PLAN
156 EXISTING REPAVING PLAN
157 EXISTING REPAVING PLAN
158 TYPICAL ROADWAY SECTION
159 TYPICAL ROADWAY SECTION
160 TYPICAL ROADWAY SECTION
161 TYPICAL CCD PAVING DETAILS
162 TYPICAL CCD PAVING DETAILS
163 PAVING DETAILS
164 OVERALL UTILITY PLAN
165 STORM PLAN AND PROFILE
166 STORM PLAN AND PROFILE
167 STORM PLAN AND PROFILE
168 STORM PLAN AND PROFILE
169 STORM PLAN AND PROFILE
170 STORM PLAN AND PROFILE
171 STORM PLAN AND PROFILE
172 STORM PLAN AND PROFILE
173 UNDERDRAIN PLAN
174 UNDERDRAIN PLAN
175 UNDERDRAIN PLAN
176 UNDERDRAIN PLAN
177 UNDERDRAIN PLAN
178 OVERALL DRAINAGE OUTFALL
179 CDOT M-STANDARD DETAILS
180 STORM DRAIN DETAILS
181 STORM DRAIN DETAILS
182 STORM DRAIN DETAILS
2022-11-17-irr-1abasebid
P-FtLogan1a-LI001
LI001
P-FtLogan1a-LI002
LI002
P-FtLogan1a-LI101
LI101
P-FtLogan1a-LI102
LI102
P-FtLogan1a-LI103
LI103
P-FtLogan1a-LI104
LI104
P-FtLogan1a-LI105
LI105
P-FtLogan1a-LI106
LI106
P-FtLogan1a-LI107
LI107
P-FtLogan1a-LI501
LI501
P-FtLogan1a-LI502
LI502
P-FtLogan1a-LI503
LI503
P-FtLogan1a-LI504
LI504
P-FtLogan1a-LI505
LI505
LA Plans from Base Bid
CEFL PHASE 1A 221107
S4-OVERALL V-100
S12-DETAIL V-108
S11-DETAIL V-109
S10-DETAIL V-110
S17-DETAIL V-113
S18-DETAIL V-114
S19-DETAIL V-115
S23-DETAIL V-116
S22-DETAIL V-117
S21-DETAIL V-118
S20-DETAIL V-119
S24-DETAIL V120
S25-DETAIL V-121
P-FtLogan1a-LI504
LI504
2022-11-17 Phase 1A
20221118 - Ft.LoganNationalCemeteryPh1A_STR - Base Bid Documents
S-003 - STRUCTURAL GENERAL NOTES - PUMP HOUSE C
S-110 - STRUCTURAL SPECIAL INSPECTIONS - PUMP HOUSE C
S-130 - TYPICAL DETAILS - CONCRETE
SB100 - DRAINAGE STRUCTURES SITE PLAN
SB103 - PUMP HOUSE C WET WELL PLAN & SECTIONS
ALT2 ELEC Pages from Volume 1 - Cemetery Bid Plans
ph1a Pages from 2022-11-17 Phase 1A Alternate 2
CS Pages from Volume 1 - Cemetery Bid Plans
bb si
g-002
11 / 03 / 2022
PHASE 1A 76
CG100 OVERALL GRADING SHEET-CG-100 OVERALL
CG-100 OVERALL
221215-CS200-CS204-ReBid-BASE
221215-CS501-CS505-ReBid-BASE
221215-LP100-LP109-LP501-ReBid-BASE
LP100-PLANTING PLAN
LP100
KEY MAP
LP101-PLANTING PLAN
LP101
KEY MAP-2
LP102-PLANTING PLAN
LP102
KEY MAP-3
LP103-PLANTING PLAN
LP103
KEY MAP-4
LP104-PLANTING PLAN
LP104
KEY MAP-5
LP105-PLANTING PLAN
LP105
KEY MAP-6
LP106-PLANTING PLAN
LP106
KEY MAP-7
LP107-PLANTING PLAN
LP107
KEY MAP-8
KEY MAP-9
LP108-PLANTING PLAN
LP108
KEY MAP-10
LP109-PLANTING PLAN
LP109
KEY MAP-11

File details come from the government source that posted it. Updated .