S02 FT LOGAN NC PHASE 1A SPECIFICATIONS - 2023 02 21.pdf

PDF 13 MB Posted

Attached to
Y1PC--Ft. Logan National Cemetery - Phase 1A Expansion (Construction FY23 Re-procurement)
Solicitation number
36C10F23R0013
Issued by

About this file

This document summarizes a federal construction contract opportunity for the Phase 1A expansion project at Fort Logan National Cemetery. The Department of Veterans Affairs seeks a firm-fixed price contract for construction services including all labor, materials, equipment and supervision. The project is set aside solely for Service-Disabled Veteran Owned Small Businesses. The contract value is estimated between $20-50 million. A pre-proposal site visit is scheduled and proposals are due by May 16, 2023 at 3:00 PM Eastern Time. The North American Industry Classification System code for this opportunity is 237990 for other heavy and civil engineering construction, with a size standard of $45 million.

View the file

Other files

File Type Posted
S06 - 36C10F23R0013 0001 Amendment -PPI Response.pdf PDF
S06 - DOL Wage Determination CO20230002 04-07-2023.pdf PDF
S06 - Pre-Proposal Conference slides FLNC 4-19.pdf PDF
S06 - Ft. Logan Sign-in 4-19-23.pdf PDF
Bid Docs - Reports - Phase 1 Expansion Geotechnical Report.pdf PDF
S06 - 36C10F23R0013 Pre-Proposal Inquiry Responses.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(5 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (4of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(4 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(1 of 2).pdf PDF
S02 - DOL Wage Determination CO20230002 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(2 of 5).pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (6 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (3of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(1 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (4 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (5 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (5of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(1 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(3 of 5).pdf PDF
S02 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certification.pdf PDF
S02 - DOL Wage Determination CO20230009 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (3 of 6).pdf PDF
S02 Past Performance Questionnaire 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (1of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (2 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (1 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (2of5).pdf PDF
S02 - 36C10F23R0013 - Final - RFP - Ft Logan Phase 1A.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA CEMETERY FORT LOGAN

Phase 1A Specification Package

FEBRUARY 2023

THIS PAGE IS INTENTIONALLY LEFT BLANK

00 01 10-1

Specification Outline

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DEVISION 01 – GENERAL REQUIREMENTS DATE

00 00 00 COVER PAGE 02-23

00 01 10 TABLE OF CONTENTS 10-18

00 01 15 LIST OF DRAWING SHEETS 05-10

01 00 01 GENERAL REQUIREMENTS MAJOR 06-14

01 32 16.13 NETWORK ANALYSIS SCHEDULES 06-14

01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 02-23

01 35 26 SAFETY REQUIREMENTS 07-20

01 42 19 REFERENCE STANDARDS 06-14

01 45 00 QUALITY CONTROL 02-21

01 45 29 TESTING LABORATORY SERVICES 06-14

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS 06-14

01 74 19 CONSTRUCTION WASTE MANAGEMENT 06-14

01 91 00 GENERAL COMISSIONING REQUIREMENTS 12-15

DEVISION 02 – EXISTING CONDITIONS

02 21 00 SITE SURVEYS 06-14

02 41 10 DEMOLITION AND SITE CLEAING 06-14

DIVISION 03 - CONCRETE

03 30 53 CAST-IN-PLACE CONCRETE (SHORT FORM) 06-14

03 48 21 PRECAST CONSRETE BURIAL CRYPT (DOUBLE DEPTH LAWN CRYPT) 06-13

03 48 24 PRECAST COLUMBARIUM UNITS 06-14

DIVISION 04 - MASONRY

04 05 13 MASONRY MORTARING 09-03

04 05 16 MASONRY GROUTING 09-03

04 20 00 UNIT MASONRY 09-03

04 72 10 STONE MASONRY 06-14

04 73 00 COLUMBARIUM NICHE COVERS 06-14

FORT LOGAN NATIONAL CEMETERY PROJECT NUMBER 888-043

PHASE 1A DEVELOPMENT – DENVER, CO BID DOC FEB 2023

00 01 10-2

DIVISION 05 – METALS

05 40 00 COLDE-FORMED METAL FRAMING 11-10

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 ROUGH CARPENTRY 09-03

06 20 00 FIBER-CEMENT PANEL SIDING AND TRIM 09-03

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 08 00 COMMISSIONING FACILITY EXTERIOR CLOSURE 12-15

07 01 50.19 PREPARATION FOR RE-ROOFING 11-10

07 11 13 BITUMINOUS DAMPROOFING 09-03

07 21 13 THERMAL INSULATION 09-03

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS 09-03

07 31 26 MULTI-WIDTH SYNTHETIC SLATE SHINGLES 09-03

07 40 00 METAL SOFFIT PANELS 09-03

07 54 19 POLYVINYL-CHLORIDE (PVC) ROOFING 09-03

07 60 00 FLASHING AND SHEET METAL 09-03

07 84 00 FIRE STOPPING 09-03

07 92 00 JOINT SEALANTS 09-03

DIVISION 08 - OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES 09-03

08 41 13 ALUMINUM STOREFRONT WINDOWS 09-03

08 71 00 DOOR HARDWARE 09-03

08 71 12.11 LOW ENERGY POWER ASSIST DOOR OPERATORS 04-21

08 80 00 GLAZING 09-03

08 90 00 LOUVERS AND VENTS 09-03

DIVISION 09 - FINISHES

09 05 16 SUBSURFACE PREPARATION FOR FLOOR FINISHES 11-10

09 06 00 SCHEDULE FOR FINISHES 09-03

09 22 16 NON-STRUCTURAL METAL FRAMING 09-03

00 01 10-3

09 24 00 PORTLAND CEMENT PLASTERING 06-14

09 29 00 GYPSUM BOARD 09-03

09 30 13 TILIING 09-03

09 51 00 ACOUSTICAL CEILINGS 09-03

09 65 13 RESILIENT BASE AND ACCESSORIES 09-03

09 65 19 RESILIENT TILE FLOORING 09-03

09 68 00 CARPETING 09-03

09 91 00 PAINTING 09-03

DIVISION 10 - SPECIALTIES

10 11 13 MARKERBOARDS 11-10

10 14 00 EXTERIOR SIGNAGE 04-21

10 14 05 INTERIOR SIGNAGE 09-03

10 21 13 TOILET COMPARTMENTS 09-03

10 28 00 TOILET AND BATH ACCESSORIES 09-03

10 44 13 FIRE EXTINGUISHER CABINETS 09-03

10 51 13 METAL LOCKERS 09-03

DIVISION 11 - EQUIPMENT

11 83 00 GLOBAL NAVAGATION SATELLITE SYSTEM (GNSS) REFERENCE SYSTEM 01-18

11 83 02 GNSS AND GIS MAPPING SYSTEM AND GEODATA 01-18

DIVISION 12 - FURNISHINGS

12 24 00 WINDOW SHADES 09-03

12 32 00 MANUFACTURED WOOD CASEWORK 09-03

12 36 00 COUNTERTOPS 09-03

DIVISION 22 - PLUMBING

22 05 11 COMMON WORK RESULTS FOR PLUMBING 07-16

22 05 12 GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 09-15

22 05 19 METERS AND GAGES FOR PLUMBING PIPING 09-15

22 05 23 GENERAL-DUTY VALVES FOR PLUMBING AND PIPING 09-15

22 07 11 PLUMBING INSULATION 09-19

22 08 00 COMMISSIONING OF PLUMBING SYSTEMS 12-15

00 01 10-4

22 11 00 FACILITY WATER DISTRIBUTION 11-19

22 11 23 DOMESTIC WATER PUMPS 09-15

22 13 00 FACILITY SANITARY AND VENT PIPING 09-15

22 15 00 GENERAL SERVICE COMPRESSED-AIR SYSTEMS 09-15

22 33 00 ELECTRIC DOMESTIC WATER HEATERS 09-15

22 34 00 FUEL-FIRED DOMESTIC WATER HEATERS 09-15

22 40 00 PLUMBING FIXTURES 09-15

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

23 05 11 COMMON WORK RESULTS FOR HVAC 02-20

23 05 12

GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION

EQUIPMENT 02-20

23 05 41 NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT 02-20

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 02-20

23 07 11 HVAC AND BOILER PLANT INSULATION 02-20

23 08 00 COMMISSIONING OF HVAC SYSTEMS 01-12

23 09 23 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC 02-22

23 11 23 FACILITY NATURAL-GAS PIPING 04-20

23 21 13 HYDRONIC PIPING 01-12

23 23 00 REFRIGERANT PIPING 02-20

23 31 00 HVAC DUCTS AND CASINGS 02-20

23 34 00 HVAC FANS 02-20

23 37 00 AIR OUTLETS AND INLETS 02-20

23 40 00 HVAC AIR CLEANING DEVICES 03-20

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT 03-20

23 81 43 AIR-SOURCE UNITARY HEAT PUMPS 03-20

23 82 00 CONVECTION HEATING AND COOLING UNITS 11-16

23 82 16 AIR COILS 03-20

23 82 39 UNIT HEATERS 01-12

DIVISION 26 - ELECTRICAL

26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS 12-04

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 12-04

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 12-04

26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 12-04

26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION 12-04

00 01 10-5

26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS 12-15

26 24 13 DISTRIBUTION SWITCHBOARDS 12-04

26 24 16 PANELBOARDS 12-04

26 27 26 WIRING DEVICES 12-04

26 29 11 MOTOR CONTROLLERS 12-04

26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 12-04

26 51 00 INTERIOR LIGHTING 12-04

26 57 00 CORS SYSTEM REQUIREMENTS 08-18

DIVISION 27 - COMMUNICATIONS

27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS 12-04

27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 12-04

27 05 33 CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS 12-04

27 10 00 STRUCTURED CABLING 12-04

27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS 12-04

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 10 00 ACCESS CONTROL 12-04

28 20 00 VIDEO SURVEILLANCE 12-04

28 46 00 FIRE DETECTION AND ALARM 12-04

DIVISION 31 - EARTHWORK

31 20 00 EARTH MOVING 11-16

31 23 19 DEWATERING 11-16

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 11-16

32 12 16 ASPHALT PAVING 11-16

32 17 23 PAVEMENT MARKINGS 10-20

32 31 13 CHAIN LINK FENCES AND GATES 10-20

32 31 19 DECORATIVE METAL FENCES AND GATES 10-20

32 33 00 SITE FURNISHINGS 11-16

32 82 00 IRRIGATION PUMPS 01-17

32 82 10 IRRIGATION PUMPS INTAKE 01-17

00 01 10-6

32 84 00 PLANTING IRRIGATION 01-17

32 90 00 PLANTING 08-20

DIVISION 33 - UTILITIES

33 08 00 COMMISSIONING OF SITE UTILITY SYSTEMS 12-15

33 10 00 WATER UTILITIES 11-16

33 30 00 SANITARY SEWERAGE UTILITIES 11-16

33 40 00 STORM SEWERAGE UTILITIES 11-16

LIST OF DRAWING SHEETS

00 01 1 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

PHASE 1A BASE BID

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

GENERAL G-001 COVER SHEET 1

G-002 SHEET INDEX - PHASE 1A 2

G-003 GENERAL NOTES - PHASE 1 DEVELOPMENT 3

G-004 GENERAL NOTES - DRAINAGE IMPROVEMENTS 4

G-005 OVERALL PHASE PLAN PHASE 1-7 5

G-006 CONSTRUCTION ACCESS PLAN 6

G-008 CONSTRUCTION TRAILER PLAN 7

SURVEY V-100 OVERALL EXISTING CONDITIONS SURVEY 8

V-108 EXISTING CONDITIONS SURVEY 9

V-109 EXISTING CONDITIONS SURVEY 10

V-110 EXISTING CONDITIONS SURVEY 11

V-113 EXISTING CONDITIONS SURVEY 12

V-114 EXISTING CONDITIONS SURVEY 13

V-115 EXISTING CONDITIONS SURVEY 14

V-116 EXISTING CONDITIONS SURVEY 15

V-117 EXISTING CONDITIONS SURVEY 16

V-118 EXISTING CONDITIONS SURVEY 17

V-119 EXISTING CONDITIONS SURVEY 18

V-120 EXISTING CONDITIONS SURVEY 19

V-121 EXISTING CONDITIONS SURVEY 20

GEOTECHNICAL B-101 SOIL BORING KEY MAP 21

B-102 SOIL BORING LOGS - PHASE I 22

B-103 SOIL BORING LOGS - PHASE I 23

B-104 SOIL BORING LOGS - PHASE I 24

B-110 PAVEMENT CORE KEY MAP 25

B-111 SOIL BORING LOGS - PAVEMENT CORE LOGS 26

B-112 SOIL BORING LOGS - PAVEMENT CORE LOGS 27

B-113 SOIL BORING LOGS - PAVEMENT CORE LOGS 28

B-114 SOIL BORING LOGS - PAVEMENT CORE LOGS 29

DEMOLITION CD100 OVERALL DEMOLITION PLAN 30

LIST OF DRAWING SHEETS

00 01 1 - 2

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

CD101 DEMOLITION PLAN - SECTIONS 89-92 31

CD102 DEMOLITION PLAN - SECTIONS 86-89 32

CD103 DEMOLITION PLAN - SECTIONS 96, 97, & 103 33

CD104 DEMOLITION PLAN - SECTIONS 93-95 & 98-101 34

CD105 DEMOLITION PLAN - SECTIONS 104, 105, & 109 35

CD106 DEMOLITION PLAN - SECTIONS 102-105 36

CD107 DEMOLITION PLAN - COLUMBARIUM 4 COURTS A AND B 37

CD108 DEMOLITION PLAN - COLUMBARIUM 4 COURTS C, D, AND E 38

CD109 DEMOLITION PLAN - COLUMBARIUM 5 COURTS A AND B 39

CD119 DEMOLITION PLAN - DENVER DRIVE 40

CD120 DEMOLITION PLAN - DENVER DRIVE 41

CD121 DEMOLITION PLAN - DENVER DRIVE 42

CD123 DEMOLITION PLAN - OKLAHOMA STREET 43

SITE

DEVELOPMENT

CS100 OVERALL SITE PLAN 44

CS101 SITE PLAN GRAVEL ROAD ENTRANCE 45

CS102 SITE PLAN ROAD B ENTRANCE 46

CS103 SITE PLAN SECTIONS 89-92 & 94-96 47

CS104 SITE PLAN SECTIONS 86-88 &93 48

CS105 SITE PLAN SECTIONS 97-103 49

CS106 SITE PLAN SECTIONS 104-105 50

CS107 SITE PLAN SECTION 109 51

CS108 SITE PLAN COLUMBARIUM 4 COURTS A, B, C 52

CS109 SITE PLAN COLUMBARIUM 4 COURTS D AND E 53

CS110 SITE PLAN COLUMBARIUM 5 COURTS A, B, C 54

CS111 OVERALL SECTION MARKER AND CONTROL MONUMENT 55

CS112 SECTION MARKER PLAN SECTIONS 88, 90-92, 94-96 56

CS113 SECTION MARKER PLAN SECTIONS 86, 87, 88, 93 57

CS114 SECTION MARKER PLAN SECTIONS 97-103 58

CS115 SECTION MARKER PLAN SECTIONS 104, 105 59

CS116 SECTION MARKER PLAN SECTIONS 109 60

CS117 SECTION MARKER PLAN COLUMBARIUM 4 COURTS A, B 61

CS118 SECTION MARKER PLAN COLUMBARIUM 4 COURTS C, D, E 62

CS119 SECTION MARKER PLAN COLUMBARIUM 5 COURTS A, B, C 63

CS120 OVERALL SECTION ADDRESSING 64

LIST OF DRAWING SHEETS

00 01 1 - 3

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

CS121 SECTION ADDRESSING SECTIONS 88, 90-92, 94-96 65

CS122 SECTION ADDRESSING SECTIONS 86, 87, 88, 93 66

CS123 SECTION ADDRESSING SECTIONS 97-103 67

CS124 SECTION ADDRESSING SECTIONS 104, 105 68

CS125 SECTION ADDRESSING SECTION 109 69

CS126 SECTION ADDRESSING COLUMBARIUM 4 COURTS A, B 70

CS127 SECTION ADDRESSING COLUMBARIUM 4 COURTS C, D, E 71

CS128 SECTION ADDRESSING COLUMBARIUM 5 COURTS A, B, C 72

CS200 SIGNAGE PLAN 73

CS201 SIGN DETAILS 1 74

CS202 SIGN DETAILS 2 75

CS203 SIGN DETAILS 3 76

CS204 SIGN DETAILS 4 77

CS501 HARDSCAPE DETAILS 78

CS502 COLUMBARIUM DETAILS 79

CS503 COLUMBARIUM DETAILS 80

CS504 COLUMBARIUM DETAILS 81

CS505 COLUMBARIUM DETAILS 82

CS510 CRYPT DETAILS 83

CS511 CRYPT DETAILS 84

GRADING CG100 OVERALL GRADING PLAN 85

CG101 DETAILED GRADING SECTIONS 89-92 86

CG102 DETAILED GRADING SECTIONS 86-89 87

CG103 DETAILED GRADING SECTIONS 96,97 & 103 88

CG104 DETAILED GRADING SECTIONS 93-95 & 98-101 89

CG105 DETAILED GRADING SECTIONS 104, 105, & 109 90

CG106 DETAILED GRADING SECTIONS 102-105 91

CG107 DETAILED GRADING COLUMBARIUM 4 COURTS A AND B 92

CG108 DETAILED GRADING COLUMBARIUM 4 COURTS C, D, AND E 93

CG109 DETAILED GRADING COLUMBARIUM 5 COURTS A AND B 94

CG113 DETAILED GRADING OVER FLOW WEIR 95

CG114 DETAILED GRADING ACCESSIBLE RAMPS 96

CG115 DETAILED GRADING ACCESSIBLE RAMPS 97

CG130 COLUMBARIUM WALL OVER EXCAVATION PLAN 98

LIST OF DRAWING SHEETS

00 01 1 - 4

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

CG131 COLUMBARIUM WALL OVER-EXCAVATION PLAN 99

CG132 COLUMBARIUM WALL OVER-EXCAVATION PLAN 100

CG133 COLUMBARIUM WALL OVER-EXCAVATION SECTIONS 101

CG134 COLUMBARIUM WALL OVER-EXCAVATION SECTIONS 102

CG135 COLUMBARIUM WALL OVER-EXCAVATION DETAILS 103

CG136 STOCK PILE REMOVAL PLAN 104

EROSION CG200 OVERALL EROSION CONTROL PLAN 105

CG201 DETAILED INITIAL EROSION CONTROL PLAN 106

CG202 DETAILED INITIAL EROSION CONTROL PLAN 107

CG203 DETAILED INITIAL EROSION CONTROL PLAN 108

CG204 DETAILED INITIAL EROSION CONTROL PLAN 109

CG205 DETAILED INITIAL EROSION CONTROL PLAN 110

CG206 DETAILED INITIAL EROSION CONTROL PLAN 111

CG207 DETAILED INITIAL EROSION CONTROL PLAN 112

CG208 DETAILED INITIAL EROSION CONTROL PLAN 113

CG209 DETAILED INITIAL EROSION CONTROL PLAN 114

CG210 DETAILED INITIAL EROSION CONTROL PLAN 115

CG211 DETAILED INITIAL EROSION CONTROL PLAN 116

CG220 EXISTING ROADS INITIAL EROSION CONTROL PLAN 117

CG221 EXISTING ROADS INITIAL EROSION CONTROL PLAN 118

CG222 DETAILED INTERIM EROSION CONTROL PLAN 119

CG223 DETAILED INTERIM EROSION CONTROL PLAN 120

CG224 DETAILED INTERIM EROSION CONTROL PLAN 121

CG225 DETAILED INTERIM EROSION CONTROL PLAN 122

CG226 DETAILED INTERIM EROSION CONTROL PLAN 123

CG227 DETAILED INTERIM EROSION CONTROL PLAN 124

CG228 DETAILED INTERIM EROSION CONTROL PLAN 125

CG229 DETAILED INTERIM EROSION CONTROL PLAN 126

CG230 DETAILED INTERIM EROSION CONTROL PLAN 127

CG231 DETAILED INTERIM EROSION CONTROL PLAN 128

CG232 DETAILED INTERIM EROSION CONTROL PLAN 129

CG241 EXISTING ROADS INITERIM EROSION CONTROL PLAN 130

CG243 DETAILED FINAL EROSION CONTROL PLAN 131

LIST OF DRAWING SHEETS

00 01 1 - 5

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

CG244 DETAILED FINAL EROSION CONTROL PLAN 132

CG245 DETAILED FINAL EROSION CONTROL PLAN 133

CG246 DETAILED FINAL EROSION CONTROL PLAN 134

CG247 DETAILED FINAL EROSION CONTROL PLAN 135

CG248 DETAILED FINAL EROSION CONTROL PLAN 136

CG249 DETAILED FINAL EROSION CONTROL PLAN 137

CG250 DETAILED FINAL EROSION CONTROL PLAN 138

CG251 DETAILED FINAL EROSION CONTROL PLAN 139

CG252 DETAILED FINAL EROSION CONTROL PLAN 140

CG253 DETAILED FINAL EROSION CONTROL PLAN 141

CG262 EXISTING ROADS FINAL EROSION CONTROL PLAN 142

CG263 EXISTING ROADS FINAL EROSION CONTROL PLAN 143

CG501 EROSION CONTROL DETAILS 144

CG502 EROSION CONTROL DETAILS 145

CG503 EROSION CONTROL DETAILS 146

ROADWAY CP100 OVERALL ROAD PLAN 147

CP101 ROAD A PLAN AND PROFILE 148

CP102 ROAD B PLAN AND PROFILE 149

CP103 ROAD B PLAN AND PROFILE 150

CP104 ROAD B PLAN AND PROFILE 151

CP105 ROAD B PLAN AND PROFILE 152

CP108 MAINTENANCE ACCESS ROAD 153

CP118 REPAVING PLAN - DENVER DRIVE 154

CP119 REPAVING PLAN - DENVER DRIVE 155

CP120 REPAVING PLAN - DENVER DRIVE 156

CP122 REPAVING PLAN - OKLAHOMA STREET 157

CP301 TYPICAL STREET SECTIONS 158

CP302 TYPICAL STREET SECTIONS 159

CP303 TYPICAL STREET SECTIONS 160

CP304 TYPICAL CCD PAVING DETAILS 161

CP305 TYPICAL CCD PAVING DETAILS 162

CP501 PAVING DETAILS 163

UTILITY CU100 OVERALL UTILITY PLAN 164

CU101 STORM PLAN AND PROFILE - STORM 1 165

LIST OF DRAWING SHEETS

00 01 1 - 6

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

CU102 STORM PLAN AND PROFILE - STORM 1 166

CU103 STORM PLAN AND PROFILE - STORM 1 167

CU104 STORM PLAN AND PROFILE - STORM 1 168

CU105 STORM PLAN AND PROFILE - LATERAL 4, 5, AND 6 169

CU106 STORM PLAN AND PROFILE - STORM 2 170

CU107 STORM PLAN AND PROFILE - POND PLAN 171

CU108 STORM PLAN AND PROFILE - LATERAL 1 172

CU109 UNDERDRAIN PLAN - SECTIONS 104, 105, & 109 173

CU110 UNDERDRAIN PLAN - SECTIONS 104 & 105 174

CU111 UNDERDRAIN PLAN - SECTIONS 97 & 103 175

CU112 UNDERDRAIN PLAN - COLUMBARIUM COURT 5 176

CU113 UNDERDRAIN PLAN - COLUMBARIUM WALL 177

CU200 OVERALL OUTFALL PLAN AND PROFILE 178

CU301 CDOT M-STANDARD DETAILS 179

CU501 STORM DRAIN DETAILS 180

CU502 STORM DRAIN DETAILS 181

CU503 STORM DRAIN DETAILS 182

IRRIGATION LI001 IRRIGATION COVER SHEET 183

LI002 OVERALL IRRIGATION PLAN 184

LI101 IRRIGATION PLAN 185

LI102 IRRIGATION PLAN 186

LI103 IRRIGATION PLAN 187

LI104 IRRIGATION PLAN 188

LI105 IRRIGATION PLAN 189

LI106 IRRIGATION PLAN 190

LI107 IRRIGATION PLAN 191

LI501 IRRIGATION DETAILS 192

LI502 IRRIGATION DETAILS 193

LI503 IRRIGATION DETAILS 194

LI504 IRRIGATION DETAILS 195

LI505 IRRIGATION PUMP DETAIL 196

LANDSCAPE LP100 PLANTING PLAN 197

LP101 PLANTING PLAN 198

LP102 PLANTING PLAN 199

LIST OF DRAWING SHEETS

00 01 1 - 7

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

LP103 PLANTING PLAN 200

LP104 PLANTING PLAN 201

LP105 PLANTING PLAN 202

LP106 PLANTING PLAN 203

LP107 PLANTING PLAN 204

LP108 PLANTING PLAN 205

LP109 PLANTING PLAN 206

LP501 PLANTING AND SOIL DETAILS 207

STRUCTURAL S-001 GENERAL STRUCTURAL NOTES & DETAILS 208

S-002 GENERAL STRUCTURAL NOTES & DETAILS 209

S-003 STRUCTURAL GENERAL NOTES - PUMP HOUSE C 210

S-110 STRUCTURAL SPECIAL INSTRUCTIONS - PUMP HOUSE C 211

S-130 TYPICAL DETAILS - CONCRETE 212

SB100 DRAINAGE STRUCTURES SITE PLAN 213

SB103 PUMP HOUSE C WET WELL PLAN & SECTIONS 214

SF501 215

ELECTRICAL E-001

ELECTRICAL GENERAL NOTES, SYBOL LEGENDS, AND

ABBREVIATIONS

ES101 ELECTRICAL SITE PLAN 217

LIST OF DRAWING SHEETS

00 01 1 - 8

PHASE 1A ALT 1 - ROADS

JAN

BID

SHEET

SHEET TITLE PAGE

GENERAL G-001 COVER SHEET 1

G-002 SHEET INDEX - PHASE 1A - ALTERNATE 1 2

G-003 GENERAL NOTES - PHASE 1 DEVELOPMENT 3

G-004 GENERAL NOTES - DRAINAGE IMPROVEMENTS 4

G-005 OVERALL PHASE PLAN PHASE 1-7 5

G-006 CONSTRUCTION ACCESS PLAN 6

SURVEY V-100 OVERALL EXISTING CONDITIONS SURVEY 7

V-101 EXISTING CONDITIONS SURVEY 8

V-102 EXISTING CONDITIONS SURVEY 9

V-103 EXISTING CONDITIONS SURVEY 10

V-104 EXISTING CONDITIONS SURVEY 11

V-105 EXISTING CONDITIONS SURVEY 12

V-106 EXISTING CONDITIONS SURVEY 13

V-107 EXISTING CONDITIONS SURVEY 14

V-108 EXISTING CONDITIONS SURVEY 15

V-109 EXISTING CONDITIONS SURVEY 16

V-110 EXISTING CONDITIONS SURVEY 17

V-111 EXISTING CONDITIONS SURVEY 18

V-112 EXISTING CONDITIONS SURVEY 19

V-113 EXISTING CONDITIONS SURVEY 20

V-114 EXISTING CONDITIONS SURVEY 21

V-115 EXISTING CONDITIONS SURVEY 22

V-116 EXISTING CONDITIONS SURVEY 23

V-117 EXISTING CONDITIONS SURVEY 24

V-118 EXISTING CONDITIONS SURVEY 25

V-120 EXISTING CONDITIONS SURVEY 26

V-121 EXISTING CONDITIONS SURVEY 27

GEOTECHNICAL B-110 PAVEMENT CORE KEY MAP 28

B-111 SOIL BORING LOGS - PAVEMENT CORE LOGS 29

B-112 SOIL BORING LOGS - PAVEMENT CORE LOGS 30

B-113 SOIL BORING LOGS - PAVEMENT CORE LOGS 31

LIST OF DRAWING SHEETS

00 01 1 - 9

DISCIPLINE

JAN

BID

SHEET

SHEET TITLE PAGE

B-114 SOIL BORING LOGS - PAVEMENT CORE LOGS 32

DEMOLITION CD100 OVERALL DEMOLITION PLAN 33

CD107 DEMOLITION PLAN - COLUMBARIUM 4 COURTS A AND B 34

CD110 DEMOLITION PLAN - LOGAN BOULEVARD 35

CD111 DEMOLITION PLAN - LOGAN BOULEVARD 36

CD112 DEMOLITION PLAN - LOGAN BOULEVARD 37

CD113 DEMOLITION PLAN - LOGAN BOULEVARD 38

CD114 DEMOLITION PLAN - KANSAS, UTAH, & WYOMING STREET 39

CD115

DEMOLITION PLAN - KANSAS, WYOMING, & MONTANA

STREET

CD116 DEMOLITION PLAN - DENVER DRIVE 41

CD117 DEMOLITION PLAN - DENVER DRIVE 42

CD118 DEMOLITION PLAN - DENVER DRIVE 43

CD119 DEMOLITION PLAN - DENVER DRIVE 44

CD120 DEMOLITION PLAN - DENVER DRIVE 45

CD121 DEMOLITION PLAN - DENVER DRIVE 46

CD122 DEMOLITION PLAN - DENVER AND OMAHA DRIVE 47

CD123 DEMOLITION PLAN - OKLAHOMA STREET 48

SITE

DEVELOPMENT

CS100 OVERALL SITE PLAN 49

CS101 SITE PLAN GRAVEL ROAD ENTRANCE 50

CS108 SITE PLAN COLUMBARIUM 4 COURTS A, B, C 51

CS117 SECTION MARKER PLAN COLUMBARIUM 4 COURTS A, B 52

CS201 SIGN DETAILS 1 53

CS203 SIGN DETAILS 3 54

GRADING CG100 OVERALL GRADING PLAN 55

CG101 DETAILED GRADING SECTIONS 89-92 56

CG113 DETAILED GRADING OVER FLOW WEIR 57

CG114 DETAILED GRADING ACCESSIBLE RAMPS 58

CG115 DETAILED GRADING ACCESSIBLE RAMPS 59

EROSION CG200 OVERALL EROSION CONTROL PLAN 60

CG207 DETAILED INITIAL EROSION CONTROL PLAN 61

CG209 DETAILED INITIAL EROSION CONTROL PLAN 62

LIST OF DRAWING SHEETS

00 01 1 - 10

DISCIPLINE

JAN

BID

SHEET

SHEET TITLE PAGE

CG213 EXISTING ROADS INITIAL EROSION CONTROL PLAN 63

CG214 EXISTING ROADS INITIAL EROSION CONTROL PLAN 64

CG215 EXISTING ROADS INITIAL EROSION CONTROL PLAN 65

CG216 EXISTING ROADS INITIAL EROSION CONTROL PLAN 66

CG217 EXISTING ROADS INITIAL EROSION CONTROL PLAN 67

CG218 EXISTING ROADS INITIAL EROSION CONTROL PLAN 68

CG219 EXISTING ROADS INITIAL EROSION CONTROL PLAN 69

CG220 EXISTING ROADS INITIAL EROSION CONTROL PLAN 70

CG221 EXISTING ROADS INITIAL EROSION CONTROL PLAN 71

CG228 DETAILED INTERIM EROSION CONTROL PLAN 72

CG230 DETAILED INTERIM EROSION CONTROL PLAN 73

CG234 EXISTING ROADS INITERIM EROSION CONTROL PLAN 74

CG235 EXISTING ROADS INITERIM EROSION CONTROL PLAN 75

CG236 EXISTING ROADS INITERIM EROSION CONTROL PLAN 76

CG237 EXISTING ROADS INITERIM EROSION CONTROL PLAN 77

CG238 EXISTING ROADS INITERIM EROSION CONTROL PLAN 78

CG239 EXISTING ROADS INITERIM EROSION CONTROL PLAN 79

CG240 EXISTING ROADS INITERIM EROSION CONTROL PLAN 80

CG241 EXISTING ROADS INITERIM EROSION CONTROL PLAN 81

CG242 EXISTING ROADS INITERIM EROSION CONTROL PLAN 82

CG249 DETAILED FINAL EROSION CONTROL PLAN 83

CG251 DETAILED FINAL EROSION CONTROL PLAN 84

CG255 EXISTING ROADS FINAL EROSION CONTROL PLAN 85

CG256 EXISTING ROADS FINAL EROSION CONTROL PLAN 86

CG257 EXISTING ROADS FINAL EROSION CONTROL PLAN 87

CG258 EXISTING ROADS FINAL EROSION CONTROL PLAN 88

CG259 EXISTING ROADS FINAL EROSION CONTROL PLAN 89

CG260 EXISTING ROADS FINAL EROSION CONTROL PLAN 90

CG261 EXISTING ROADS FINAL EROSION CONTROL PLAN 91

CG262 EXISTING ROADS FINAL EROSION CONTROL PLAN 92

CG263 EXISTING ROADS FINAL EROSION CONTROL PLAN 93

CG501 EROSION CONTROL DETAILS 94

CG502 EROSION CONTROL DETAILS 95

LIST OF DRAWING SHEETS

00 01 1 - 11

DISCIPLINE

JAN

BID

SHEET

SHEET TITLE PAGE

CG503 EROSION CONTROL DETAILS 96

ROADWAY CP100 OVERALL ROAD PLAN 97

CP106 DENVER DRIVE PLAN AND PROIFLE 98

CP108 MAINTENANCE ACCESS ROAD 99

CP109 REPAVING PLAN - LOGAN BOULEVARD 100

CP110 REPAVING PLAN - LOGAN BOULEVARD 101

CP111 REPAVING PLAN - LOGAN BOULEVARD 102

CP112 REPAVING PLAN - LOGAN BOULEVARD 103

CP113 REPAVING PLAN - KANSAS, UTAH, & WYOMING STREET 104

CP114 REPAVING PLAN - KANSAS, WYOMING, & MONTANA STREET 105

CP115 REPAVING PLAN - DENVER DRIVE 106

CP116 REPAVING PLAN - DENVER DRIVE 107

CP117 REPAVING PLAN - DENVER DRIVE 108

CP118 REPAVING PLAN - DENVER DRIVE 109

CP119 REPAVING PLAN - DENVER DRIVE 110

CP120 REPAVING PLAN - DENVER DRIVE 111

CP121 REPAVING PLAN - DENVER AND OMAHA DRIVE 112

CP122 REPAVING PLAN - OKLAHOMA STREET 113

CP131 REPAVING PLAN - COMMITTAL SHELTER B 114

CP200 REPAVING PROFILE - DENVER DRIVE 115

CP211 SIGNAGE AND STRIPING PIC BUILDING 116

CP212 SIGNAGE AND STRIPING COMMITTAL SHELTER 117

CP213 SIGNAGE AND STRIPING ADMIN & ON-STREET PARKING 118

CP301 TYPICAL STREET SECTIONS 119

CP302 TYPICAL STREET SECTIONS 120

CP303 TYPICAL STREET SECTIONS 121

CP304 TYPICAL CCD PAVING DETAILS 122

CP305 TYPICAL CCD PAVING DETAILS 123

CP501 PAVING DETAILS 124

UTILITY CU100 OVERALL UTILITY PLAN 125

CU113 UNDERDRAIN PLAN - COLUMBARIUM WALL 126

CU200 OVERALL OUTFALL PLAN AND PROFILE 127

CU301 CDOT M-STANDARD DETAILS 128

LIST OF DRAWING SHEETS

00 01 1 - 12

DISCIPLINE

JAN

BID

SHEET

SHEET TITLE PAGE

CU501 STORM DRAIN DETAILS 129

CU502 STORM DRAIN DETAILS 130

CU503 STORM DRAIN DETAILS 131

IRRIGATION LI001 IRRIGATION COVER SHEET 132

LI002 OVERALL IRRIGATION PLAN 133

LI101 IRRIGATION PLAN 134

LI102 IRRIGATION PLAN 135

LI103 IRRIGATION PLAN 136

LI104 IRRIGATION PLAN 137

LI105 IRRIGATION PLAN 138

LI106 IRRIGATION PLAN 139

LI107 IRRIGATION PLAN 140

LI501 IRRIGATION DETAILS 141

LI502 IRRIGATION DETAILS 142

LI503 IRRIGATION DETAILS 143

LI504 IRRIGATION DETAILS 144

LI505 IRRIGATION PUMP DETAIL 145

LANDSCAPE LP100 PLANTING PLAN 146

LP101 PLANTING PLAN 147

LP102 PLANTING PLAN 148

LP103 PLANTING PLAN 149

LP104 PLANTING PLAN 150

LP105 PLANTING PLAN 151

LP106 PLANTING PLAN 152

LP107 PLANTING PLAN 153

LP108 PLANTING PLAN 154

LP109 PLANTING PLAN 155

LP501 PLANTING AND SOIL DETAILS 156

LIST OF DRAWING SHEETS

00 01 1 - 13

PHASE 1A ALT 2 – PIC

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

GENERAL G-001 COVER SHEET 1

G-002 SHEET INDEX - PHASE 1A - ALTERNATE 2 2

G-006 CONSTRUCTION ACCESS PLAN 3

SURVEY V-100 OVERALL EXISTING CONDITIONS SURVEY 4

V-111 EXISTING CONDITIONS SURVEY 5

SITE

DEVELOPMENT

CS100 OVERALL SITE PLAN 6

EROSION CG200 OVERALL EROSION CONTROL PLAN 7

CG213 EXISTING ROADS INITIAL EROSION CONTROL PLAN 8

CG214 EXISTING ROADS INITIAL EROSION CONTROL PLAN 9

CG234 EXISTING ROADS INITERIM EROSION CONTROL PLAN 10

CG235 EXISTING ROADS INITERIM EROSION CONTROL PLAN 11

CG255 EXISTING ROADS FINAL EROSION CONTROL PLAN 12

CG256 EXISTING ROADS FINAL EROSION CONTROL PLAN 13

IRRIGATION LI001 IRRIGATION COVER SHEET 14

LI002 OVERALL IRRIGATION PLAN 15

LI501 IRRIGATION DETAILS 16

LI502 IRRIGATION DETAILS 17

LI503 IRRIGATION DETAILS 18

ARCHITECTURE AD104

BUILDING 1401 – PUBLIC INFORMATION CENTER –

DEMOLITION PLANS

AD105

BUILDING 1401 – PUBLIC INFORMATION CENTER –

DEMOLITION ROOF PLAN

AD106

BUILDING 1401 – PUBLIC INFORMATION CENTER –

DEMOLITION ELEVATIONS

AD107

BUILDING 1401 – PUBLIC INFORMATION CENTER – EXISTING

PHOTOGRAPHS

AS001

ABBREVIATIONS, SYMBOLS, LEGENDS AND ARCHITECTURE

GENERAL NOTES

AS002 WALL TYPES/DETAILS 24

AS003 PARTITION FRAMING DETAILS 25

AS020

BUILDING 1401 - PUBLIC INFORMATION CENTER - PHASING

PLAN

AS103

BUILDING 1401 – PUBLIC INFORMATION CENTER – FLOOR

PLAN/CEILING PLAN

LIST OF DRAWING SHEETS

00 01 1 - 14

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

AS104

BUILDING 1401 - PUBLIC INFORMATION CENTER – ROOF

PLAN/DETAILS

AS105

BUILDING 1401 – PUBLIC INFORMATION CENTER – EXTERIOR

ELEVATIONS

AS300

BUILDING 1401 - PUBLIC INFORMATION CENTER - TYPICAL

WALL SECTIONS

AS301 BUILDING 1401 - PUBLIC INFORMATION CENTER - DETAILS 31

AS302

BUILDING 1401 - PUBLIC INFORMATION CENTER - PLAN

DETAILS

AS400

BUILDING 1401 - PUBLIC INFORMATION CENTER - FLOOR

FINISH PLAN & FINISH SCHEDULE

AS401

BUILDING 1401 - PUBLIC INFROMATION CENTER - INTERIOR

ELEVATIONS

AS403

BUILDIND 1401 - PUBLIC INFORMATION CENTER - CASEWORK

DETAILS

AS500

BUILDING 1401 - - PUBLIC INFORMATION CENTER - SIGNAGE

SCHEDULE

AS600

BUILDING 1401 - - PUBLIC INFORMATION CENTER - DOOR

SCHEDULE AND DETAILS

AS601 WINDOW SCHEDULE/ WINDOW ELEVATIONS 38

AS602 WINDOW DETAILS 39

AF100

BUILDING 1401 - PUBLIC INFO CENTER - FURNISHING FLOOR

PLAN

STRUCTURAL S-001 GENERAL STRUCTURAL NOTES & DETAILS 41

S-002 GENERAL STRUCTURAL NOTES & DETAILS 42

S-101 BUILDING 1401 - PUBLIC INFORMATION CENTER 43

SF502 SECTIONS AND DETAILS 44

PLUMBING P-001 PLUMBING GENERAL INFORMATION 45

PD102

BUILDING 1401 - PUBLIC INFORMATION CENTER - PLUMBING

DEMOLITION PLAN

PP102

BUILDING 1401 - PUBLIC INFORMATION CENTER - DOMESTIC

WATER PLAN

PP103

BUILDING 1401 - PUBLIC INFORMATION CENTER - WASTE &

VENT PLAN

P-501 PLUMBING DETAILS 49

P-502 PLUMBING DETAILS 50

P-601 PLUMBING SCHEDULES AND DIAGRAMS 51

MECHANICAL M-001 MECHANICAL GENERAL INFORMATION 52

LIST OF DRAWING SHEETS

00 01 1 - 15

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

(HVAC)

MD102 BUILDING 1401 - P.I.C. - MECHANICAL DEMOLITION PLAN 53

MH102 BUILDING 1401 - P.I.C. - MECHANICAL PLAN 54

MH401 ENLARGED MECHANICAL PLANS 55

M-501 MECHANICAL DETAILS 56

M-601 MECHANICAL SCHEDULES 57

M-602 MECHANICAL CONTROLS 58

ELECTRICAL E-001

ELECTRICAL GENERAL NOTES, SYBOL LEGENDS, AND

ABBREVIATIONS

ES101 ELECTRICAL SITE PLAN 60

ED102

BUILDING 1401 – PUBLIC INFORMATION CENTER –

ELECTRICAL DEMOLITION PLAN

EP102

BUILDING 1401 - PUBLIC INFORMATION CENTER – ELECRICAL

POWER PLAN

E-401 ELECTRICAL ENLARGEMENTS 63

E-501 ELECTRICAL DETAILS 64

E-601 ELECTRICAL SCHEDULES 65

E-602 ONE-LINE DIAGRAMS 66

FIRE ALARM FA-001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND 67

FA102

BUILDING 1401 - PUBLIC INFORMATION CENTER – FIRE

ALARM PLAN

TECHNOLOGY TK001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND 69

TK102

BUILDING 1401 - PUBLIC INFORMATION CENTER –

TECHNOLOGY PLAN

LIST OF DRAWING SHEETS

00 01 1 - 16

PHASE 1A ALT 3 – FCA & ADMIN

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

GENERAL G-001 COVER SHEET 1

G-002 SHEET INDEX - PHASE 1A - ALTERNATE 3 2

G-006 CONSTRUCTION ACCESS PLAN 3

SITE

DEVELOPMENT

CS211 FACILITY CONDITIONS ASSESSMENT CIVIL REPAIR 4

CS212 FACILITY CONDITIONS ASSESSMENT CIVIL REPAIR 5

CS501 HARDSCAPE DETAILS 6

ROADWAY CP211 SIGNAGE AND STRIPING PIC BUILDING 7

ARCHITECTURE AD100

BUILDING 1301 – ADMIN./MAINTENANCE – DEMOLITION

CEILING PLAN

AD101

BUILDING 1301 – ADMIN./MAINTENANCE – DEMOLITION

ROOF PLAN

AD102

BUILDING 1301 – ADMIN./MAINTENANCE – DEMOLITION

ELEVATIONS

AD103

BUILDING 1301 – ADMIN./MAINTENANCE – EXISTING

PHOTOGRAPHS

AD108

BUILDING 3001 – SATELLITE MAINTENANCE – DEMOLITION

PLANS

AD109

BUILDING 3001 – SATELLITE MAINTENANCE – DEMOLITION

ELEVATIONS

AD110

BUILDING 3001 – SATELLITE MAINTENANCE – EXISTING

PHOTOGRAPHS

AD111

PUMP HOUSE B – DEMOLITION ELEVATIONS AND EXISTING

PHOTOGRAPHS

AD112

BUILDING 3003 – MAINTENANCE BARN – DEMO ELEVATIONS

AND EXISTING PHOTOGRAPHS

AS001

ABBREVIATIONS, SYMBOLS, LEGENDS AND ARCHITECTURE

GENERAL NOTES

AS002 WALL TYPES/DETAILS 18

AS003 PARTITION FRAMING DETAILS 19

AS010 BUILDING 1301 - ADMIN./MAINTENANCE - PHASING PLAN 20

AS100

BUILDING 1301 – ADMIN./MAINTENANCE – REFLECTED

CEILING PLAN

AS101 BUILDING 1301 – ADMIN./MAINTENANCE – ROOF PLAN 22

AS102

BUILDING 1301 – ADMIN./MAINTENANCE – EXTERIOR

ELEVATIONS

AS106 BUILDING 3001 – SATELLITE MAINTENANCE – FLOOR 24

LIST OF DRAWING SHEETS

00 01 1 - 17

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

PLAN/REFLECTED CEILING PLAN

AS107

BUILDING 3001 – SATELLITE MAINTENANCE – EXTERIOR

ELEVATIONS

AS108

PUMP HOUSE B/BUILDING 3003 – MAINTENANCE BARN –

EXTERIOR ELEVATIONS

AS303

BUILDING 3001 – SATELLITE MAINTENANCE – TYPICAL WALL

SECTIONS/DETAILS

AS604

BUILDING 1301 - ADMIN./MAINTENANCE - DOOR SCHEDULE

AND DETAILS

PLUMBING P-001 PLUMBING GENERAL INFORMATION 29

PD101

BUILDING 1301 - ADMIN./MAINTENANCE - PLUMBING

DEMOLITION PLAN

PP101 BUILDING 1301 - ADMIN./MAINT - DOMESTIC WATER PLAN 31

P-501 PLUMBING DETAILS 32

P-502 PLUMBING DETAILS 33

P-601 PLUMBING SCHEDULES AND DIAGRAMS 34

MECHANICAL

(HVAC)

M-001 MECHANICAL GENERAL INFORMATION 35

MD101

BUILDING 1301 - ADMIN./MAINTENANCE - MECHANICAL

DEMOLITION PLAN

MH101

BUILDING 1301 - ADMIN./MAINTENANCE - MECHANICAL

PLAN

MH103 BUILDINGS 3001 AND 3003 - STORAGE - MECHANICAL PLANS 38

MH401 ENLARGED MECHANICAL PLANS 39

M-501 MECHANICAL DETAILS 40

M-601 MECHANICAL SCHEDULES 41

M-602 MECHANICAL CONTROLS 42

ELECTRICAL E-001

ELECTRICAL GENERAL NOTES, SYBOL LEGENDS, AND

ABBREVIATIONS

ES101 ELECTRICAL SITE PLAN 44

EP101

BUILDING 1301 AND 3003– ADMIN./MAINTENANCE

COMPLEX – ELECTRICAL POWER PLAN

EP103

BUILDING 3001 – SATELLITE MAINTENANCE – ELETRICAL

POWER PLAN

E-401 ELECTRICAL ENLARGEMENTS 47

E-501 ELECTRICAL DETAILS 48

E-601 ELECTRICAL SCHEDULES 49

LIST OF DRAWING SHEETS

00 01 1 - 18

DISCIPLINE

BID

SHEET

SHEET TITLE PAGE

E-602 ONE-LINE DIAGRAMS 50

E-603

BUILDING 1301 AND 3003 – ADMIN. / MAINTENANCE

COMPLEX – ELEC. PNL SCDLS

E-604

BUILDING 1301 AND 3003 – ADMIN. / MAINTENANCE

COMPLEX – ELEC. PNL SCDLS

TECHNOLOGY TK001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND 53

TK101

BUILDING 1301 – ADMIN. / MAINTENANCE BLDG –

TECHNOLOGY PLAN

LIST OF DRAWING SHEETS

00 01 1 - 19

PHASE 1A ALT 4 - ROADS

JAN

BID

SHEET

SHEET TITLE PAGE

GENERAL G-001 COVER SHEET 1

G-002 SHEET INDEX - PHASE 1A - ALTERNATE 1 2

G-003 GENERAL NOTES - PHASE 1 DEVELOPMENT 3

G-004 GENERAL NOTES - DRAINAGE IMPROVEMENTS 4

G-005 OVERALL PHASE PLAN PHASE 1-7 5

G-006 CONSTRUCTION ACCESS PLAN 6

SURVEY V-100 OVERALL EXISTING CONDITIONS SURVEY 7

V-101 EXISTING CONDITIONS SURVEY 8

V-102 EXISTING CONDITIONS SURVEY 9

V-103 EXISTING CONDITIONS SURVEY 10

V-104 EXISTING CONDITIONS SURVEY 11

V-105 EXISTING CONDITIONS SURVEY 12

V-106 EXISTING CONDITIONS SURVEY 13

V-107 EXISTING CONDITIONS SURVEY 14

V-108 EXISTING CONDITIONS SURVEY 15

V-109 EXISTING CONDITIONS SURVEY 16

V-110 EXISTING CONDITIONS SURVEY 17

V-111 EXISTING CONDITIONS SURVEY 18

V-112 EXISTING CONDITIONS SURVEY 19

V-113 EXISTING CONDITIONS SURVEY 20

V-114 EXISTING CONDITIONS SURVEY 21

V-115 EXISTING CONDITIONS SURVEY 22

V-116 EXISTING CONDITIONS SURVEY 23

V-117 EXISTING CONDITIONS SURVEY 24

V-118 EXISTING CONDITIONS SURVEY 25

V-120 EXISTING CONDITIONS SURVEY 26

V-121 EXISTING CONDITIONS SURVEY 27

GEOTECHNICAL B-110 PAVEMENT CORE KEY MAP 28

B-111 SOIL BORING LOGS - PAVEMENT CORE LOGS 29

B-112 SOIL BORING LOGS - PAVEMENT CORE LOGS 30

B-113 SOIL BORING LOGS - PAVEMENT CORE LOGS 31

LIST OF DRAWING SHEETS

00 01 1 - 20

DISCIPLINE

JAN

BID

SHEET

SHEET TITLE PAGE

B-114 SOIL BORING LOGS - PAVEMENT CORE LOGS 32

DEMOLITION CD100 OVERALL DEMOLITION PLAN 33

CD107 DEMOLITION PLAN - COLUMBARIUM 4 COURTS A AND B 34

CD116 DEMOLITION PLAN - DENVER DRIVE 35

CD117 DEMOLITION PLAN - DENVER DRIVE 36

CD118 DEMOLITION PLAN - DENVER DRIVE 37

CD119 DEMOLITION PLAN - DENVER DRIVE 38

CD120 DEMOLITION PLAN - DENVER DRIVE 39

CD121 DEMOLITION PLAN - DENVER DRIVE 40

CD122 DEMOLITION PLAN - DENVER AND OMAHA DRIVE 41

SITE

DEVELOPMENT

CS100 OVERALL SITE PLAN 42

CS101 SITE PLAN GRAVEL ROAD ENTRANCE 43

CS108 SITE PLAN COLUMBARIUM 4 COURTS A, B, C 44

CS117 SECTION MARKER PLAN COLUMBARIUM 4 COURTS A, B 45

CS201 SIGN DETAILS 1 46

CS203 SIGN DETAILS 3 47

GRADING CG100 OVERALL GRADING PLAN 48

CG101 DETAILED GRADING SECTIONS 89-92 49

CG113 DETAILED GRADING OVER FLOW WEIR 50

CG114 DETAILED GRADING ACCESSIBLE RAMPS 51

CG115 DETAILED GRADING ACCESSIBLE RAMPS 52

EROSION CG200 OVERALL EROSION CONTROL PLAN 53

CG207 DETAILED INITIAL EROSION CONTROL PLAN 54

CG209 DETAILED INITIAL EROSION CONTROL PLAN 55

CG213 EXISTING ROADS INITIAL EROSION CONTROL PLAN 56

CG214 EXISTING ROADS INITIAL EROSION CONTROL PLAN 57

CG215 EXISTING ROADS INITIAL EROSION CONTROL PLAN 58

CG216 EXISTING ROADS INITIAL EROSION CONTROL PLAN 59

CG217 EXISTING ROADS INITIAL EROSION CONTROL PLAN 60

CG218 EXISTING ROADS INITIAL EROSION CONTROL PLAN 61

CG219 EXISTING ROADS INITIAL EROSION CONTROL PLAN 62

CG220 EXISTING ROADS INITIAL EROSION CONTROL PLAN 63

LIST OF DRAWING SHEETS

00 01 1 - 21

DISCIPLINE

JAN

BID

SHEET

SHEET TITLE PAGE

CG221 EXISTING ROADS INITIAL EROSION CONTROL PLAN 64

CG228 DETAILED INTERIM EROSION CONTROL PLAN 65

CG230 DETAILED INTERIM EROSION CONTROL PLAN 66

CG234 EXISTING ROADS INITERIM EROSION CONTROL PLAN 67

CG235 EXISTING ROADS INITERIM EROSION CONTROL PLAN 68

CG236 EXISTING ROADS INITERIM EROSION CONTROL PLAN 69

CG237 EXISTING ROADS INITERIM EROSION CONTROL PLAN 70

CG238 EXISTING ROADS INITERIM EROSION CONTROL PLAN 71

CG239 EXISTING ROADS INITERIM EROSION CONTROL PLAN 72

CG240 EXISTING ROADS INITERIM EROSION CONTROL PLAN 73

CG241 EXISTING ROADS INITERIM EROSION CONTROL PLAN 74

CG242 EXISTING ROADS INITERIM EROSION CONTROL PLAN 75

CG249 DETAILED FINAL EROSION CONTROL PLAN 76

CG251 DETAILED FINAL EROSION CONTROL PLAN 77

CG255 EXISTING ROADS FINAL EROSION CONTROL PLAN 78

CG256 EXISTING ROADS FINAL EROSION CONTROL PLAN 79

CG257 EXISTING ROADS FINAL EROSION CONTROL PLAN 80

CG258 EXISTING ROADS FINAL EROSION CONTROL PLAN 81

CG259 EXISTING ROADS FINAL EROSION CONTROL PLAN 82

CG260 EXISTING ROADS FINAL EROSION CONTROL PLAN 83

CG261 EXISTING ROADS FINAL EROSION CONTROL PLAN 84

CG262 EXISTING ROADS FINAL EROSION CONTROL PLAN 85

CG263 EXISTING ROADS FINAL EROSION CONTROL PLAN 86

CG501 EROSION CONTROL DETAILS 87

CG502 EROSION CONTROL DETAILS 88

CG503 EROSION CONTROL DETAILS 89

ROADWAY CP100 OVERALL ROAD PLAN 90

CP106 DENVER DRIVE PLAN AND PROIFLE 91

CP107 OMAHA DRIVE PLAN AND PROFILE 92

CP108 MAINTENANCE ACCESS ROAD 93

CP115 REPAVING PLAN - DENVER DRIVE 94

CP116 REPAVING PLAN - DENVER DRIVE 95

CP117 REPAVING PLAN - DENVER DRIVE 96

LIST OF DRAWING SHEETS

00 01 1 - 22

DISCIPLINE

JAN

BID

SHEET

SHEET TITLE PAGE

CP118 REPAVING PLAN - DENVER DRIVE 97

CP119 REPAVING PLAN - DENVER DRIVE 98

CP120 REPAVING PLAN - DENVER DRIVE 99

CP121 REPAVING PLAN – DENVER AND OMAHA DRIVE 100

CP123 REPAVING PLAN - OMAHA DRIVE 101

CP124 REPAVING PLAN - OMAHA DRIVE 102

CP125 REPAVING PLAN - OMAHA DRIVE 103

CP126 REPAVING PLAN – OMAHA DRIVE & NEW MEXICO STREET 104

CP127 REPAVING PLAN - OMAHA DRIVE & COLORADO STREET 105

CP128 REPAVING PLAN – COLORADO & ARIZONA STREET 106

CP129 REPAVING PLAN – COLORADO STREET 107

CP130 REPAVING PLAN – COLORADO & NEW MEXICO STREET 108

CP131 REPAVING PLAN – COMMITTAL SHELTER B 109

CP200 REPAVING PROFILE – DENVER DRIVE 110

CP211 SIGNAGE AND STRIPING PIC BUILDING 111

CP212 SIGNAGE AND STRIPING COMMITTAL SHELTER B 112

CP213 SIGNAGE AND STRIPING ADMIN & ON-STREET PARKING 113

CP301 TYPICAL STREET SECTIONS 114

CP302 TYPICAL STREET SECTIONS 115

CP303 TYPICAL STREET SECTIONS 116

CP304 TYPICAL CCD PAVING DETAILS 117

CP305 TYPICAL CCD PAVING DETAILS 118

CP501 PAVING DETAILS 119

UTILITY CU100 OVERALL UTILITY PLAN 120

CU113 UNDERDRAIN PLAN - COLUMBARIUM WALL 121

CU200 OVERALL OUTFALL PLAN AND PROFILE 122

CU301 CDOT M-STANDARD DETAILS 123

CU501 STORM DRAIN DETAILS 124

CU502 STORM DRAIN DETAILS 125

CU503 STORM DRAIN DETAILS 126

IRRIGATION LI001 IRRIGATION COVER SHEET 127

LI002 OVERALL IRRIGATION PLAN 128

LI101 IRRIGATION PLAN 129

LIST OF DRAWING SHEETS

00 01 1 - 23

DISCIPLINE

JAN

BID

SHEET

SHEET TITLE PAGE

LI102 IRRIGATION PLAN 130

LI103 IRRIGATION PLAN 131

LI104 IRRIGATION PLAN 132

LI105 IRRIGATION PLAN 133

LI106 IRRIGATION PLAN 134

LI107 IRRIGATION PLAN 135

LI501 IRRIGATION DETAILS 136

LI502 IRRIGATION DETAILS 137

LI503 IRRIGATION DETAILS 138

LI504 IRRIGATION DETAILS 139

LI505 IRRIGATION PUMP DETAIL 140

LANDSCAPE LP100 PLANTING PLAN 141

LP101 PLANTING PLAN 142

LP102 PLANTING PLAN 143

LP103 PLANTING PLAN 144

LP104 PLANTING PLAN 145

LP105 PLANTING PLAN 146

LP106 PLANTING PLAN 147

LP107 PLANTING PLAN 148

LP108 PLANTING PLAN 149

LP109 PLANTING PLAN 150

LP501 PLANTING AND SOIL DETAILS 151

GENERAL REQUIREMENTS - TOC

01 00 01 - 1

SECTION 01 00 01

GENERAL REQUIREMENTS (MAJOR NCA PROJECTS)

TABLE OF CONTENTS

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEM(S)

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.4 CONSTRUCTION SECURITY REQUIREMENTS

1.5 FIRE SAFETY

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 ENVIRONMENTAL CONTROLS

1.9 DISPOSAL AND RETENTION

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

1.11 RESTORATION

1.12 PHYSICAL DATA

1.13 PROFESSIONAL SURVEYING SERVICES

1.14 LAYOUT OF WORK

1.15 AS-BUILT DRAWINGS

1.16 USE OF ROADWAYS

1.17 RE/COR'S FIELD OFFICE

1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.19 TEMPORARY TOILETS

1.20 AVAILABILITY AND USE OF UTILITY SERVICES

1.21 NEW TELEPHONE EQUIPMENT

1.22 TESTS

1.23 INSTRUCTIONS

1.24 GOVERNMENT-FURNISHED PROPERTY

1.25 RELOCATED ITEMS

GENERAL REQUIREMENTS - TOC

01 00 01 - 2

1.26 CONSTRUCTION SIGN

1.27 SAFETY SIGN

1.28 CONSTRUCTION DIGITAL IMAGES

1.29 FINAL ELEVATION DIGITAL IMAGES

1.30 HISTORIC PRESERVATION

1.31 PROJECT HEALTH AND SAFETY PLAN

1.32 PROJECT SUSTAINABILITY GOALS

1.33 TEMPORARY PIC TRAILER AND RESTROOM TRAILER

1.34 VA PMIS

GENERAL REQUIREMENTS

01 00 01 - 1

SECTION 01 00 01 (MAJOR NCA PROJECTS)

GENERAL REQUIREMENTS

1.1 GENERAL INTENTION

A. Completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Department of Veterans Affairs as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Cemetery Director.

C. Offices of Calibre Engineering, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Resident Engineer (RE) or duly authorized Contracting

Officer Representative (COR).

D. All Testing Laboratory services will be retained and paid for by the

Contractor (see Spec. Section 01 45 29 Testing Laboratory Services).

However, the Department of Veterans Affairs may elect to retain its own

Testing Laboratory for any purpose. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the notify the RE/COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall not be less than three working days unless otherwise designated by the RE/COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program. All Contractors on site will require VA badges at all times and must go through the security background clearance.

F. Prior to commencing work, general contractor shall provide proof that an OSHA certified “competent person” (CP) as defined in 29 CFR

1926.20(b)(2) will maintain a presence at the work site whenever the general contractor or subcontractors are present.

G. Training:

1. All employees of general contractor or subcontractors having supervisory responsibilities shall have the 10-hour OSHA certified

Construction Safety course and/or other relevant competency training, as determined by VA CP.

01 00 01 - 2

2. All other employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and/or other relevant competency training. Relevant competency training shall be as determined acceptable by the VA CP.

3. Submit training records of all such employees for approval before the start of work.

1.2 STATEMENT OF BID ITEM(S)

A. Base Bid – GENERAL CONSTRUCTION:

1. Interment Areas (Burial Sections): NOTE: Provide maximum gravesites, per category, to fully develop the respective burial section based upon environmental and topography constraints.

a. Casketed Remains:

1) Approximately 7,620 pre-placed crypt full casket (3’x8’) gravesites in sections 103, 104, 105, and 109.

2) Approximately 672 pre-placed oversized full casket (4’x10’) gravesites in section 97.

b. Cremated Remains:

1) Approximately 19,694 (3’x4’) in-ground, garden niche, or terrace sites in sections 86 through 96 and 98 through 102.

2) Approximately 10,560 columbarium niches in columbaria 4 and

5.

2. Access Roads and Parking:

a. Construct access road to new burial areas from Omaha Drive to

Denver Drive.

b. Signage and striping as required.

3. Grading, Drainage, and Landscaping throughout new Phase 1 expansion section (approximately 15 acres) and adjacent to existing road major repairs.

4. Signage and Site Furnishings for the new Phase 1 expansion area and new columbarium 4 and 5.

5. Develop utilities infrastructure required for the expansion area.

6. Extend Irrigation system into new Phase 1 burial areas.

7. Install new skidded irrigation pump house unit “C” .

8. Construct new wet well and adjacent retaining wall near new pump house “C”.

9. Provide temporary material storage bins as noted.

10. Removal/reuse of existing soil stockpile.

01 00 01 - 3

11. Compliance with all erosion control measures per plans and specifications.

12. Provide black vinyl chain link around new cemetery property line.

13. Obtain state/local construction permitting as required.

14. Protected Habitat Preservation, Wetlands, and Mitigation efforts as required to meet governing body mandates.

15. Construct/maintain construction yard and provide resident engineer trailer space per plans and specifications.

16. Geographic Information System (GIS) Site Integration, as per the latest NCA master specifications 11 83 00 and 11 83 02 requirements.

B. Bid Alternative #1 (Additive) – Repair roadway pavement on existing developed land Phases 1 through 5 as noted on Drawing CP100 of the plans, ensuring burial site access is maintained throughout construction: resurface/repair existing roads, both concrete and asphalt, including curbs and storm sewer inlets, to include sections of full rehabilitation, mill/overlay, crack sealant as noted on plans.

Includes landscaping, signage, erosion and traffic controls. Areas noted within the area of impact at the Veterans and Memorial dam drainageways are excluded from this option.

C. Bid Alternative #2 (Additive) – Renovate/upgrade Public Information

Center (PIC)/Public Restroom/Honor Guard building 1401:

1. Provide temporary trailer space adjacent to the existing PIC structure during construction, temporarily relocate gravesite locator/visitor kiosk; connect network cabling and utilities from existing facility.

2. Replace roofs, renovate exterior and interior finishes, casework, doors, windows, plumbing, mechanical, electrical, fire alarms, hardware as required.

3. Ensure correction of all Facility Correction Deficiencies (FCA) graded as “D” or “F” within the PIC area of impact.

4. Remove and replace service seals at PIC entrance, include new Space

Force emblem.

D. Bid Alternative #3 (Additive) – Renovate administration/maintenance building 1301, satellite maintenance facility building 3001, and maintenance barn building 3003 to correct all FCA deficiencies graded as “D” or “F” per plans and specifications. Include corrections to any additional site-wide FCA deficiencies not associated with Building

01 00 01 - 4

1401, irrigation lakes, or drainageways. Complete physical security upgrades site-wide to deliver a fully operational system.

E. Bid Alternative #4 (Additive) – Repair roadway pavement on existing developed land Phases 6 through 8 as noted on Drawing CP100 of the plans, ensuring burial site access is maintained throughout construction: resurface/repair existing roads, both concrete and asphalt, including curbs and storm sewer inlets, to include sections of full rehabilitation, mill/overlay, crack sealant as noted on plans.

Includes landscaping, signage, erosion and traffic controls. Areas noted within the area of impact at the Veterans and Memorial dam drainageways are excluded from this option.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. AFTER AWARD OF CONTRACT, full-sized drawing sets and 1 set of specifications will be furnished as well as an electronic set of plans and specifications.

B. Additional sets of drawings may be made by the Contractor, at

Contractor's expense.

1.4 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. Assure that all sub-contractors working on the project and their employees also comply with these regulations. Dismissal of violators may be directed by the Resident Engineer.

B. Security Procedures:

1. Contractor’s employees shall not enter the project site without an appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. For working outside the “regular hours” as defined in the contract, give 3 days' notice to the RE/COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the RE/COR.

01 00 01 - 5

4. VA reserves the right to close down or shut down the project site and order Contractor’s employees off the premises in the event of a national emergency. Return to the site only with the written approval of the RE/COR.

C. Guards:

1. Provide unarmed guards at the project after construction hours if deemed necessary because of vandalism or theft within the contract work areas.

2. Secure the project site, work in progress, materials, tools, equipment, and any other materials within the project site that are not under operational control of the Cemetery staff. The use of guards is a Contractor responsibility, if deemed necessary because of ongoing theft and/or vandalism within the project work area.

Coordinate the use of guards with the RE following input from the

Cemetery Operations through the RE. Any guards provided shall be able to communicate with the local police.

D. Key Control:

1. Provide duplicate keys and lock combinations to the RE/COR for the purpose of security inspections of every area of project including tool boxes and parked machines and to take any emergency action(s).

2. Turn over all permanent lock cylinders to the VA locksmith for permanent installation. Coordinate the lock cylinder and key system work and shall provide the devices required to comply with the facility security system.

E. Document Control:

1. Before starting any work, submit an electronic security memorandum, from the Contractor and each Subcontractor describing the actions to be performed to achieve the goals of maintaining confidentiality of

“sensitive information”.

2. Perform safekeeping procedures for all drawings, project manual and other project information. This information from these shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access

01 00 01 - 6 to only those who will need it for the project. Return the information to the RE/COR upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of the RE/COR.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify RE/COR immediately when there is a loss or compromise of

“sensitive information”.

7. All electronic information shall be stored in a specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

1.5 FIRE SAFETY

A. Applicable Publications: Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by the basic designation only. Comply with applicable provisions and recommendations of the following, except as otherwise shown or specified.

1. American Society for Testing and Materials (ASTM):

E84-2013 Surface Burning Characteristics of Building

Materials

2. National Fire Protection Association (NFPA):

10-2013 Standard for Portable Fire Extinguishers

30-2012 Flammable and Combustible Liquids Code

51B-2014 Standard for Fire Prevention During Welding, Cutting and Other Hot Work

70-2011 National Electrical Code

01 00 01 - 7

241-2013 Standard for Safeguarding Construction, Alteration, and Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926 Safety and Health Regulations for Construction

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to RE/COR/Cemetery Director for review for compliance with contract requirements in accordance with Section 01 33

23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. Prior to any worker for the contractor or subcontractor’s beginning work, they shall undergo a safety briefing provided by the Contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of NCA equipment, etc.

Documentation shall be provided to the RE/COR that individuals have undergone the Contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Temporary Construction Partitions:

1. Install and maintain temporary construction partitions to…