S06 - 36C10F23R0013 0001 Amendment -PPI Response.pdf

PDF 199 KB Posted

Attached to
Y1PC--Ft. Logan National Cemetery - Phase 1A Expansion (Construction FY23 Re-procurement)
Solicitation number
36C10F23R0013
Issued by

About this file

This document provides information on a federal construction solicitation for the Phase 1A Expansion project at Fort Logan National Cemetery. The solicitation is issued by the Department of Veterans Affairs Office of Construction and Facilities Management for a firm-fixed-price construction contract between $20-50 million. The contractor shall provide all labor, materials, and equipment for construction according to the plans, drawings, and specifications. The North American Industry Classification System code is 237990 for other heavy and civil engineering construction with a size standard of $45 million. The pre-proposal site visit is scheduled and proposals are due by May 16, 2023 at 3:00 PM Eastern Time. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses.

View the file

Other files

File Type Posted
S06 - DOL Wage Determination CO20230002 04-07-2023.pdf PDF
S06 - Pre-Proposal Conference slides FLNC 4-19.pdf PDF
S06 - Ft. Logan Sign-in 4-19-23.pdf PDF
Bid Docs - Reports - Phase 1 Expansion Geotechnical Report.pdf PDF
S06 - 36C10F23R0013 Pre-Proposal Inquiry Responses.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(5 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (4of5).pdf PDF
S02 FT LOGAN NC PHASE 1A SPECIFICATIONS - 2023 02 21.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(4 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(1 of 2).pdf PDF
S02 - DOL Wage Determination CO20230002 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(2 of 5).pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (6 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (3of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(1 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (4 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (5 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (5of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(1 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(3 of 5).pdf PDF
S02 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certification.pdf PDF
S02 - DOL Wage Determination CO20230009 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (3 of 6).pdf PDF
S02 Past Performance Questionnaire 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (1of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (2 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (1 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (2of5).pdf PDF
S02 - 36C10F23R0013 - Final - RFP - Ft Logan Phase 1A.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

888-043

003C4

Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 425 I Street NW Washington DC 20001

101F

Department of Veterans Affairs Office of Construction and Facilities Management 425 I Street NW Washington DC 20001

To all Offerors/Bidders

36C10F23R0013

04-04-2023

X

X X

June 2, 2023 at 3:00 PM, Eastern

Ft. Logan National Cemetery | Phase 1A Expansion (Construction FY23 Re-procurement) | Project No. 888-043

Please see continuation pages for amendment description.

David Bullerwell Director, National Region, CFM

The purpose of this amendment is to provide answers to vendor received questions, publish information from the pre-proposal site visit, revise submission requirements, update specifications, update wage determinations, and extend offer deadline. Proposal due date is extended to June 2, 2023, by 3:00 PM, Eastern.

Responses to PPI

Final responses to vendor received questions can be accessed through the attachment posted with the amendment or by clicking the following link. 2023 05 12 Pre-Bid RFI Response

Specification Revisions

The following specification sections have been revised. Offerors are to incorporate the following updated sections to their files. The new files can be accessed for download at 2023 05 12 Pre-Bid RFI Response

01 00 01 General Requirements (Rev 1)

01 32 16.13 Network Schedules (Rev 1)

01 81 13 Sustainable Construction Requirements

10 14 00 Exterior Signage

Sub-factor 1.1 Revision

Replace the following:

a. Project Manager – Minimum Qualifications:

• Ten (10) years of experience leading on-site construction projects considered somewhat relevant or better, as defined in this solicitation.

• Bachelor’s Degree in Engineering, Construction, Architecture, or Landscape Architecture.

• Show evidence candidate meets Health & Safety qualifications in the solicitation specifications for key personnel (see Specification 01 35 26), at the time of proposal.

With revised minimum qualifications below:

a. Project Manager – Minimum Qualifications:

• Ten (10) years of experience leading on-site construction projects considered somewhat relevant or better, as defined in this solicitation and a Bachelor’s Degree in Engineering, Construction, Architecture, or Landscape Architecture.

• Fifteen (15) years of experience leading on-site construction projects considered somewhat relevant or better, in lieu of a Bachelor’s Degree in Engineering, Construction, Architecture, or Landscape Architecture.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcalibreeng-my.sharepoint.com%2F%3Af%3A%2Fg%2Fpersonal%2Fdconner_calibre-engineering_com%2FEmy33wTbAENCvrlHog9_Tw4BXs7LUoEGd4WyMJ-k05jllw%3Fe%3DFo2TlG&data=05%7C01%7C%7Cc66f2e42a63f4b9c15f208db531ba828%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638195150484758148%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=5na3Kwx3ijhymNzCES%2FXnvAJ%2BnfTtOGGHvT%2BuaviG6s%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcalibreeng-my.sharepoint.com%2F%3Af%3A%2Fg%2Fpersonal%2Fdconner_calibre-engineering_com%2FEmy33wTbAENCvrlHog9_Tw4BXs7LUoEGd4WyMJ-k05jllw%3Fe%3DFo2TlG&data=05%7C01%7C%7Cc66f2e42a63f4b9c15f208db531ba828%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638195150484758148%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=5na3Kwx3ijhymNzCES%2FXnvAJ%2BnfTtOGGHvT%2BuaviG6s%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcalibreeng-my.sharepoint.com%2F%3Af%3A%2Fg%2Fpersonal%2Fdconner_calibre-engineering_com%2FEmy33wTbAENCvrlHog9_Tw4BXs7LUoEGd4WyMJ-k05jllw%3Fe%3DFo2TlG&data=05%7C01%7C%7Cc66f2e42a63f4b9c15f208db531ba828%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638195150484758148%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=5na3Kwx3ijhymNzCES%2FXnvAJ%2BnfTtOGGHvT%2BuaviG6s%3D&reserved=0

• Show evidence candidate meets Health & Safety qualifications in the solicitation specifications for key personnel (see Specification 01 35 26), at the time of proposal.

Factor 3 Revision

Replace the following:

Factor 3 – Past Performance (limited to 6 pages maximum):

The offeror shall provide part performance brief narrative project description and references for three (3) projects submitted under Sub-factor 1.1 – Project Experience including project name & title, project location/address, contract number, contract total amount, contract period of performance, project point of contact (POC), email address, current phone number, and DUNS/SAM Unique Entity Identifier (UEI). Additionally, the offeror shall provide information regarding completed Contractor Performance Assessment Reporting System (CPARS) evaluations for each of the three (3) projects submitted under Sub-factor 1.1 – Project Experience. The offeror shall clearly identify, by contract number, which projects have interim and final CPARS past performance evaluations. There is no requirement to submit the CPARS reports.

With revised past performance submission information below:

Factor 3 – Past Performance (limited to 6 pages maximum):

The offeror shall provide three (3) project summaries for recent and relevant past performance on which the offeror’s firm was the prime contractor, joint venture partner, or a major subcontractor, in accordance with FAR 15.305(a)(2). These projects do not have to be the same as submitted under the Project Experience factor.

For each project selected, offerors shall provide a current owner point of contact for reference and brief narrative project description, including project name & title, project location/address, contract number, contract total amount, contract period of performance, project point of contact (POC), email address, current phone number, and DUNS/SAM Unique Entity Identifier (UEI). Additionally, the offeror shall provide information regarding completed Contractor Performance Assessment Reporting System (CPARS) evaluations for each of the three (3) projects submitted. The offeror shall clearly identify, by contract number, which projects have interim and final CPARS past performance evaluations. There is no requirement to submit the CPARS reports.

Wage Determination

DOL Wage Determination CO20230002 (Heavy) revision dated 04-07-2023 is incorporated as an attachment. The inclusion of the updated wage determination does not remove Wage Determination CO20230009 (Highway) dated 2-24-2023.

A.1 LIST OF ATTACHMENTS

See attached document: S05 - 36C10F23R0013 Pre-Proposal Inquiry Responses.

See attached document: S06 - Ft. Logan Sign-in 4-19-23.

See attached document: S06 - Pre-Proposal Conference slides FLNC 4-19.

See attached document: S06 - DOL Wage Determination CO20230002 04-07-2023.

See attached document: Bid Docs - Reports - Phase 1 Expansion Geotechnical Report.

A.1 LIST OF ATTACHMENTS

File details come from the government source that posted it. Updated .