S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (2 of 6).pdf
PDF 38 MB Posted
- Attached to
- Y1PC--Ft. Logan National Cemetery - Phase 1A Expansion (Construction FY23 Re-procurement)
- Solicitation number
- 36C10F23R0013
About this file
This document summarizes a federal construction contract solicitation. The Department of Veterans Affairs is seeking a firm-fixed-price construction contract for Phase 1A expansion at Fort Logan National Cemetery in Denver, Colorado. The project involves providing all labor, materials, and equipment for construction according to the plans, drawings, and specifications. The North American Industry Classification System code for this project is 237990 for other heavy and civil engineering construction, with a size standard of $45 million. The estimated construction cost is between $20-50 million. The solicitation is fully set aside for Service-Disabled Veteran Owned Small Businesses. A pre-proposal site visit is scheduled and proposals are due by May 16, 2023 at 3:00 PM Eastern Time. The agency contact is the Department of Veterans Affairs Office of Construction and Facilities Management.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRAVEL ACCESS ROAD
MONTANA ST
C.P.C.P.C.P.
M
M
M
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
PROPERTY LINE
ROAD B
ROAD A
R O
A D
B
RO
AD
B
PROJECT
BOUNDARY
PROPERTY LINE
G R
A V
E L
A C
C E
S S
R O
A D
OKLAHOMA ST
DENVER DR
DE
NVE
R
DR
OMAHA DR
O M
A H
A D
R
LOGAN BLVD
L O
G A
N B
LV
D
K A
N S
A S
S T
W Y
O M
IN
G
S T
DENVER DRDENVER DR
UTAH ST
MEMORIAL LAKE
COLORADO ST
COLORADO ST
COLORADO ST
W. KENYON AVE
S . S
H E
R
ID
A N
B
LV
D
VETERANS LAKE
OMAHA DR
U T
A H
S T
R E
E T
COMMITTAL
SHELTER B
COMMITTAL
SHELTER A
COMMITTAL
SHELTER C
QUINCY AVE
LO
W
E
LL
B
LV
D
ADMIN AND
MAINTENANCE
BUILDING
COMMITTAL
PARKING C
COMMITTAL A
PARKING
SHEET CS103 SHEET CS104
SHEET CS105
SHEET CS106
SHEET CS107
SHEET CS108SHEET CS109SHEET CS110
EX DETENTION POND
(SOUTH POND)
WEST GATE
ENTRANCE
MAIN GATE
ENTRANCE
SHEET CS101 SHEET CS102
TEMPORARY MATERIAL
STORAGE YARD
W
P.I.C.
BUILDING
EXISTING
STOCKPILE
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
OF
OVERALL SITE PLAN
ETG RLB
CS100
45 161
1-800-922-1987
LEGEND
KEYMAP
ENGINEER NOTES:
CONSTRUCTION KEYNOTES
11 / 03 / 202201 / 31 / 202302 / 10 / 2023
SECTION 4
SECTION 27
EXISTING
DETENTION POND
(SOUTH POND)
OMAHA DR
N E
B R
A S
K A
S T
G R
A V
E L
A C
C E
S S
R O
A D
SECTION 27
KEYMAP
ENGINEER NOTES:
NORTH
1-800-922-1987
LEGEND
CONSTRUCTION KEYNOTES
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
SITE PLAN
ETG JDS
CS101
66 161GRAVEL ROAD ENTERANCE 45 OF 217
11 / 03 / 202201 / 31 / 2023 BASH02 / 10 / 2023
OMAHA DR
GRAVEL
CONSTRUCTION
ACCESS ROAD
EXISTING
DETENTION POND
(SOUTH POND)
N E
B R
A S
K A
S T
R O
A D
B
OMAHA DR
KEYMAP
ENGINEER NOTES:
NORTH
1-800-922-1987
LEGEND
CONSTRUCTION KEYNOTES
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
SITE PLAN
ETG JDS
CS102
42 16146 OF 217ROAD B ENTERANCE
G R
A V
E L
A C
C E
S S
R O
A D
ROAD B
SECTION 88
SECTION 4
SECTION 4
SECTION 95
SECTION 89SECTION 91 SECTION 90SECTION 92
SECTION 94SECTION 96
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
KEYMAP
ENGINEER NOTES:
NORTH
1-800-922-1987
LEGEND
CONSTRUCTION KEYNOTES
OF
SITE PLAN
SECTIONS 89-92 & 94-96
ETG JDS
CS103
47 215217
RO
AD
B
ROAD B
SECTION 86SECTION 87SECTION 88
SECTION 93
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
KEYMAP
ENGINEER NOTES:
NORTH
1-800-922-1987
LEGEND
CONSTRUCTION KEYNOTES
OF
SITE PLAN
SECTIONS 86-88 & 93
ETG JDS
CS104
48 215
SCALE: 3/8" = 1'-0"
CHAIN-LINK FENCE DETAIL1
SCALE: 3/8" = 1'-0"
CHAIN-LINK DOUBLE SWING GATE DETAIL2
NEW FENCE NOTES;
A V
E L
A C
C E
S S
R O
A D
R O
A D
B
SECTION 98
SECTION 103
SECTION 99
SECTION 97
SECTION 103
SECTION 97
SECTION 100
SECTION 101
SECTION 102
Δ
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
KEYMAP
ENGINEER NOTES:
NORTH
1-800-922-1987
LEGEND
CONSTRUCTION KEYNOTES
OF
SITE PLAN
SECTIONS 97-103
ETG JDS
CS105
49 215217
O
A D
A
ROAD B
R O
A D
B
ROAD A
TEMPORARY
MATERIALS
STORAGE
YARD
SECTION 105
SECTION 104
SECTION 105
SECTION 104
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
KEYMAP
ENGINEER NOTES:
NORTH
1-800-922-1987
LEGEND
CONSTRUCTION KEYNOTES
OF
SITE PLAN
SECTIONS 104-105
ETG JDS
CS106
50 215217
DENVER DR
O
A D
A
SECTIONS 6 SECTIONS 6
SECTIONS 6
SECTION 7
SECTION 7
ROAD A
GRAVEL ACCESS ROAD
SECTION 7
DENVER DRIVE
COLUMBARIUM COURT 4A
MAINTENANCE STORAGE
SECTION 104SECTION 109 SECTION 109
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
KEYMAP
ENGINEER NOTES:
NORTH
1-800-922-1987
LEGEND
CONSTRUCTION KEYNOTES
OF
SITE PLAN
SITE PLAN SECTION 109
ETG JDS
CS107
51 215217
1. CONTRACTOR SHALL CONTACT
THE COTR REGARDING ANY DISCREPANCIES
BETWEEN FIELD CONDITIONS AND PLANS PRIOR TO
PROCEEDING WITH WORK. THE WRITTEN DIMENSION
SHALL SUPERSEDE THE DRAWN DIMENSION. ALL
FIELD ADJUSTMENTS MUST BE APPROVED BY THE
COTR PRIOR TO INSTALLATION.
2. ALL DIMENSIONS ARE TO CENTER LINE OR EDGE
OF PAVING, UNLESS OTHERWISE NOTED. ALL
DIMENSIONS ARE AT 90 DEGREES, UNLESS
OTHERWISE NOTED.
3. IF DISCREPANCIES OCCUR IN FIELD BETWEEN
THIS SET OF DRAWINGS AND FIELD CONDITIONS.
THE CONTRACTOR SHALL CONTACT THE COTR TO
REVIEW PRIOR TO CONSTRUCTION.
ENGINEER NOTES:
DD
COLUMBARIUM 4 / COURT A
(1,200 NICHES, 240 COLUMNS)
COLUMBARIUM 4 / COURT B
(960 NICHES, 192 COLUMNS)
ACCESSIBLE
CURB RAMP
ACCESSIBLE
CURB RAMP
ACCESSIBLE
CURB RAMP
END PIER
(TYP.)
END PIER
(TYP.)
END PIER
(TYP.)
COLUMN 1COLUMN 240
COLUMN 1
COLUMN 192COLUMN 1
FLOWER WATERING STATION
8' BENCH ON
12' X 3' CONCRETE
PAD 8' BENCH ON
12' X 3' CONCRETE PAD
PINEHURST ESTATES
PHASE 1A CONSTRUCTION LIMITS, TYP
PHASE 1A CONSTRUCTION LIMITS, TYP
24 Columns - 5 High
Single Side Typ. All Sections
20'
TYP.
8'-0"
TYP
8'-0"
TYP20'
TYP
8'-0"
4' -4
2'
-0
/2
27'-8 9/16"
R 100'-0"
N E
660106'11.505" 128148'2.38"
'-4
1/
0'
-7
/8
14'-1 5/16"
'-8
3/
N E
660111.9969
128466.4786 N
E 660108'1.517" 128742'10.366"
6'
-0
R 100'-0"
'-0
JOINTING NOTES:
EXPANSION JOINTS, PER DETAILS, AT EVERY PIER AND COLUMN OF
COLUMBARIUM WALL ALONG WALK AND IN PLAZA AREA.
EXPANSION JOINT LOCATIONS SHALL ALIGN WITH A JOINT THAT IS
PERPENDICUALR WITH A WALL PIER OR COLUMN AND SHALL BE SPACED
ALONG THE WALK NO GREATER THAN 75' +/-.
ALL OTHER SCORING TO BE A CONTROL AND/OR CONSTRUCTION JOINT.
THE CONTRACTOR SHALL PROVIDE A MARKED UP PLAN SHOWING
EXPANSION JOINT LOCATIONS BASED AROUND THEIR DAILY CONCRETE
POURS AND GAIN APPROVAL FOR VA COR PRIOR TO COMMENCMENT OF
CONRETE POURS.
CONTRACTOR TO
REPLACE ALL FAILING
JOINT SEALANTS AT
THE MASONRY SEAT
WALL WITH CAST
STONE AT COMMITTAL
SHELTER C.
CONTRACTOR TO
REFER TO JOINT
SEALANT DETAILS FOR
COLUMBARIUM STONE
CAPS.
R 136'-5 5/8"
R 30'-0"
R 30'-0"
4'-0"
4'-0"
R 30'-0"
R 51'-6 7/16"
EXISTING
TREES TO
REMAIN, TYP
6' GRAVEL
SERVICE DRIVE,
TYP
EDGE OF
BURIAL PLOTS,
TYP
S
D
S
MH-5
IGC
PHASE 1A - BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting / Chalona Studios Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Roderick Grier (480)-842-1520
SITE PLAN COLUMBARIUM
4 - COURTS A, B, C
11/03/2022 MWC MWC
CS108
OF 21752
CALL BEFORE
YOU DIG
OR
Utility Notification Center of Colorado
NORTH
1 inch = ft. Horizontal
00 100 20050
01 / 31 / 202302 / 10 / 2023
BETWEEN FIELD CONDITIONS AND PLANS PRIOR TO
PROCEEDING WITH WORK. THE WRITTEN DIMENSION
SHALL SUPERSEDE THE DRAWN DIMENSION. ALL
FIELD ADJUSTMENTS MUST BE APPROVED BY THE
COTR PRIOR TO INSTALLATION.
2. ALL DIMENSIONS ARE TO CENTER LINE OR EDGE
OF PAVING, UNLESS OTHERWISE NOTED. ALL
DIMENSIONS ARE AT 90 DEGREES, UNLESS
OTHERWISE NOTED.
3. IF DISCREPANCIES OCCUR IN FIELD BETWEEN
THIS SET OF DRAWINGS AND FIELD CONDITIONS.
THE CONTRACTOR SHALL CONTACT THE COTR TO
REVIEW PRIOR TO CONSTRUCTION.
4. SLEEVING SHALL BE COORDINATED WITH
SITE/CONCRETE WORK. REFER TO IRRIGATION PLAN
FOR SLEEVING LOCATIONS.
5. ALL LANDSCAPE AND SITE AMENITY WORK TO
CONFORM SPECIFICATIONS.
6. LAYOUT OF SITE ELEMENTS SHALL BE
APPROVED BY THE COTR PRIOR TO INSTALLATION.
7. ALL ELEMENTS TO BE INSTALLED PER
MANUFACTURER'S RECOMMENDATION.
ENGINEER NOTES:
OHEOHE OHEOHE
COLUMBARIUM 4 / COURT C
(1,080 NICHES, 216 COLUMNS)
COLUMBARIUM 4 / COURT E
(1,080 NICHES, 216 COLUMNS )
ACCESSIBLE
CURB RAMP
END PIER
(TYP.)INTERMEDIATE PIER
(TYP.)
ACCESSIBLE
CURB RAMP
END PIER
(TYP.)
COLUMN 216COLUMN 1COLUMN 216COLUMN 1COLUMN 216
8' BENCH ON
12' X 3' CONCRETE PAD
8' BENCH ON
12' X 3' CONCRETE PAD
COLUMBARIUM 4 / COURT D
(1,080 NICHES, 216 COLUMNS)
N E
660118.3943 127688.797
3'
-1
/4
'-1
/4
R 100'-0"
JOINTING NOTES:
EXPANSION JOINTS, PER DETAILS, AT EVERY PIER AND COLUMN OF
COLUMBARIUM WALL ALONG WALK AND IN PLAZA AREA.
EXPANSION JOINT LOCATIONS SHALL ALIGN WITH A JOINT THAT IS
PERPENDICUALR WITH A WALL PIER OR COLUMN AND SHALL BE SPACED
ALONG THE WALK NO GREATER THAN 75' +/-.
ALL OTHER SCORING TO BE A CONTROL AND/OR CONSTRUCTION JOINT.
THE CONTRACTOR SHALL PROVIDE A MARKED UP PLAN SHOWING
EXPANSION JOINT LOCATIONS BASED AROUND THEIR DAILY CONCRETE
POURS AND GAIN APPROVAL FOR VA COR PRIOR TO COMMENCMENT OF
CONRETE POURS.
LEGEND
EX. FENCE
EX. POWER POLE
EX. SANITARY SEWERS
EX. STORM DRAIN INLET
EX. UNDERGROUND TELEPHONE
EX. FIRE HYDRANT
EX. WATER VALVE
EX. STORM DRAIN
EX. WATER MAIN
EX. GAS MAIN
ROW/PROPERTY LINE
CENTERLINE
PROPERTY BOUNDARY
EASEMENT
EX. UNDERGROUND ELECTRIC
S
D
SANITARY SEWER MANHOLE NUMBER
STORM DRAINAGE MANHOLE NUMBER
NEW SANITARY SEWER MAIN
NEW STORM DRAIN
NEW FIRE HYDRANT
NEW WATER VALVE
NEW WATER MAIN
NEW STORM DRAIN INLET
S
MH-5
IGC (IN GROUND CREMAINS)
PPC (PRE-PLACED CRYPTS)
IGC
LIMITS OF DISTURBANCE
PHASE 1A - BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting / Chalona Studios Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Roderick Grier (480)-842-1520
SITE PLAN COLUMBARIUM
4 - COURTS D & E
11/03/2022 MWC MWC
CS109
OF 21753
CALL BEFORE
YOU DIG
OR
Utility Notification Center of Colorado
NORTH
1 inch = ft. Horizontal
00 100 20050
BETWEEN FIELD CONDITIONS AND PLANS PRIOR TO
PROCEEDING WITH WORK. THE WRITTEN DIMENSION
SHALL SUPERSEDE THE DRAWN DIMENSION. ALL
FIELD ADJUSTMENTS MUST BE APPROVED BY THE
COTR PRIOR TO INSTALLATION.
2. ALL DIMENSIONS ARE TO CENTER LINE OR EDGE
OF PAVING, UNLESS OTHERWISE NOTED. ALL
DIMENSIONS ARE AT 90 DEGREES, UNLESS
OTHERWISE NOTED.
3. IF DISCREPANCIES OCCUR IN FIELD BETWEEN
THIS SET OF DRAWINGS AND FIELD CONDITIONS.
THE CONTRACTOR SHALL CONTACT THE COTR TO
REVIEW PRIOR TO CONSTRUCTION.
4. SLEEVING SHALL BE COORDINATED WITH
SITE/CONCRETE WORK. REFER TO IRRIGATION PLAN
FOR SLEEVING LOCATIONS.
5. ALL LANDSCAPE AND SITE AMENITY WORK TO
CONFORM SPECIFICATIONS.
6. LAYOUT OF SITE ELEMENTS SHALL BE
APPROVED BY THE COTR PRIOR TO INSTALLATION.
7. ALL ELEMENTS TO BE INSTALLED PER
MANUFACTURER'S RECOMMENDATION.
ENGINEER NOTES:
OHEOHEOHEOHEOHEOHEOHEOHE OHEOHEOHEOHEOHEOHEOHEOHE
C
OL
UM
NS
EA
CH
S
ID
E
COLUMBARIUM 5 / COURT A
(2,160 NICHES, 432 COLUMNS)
C
OL
UM
NS
EA
CH
S
ID
E
C
OL
UM
NS
EA
CH
S
ID
E
C
OL
UM
NS
EA
CH
S
ID
E
ALIGN JOINTS WITH
CORNERS OF PIERS AS
SHOWN (TYP.)
INTERMEDIATE PIER
(TYP.)
CONCRETE WALK (TYP.)
END PIER WITH
COURT MARKER
(TYP.)
COLUMN 1COLUMN 216COLUMN 217
COLUMN 432 8' BENCH ON
12' X 3' CONCRETE PAD
8' BACKED BENCH
TO MATCH CEMETERY
STANDARD (TYP.)
FLOWER WATER ING STATION
'-0
57'-3 3/8"
PROPERTY LINE
CORNER - POB
JOINTING NOTES:
EXPANSION JOINTS, PER DETAILS, AT EVERY PIER AND COLUMN OF
COLUMBARIUM WALL ALONG WALK AND IN PLAZA AREA.
EXPANSION JOINT LOCATIONS SHALL ALIGN WITH A JOINT THAT IS
PERPENDICUALR WITH A WALL PIER OR COLUMN AND SHALL BE SPACED
ALONG THE WALK NO GREATER THAN 75' +/-.
ALL OTHER SCORING TO BE A CONTROL AND/OR CONSTRUCTION JOINT.
THE CONTRACTOR SHALL PROVIDE A MARKED UP PLAN SHOWING
EXPANSION JOINT LOCATIONS BASED AROUND THEIR DAILY CONCRETE
POURS AND GAIN APPROVAL FOR VA COR PRIOR TO COMMENCMENT OF
CONRETE POURS.
EXPANSION JOINTS
AROUND ALL THREE (3)
SIDES OF END
COLUMNS IN PLAZA
COURT, TYP
LEGEND
EX. FENCE
EX. POWER POLE
EX. SANITARY SEWERS
EX. STORM DRAIN INLET
EX. UNDERGROUND TELEPHONE
EX. FIRE HYDRANT
EX. WATER VALVE
EX. STORM DRAIN
EX. WATER MAIN
EX. GAS MAIN
ROW/PROPERTY LINE
CENTERLINE
PROPERTY BOUNDARY
EASEMENT
EX. UNDERGROUND ELECTRIC
S
D
SANITARY SEWER MANHOLE NUMBER
STORM DRAINAGE MANHOLE NUMBER
NEW SANITARY SEWER MAIN
NEW STORM DRAIN
NEW FIRE HYDRANT
NEW WATER VALVE
NEW WATER MAIN
NEW STORM DRAIN INLET
S
MH-5
IGC (IN GROUND CREMAINS)
PPC (PRE-PLACED CRYPTS)
IGC
LIMITS OF DISTURBANCE
PHASE 1A - BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting / Chalona Studios Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Roderick Grier (480)-842-1520
SITE PLAN COLUMBARIUM
5 - COURTS A, B, C
11/03/2022 MWC MWC
CS110
OF 21754
OHEOHE OHEOHE
C
OL
UM
NS
EA
CH
S
ID
E
C
OL
UM
NS
EA
CH
S
ID
E
C
OL
UM
NS
EA
CH
S
ID
E
C
OL
UM
NS
EA
CH
S
ID
E
ALIGN JOINTS WITH
CORNERS OF PIERS AS
SHOWN (TYP.)
COLUMN 432
8' BACKED BENCH
TO MATCH CEMETERY
STANDARD (TYP.)
COURT C ENLARGEMENT PLAN
Scale: 1" = 10'-0"1
71'-0 3/4"
3' -0
5'-0" 5'-0"
5'-10" 10'-0"
51'-1 9/16"
15'-7 11/16" 10'-0" 21'-7 1/2" 10'-0" 13'-9 9/16"
6.
8'-0"
8' -0
8'-0"
60'-2 3/16"
'-4
3/
153.18°
N E
660173'11.933" 126938'1.563"
N E
660174.2187 126851.0697
N E
660145'3.375" 126808'4.469"
EJEJ
EJ
EJEJ
EJ
C98
C146
C196
C244
C294
C342
C97
C49
C01
C48
C195
C147
C293
C245
C391
C343
C392
C436 C437
C481 C482
C555
C518 C519
C556
C588
C621
C589
EACH END PIER (BOTH ENDS)
SHALL RECEIVE A BRONZE COURT
MARKER, TYP
FLOWER WATERING STATION, TYP
COURT C NICHE NUMBERING SHALL
BE FROM SOUTH TO NORTH THEN
FLIP TO THE NORTH EAST AND
CONTINUE ON NORTH TO THE
WEST END OF THE COLUMBARIUMS
8' BACKLESS BENCH, CENTERED IN
WALK AND WITH COLUMBARIUM, TYP.
COLUMBARIUMS ARE 5 NICHES HIGH, TYP
EACH END PIER (BOTH ENDS)
SHALL RECEIVE A BRONZE COURT
MARKER, TYP
IRRIGATION PUMP
HOUSE C
VETERANS
LAKE
IRRIGATION PUMP HOUSE C PLAN
Scale: 1" = 20'-0"2
15'-11 15/16"
14'-11 15/16"
N E
660184'3.293" 127313'5.621"
N E
660308'2.638" 127316'5.316"
N E
660290.013 127262.1862
N E
660324'6.761" 127336'11.298"
N E
660179'2.897" 127383'.334"
R
5' -0
R 10'-0"
42'-0"
'-0
" 2'-11"
2'-1"
12'-0"
26'-0 1/8"
118'-7 5/16"
Gravel Access Road
R 50'-0"
CALL BEFORE
YOU DIG
OR
Utility Notification Center of Colorado
NORTH
1 inch = ft. Horizontal
00 100 20050
C.P.C.P.C.P.
M
M
M
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
W
ROAD B
ROAD A
R O
A D
B
RO
AD
B
PROPERTY LINE
G R
A V
E L
A C
C E
S S
R O
A D
OKLAHOMA ST
DENVER DR
DE
NVE
R
DR
OMAHA DR
O M
A H
A D
R
LOGAN BLVD
L O
G A
N B
LV
D
K A
N S
A S
S T
W Y
O M
IN
G
S T
DENVER DRDENVER DR
UTAH ST
MEMORIAL LAKE
COLORADO ST
COLORADO ST
COLORADO ST
S . S
H E
R
ID
A N
B
LV
D
KENYON AVE
S . S
H E
R
ID
A N
B
LV
D
VETERANS LAKE
OMAHA DR
U T
A H
S T
R E
E T
COMMITTAL
SHELTER B
COMMITTAL
SHELTER A
COMMITTAL
SHELTER C
LO
W
E
LL
B
LV
D
ADMIN AND
MAINTENANCE
BUILDING
COMMITTAL
PARKING C
COMMITTAL B
PARKING
COMMITTAL A
PARKING
SHEET CS112 SHEET CS113
SHEET CS114
SHEET CS115
SHEET CS116
SHEET CS117SHEET CS118SHEET CS119
EX DETENTION
POND
WEST GATE
ENTRANCE
MAIN GATE
ENTRANCE
SECTION 1
SECTION 2
SECTION
MC
SECTION P
SECTION R
SECTION S
SECTION Q
SECTION MA
SECTION MB
SECTION O
T
SECTION U
SECTION 10
SECTION 13
SECTION 15-18
SECTION 14
SECTION 12
SECTION 11
SECTION 3
SECTION 8
SECTION 27
SECTION 26
SECTION 28A
SECTION 28B
SECTION 28C SECTION 28
SECTION 29
SECTION 30
SECTIONS 30A-30D
SECTION 31
SECTIONS 62&64
SECTIONS 66-76
SECTIONS 34&35
SECTIONS 32&33
SECTIONS 42&43
SECTION 45
SECTIONS 47&48
SECTIONS 51 53 &55
SECTIONS 56-59
SECTIONS 61&62
SECTIONS 25
SECTIONS 20-24
SECTIONS 44, 46, & 48
SECTIONS 50, 52, &54
SECTION X
SECTION T1&T2
SECTION T
SECTION 4
SECTION 27
SECTIONS 6SECTION 7SECTION 9
SECTION 5
STOCK PILE
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
OVERALL SITE SECTION MARKER
AND CONTROL MONUMENT
ETG RLB
CS111
55 215
NORTH
1-800-922-1987
CONSTRUCTION NOTES:
KEYMAP
LEGEND
SECTION MARKER DETAIL
CAST-IN-PLACE GRAVESITE
CONTROL MONUMENTS
4'-3"
909089
96.1
88C
88D
88I
88J
88O
89A89B89C
89D 89E 89F
89G89H89I
89J 89K 89L
89M
89N
90A 90B
90C
90E 90F 90G
90I 90J90K90L
90M 90N 90O
90Q
90R
90S90T
91A91B91C
91D 91E 91F
91G 91I
91J 91K 91L
91M 91N91O
92A92B92C
92D 92E 92F
92G 92H92I
92J 92K 92L
92M
92N92O
96A96C
96D
96E
96F
96H
96I
96J96K
96L
96M
96N96O
96P
96Q
96R
95A95B
95G
95D 95E95H95G
95I 95J
95K
94A94B94C 94D
94E 94F 94G 94H
94I 94J94K94L
88.289.1 91.1
96.2
94.195.1
88C
88D
88I
88J
88O
89A89B89C
89D 89E 89F
89G89H89I
89J 89K 89L
89M
89N
90A 90B
90C 90D
90E 90F 90H
90J90K90L
90M 90N 90O 90P
90Q
90R
90S90T
91A91B91C
91D 91E 91F
91H91I
91J 91K 91L
91M 91O
92A92B92C
92D
92G 92H92I
92J 92K 92L
92M
92O92P
96C96D
96E
96B
96A 96I
96H
96G
96F96M
96L
96K
96J96Q
96P
96O
96N
95B 95E95K
95F 95A
95J 95I 95D
95C
94A94B94C 94D
94E 94F 94G 94H
94I 94J94K94L
88.289.189.2
90.2
91.1
91.292.1
92.2
94.195.1
95.2
96.2
92N
89O89O
94.2
SECTION 95
SECTION 89
SECTION 91
SECTION 90SECTION 92
SECTION 94
SECTION 96
G R
A V
E L
A C
C E
S S
R O
A D
ROAD B
SECTION 92
SECTION 94
SECTION 91
SECTION 90
90.1
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
SECTION MARKER PLAN
SECTIONS 89-92, 94-96
ETG JDS
CS112
52 215
1-800-922-1987
NORTH
COMMENT REVISIONS 04-19-22
86A
86C86F
86I86J
86G86H
87A
87B87C
87D 87E 87F
87G 87H87I
87J 87K 87L
87M 87N87O
88B88C
88D 88E
88H88I
88J
88K 88L
88M 88O
94A
94H
94I
93A93B93C93D
93F 93G 93H
93N
88.2
93.2
86J
86A
86D86M
86N
86I
87A
87B87C
87D 87E 87F
87G 87H87I
87J 87K 87L
87M 87N87O
88A88B88C
88D 88E
88G 88H88I
88J
88K 88L
88M 88N
88O
94A
94H
94I
93A93B93C93D
93E
93F 93G 93H 93I
93M
93K93L
86.1
86.2
87.1
87.2 88.2
93.1
93.2
86O
86F
86E
SECTION 86
SECTION 87
SECTION 88
SECTION 93
RO
AD
B
SECTION 87
SECTION 88
SECTION 94
86C
87B88F
93J
88.1
86K
86L
87 93
86 88
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
SECTION MARKER PLAN
SECTIONS 86, 87, 88, 93
ETG JDS
CS113
57 215
1-800-922-1987
COMMENT REVISIONS 04-19-22
102.2
103.2
97A
97C
97D 97F
97H
97J
97K
97P
97R
97T
103A
103B
103C
103D 103G
103H
103I
103K
103L
103M
103N103Q
103R
103S
103T
98A
98B 98C
98D 98E
98F 98G
98H 98I
98J 98K
98L
99A
99B 99C
99D 99E
99F 99G
99H 99I
99J 99K
99L
100A
100B 100C
100D 100E
100F 100G
100H 100I
100J 100K
100L
101A
101B 101C
101D 101E
101F 101G
101H 101I
101J 101K
101L
102A
102B 102C
102D 102E
102F 102G
102H 102I
102J 102K
102L
100.1
97.1
97.2
103.1
103E103F103O
97B
97C
97E
97F
97G
97H97I
97J
97L 97M
97N
97O
97P
103A
103B
103C
103D
103E103F
103G
103H
103I
103K
103L
103M
103N
103O103P
103Q
103R
103S
103T
101A
98.1
98.2
99.1
100.2
101.1
101.2
102.1
97.1
97.2
103.1103J
SECTION 99
SECTION 97
SECTION 103
G R
A V
E L
A C
C E
S S
R O
A D
SECTION 98
SECTION 100
SECTION 101
SECTION 102
R O
A D
B
99.2
100 101101 102 102
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
SECTION MARKER PLAN
SECTIONS 97-103
ETG JDS
CS114
58 215
1-800-922-1987
104B
104C
104E
104F
104G104J
104AA
105C
105D
105F
105G
105H
105I105J
105K
105N
105O
105P
105Q105A
105S
105T
105U105V
105X
109G
104.2
103E
104H
104K
104L104M
104N
104O104R
104T104U
104V
104W
104BB
104Z104CC
105C
105D
105F
105G
105H
105.2
105J
105K
105N
105O
105P
105Q
105.3
105S
105W
105U105V
105X
109B
104.3
105.1 105.4
105T
104P
104Q104X104Y104DD
104S
105E
105A
105B 105L
109.1 104.4
SECTION 105
SECTION 104
TEMPORARY
MATERIAL
STORAGE
R O
A D
A
ROAD B
SECTION 104
R O
A D
A
104EE
109A
105M
104.1 104I
104A
104D
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
SECTION MARKER PLAN
SECTIONS 104, 105
ETG JDS
CS115
59 215
NORTH
1-800-922-1987
SECTIONS 6
SECTION 7
SECTION 7
SECTION 7
104AA
105V
109G
109H
109W 109V
SECTIONS 6
104BB
104Z104CC
105V
109B
109D
109N
104.3
105.4
109.2
104Y104DD
109C109J109K109R 109S
109T 109Q 109L 109I
109E109H109M109P109U
109O 109G 109F
109.1 104.4
SECTION 104SECTION 109 SECTION 109
GRAVEL ACCESS ROAD
R O
A D
A
104EE
109A
COLUMBARIA 4 / COURT A
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
SECTION MARKER PLAN
SECTIONS 109
ETG JDS
CS116
60 215
NORTH
1-800-922-1987
SECTION 7
109V
SECTION 11 SECTION 9
109T
109U
DENVER DR
SECTION 109
PINEHURST ESTATES
COLUMBARIA 4 / COURT B
COLUMBARIA 4 / COURT A
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
OF
SECTION MARKER PLAN
COLUMBARIUM 4 COURTS A, B
CFS JDS
CS117
61 215
1-800-922-1987
SECTION 13
SECTION 14
SECTION 12
SECTION 1
SECTION 13
SECTION 14
SECTION 12
SECTION 1
OKLAHOMA ST
DENVER DR
COLUMBARIA 4 / COURT E COLUMBARIA 4 / COURT D COLUMBARIA 4 / COURT C
PINEHURST ESTATES
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
OF
SECTION MARKER PLAN
COLUMBARIUM 4 COURTS C, D, E
ETG JDS
CS118
62 215
1-800-922-1987
W
OKLAHOMA ST.
S . S
H E
R
ID
A N
B
LV
D
VETERANS LAKE
PINEHURST ESTATES
SECTION 15-18
COLUMBARIA 5 / COURT B COLUMBARIA 5 / COURT A
COLUMBARIA 5 / COURT C
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
SECTION MARKER PLAN
COLUMBARIUM 5 COURTS A, B, C
ETG JDS
CS119
63 215
NORTH
1-800-922-1987
C.P.C.P.C.P.
M
M
M
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
W
PROJECT
BOUNDARY
ROAD B
ROAD A
R O
A D
B
RO
AD
B
PROJECT
BOUNDARY
PROJECT
BOUNDARY
G R
A V
E L
A C
C E
S S
R O
A D
OKLAHOMA ST
DENVER DR
DE
NVE
R
DR
OMAHA DR
O M
A H
A D
R
LOGAN BLVD
L O
G A
N B
LV
D
K A
N S
A S
S T
W Y
O M
IN
G
S T
DENVER DRDENVER DR
UTAH ST
MEMORIAL LAKE
COLORADO ST
COLORADO ST
COLORADO ST
S . S
H E
R
ID
A N
B
LV
D
W. KENYON AVE
S . S
H E
R
ID
A N
B
LV
D
VETERANS LAKE
OMAHA DR
U T
A H
S T
R E
E T
COMMITTAL
SHELTER B
COMMITTAL
SHELTER A
COMMITTAL
SHELTER C
QUINCY AVE
LO
W
E
LL
B
LV
D
ADMIN AND
MAINTENANCE
BUILDING
COMMITTAL
PARKING C
COMMITTAL A
PARKING
SHEET CS121 SHEET CS122
SHEET CS123
SHEET CS124
SHEET CS125
SHEET CS126SHEET CS127SHEET CS128
EX DETENTION
POND
WEST GATE
ENTRANCE
MAIN GATE
ENTRANCE
SECTION 1
SECTION 2
SECTION 5
SECTION
MC
SECTION P
SECTION R
SECTION
S
SECTION Q
SECTION MA
SECTION MB
SECTION O
T2
T
SECTION U
SECTION 10
SECTION 13
SECTION 15-18
SECTION 14
SECTION 12 SECTION 11
SECTION 3
SECTION 4
SECTION 8
SECTION 27
SECTION 26
SECTION 28A
SECTION 28B
SECTION 28C SECTION 28
SECTION 29
SECTION 30
SECTIONS 30A-30D
SECTION 31
SECTIONS 62&64
SECTIONS 66-76
SECTIONS 34&35
SECTIONS 32&33
SECTIONS 42&43
SECTION 45
SECTIONS 47&48
SECTIONS 51 53 &55
SECTIONS 56-59
SECTIONS 61&62
SECTIONS 25
SECTIONS 20-24
SECTIONS 44, 46, & 48
SECTIONS 50, 52, &54
SECTION X
SECTION T1&T2
SECTION T
SECTION 5
SECTION 4
SECTION 4
SECTION 27
SECTIONS 6
SECTIONS 6
SECTION 7
SECTION 7
SECTION 9
SECTION 5
MATERIAL STORAGE YARD
FUTURE CEMETERY DEVELOPMENT
COMMITTAL B
PARKING
MAINTENANCE
BUILDING 3001
SECTION 4
OF
OVERALL SITE ADDRESSING
ETG RLB
CS120
64 215
NORTH
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 217
A V
E L
A C
C E
S S
R O
A D
ROAD B
SECTION 95
SECTION
SECTION
91 SECTION
SECTION
SECTION 94SECTION 96
OF
SECTION ADDRESSING
SECTION 89-92, 94-96
CFS RLB
CS121
65 215
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
SECTION 86SECTION 87SECTION 88
SECTION 93
RO
AD
B
OF
SECTION ADDRESSING
SECTIONS 86, 87, 88, 93
ETG RLB
CS122
66 215
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
A V
E L
A C
C E
S S
R O
A D
SECTION 95 SECTION 94SECTION 96
SECTION
SECTION
SECTION
SECTION
SECTION 102
SECTION
SECTION 103
OF
SECTION ADDRESSING
SECTIONS 97-103
ETG RLB
CS123
67 215
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
SECTION
SECTION 105
SECTION
SECTION 105
SECTION 103
R O
A D
A
ROAD B
FUTURE CEMETERY
DEVELOPMENT
OF
SECTION ADDRESSING
SECTIONS 104, 105
ETG RLB
CS124
68 215
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
SECTION
SECTION 109
R O
A D
A
FUTURE CEMETERY
DEVELOPMENT
COLUMBARIUM
COURT 4A
SECTIONS 6
SECTIONS 6
SECTION 7
SECTION 7SECTION 9
OF
SECTION ADDRESSING
SECTION 109
ETG RLB
CS125
69 215
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
DENVER DR
COLUMBARIUM
COURT 4C
COLUMBARIUM
COURT 4B
PINEHURST ESTATES
SECTION 11
SECTION 9
SECTION
SECTION 10SECTION 1
OF
SECTION ADDRESSING
COLUMBARIA 4 COURT A,B,C
ETG RLB
CS126
70 215
NORTH
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 217
OKLAHOMA ST
OKLAHOMA ST
DENVER DR
COLUMBARIUM
COURT 4D
COLUMBARIUM
COURT 4E
COLUMBARIUM
COURT 5A
PINEHURST ESTATES
SECTION 13
SECTION 12
SECTION 14
VETERANS LAKE
OF
SECTION ADDRESSING
COLUMBARIA 4 COURT D,E
ETG JDS
CS127
71 215
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
W
VETERANS LAKE
S . S
H E
R
ID
A N
B
LV
D
PINEHURST ESTATES
COLUMBARIUM
COURT 5C
SECTION 15-18
COLUMBARIUM
COURT 5B
COLUMBARIUM
COURT 5A
OF
SECTION ADDRESSING
COLUMBARIA 5 COURT A,B,C
ETG JDS
CS128
72 215
1-800-922-1987
KEYMAP
LEGEND
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .