This document outlines a federal construction contract solicitation. The Department of Veterans Affairs, Office of Construction and Facilities Management is seeking proposals for the Phase 1A Expansion project at Fort Logan National Cemetery in Denver, Colorado. Contractors shall provide all labor, materials, and equipment for construction services as defined in the plans, drawings, and specifications. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The NAICS code is 237990 for other heavy and civil engineering construction up to $45 million in size. The estimated construction cost is between $20-50 million. A pre-proposal site visit is scheduled and proposals are due by May 16, 2023 at 3:00 PM Eastern Time.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C.P.C.P.C.P.
M
M
M
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
W
SECTION 13
PROJECT
BOUNDARY
COMITTAL C
PARKING
COMITTAL
SHELTER B
GRAVEL ACCESS ROAD
COMMITTAL
SHELTER A
COMMITTAL
A PARKING
WEST GATE
ENTRANCE
MAIN GATE
ENTRANCE
STOCK
PILE
ROAD B
ROAD A
R O
A D
B
RO
AD
B
ACCESS ROAD
G R
A V
E L
A C
C E
S S
R O
A D
OKLAHOMA ST
DENVER DR
D E
N V
E R
D R
OMAHA DR
O M
A H
A D
R
LOGAN BLVD
L
O G
A N
B
LV
D
K A
N S
A S
S T
W Y
O M
IN
G
S T
MONTANA ST
DENVER DR
UTAH ST
MEMORIAL LAKE
COLORADO ST
COLORADO ST
NEW MEXICO ST
S . S
H E
R
ID
A N
B
LV
D
KENYON AVE
S . S
H E
R
ID
A N
B
LV
D
VETERANS LAKE
OMAHA DR
LO
W
E
LL
B
LV
D
RE AND
CONTRACTOR TRAILERS
PROJECT
BOUNDARY
PROJECT
BOUNDARY
PROJECT
BOUNDARY
PROJECT
BOUNDARY
COMMITTAL B
PARKING
NEW MEXICO ST
NEBRASKA ST
ACCESS
#2
ACCESS
#3
MAIN
ACCESS
COMMITTAL
SHELTER C
COLORADO ST COLORADO ST
S H
E E
T
SHEET #####
SHEET #####
SH
EE
T
S H
E E
T
SHEET CP106
SH
EET C
P107
SHEET CP109
SHEET CP110
SHEET CP111
SHEET CP112
SHEET CP114
SHEET CP113
S
H E
E T
C P
S H
E E
T C
P
SHEET CP115 SHEET CP116
S H
E E
T C
P
SHEET CP119
SHEET CP120
S H
E E
T C
P
S H
E E
T C
P
SHEET CP122
SHEET CP123
SHEET CP124
SHEET CP125
SHEET CP126
SHEET CP127
SHEET CP128SHEET CP129
SHEET
CP130
SHEET CP131
SEE NOTE 4
BELOW
SEE NOTE 4
BELOW
SEE NOTE 4
BELOW
SEE NOTE 4
BELOW
SEE NOTE 4
BELOW
SEE NOTE 4
BELOW
DENVER DR
NORTH
FORT LOGAN NATIONAL CEMETERY SHEET INDEX
OF
OVERALL ROAD PLAN
ETG JDS
CP100
93 165
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
PHASE 1:
PHASE 2:
PHASE 3:
PHASE 4:
PHASE 5:
PHASE 6:
PHASE 7:
STREET PHASING:
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 8:
PHASE 9:
FLNC PH1
11 / 03 / 2022
PHASE 1A - ALTERNATE 1 BID DOCUMENTSPHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
SEE PHASE 1A - ALTERNATE 1A
SEE PHASE 1A - ALTERNATE 1A
SEE PHASE 1A - ALTERNATE 1A
SEE PHASE 1A - ALTERNATE 1A
SEE PHASE 1A - ALTERNATE 1A
SEE PHASE 1A - BASE BID
CP
CP104
C P
C P
CP102
GRAVEL ACCESS ROAD
BASH
PHASE 1A - ALTERNATE 4 BID DOCUMENTS
02 / 10 / 2023
DENVER DR
LATERAL 1
JDS
OF
DENVER DRIVE
PLAN AND PROFILE
ETG JDS
CP106
94 165
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
NORTH
DENVER DRIVE - PLAN & PROFILE
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
BASH02 / 10 / 2023
M
M
LO
G
A N
B
LV
D
OMAHA DRIVE
LO
G
A N
B
LV
D
Δ
LATERAL 2
NORTH
OMAHA DRIVE - PLAN & PROFILE
1-800-922-1987
LEGEND
KEYMAP
STREET
REHABILITATION LEGEND
NOTES:
CONCRETE APRON DETAIL
N O
R
TH
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
OMAHA DRIVE
PLAN AND PROFILE
ETG JDS
CP107
94 16599 OF 165
11 / 03 / 2022
PHASE 1B
RE: PHASE 1B
RE: PHASE 1B
FUTURE 1B
CONSTRUCTION LIMITS
FUTURE PHASE 1B WORK
(NOT FOR BID)
FUTURE PHASE 1B WORK
(NOT FOR BID)
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
DEN
VER
D R
G R
A V
E L
A C
C E
S S
R O
A D
GRAVEL ACCESS ROAD
R O
A D
A
Δ
EX
R
.B . 7
S.
B. 25
OMAHA DR
SECTION 92
G R
A V
E L
A C
C E
S S
R O
A D
Δ
OKLAHOMA ST
VETERANS LAKE
Δ
Δ
PINEHURST ESTATES
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
SITE MAINTENANCE ACCESS
1-800-922-1987
LEGEND
KEYMAP
NOTES:
PUMPHOUSE C MAINTENANCE ACCESS
OF
MAINTENANCE ACCESS ROAD
ETG RLB
CP108
96 165
NORTH
11 / 03 / 2022
PHASE 1A - ALTERNATE 1 BID DOCUMENTSPHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
U T
A H
S T
K A
N S
A S
S T
S H
E R
ID
A
N B
LV
D
W Y
O M
IN
G
S T
U T
A H
S
TIT1
IT2
IT2
IT3
S H
E R
ID
A
N B
LV
D
Δ
Δ
Δ
Δ
Δ
Δ Δ
Δ Δ
Δ
Δ
Δ
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
NORTH
OF
EXISTING REPAVING PLAN
DENVER DRIVE
ETG JDS
CP115
103 165
LEGEND-PAVEMENT ITEMS
INT-1 INT-2 INT-3
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
STREET REHABILITATION NOTES.
SITE TRIANGLE NOTES
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
COLO
RADO S
T
Δ
IT4
IT5
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
NORTH
OF
EXISTING REPAVING PLAN
DENVER DRIVE
ETG JDS
CP116
104 165
NORTH
NORTH
INT-4
INT-5
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
O M
A H
A D
R O
M A
H A
D R
Δ
Δ
IT6
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
N O
R T
H
OF
EXISTING REPAVING PLAN
DENVER DRIVE
CFS JDS
CP117
105 165
NORTH
INT-6
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
DENVER DRIVE
ROAD A
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
EXISTING REPAVING PLAN
DENVER DRIVE
ETG RLB
CP118
106 165
NORTH
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
STREET REHABILITATION NOTES.
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
D
EN
V
ER
D R
IV
E
PARKING FOR
COMMITTAL
SHELTER C
IT9
IT10
Δ
DENVER DRIVE
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
EXISTING REPAVING PLAN
DENVER DRIVE
ETG RLB
CP119
107 165
NORTH
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMS
INT-10
INT-9
STREET REHABILITATION NOTES.
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
DENVER DRIVE
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
EXISTING REPAVING PLAN
DENVER DRIVE
ETG RLB
CP120
108 165
NORTH
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
STREET REHABILITATION NOTES.
LEGEND-PAVEMENT ITEMS
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
DE
N
VE
R
DR
IV
E
O M
A H
A D
R
IV
E
O K
LA
H
O M
A S
TR
EE
T
DENVER DRIVE
OKLAHOM
A
STREET
S E
C T
IO
N
SECTION 1
SECTION 13
SECTION 12
OF
EXISTING REPAVING PLAN
DENVER AND OMAHA DRIVE
ETG JDS
CP121
109 165
NORTH
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMSSTREET REHABILITATION NOTES.
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
NE
BR
AS
KA
S
TR
EE
T
EX DETENTION POND
(SOUTH POND)
OMAHA DRIVE
SECTION 27
EXISTING
DETENTION POND
(SOUTH POND)
POND EMBANKMENT
M.E. 394.14±
BEGIN NEW C&G
TC 394.14 M.E.
FL 393.66
BEGIN NEW C&G
TC 394.46 M.E.
TC
.0
394.08 M.E.
TC 394.43
Δ
OF
EXISTING REPAVING PLAN
OMAHA DRIVE
ETG JDS
CP123
111 165
NORTH
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION NOTES.
OMAHA /NEBRASKA
IMPROVEMENTS - DETAIL
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
A H
A D
R
IV
E
N
EB
R A
SK
A
STR
EET
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
EXISTING REPAVING PLAN
OMAHA DRIVE
ETG RLB
CP124
112 165
N O
R T
H
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
A H
A D
R
IV
E
NEBRASKA STREET
NEBRASKA STREET
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
EXISTING REPAVING PLAN
OMAHA DRIVE
ETG RLB
CP125
113 165
N O
R T
H
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
N E
W M
E X
IC
O
S T
R E
E T
OMAHA DRIVE
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
EXISTING REPAVING PLAN
OMAHA DRIVE & NEW MEXICO STREET
ETG RLB
CP126
114 165
N O
R T
H
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
A H
A D
R
IV
E
COLORADO STREET
O M
A H
A D
R
IV
E
OM
AHA D
R
COLORADO ST
SECTION 31
SECTIONS 32&33
SECTIONS 47&48
KENYON AVENUE
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
EXISTING REPAVING PLAN
OMAHA DR & COLORADO ST
ETG RLB
CP127
115 165
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
NORTH
STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
ARIZONA STREET
COLO
RADO S
TR
EE
T
SECTION 28
SECTIONS 61&62
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
EXISTING REPAVING PLAN
COLORADO & ARIZONA ST
ETG RLB
CP128
116 165
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMS
NORTH
STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
PARKING LOT
COLORADO ST
SECTION 28B
SECTION 28C
SECTIONS 25
COLORADO STREET
COLORADO STREET
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
EXISTING REPAVING PLAN
COLORADO STREET
ETG RLB
CP129
117 165
NORTH
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
STREET REHABILITATION NOTES.
11 / 03 / 202211 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
NEW MEXICO STREET
NEW
M
EXICO STREET
COLORADO STREET
NEW MEXICO STREET
LOGAN CIRCLE
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
EXISTING REPAVING PLAN
COLORADO & NEW MEXICO STREET
ETG RLB
CP130
118 165
NORTH
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMS
STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
COMMITTAL SHELTER B
ENTRY DRIVE & PARKING
OMAHA DRIVE
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
NORTH
OF
EXISTING REPAVING PLAN
COMMITTAL SHELTER B
ETG RLB
CP131
119 165
STREET REHABILITATION LEGEND
CONSTRUCTION NOTES:
1-800-922-1987
KEYMAP
LEGEND
LEGEND-PAVEMENT ITEMS STREET REHABILITATION NOTES.
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
REPAVING PROFILE
DENVER DRIVE
ETG JDS
CP200
120 165
DENVER DR
STA: 9+00 - STA: 25+50
DENVER DR
STA: 25+50 - STA: 42+30
1-800-922-1987
LEGEND
KEYMAP
STREET
REHABILITATION LEGEND
NOTES:
11 / 03 / 2022
FUTURE PHASE 1B WORK
(NOT FOR BID)
FUTURE PHASE 1A - ALT 1FUTURE PHASE 1A - ALT 1
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
AR
K A
N S
A S
S T
W Y
O M
IN
G
S T
LOGAN BLVD
VETERANS LAKE
N.W.S. 5429.85
P.I.C.
BUILDING
NORTH
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
OF
SIGNAGE AND STRIPING
PIC BUILDING
ETG RLB
CP211
121 165
LEGEND
KEYMAP
ENGINEER NOTES:
1-800-922-1987
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
COMMITTAL
LOT-B
OMAHA DR
COMMITTAL
LOT-A
M O
N T
A N
A S
T
LOGAN BLVD
COMMITTAL
LOT-C
DENVER DR
NORTH
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
COMMITTAL SHELTER B STRIPING PLAN
COMMITTAL SHELTER A STRIPING PLAN
COMMITTAL SHELTER C STRIPING PLAN
OF
SIGNAGE AND STRIPING
COMMITTAL SHELTERS
ETG RLB
CP212
122 165
LEGEND
KEYMAP
ENGINEER NOTES:
1-800-922-1987
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
COLORADO ST
ARIZONA ST
DENVER DR
COLUMBARIUM 1
U T
A H
S T
R E
E T
K A
N S
A S
S T
R E
E T
DENVER DR
U T
A H
S T
R E
E T
NORTH
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
UTAH STREET PARKING
MAINTENANCE / ADMINISTRATION BUILDING PARKING
DENVER DRIVE PARKING COLUMBARIUM 1 PARKING (NO STRIPING REQUIRED)
OF
SIGNAGE AND STRIPING
ADMIN & ON STREET PARKING
ETG RLB
CP213
123 165
LEGEND
KEYMAP
ENGINEER NOTES:
1-800-922-1987
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
SECTION 2 - FULL RECONSTRUCTION SECTION 6 - FULL RECONSTRUCTION
SECTION 7 - ASPHALT REPLACEMENT
SECTION 8 - 11
2" MILL 2" OVERLAY
SECTION 3 - ASPHALT REPLACEMENT
SECTION 4 - 11
2" MILL 2" OVERLAY
SECTION 5 - CRACK SEAL/SURFACE TREATMENTSECTION 1 - ASPHALT REPLACEMENT
NOTES:
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
TYPICAL ROADWAY SECTION
ETG RLB
CP301
124 165
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 128 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
SECTION 10 - CRACK SEAL/SURFACE TREATMENT
SECTION 9 - FULL RECONSTRUCTION
SECTION 13 - EDGE PATCHING/
CRACK SEAL/ SURFACE TREATMENT
SECTION 15 - NEW CONSTRUCTION
SECTION 14 - ASPHALT REPLACEMENT
COMMITTAL SHELTER C DRIVEWAY
SECTION 16 - GRAVEL MAINTENANCE ACCESS
NOTES:
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
TYPICAL ROADWAY SECTION
ETG JDS
CP302
125 165129 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
SECTION 11 - ASPHALT REPLACEMENT
LOGAN BOULEVARD
SECTION 12 - ASPHALT REPLACEMENT
LOGAN BOULEVARD
NOTES:
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF
TYPICAL ROADWAY SECTION
ETG JDS
CP303
126 165130 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
OF
TYPICAL CCD PAVING DETAILS
JRB JDS
CP304
127 165
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 131 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
TYPICAL CCD PAVING DETAILS
CFS JDS
CP305
128 165
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 132 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
PAVING DETAILS
ETG JDS
CP501
129 165
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
ROLL-OVER CURB & GUTTER DETAIL
6" MEDIAN CURB & GUTTER DETAIL
SAW JOINT DETAIL
HANDICAP PARKING DETAIL
FLOWER WATERING STATION
CURB TRANSITION DETAIL
SAWCUT DEPTH TABLE 2
CONCRETE SIDEWALK DETAIL
CONTRACTION JOINT
EXPANSION JOINT
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
| Sheets and Views |
| 1 COVER SHEET |
| 2 SHEET INDEX |
| 3 GENERAL NOTES |
| 4 GENERAL NOTES |
| 5 CONSTRUCTION PHASE PLAN |
| 6 CONSTRUCTION ACCESS PLAN |
| 24 PAVEMENT CORE KEY MAP |
| 25 SOIL BORING LOGS |
| 26 SOIL BORING LOGS |
| 27 SOIL BORING LOGS |
| 28 SOIL BORING LOGS |
| 29 OVERALL DEMOLITION PLAN |
| 30 DEMOLITION PLAN |
| 31 DEMOLITION PLAN |
| 32 DEMOLITION PLAN |
| 33 DEMOLITION PLAN |
| 34 DEMOLITION PLAN |
| 35 DEMOLITION PLAN |
| 36 DEMOLITION PLAN |
| 37 DEMOLITION PLAN |
| 38 DEMOLITION PLAN |
| 39 DEMOLITION PLAN |
| 40 DEMOLITION PLAN |
| 41 DEMOLITION PLAN |
| 42 DEMOLITION PLAN |
| 43 DEMOLITION PLAN |
| 44 DEMOLITION PLAN |
| 45 OVERALL SITE PLAN |
| 46 SITE PLAN |
| 47 SITE PLAN |
| 48 SECTION MARKER PLAN |
| 51 OVERALL GRADING SHEET |
| 52 DETAILED GRADING |
| 53 DETAILED GRADING |
| 54 DETAILED GRADING |
| 55 DETAILED GRADING |
| 56 OVERALL EROSION CONTROL |
| 57 DETAILED INITIAL |
| 58 DETAILED INITIAL |
| 59 EXISTING ROADS INITIAL |
| 60 EXISTING ROADS INITIAL |
| 61 EXISTING ROADS INITIAL |
| 62 EXISTING ROADS INITIAL |
| 63 EXISTING ROADS INITIAL |
| 64 EXISTING ROADS INITIAL |
| 65 EXISTING ROADS INITIAL |
| 66 EXISTING ROADS INITIAL |
| 67 EXISTING ROADS INITIAL |
| 68 DETAILED INTERIM |
| 69 DETAILED INTERIM |
| 70 EXISTING ROADS INTERIM |
| 71 EXISTING ROADS INTERIM |
| 72 EXISTING ROADS INTERIM |
| 73 EXISTING ROADS INTERIM |
| 74 EXISTING ROADS INTERIM |
| 75 EXISTING ROADS INTERIM |
| 76 EXISTING ROADS INTERIM |
| 77 EXISTING ROADS INTERIM |
| 78 EXISTING ROADS INTERIM |
| 79 DETAILED FINAL |
| 80 DETAILED FINAL |
| 81 EXISTING ROADS FINAL |
| 82 EXISTING ROADS FINAL |
| 83 EXISTING ROADS FINAL |
| 84 EXISTING ROADS FINAL |
| 85 EXISTING ROADS FINAL |
| 86 EXISTING ROADS FINAL |
| 87 EXISTING ROADS FINAL |
| 88 EXISTING ROADS FINAL |
| 89 EXISTING ROADS FINAL |
| 90 EROSION CONTROL DETAILS |
| 91 EROSION CONTROL DETAILS |
| 92 EROSION CONTROL DETAILS |
| 93 OVERALL ROAD PLAN |
| 94 DENVER DRIVE |
| 95 OMAHA DRIVE |
| 96 MAINTENANCE ACCESS ROAD |
| 97 EXISTING REPAVING PLAN |
| 98 EXISTING REPAVING PLAN |
| 99 EXISTING REPAVING PLAN |
| 100 EXISTING REPAVING PLAN |
| 101 EXISTING REPAVING PLAN |
| 102 EXISTING REPAVING PLAN |
| 103 EXISTING REPAVING PLAN |
| 104 EXISTING REPAVING PLAN |
| 105 EXISTING REPAVING PLAN |
| 106 EXISTING REPAVING PLAN |
| 107 EXISTING REPAVING PLAN |
| 108 EXISTING REPAVING PLAN |
| 109 EXISTING REPAVING PLAN |
| 110 EXISTING REPAVING PLAN |
| 111 EXISTING REPAVING PLAN |
| 112 EXISTING REPAVING PLAN |
| 113 EXISTING REPAVING PLAN |
| 114 EXISTING REPAVING PLAN |
| 115 EXISTING REPAVING PLAN |
| 116 EXISTING REPAVING PLAN |
| 117 EXISTING REPAVING PLAN |
| 118 EXISTING REPAVING PLAN |
| 119 EXISTING REPAVING PLAN |
| 120 REPAVING PROFILE |
| 121 SIGNAGE AND STRIPING |
| 122 SIGNAGE AND STRIPING |
| 123 SIGNAGE AND STRIPING |
| 124 TYPICAL ROADWAY SECTION |
| 125 TYPICAL ROADWAY SECTION |
| 126 TYPICAL ROADWAY SECTION |
| 127 TYPICAL CCD PAVING DETAILS |
| 128 TYPICAL CCD PAVING DETAILS |
| 129 PAVING DETAILS |
| 130 OVERALL UTILITY PLAN |
| 131 UNDERDRAIN PLAN |
| 132 OVERALL DRAINAGE OUTFALL |
| 133 CDOT M-STANDARD DETAILS |
| 134 STORM DRAIN DETAILS |
| 135 STORM DRAIN DETAILS |
| 136 STORM DRAIN DETAILS |
| G008 |
| G-006 |
| PHASE 1A ALT 1 221107 |
| S4-OVERALL V-100 |
| S5-DETAIL V-101 |
| S6-DETAIL V-102 |
| S7-DETAIL V-103 |
| S8-DETAIL V-104 |
| S9-DETAIL V-105 |
| S14-DETAIL V-106 |
| S13-DETAIL V-107 |
| S12-DETAIL V-108 |
| S11-DETAIL V-109 |
| S10-DETAIL V-110 |
| S15-DETAIL V-111 |
| S16-DETAIL V-112 |
| S17-DETAIL V-113 |
| S18-DETAIL V-114 |
| S23-DETAIL V-116 |
| S22-DETAIL V-117 |
| S21-DETAIL V-118 |
| 2022-11-17-irr-1abasebid |
| P-FtLogan1a-LI001 |
| LI001 |
| P-FtLogan1a-LI002 |
| LI002 |
| P-FtLogan1a-LI101 |
| LI101 |
| P-FtLogan1a-LI102 |
| LI102 |
| P-FtLogan1a-LI103 |
| LI103 |
| P-FtLogan1a-LI104 |
| LI104 |
| P-FtLogan1a-LI105 |
| LI105 |
| P-FtLogan1a-LI106 |
| LI106 |
| P-FtLogan1a-LI107 |
| LI107 |
| P-FtLogan1a-LI501 |
| LI501 |
| P-FtLogan1a-LI502 |
| LI502 |
| P-FtLogan1a-LI503 |
| LI503 |
| P-FtLogan1a-LI504 |
| LI504 |
| P-FtLogan1a-LI505 |
| LI505 |
| P-FtLogan1a-LI504 |
| LI504 |
| LS Pages from FT LOGAN NC PHASE 1A - 2022 11 21 |
| sIGN Pages from Volume 1 - Cemetery Bid Plans |
| 1b index |
| g-002 1b |
File details come from the government source that posted it. Updated .