S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(5 of 5).pdf
PDF 38 MB Posted
- Attached to
- Y1PC--Ft. Logan National Cemetery - Phase 1A Expansion (Construction FY23 Re-procurement)
- Solicitation number
- 36C10F23R0013
About this file
This document outlines a federal construction contract solicitation. The Department of Veterans Affairs, Office of Construction and Facilities Management is seeking proposals for the Phase 1A Expansion project at Fort Logan National Cemetery in Denver, Colorado. The contractor will provide all labor, materials, equipment and supervision to complete the construction as defined in the plans, drawings and specifications. This is a 100% set aside for Service-Disabled Veteran Owned Small Businesses. The North American Industry Classification for this project is 237990 for Other Heavy and Civil Engineering Construction, with a size standard of $45 million. The estimated construction cost is between $20-50 million. A pre-proposal site visit is scheduled and proposals are due by May 16, 2023 at 3:00 PM Eastern Time.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C.P.C.P.C.P.
M
M
M
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
S
THIS LINEWORK WAS GIVENT TO US FROM SURVEY SYSTEMSLINES ARE NOT CONNECTED. WHAT YOU SEE IS WHAT YOU GET
S
THIS LINEWORK WAS GIVENT TO US FROM SURVEY SYSTEMSLINES ARE NOT CONNECTED. WHAT YOU SEE IS WHAT YOU GET
W
COMMITTAL B
COMMITTAL A
COMMITTAL C
ADMIN AND
MAINTENANCE
BUILDING
COMMITTAL C
PARKING
COMMITTAL B
PARKING
COMMITTAL A
PARKING
SHEET CU105
SHEET CU104
SHEET CU105 SHEET CU105
SHEET CU107
S H
E E
T C
U
SHEET CU107
S H
E E
T C
U
SHEET CU102
SHEET CU108
NEBRASKA ST
NEW
M
EXICO ST
PROJECT
BOUNDARY
ROAD B
ROAD A
R O
A D
B
RO
AD
B
GRAVEL ACCESS ROAD
PROJECT
BOUNDARY
PROJECT
BOUNDARY
PROJECT
BOUNDARY
PROJECT
BOUNDARY
G R
A V
E L
A C
C E
S S
R O
A D
OKLAHOMA ST
DENVER DR
DE
NVE
R
DR
OMAHA DR
O M
A H
A D
R
LOGAN BLVD
L O
G A
N B
LV
D
K A
N S
A S
S T
W Y
O M
IN
G
S T
MONTANA ST
DENVER DRDENVER DR
UTAH ST
MEMORIAL LAKE
COLORADO ST
COLORADO ST
NEW MEXICO ST
S . S
H E
R
ID
A N
B
LV
D
KENYON AVE
S . S
H E
R
ID
A N
B
LV
D
VETERANS LAKE
OMAHA DR
U T
A H
S T
R E
E T
QUINCY AVE
LO
W
E
LL
B
LV
D
SHEET CU106
OF
OVERALL UTILITY PLAN
ETG JDS
CU100
130 165
CONSTRUCTION NOTES
LEGEND
KEYMAP
1-800-922-1987
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
NORTH
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
BASH
PHASE 1A - ALTERNATE 4 BID DOCUMENTS
02 / 10 / 2023
SECTION 15-18
SECTION 15-18
SECTION 14
COLUMBARIUM 5 / COURT A
(1,080 NICHES, 216 COLUMNS)
PINEHURST ESTATES
COLUMBARIUM 5 / COURT E
(1,080 NICHES, 216 COLUMNS)
PINEHURST ESTATES
SECTION 12
SECTION 12
COLUMBARIUM 5 / COURT D
(1,080 NICHES, 216 COLUMNS)
COLUMBARIUM 5 / COURT C
(1,080 NICHES, 216 COLUMNS)
PINEHURST ESTATES
PINEHURST ESTATES
SECTION 11
COLUMBARIUM 5 / COURT B
(960 NICHES, 192 COLUMNS)
COLUMBARIUM 4 / COURT A
(1,200 NICHES, 240 COLUMNS)
PINEHURST ESTATES
OF
UNDERDRAIN PLAN
COLUMBARIUM WALL
ETG JDS
CU113
131 165
CONSTRUCTION NOTES
LEGEND
KEYMAP
1-800-922-1987
NORTH
NORTH
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
11-03-2022
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
BASH02 / 10 / 2023
M
M
M
M
M
M M
M
M M
M
M
M
M M
M
M
M
M
M
M
M
M
M
M
M M
M
M M
M
M
M
M M
M
M
M
W
MARSTON LAKE NORTH DRAINAGEWAY
MARSTON LAKE NORTH DRAINAGEWAY
VETERANS LAKE
MEMORIAL LAKE
SH
ER
ID
AN
B O
U
LE
VA
RD
KENYON
AVENUE
MEMORIAL LAKE
VETERANS LAKE
EL 5413.05
EL 5429.85
EL 5436.00
EL 5427.05
EL 5410.55
EL 5418.85
N O
R T
H
REACH 2 - MARSTON LAKE NORTH
DRAINAGEWAY - OVERALL PLAN
OMAHA DR 8'x12' RCBC DENVER DR 8'x12' RCBC
NE CHANNEL IMPROVEMENTS
DENVER DR 8'x12' RCBC
OMAHA DR 8'x12' RCBC
NOTE:
NE CHANNEL
IMPROVEMENTSVETERAN LAKE EMBANKMENT
AND SPILLWAY
MEMORIAL LAKE EMBANKMENT
AND SPILLWAY
MEMORIAL DAM IMPROVEMENTS:
VETERANS DAM IMPROVEMENTS:
OF
OVERALL DRAINAGE OUTFALL
PLAN AND PROFILE
ETG JDS
CU200
132 165
CONSTRUCTION NOTES
LEGEND
KEYMAP
1-800-922-1987
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 136 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
BASH02 / 10 / 2023
OF
CDOT M-STANDARD DETAILS
ETG JDS
CU301
133 165
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 137 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
BASH
STORM DRAIN DETAILS
ETG JDS
CU501
134 165
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 138 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
BASH
ETG JDS
CU502
135 165
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 139 OF 165
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
BASH
ETG JDS
CU503
136 165
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
BASH
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI001
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
IRRIGATION COVER SHEET
GENERAL DESCRIPTION FLAG NOTES
DEMOLITION FLAG NOTES
GENERAL NOTES
LEGEND
Q
C
2"
A B C
P
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
PHASE 1A - ALTERNATE 4 BID DOCUMENTS
FOR INFORMATION ONLY - NOT FOR BID
15151515
151515
15 15 15 15 15
15 15 15 15
15 15 15 15
15151515
20 20
15151515
15 15 15 15 15
15 15
15 15 15 15 15 15 15
151515
15 15
15 15 15
15 15 15
15 15 15 15
1515 15
15 15 15 15
15 15 15
15151515
15 15
15 1515
1515151515
15 15
15 15
15 15
15 15 15 15
15 15 15 15
15 15
15 15
15 15
15 15 15 15
15 15
15 15
15 15 15
15 15
15 15
15 15
15 15 15 15
15 15 15 15 15
20 10
15 15 15 15 15 15 15 15 15 15 15
15 15 15 15 15 15 15 15 15 15 15
25 25 25
20 20
4"
3"
2525252525252525252525 25
20 20
20 20
20 20 20
252525
15 15 15
25 25
20 20
20 20
10 20 10 10
25 25
25 25
15 15
25 25 25
25 25 25
20 20 20
252525252525
25 25
25 25 15 15
15 15
151515
252525
25 25 25 25 25 25
151515
30 30 30
30 30
15 15 15 15
15 15 15
15 15 15 15 15 15
15 15 15 15 15 15
25 25
15 15 15 15 15 15 15 15 15 15
15 15 15 15 15 15 15 15 15 15
15 15 15 15 15 15 15 15 15 15
15 15 15 15 15 15 15 15 15 15 15
15 15
15 15 15 15 15 15
15 15 15
15 15 15
15 15 15
15 15
E S S S S S S
S
S
S S
S
S
SS
S
C
E
30 30
3" 3"
10"
6"
1515 15
2"
27-3
2" 27-4
2" 27-5
- 2"
27-6
2"
27-9
- 2"
27-10
2"
27-13
2"
27-11
2" 27-2
2" 27-7
2"
27-12
2"
27-8
21"
11"
11"
11"
11 "
211"
2"
27-1
2"
27-17
2"
27-14
11"
11 "
11 "
21 "
2"
11"
11 "
11 "
11"
11"
21 "
11"
11"
11 "
11 "
11"
3"
2"
2"
11 "
2"
2"
11"
3" 2"
2"
11 "
2"
2"
11 "
2 1"
2"
11 "
11"
3"
2 1"
11"
11"
11 "
11"
11"
11 "
11"
11"
11"
11 "
11"
21 "
2"
11"
11"
21 "
2"
11"
11"
2"
11 "
21"
11"
11"
11 "
11"
11 "
11"
3"
2"
3"
11"
11"
11 "
2"
2"
11"
11 "
2"
2"
27-15
3"
11"
3"11"
421"
211"
42"
11"
411"
11"
411"
411"
2"
27-18
11 "
11 "
11"
11 "
11"
11 "
2 1"
11 "
211"
11 "
11"
211"
21"
11"
11"
11"
2"
27-16
2" 26-3
2"
26-4
- 2"
26-6
3"
2"
26-10
2 1"
11"
2"
11"
11 "
11"
11 "
11 "
2 1"
2"
2"
11 "
11"
11"
11 "
2"
2"
2"
11"
211"
11"
11"
11"
11"
4 11 "
2"
26-11
11"
21"
21 "
2"
11"
11 "
2"
26-8
11 "
11"
11 "
2"
26-2
3"
2 1"
2"
2"
11 "
11"
11 "
11"
11"
11 "
21 "
2"
2"
11"
11"
3"
2"
20-6
2"
20-15
3"
11"
11"
11"
11 "
2"
20-16
2"
20-17
- 3"
2 1"
11"
11"
2"
20-19
3"
11 "
11 "
2"
20-20
3"
11"
11 "
11 "
3"
21"
2"
11"
21 "
2 2"
11"
2"
20-14
2"
20-9
3"
2"
20-10
2"
20-12
2"
2"
2"
2"11 "
11"
11 "
2"
20-7
11 "
2"
20-8
- 3"
21"
11"
2"
20-11
2 1"
2"11"
11"
11"
11 "
2"
11 "
11"
11 "
11 "
2"
20-13
2"
26-17
3"
11"
4 3"
2 1"
2"
11"
11"
11"
11 "
11"
11"
11"
2"
26-18
3" 2"
11"
11 "
11"
11"
11"
11 "
11 "
2" 20-5
3"
11"
2 1"
2"
11"
11 "
2" 20-2
11"
2"
11"
11 "
11"
11"
11 "
11"
3"
2"
2"
11 "
3"
2 1"
2"
11"
11"
2"
20-21
2"
20-22
11"
211"
2" 21-5
3"
11 "
11 "
11 "
11 "
42"
11 "
411"
11"
11"
2"
21-6
2"
11"
2"
21-7
2"
21-8
2"
21-9
3" 3"
21 "
2"
11 "
11 "
11"
11"
11"
11"
11"
411"
2"
21-10
2 1"
11"
2"
21-11
- 2"
21-12
2"
21-13
- 2"
21-14
3"
21"
2"
11 "
2"
21-15
21 "
11"
11"
3"
3"
2 1"
2"
11"
2"
21-17
2"
21-16
21 "
21"
2"
11 "
2"
21-18
2"
21-19
2"
21-20
2 1"
11 "
2"
21-21
2 1"
2"
11"
21"
11"
11"
11 "
11"
11 "
11"
3"
3"
2 1"
2"
11 "
11"
11"
11"
11"
11"
11"
2"
21-22
2"
11"
11 "
11"
11"
11 "
11"
2"
21-23
2"
21-2
2"
11"
11"
11 "
11"
3"
21 "
11"
2"
11 "
11"
11 "
11 "
11"
11"
2"
11 "
11"
11"
11"
211"
11"
11 "
2"
24-1
2"
24-14
2"
24-13
2"
24-12
2"
24-11
2"
24-5
2"
24-6
2"
24-7
2" 24-8
11 "
11"
11"
11 "
11"
11 "
2"
20-26
2"
20-27
- 3"
3"
2 1"
2"
11"
11"
2"
20-28
2"
20-29
3"
3"
2 1"
2"
2"
11"
11 "
11"
3"
2 1"
2"
11 "
11 "
2"
24-15
2"
24-10
2"
24-9
2"
24-17
2"
24-18
2"
24-19
11"
2"
24-20
3"
21 "
2"
11"
11 "
11"
11"
2"
24-21
2"
24-27
- 2"
24-28
3"
11"
11"
21 "
2 1"
11"
11 "
11"
11"
11"
2" 28-1
2"
2"
11 "
11"
2"
28-2
- 3"
11"
3"
21"
2"
2"
11 "
11 "
11"
11 "
11"
11"
11"
11 "
11"
2"
28-3
2"
28-4
21"
21"
2"
11 "
11 "
11"
11"
11 "
11"
2"
24-25
2"
24-24a
2 1"
21"
21 "
2"
11 "
11"
11 "
2"
24-24b
-3" 2 1"
11"
11 "
11"
2"
11"
11"
11"
2"
24-23
2"
11 "
11"
11 "
11 "
2"
24-22
2 1"
2"2"
11 "
11"
11 "
11"
11 "
2"
21 "
2" 11 "
11"
11 "
3"
21 "
22"
11"
11"
3"
2 1"
11 "
11"
11"
3"
3"2 1"
2"
11"
11"
3"
2 1"
2"
2"
11"
11"
2 1"
2"
2"
11 "
11"
3"
21 "
2"
2"
2"
11 "
3"
2 1"
2"
2"
11"
11"
11 "
11"
11 "
11"
11 "
21"
2"
11"
11"
2"
11 "
11"
3"
11 "
2"
24-29
2"
11"
11"
3"
3"
2 1"
2 1"
2"
2"
11"
2"
28-5
11"
2"
3"
3"
21 "
2"
2"
11"
21 "
2" 11"
2 11 "
11"
11 "
2 11 "
2 11 "
11"
2"
2"
2"
11"
11 "
11 "
21 "
1-1/2"
24-26
1-1/2"
26-23
1-1/2"
26-22
1-1/2"
26-1
1-1/2"
24-3
1-1/2"
21-1
1-1/2"
21-4
3"
3"
21 "
2"
28-24
3"
21"
2"
11"
11"
2"
28-25
3"
21 "
2"
11"
11"
2"
28-26
2 1"
2"
11 "
11 "
2"
28-27
2"
28-15
3"
3"21 "
2 1"
2"
2"
11"
11 "
11 "
11 "
11 "
11"
11 "
11 "
2"
2"
11"
11"
11"
2"
28-17
2"
28-16
21 "
11"
11"
11"
11 "
11 "
11 "
21"
211"
11"
411"
11"
11"
2"
28-18
3"
11 "
3"
21"
21"
11"
2"
11"
211"
211 "
11"
4 11"
11"
11"
2"
28-19
2 1"
11"
11"
11 "
11 "
11"
11"
2"
28-23
- 2"11 "
11"
11"
11 "
11"
11 "
2"
28-20
2"
2"
2"
28-21
2"
29-7
2"
29-6
2"
29-5
3"
11 "
21"
2 1"
2 2" 2"
11"
11"
11"
11 "
11 "
21 "
2 2"11"
11"
11"
11 "
2"
11"
11"
11"
11"
11"
11 "
2" 29-4
2" 29-3
2" 29-2
2" 29-1
-3"
2"11 "
211 "
4 2" 11"
2 11 "
3"
2 1"
2"11"
211 "
4 11"
2 11"
2" 29-9
2"
29-8
3"
21"
11 "
11 "
11 "
11 "
2"
29-12
2"
29-11
-21"
2"
11"
11"
2"
29-10
3"
3"
3"
2"
11"
11"
11 "
2"
11 "
11"
11"
2"
29-14
2 1"
2 1"
2"
11"
2"
29-13
3"
3"
2 1"
11 "
11"
2"
29-17
3"
3"
21"
2"
11"
11 "
2"
29-16
-3"
3"
11 "
11"
11"
2"
29-15
2"
28-7
2 1"
11"
11 "
2"
11"
11"
4 11"
11"
11 "
2"
11 "
11"
1-1/2"
28-6
2"
11"
1-1/2"
28-8
2" 11"
11"
1-1/2"
28-9
11 "
2 11"
11"
1-1/2"
28-10
1-1/2"
28-11
1-1/2"
28-12
2"
2" 11"
1-1/2"
28-14
2"
3"
2"
2"
11"
11 "
11"
11"
2"
3"
3"
21 "
2"
11 "
2"
29-19
2"
29-18
3"
2 1"
22 1"
22"
11"
11"
11"
11"
2"
29-21
2"
29-20
3"
21 "
2"
11"
11"
2"
23-17
3"21"
22"
11 "
11"
11"
11 "
2"
23-16
3"
3"
2 1"
2"
2"
11"
3"
3"
2 1"
2"
11 "
11"
11"
3"
11"
11"
11 "
2"
26-5
3"
11"
11"
11 "
11"
2" 26-7
2"
11"
2"
11"
2" 26-9
2"
11 "
2"
26-12
2 1"
2"
11"
2"
26-13
3"
11"
11 "
2"
11"
11"
2 1"
2"
2"
11"
11 "
2"
20-18
-2 1"
2"
2"
11 "
11"
21 "
2"
11"
411"
4 11"
4 11 "
2"
11"
411"
4 11"
11"
43"3"
11 "
2 1"
2"
11"
11"
11 "
211"
11 "
11"
11"
2"
26-16
2"
26-14
21"
21"
11"
2"
26-15
2"
11 "
11 "
2"
11 "
2 11"
2"
28-13
2"
23-19
2"
23-22
2 1"
21"
11 "
11"
2"
23-23
2"
23-21
2" 11"
11"
11"
11"
11"
4 21"
2"
11"
21"
22"11"
411 "
2"
11"
11 "
2"
23-25
21"
2"
11"
11 "
11 "
2" 11 "
11"
3"
2"
11"
11 "
11 "
2"
23-20
21"
2"
11"
11"
2"
23-24
3"
3"
2 1"
2"
11"
11"
11"
2"
22-18
2"
2"11"
11 "
11 "
2"
22-17
3"
3" 2 1"
2" 2" 11"
2 11 "
2"
22-21
2"11"
211 "
1-1/2"
23-1
- 2"2"11"
1-1/2"
23-3
2"2"11"
1-1/2"
23-5
11"
1"
23-2
11"
411"
1"
23-4
11"
2 11"
11"
1-1/2"
23-7
11"
11"
1-1/2"
23-8
1-1/2"
23-9
11"
11"
11"
11"
1-1/2"
23-11
11"
11"
1-1/2"
23-13
3"
11 "
4 11"
21 "
21"
11 "
11 "
11"
11 "
11"
11"
2"
23-14
-2"
11"
11"
11 "
11 "
11"
1-1/2"
23-15
11"
11"
1-1/2"
23-12
3"
2"
2"
11 "
11 "
2"
11"
11"
2" 22-7
10 10 10 10 10 10
20 20
15 15
15 15
252525252525252525252525252525
25 20
20 20
202020202020
20202020
15 15
15151515
151515
15 15
3"
2"
2"
11"
11"
2"
2"
11"
11"
2" 22-6
2 1"
2"
11"
11 "
2"
22-5
21 "
2"
11"
11"
2"
22-4
2"
22-3
2"
22-20
3"11"
211 "
411 "
2" 11 "
11"
11"
2"
22-15
2 1"
11"
11"
11"
11"
2"
22-14
2 1"
11 "
11"
11"
2"
22-12
2 1"
11"
4 11"
11"
11"
4 11"
2"
22-17
21 "
11 "
11"
11"
2"
22-11
2"
11"
11 "
2"
22-9
21 "
11 "
11 "
11"
11"
11"
2"
22-2
21 "
11"
11 "
11 "
11 "
11 "
11"
11"
2"
22-24
3"
3"
3"
11"
21"
2 1"
211"
2"
2"
11"
11"
11 "
11"
11"
11"
11 "
11"
2"
22-22
21"
11"
11 "
11"
11"
11"
211 "
11"
2"
22-23
2"
22-25
3"2"11 "
11"
11"
11"
11"
11 "
2"
11"
11 "
11"
11 "
11"
2"
22-1
3"
11"
11"
11"
11"
11"
2"
2"
11"
4 11 "
2 11"
4 11"
11 "
2 1"
2 11"
411"
211"
2"
22-8
21"
2 11"
2 11"
11"
11"
2"
22-13
3"
11 "
3"
21"
2 2"
2"
22-16
3"
3" 21"
2" 2" 2"
11"
4 11 "
11 "
11"
211 "
11"
42"
22-26
3"
2 1"
2 11"
11"
11 "
2"
11"
11"
2"
25-22
3"
11 "
11 "
2"
11 "
11"
2"
25-21
2"
11"
11"
2"
25-19
2 1"
2"
11"
11"
2"
25-18
3"
2"
11"
11 "
2"
2"
11"
11 "
2"
25-17
3"
11"
11 "
11"
11"
11 "
11"
11 "
11"
2"
25-16
21"
211"
11 "
11"
11"
2"
25-15
2"
25-13
3" 11 "
2 11"
2"
11"
211"
4 2"
25-20
- 3"
11"
11"
2 1"
2"11"
211"
2"
25-14
2 1"
11"
11"
2"
25-12
21"
2 11"
11"
11 "
11"
11"
11"
2"
25-24
3"
11"
11 "
3"
21"
2"
2"
11 "
11"
11 "
2"
25-23
21 "
11"
2 11 "
11 "
11 "
11"
2"
25-7
3"
11"
2 1"
2"
2"2"
11 "
11 "
11"
2" 25-8
21 "
11"
11 "
11"
2"
25-9
11"
3"
2 1"
11"
4 11"
11"
2"
25-10
2"
11 "
4 11"
11 "
11 "
11"
11"
2"
25-11
2 1"
11"
11"
2"
25-36
3"
11 "
211"
2" 11 "
2 11"
2"
25-35
2"
25-34
2 1"
2"
2"
11 "
11"
11"
11"
2"
25-33
21"
2"
11"
11"
2"
25-32
3"
2" 11 "
2 11"
42"11"
211"
2"
25-31
2 1"
2"
11"
11 "
11"
2"
25-30
2"
11"
11"
11"
2"
25-29
21 "
2"
2" 11 "
11"
11"
2"
25-28
3"
2"
11"
11 "
11 "
2"
11"
11 "
2"
25-27
3"
2" 11"
11"
2"11"
11 "
2"
25-26
21"
11 "
11"
2"
11"
11 "
2"
25-25
21 "
11"
11"
11 "
211"
11"
11"
11 "
11"
11"
11 "
4 2"
25-1
3"
3"
21 "
2"
11 "
11 "
2" 25-2
2 1"
211 "
211"
411 "
11"
11"
2"
25-3
3"
21 "
22"
11"
11 "
11"
2 11"
2" 25-4
2"
25-6
2 1"
11"
11 "
11 "
11"
2 11"
11"
3"
2"
11"
11 "
2"
11"
11"
2" 25-5
11"
2 2"
2"
2"
11 "
11 "
11"
11"
2"
11"
2"
11 "
11"
21 "
2 1"
2 2"
11 "
2"
23-6
3" 21 "
2" 11"
11"
11"
11"
2"
23-10
2"
2"
3"
11"
11"
11 "
2"
11"
11"
11"
3"
3"
3"
25 25 25 25
25 25 25 25
20 20
20 20
20 20 20 20
15 15
15 15 15
3"3" 2"
11"
11"
2"
11 "
11"
2"
15-28
3" 2"
11"
11 "
2"
11"
11 "
3"
2"
11 "
11"
2"
11 "
11 "
2"
15-26
2"
15-24
3"
3"
11"
11"
2"
11"
211 "
2"
15-27
3"
2"
11 "
11 "
11"
11 "
11"
2"
15-31
3"
21 "
2"
11"
11"
2"
15-30
- 3"3"
3"
21 "
2"
11"
11 "
2"
15-29
3"3"
21"
2"2"11 "
2"
15-22
2"
20-25
2"
20-23
2"
20-24
4 5 6
3"
2"
2"
2"
11"
211"
211 "
211"
2"
2"
11"
11"
211"
411"
2"
16-23b
2"
11 "
11"
2"
11"
2"
15-25
11"
11"
11"
11 "
4 11 "
2"
15-32
25 25
15 15
151515151515
15 15
15151515
15 15 15
20 20
1515151515151515
15 15 15 15 15 15 15 15
2"
30-16
2"
30-17
2"
30-18
- 2"
30-14
2"
30-15
151515
E E
15 15
151515
20 20
1515151515151515151515151515
15 15
15 15 15 15 15 15 15 15 15 15 15 15 15 15
25 25 25
202020
15 15
CC
151515
15 15 15
2"
30-20
2" 30-22
-2" 30-23
2 RR
15 15
15 15
2"
30-21
2"
30-19
2"
30-13
2"
30-12
2"
30-11
2"
30-5
2"
30-10
2"
30-6
30CB
CB
CB
CB
CB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"
3"
3"
3" 3"
3"
3"
3"
3"
3"
3"
3"3"3"3"3"
3"
3"
3" x 4" x 3" TEE
W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB3"-11.25°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB 3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
4" x 3" x 4" TEE
W / TB
4" TEE
W / TB4" TEE
W / TB
3" x 4" x 6" TEE
W / TB
3" TEE
W / TB
4"-22.5°
EL W / TB
4"-45°
EL W / TB
4"-22.5°
EL W / TB
4"-11.25°
EL W / TB
4" x 3" x 3" TEE
W / TB
3"-11.25°
EL W / TB
3"-45°
EL W / TB4"
4"
4"
3"
4"
3"4"
3"4"
4"
3"
3" TEE
W / TB
3"
3"
3"
3"
3"
3"
3"
3"
3"
3" 3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
6"
6" TEE
W / TB
3"-11.25°
EL W / TB
3"-22.5°
EL W / TB
3"-11.25°
EL W / TB
6"-22.5°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4" x 4" x 3" TEE
W / TB
4" x 4" x 3" TEE
W / TB
3"-45°
EL W / TB
3"
3"
3"-22.5°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3" TEE
W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"3"
3"
3"
3"3"3"
3"
3"
3"
3"
4"
4"
4" 4"
4"
4"
3"
4"
3" x 4" x 4" TEE
W / TB
3"
3"3"3"3"
3"
6"
4" x 6" x 4" TEE
W / TB
6"-11.25°
EL W / TB
6"-11.25°
EL W / TB
6"-11.25°
EL W / TB
6"-11.25°
EL W / TB
6"-22.5°
EL W / TB
8"
8" x 6" x 4" TEE
W / TB
6" x 6" x 3" TEE
W / TB
6" x 6" x 3" TEE
W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
6"
6"
6"
3" 3"
3"
8"-22.5°
EL W / TB
8" x 8" x 3" TEE
W / TB
3" TEE
W / TB
3"-45°
EL W / TB
3" TEE
W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
8" x 8" x 3" TEE
W / TB
8" x 8" x 3" TEE
W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
11"
2"
21 "
3"-22.5°
EL W / TB
3"-11.25°
EL W / TB
8" x 8" x 3" TEE
W / TB
8" x 8" x 3" TEE
W / TB
8"-45°
EL W / TB
8"-45°
EL W / TB
8"-45°
EL W / TB
8"-45°
EL W / TB
8"
8"
8"
8"8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
3"
3"
3"
8"
3"
3"
8"
3"
8"
3"
4"
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB 3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
8"-11.25°
EL W / TB
3"
3"
3"
3"
8" x 8" x 3" TEE
W / TB
8" x 8" x 3" TEE
W / TB
8" x 8" x 3" TEE
W / TB
8" x 8" x 3" TEE
W / TB
8" x 8" x 3" TEE
W / TB
8" x 8" x 3" TEE
W / TB
3"
3"
3"
3"
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
3" TEE
W / TB
8"
3"
8" x 8" x 3" TEE
W / TB
3" TEE
W / TB
8"
8"
3"
8" x 8" x 3" TEE
W / TB
3"
8" x 8" x 3" TEE
W / TB
3" TEE
W / TB
8"-45°
EL W / TB
8"
8"
8"-45°
EL W / TB
8"-45°
EL W / TB
8"-45°
EL W / TB
3"
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3" TEE
W / TB
3"
3"
6"
6"
6"
6"
6"
3"-22.5°
EL W / TB
3"-45°
EL W / TB
3"-11.25°
EL W / TB
6"-22.5°
EL W / TB
3" x 6" x 6" TEE
W / TB
6"
6" 4" 4"
4"
4"
4"
4"
4"
4"
3"
3"
4"
4"
2"
11 "
11"
11 "
3" TEE
W / TB
3"-22.5°
EL W / TB
3"-22.5°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-45°
EL W / TB
3"-11.25°
EL W / TB
3" TEE
W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-22.5°
EL W / TB3"-11.25°
EL W / TB
4"-22.5°
EL W / TB
4"-45°
EL W / TB
4"-45°
EL W / TB
4"-22.5°
EL W / TB
4"-11.25°
EL W / TB
4"-22.5°
EL W / TB
4"-11.25°
EL W / TB
4" x 4" x 3" TEE
W / TB 4"-45°
EL W / TB
4"-45°
EL W / TB
4"-11.25°
EL W / TB
4"-22.5°
EL W / TB
4"-11.25°
EL W / TB
4" TEE
W / TB
4"
4"
4"
4"-45°
EL W / TB
4"-45°
EL W / TB
4"-22.5°
EL W / TB
4"-22.5°
EL W / TB
4" x 3" x 3" TEE
W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-45°
EL W / TB
3"-22.5°
EL W / TB
4"
8" x 8" x 4" TEE
W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8" x 4" x 6" TEE
W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
4"-11.25°
EL W / TB
6"-11.25°
EL W / TB
6"
3"
6" x 6" x 3" TEE
W / TB
6"-11.25°
EL W / TB
6"-11.25°
EL W / TB
6" 3"
6" x 6" x 3" TEE
W / TB
6"-11.25°
EL W / TB
3" TEE
W / TB
6"-11.25°
EL W / TB
6"-45°
EL W / TB
6"-45°
EL W / TB
3"
6" x 6" x 3" TEE
W / TB
3"
3"
3" TEE
W / TB 3"-11.25°
EL W / TB
6"-11.25°
EL W / TB
6"-11.25°
EL W / TB6"
6"-45°
EL W / TB
6"-45°
EL W / TB
6"-45°
EL W / TB
6"-45°
EL W / TB
3"-11.25°
EL W / TB
3"-45°
EL W / TB
3"
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
3"-11.25°
EL W / TB
2"
23-18
21 "
11"
11"
3"-45°
EL W / TB
3" 8" x 8" x 3" TEE
W / TB
3"-11.25°
EL W / TB
3"
3"-22.5°
EL W / TB
3" TEE
W / TB
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
2 1"
2"2"
11"
11"
11"
11"
11 "
2"
11"
11 "
3"
2 1"
21 "
2"
11"
11"
11"
11"
11 "
11"
21"
11"
11"
11"
11 "
2"
11"
11"
11"
11"
1-1/2"
30-9
2"
30-8
2"
30-7
11 "
11"
21"
11"
2"2"11"
11"
11"
11 "
11"
3"21 "
21"
2"
2"
11 "
11"
2"
30-4
2"
11 "
11"
1-1/2"
30-3
11"
3"
3"
3"
3"
3" 3"
3"
3"
3"
11"
11"
11"
11"
11"
11 "
11 "
11 "
2 2"
21"
2 21 "
11"
11"
11"
11"
3" 11 "
4 11"
11"
21 "
21 "
11 "
3"
11"
11"
3" 2"
2"
21"
11"
11 "
11"
2"
11"
11 "
11"
11"
3"
3" 3"-45°
EL W / TB
11 "
11"
2"
11 "
411 "
411"
4 11"
411 "
3"11"
211"
411"
11"
4 21 "
11 "
2" 11 "
4 11 "
2 11"
2 1"
11 "
11"
11"
11"
11"
11 "
11 "
11"
11"
11"
3"
3"
21 "
2 1"
11 "
2"
11"
11"
11"
411"
11"
11 "
11"
11 "
3"
2" 2"11 "
11"
11"
11"
11"
11"
11"
11"
11 "
11 "
8"
151515
151515
21 "
2"
11"
11"
11 "
11"
11"
11 "
11"
2"
7-24
3"
2"
2"
11"
11 "
11"
2"
11 "
11"
11 "
2" 7-2
-14 14
2 1"
2"
11"
11"
11 "
11"
11"
2"
20-4
2"
11 "
11"
11"
2"
20-3
8"
2"
11"
11 "
11 "
4 11 "
1-1/2"
20-1
21 "
11 "
11 "
2"
30-2
2"
11 "
1-1/2"
30-1
3"
4"
11"
6"
4"
3"3" 3"
3"
3"3"
3"3"3"3"3"
8"
3"
3"
3"
3"
4"
4" 3"
3"
3"
3"
3"
3"
3"
3" 3" 3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
11 "
11"
11 "
11"
211"
11"
3"
3"
11 "
11 "
2"
11"
11"
2"
15-23
2"
11"
2 1"
3"
3"
2"
2"
11"
11 "
11 "
3"
3"
21"
2"
2"
2"
11"
3"
11"
11"
2 1"
11"
11"
2"
11"
2"
11 "
11"
11"
11"
11"
25 11"
11"
3"
25 11 "
3"
3"
21 "
2"
2"
11"
11"
2"
24-16
11"
11"
11 "
11"
411"
3"
3"
2"
11 "
11"
11"
11"
3" 2"
2"
11"
2 11 "
11"
4 11"
3"
2"
11 "
11"
2"
11"
11"
11"
21 "
2"
11 "
11 "
2"
11 "
21"
2"
11"
11"
11"
2"
2"
11"
11 "
2"
11"
11"
1-1/2"
22-10
11"
11 "
11"
2511"
11"
2"
11"
11"
1-1/2"
21-3
2 1"
11"
3"-45°
EL W / TB
21"
2 1"
2"
11"
11"
11"
11"
3"
3"
2 1"
2"
2"
11"
11 "
11"
11 "
2"
2"
11"
11"
252525
1-1/2"
30-25
3"
21 "
2 1"
2"
11"
11"
11 "
11 "
11"
2"
30-24
3" 3"
3"
11"
11"
2"
11"
11"
3"
3"
3"
3" 3"
3"
3"
3"
2 1"
2"
11"
211"
11"
11"
3"
3"21"
21"
2"
11"
11"
2"
29-22
11"
3"3"
2 1"
11"
2 11 "
411 "
11"
2"
22-10
3" 11 "
2 1"
211"
2"
2"
11"
11"
11"
11"
2"
16-24
2"
2"
2"
2"11 "
11 "
211"
11"
11"
1-1/2"
16-23a
1-1/2"
16-22b
11"
1-1/2"
16-22a
153"
3"
2"
9-10
1"
9-11
1"
9-12
3"
2 1"
2 1"
2"
11"
11"
2" 7-1
2 1"
2"
2"
2"
11 "
11"
11"
2" 7-4
11"
1-1/2"
7-3
1" 9-3
11 "
11 "
411"
1" 9-4
11 "
11 "
3"
3" 11 "
11"
3"
21"
2"
11"
11"
11"
2" 9-6
2"
11"
11"
11"
1" 9-7
11"
11"
11"
11"
1" 9-8
11"
1" 9-9
3"
11"
11 "
11"
11"
11"
2" 11-1
- 2" 11-2
2"
11-3
3"3"
11"
4 11"
11"
4 11"
11"
11 "
6"
3"
11"
4 2 1"
2"
2"
11"
11"
11"
11"
2"
10-7
2" 2"
11 "
11 "
11 "
11"
15 15
2 1"
2 11"
11 "
11"
11 "
2 11"
2"
1-1/2"
10-8
2" 2"
11 "
11"
11 "
11 "
3"
3"
3" 2 1"
2 1"
2"
2"
11"
11"
11"
11 "
2"
10-11
2"
2"
11"
11"
2"
10-10
11"
11 "
2"
10-9
1"
13-11
11"
411"
2"
13-13
11"
11 "
2"
13-14
3"
3"
11"
21 "
2"
2"
11"
2"
13-15
3"
11 "
11"
2"
11"
11 "
11"
11"
2"
13-16
21 "
2 1"
2"
11"
11 "
1"
13-10
- 1"
13-12
21"
11"
11"
11"
11"
2"
11 "
11"
11"
11 "
2"
18-25
2"
18-31
2" 2"
11"
11"
11 "
2"
11 "
11"
11"
11"
1-1/2"
18-26
2"
11"
11"
11 "
11"
11 "
2"
18-30
EXISTING RCV,
AIR VACUUM RELIEF VALVE
AND ISLOATION GATE VALVE
1-1/2"
18-29
2"
11"
11"
11"
11 "
1-1/2"
18-28
11"
11 "
1-1/2"
18-27
2"
18-32
3"
3"
21 "
2"
11"
11"
11"
11"
2 1"
11 "
11"
2" 11"
11"
11"
11"
1-1/2"
18-33
3"
11 "
2 11"
2"
11"
11"
3"
2 1"
2"
11"
11"
11"
11"
2"
20-30
2"
11"
11"
2"
20-31
3"
11 "
11 "
2"
11"
11"
2"
20-32
11"
11"
2 11"
2"
20-33
11"
3"
3"
21 "
11"
2"
11"
11 "
11"
11"
2"
26-19
3"
11"
11 "
411"
11 "
2"
26-20
21 "
2 2"11"
11"
11"
2"
26-21
3" TEE
W / TB
3"
4"-22.5°
EL W / TB
3"
2"
11"
11"
11"
11 "
11"
2"
11"
411 "
11"
11 "
11"
1"
28-28
21"
2"
11"
2"
30-27
3"
21"
2"
11"
11"
11"
2"
30-26
2"
3"
3"
3" 21 "
11 "
11"
11 "
11"
11 "
11"
11 "
3"
2 1"
2 1"
2"
11 "
11"
10 10 10
3"
21"
221 "
11 "
11"
11 "
11"
11"
11"
3"
21"
11 "
11"
11"
11 "
3"
3"
21 "
2"
2"
11"
11"
3"
2 1"
2"
11"
11 "
2"
2"
11 "
11"
4 11 "
11 "
11"
11"
11"
11"
11"
21"
2 1"
11"
21 "
21 "
11"
11"
11"
11"
11"
11"
2 1"
3"
3"
11"
11 "
2 1"
11 "
11"
2"
2"
11 "
1"
15-1
2" 11"
2 11 "
11"
11"
3"
2 1"
11 "
11 "
11"
11"
11 "
11"
2"
2"
21 "
21"
2"
11"
11"
2 1"
2 11"
4 2"
2"
11"
11"
2"
24-4
2" 24-2
2 1"
2 2 1"
2"
2"
11"
11"
3"
21 "
2"
2"
11"
11"
11"
2"
2"
11"
11"
11 "
11 "
8"
3"-45°
EL W / TB
2 1"
2 1"
11"
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
4"
4" 4"
PLANT SCHEDULE
SYMBOL QTY BOTANICAL NAME SIZE
62 ELM LARGE
40 OAK MEDIUM
41 LOCUS MEDIUM
18 SPRUCE MEDIUM
925,138 SF TURF N/A
SECTION 1
SECTION 2
SECTION 5
SECTION
MC
SECTION
P
SECTION
R
SECTION
S
SECTION Q
SECTION
MA
SECTION 10
SECTION 13
SECTION 15-18
SECTION 14
SECTION 12 SECTION 11
SECTION 3
SECTION 4
SECTION 8
SECTION 27
SECTION 26
SECTION 28A
SECTION 28B
SECTION 28C
SECTION 28
SECTION 29
SECTION 30
SECTIONS 30A-30D
SECTION 31
SECTIONS 62&64
SECTIONS 66-76
SECTIONS 34&35
SECTIONS 32&33
SECTION 45
SECTIONS 47&48
SECTIONS 56-59
SECTIONS 61&62
SECTIONS 25
SECTION
X
SECTIONS 6&7
S
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
W
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
RELOCATE 1,950-FEET OF 4-INCH MAINLINE PIPE TO BACK OF WALL, SAME
AMOUNT OF PVC LATERAL PIPE 1-2.5" SIZE, AND 100 SHORT RADIUS ROTOR
SPRINKLERS, AND 25 2-IINCH REMOTE CONTROL VALVE ASSEMBLIES.
REPAIR 50-FEET OF 10-INCH PVC PIPE, COORDINATE WITH BOX CULVERT ,
COORDINATE WITH SHEET CD111.
COORDINATE WITH LAKE DRAW DOWN FOR WET WELL AND PUMP INTAKE
INSTALLATION
PUMP STATION C NEW INTAKE LOCATION
PUMP STATION "C"
8" 8"
8" 8"
6"
10"
10"
10" 10"
6"
6"
4"
4"
4"
4"
4"
6"
6"
6"
6"
6"
6" 6"
6" 6"
6"
6"
6"
10" 10" 10" 3"2.5"2"1.25"
3"
2.5" 2.5" 2"
3"
1.5"
2.5"
2.5"
2"
3"
2"
2"
2"
1.25"
1.25"
2.5"
2"1.25"
3"
3"
3"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
3"
2.5"
2.5"
1.5"
1.5"
2.5"
1.5"
2"
1.5"
3" 2"
2"
1.5"
1.5"
3"
2"
2"
1.5"
1.5"
3" 2"
2"
1.25"
1.5"
3"2"
2"
1.25"
1.25"
3"
2.5"2"1.5"
3"
2.5"
2"
1.5"
3"
2"
2"
1.25"
1.25"
3"
2"
2"
1.25"
1.25"
3"
2.5"
2"
1.5"
3"
2"
2"
1.25"
1.25"
3" 2.5"2"1.5"
2.5"
1.25"
2"
1.25"
2.5"
2"
1.5"
3"
2.5"
2"
1.25"
3" 2.5" 2" 1.5"
3" 2.5" 2" 1.25" 3" 1.5"
2.5"
2"
1.5" 3"
2.5" 2" 1.5"
2"
1.5"
1.5"
3"
2.5"
2.5"
2"
2.5" 2" 1.25"2"
1.5"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.25"
3"
2.5"2"1.5"
3"
2.5"
2"
1.25"
1.25"
3"
2"
2"
1.25"
1.25"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
1.25"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
1.25"1.25"
1.25"
2"
1.25"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.25"
2.5"
2"
1.25"
2"
1.25"
2.5"
2"
1.5" 1.5"
3"
2.5"
2"
1.25"
1.25"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
1.25" 2.5" 2" 1.25"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
2" 2"1.25" 1.25"
2"
1.25"
3"
2"
2"
1.25"
1.25"
3"
2.5"
1.25" 2"
1.25"1.25"
1"
1"
1"
1"
1"
1"
3"1.5"
2.5"
2"
1.5"
1.5"
20 20 20 20
2020 20 20
20 20 20 20
20 20 20 20 20 20 20
20202020202020
20202020
Q
Q
Q Q
Q
Q
Q
Q
Q
Q
Q
Q
Q Q
Q
QQQQQQQQ
A
B C
2020202020202020
20202020202020
202020202020
20 20 20 20 20 20
20 20 20 20 20
20 20 20 20
20 20 20 20 20
20 20 20 20 20
20 20
20 20
20 20
20 20
2020202020
20 20202020
20 20202020
20 20 20202020
20 20 20202020
20 20 20202020
20 20 20202020
20 20 20202020
20 20 20202020
20 20 20202020
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20 20
20 20 20
20 2020 20
20 20 2020
20 202020
20 20 2020
20 20 20
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI002
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
OVERALL IRRIGATION PLAN
OVERALL IRRIGATION
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
PHASE 1A - ALTERNATE 1B BID DOCUMENTS
01 / 31 / 2023
PHASE 1A - ALTERNATE 4 BID DOCUMENTS
FOR INFORMATION ONLY - NOT FOR BID
15 15
11 "
2"
11 "
11 "
11 "
11 "
252525252525252525
25 20
20202020
15151515
151515
15 15
21 "
11 "
11 "
2"
25-36
3"
11 "
211 "
4 2" 11 "
2 11 "
2"
25-35
2"
25-34
2 1 "
2"
2"
11 "
11 "
11 "
11 "
2"
25-33
21 "
2"
11 "
11 "
2"
25-32
3"
2" 11 "
22"11 "
211 "
2"
25-31
2 1 "
2"
11 "
11 "
11 "
2"
25-30
2 1 "
11 "
11 "
11 "
211 "
11 "
11 "
11 "
11 "
11 "
11 "
4 2"
25-1
3"
3"
2 1 "
2"
11 "
11 "
2" 25-2
2"
25-3
2 1 "
22"
11 "
11 "
11 "
2" 25-4
3"
11 "
11 "
11 "
2"
11 "
11 "
11 "
8"
8"
3"
8"
3"
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
8" x 8" x 3" TEE
W / TB
8" x 8" x 3" TEE
W / TB
8"-45°
EL W / TB
8"
8"-45°
EL W / TB
3"
3"-45°
EL W / TB
3"-45°
EL W / TB
3"3"3"3"
8"
8"
SECTION 4
SECTIONSECTION
SECTION
SECTION
SECTION
6"
6" 6"
2.5"2"1.5"
1.25"1.5" 3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3" 1.25"
1.25"
2"
1.25" 2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
1.25" 2.5" 2" 1.25"
3"
2.5"
2"
1.25"
3" 3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
1.5"
20 20 20 20 20
2020202020
B C
B8
2"
B3
2"
20 20
20 20 2020
20 202020
B11
2"
B10
2"
B9
2"
B7
1.5"
B6
2"
B5
2"
B4
2"
B1
2"
B2
2"
C1
2"
C2
2"
C3
2"
C4
2"
-4
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI101
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
NORTH
IRRIGATION PLAN
M
AT
C H
LI
N
E
SE
E
SH
EE
T
LI
MATCHLINE SEE SHEET LI103
KEY MAP NTS
LI107
LI101 LI102
LI103 LI104
LI105 LI106
LI107
LEGEND
Q
C
2"
A B C
P
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
15 15
151515
15 15
15 15
25 25
2"
15 15
15 15
252525252525252525
25 25
20 20
202020202020
202020
2 1 "
2 11 "
11 "
11 "
2"
25-22
21 "
2 11 "
11 "
11 "
11 "
11 "
11 "
2"
25-24
3"
11 "
11 "
3"
21 "
2"
2"
11 "
11 "
11 "
2"
25-23
2 1 "
2"
2"
11 "
11 "
11 "
11 "
2"
25-33
21 "
2"
11 "
11 "
2"
25-32
3"
2" 11 "
2 11 "
42"11 "
211 "
2"
25-31
2 1 "
2"
11 "
11 "
11 "
2"
25-30
2"
11 "
11 "
11 "
2"
25-29
2 1 "
2"
2" 11 "
11 "
11 "
2"
25-28
3"
2"
11 "
11 "
11 "
2"
11 "
11 "
2"
25-27
3"
2" 11 "
11 "
2"11 "
11 "
2"
25-26
2 1 "
11 "
11 "
2"
11 "
11 "
2"
25-25
2"
25-3
2 1 "
22"
11 "
11 "
11 "
2 11 "
2" 25-4
2"
25-6
2 1 "
11 "
11 "
11 "
11 "
2 11 "
11 "
3"
2"
11 "
11 "
2"
11 "
11 "
2" 25-5
1 "
8"
8"
8"
3" 8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
W / TB
8" x 8" x 3" TEE
W / TB
8"
3"
8" x 8" x 3" TEE
W / TB
3"-45°
EL W / TB
3" TEE
W / TB
4"
8" x 8" x 4" TEE
W / TB
8"-11.25°
EL W / TB
8"-11.25°
EL W / TB
TYP
3"
3" 3"-45°
EL W / TB
3"
3"3"
3"3"3"3"
11 "
3"
3"
21 "
2 2"11 "
11 "
SECTION
SECTION
SECTION
SECTION
REPAIR SPRINKLERS AND LATERAL
PIPE WITHIN DEMOLITION BOUNDARY
TO MATCH EXISTING AFTER
CONSTRUCTION
4"
4"
6"
6" 6"
6"
6"
6"
2.5"2" 3"
2.5"2"1.5"
2.5"
1.25"
2"
1.25"
2.5"
2"
1.5"
2.5"
2"
1.25"
2"
1.25"
2.5"
2"
1.5" 1.5"
3"
2.5"
2"
1.25"
1.25"
3"
2.5"
2"
1.25"
3"
1.25" 2.5" 2" 1.25"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.5"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
2" 2"1.25" 1.25" 20 20 20 20 20 20
202020202020
Q
Q
Q
Q
B C
20 20
C10
2"
C9
1.5"
C8
2"
C11
2"
C1
2"
C2
2"
C3
2"
C4
2"
C7
2"
C6
2"
C5
2"
-4
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI102
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
NORTH
IRRIGATION PLAN
M
AT
C H
LI
N
E
SE
E
SH
EE
T
LI
MATCHLINE SEE SHEET LI104
LI107
LI101 LI102
LI103 LI104
LI105 LI106
LI107
LEGEND
Q
C
2"
A B C
P
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
1 "
W
SECTIONS 6&7
SECTION
SECTION
SECTION
6"
6"
6"
6"
6"
2"
1.25"
2.5"
3"
2.5"
2"
3"
2"1.25"
3"
2"
2"
1.25"
1.25"
3"
2.5"
2"
1.5"
1.25"
3"
2"
2"
1.25"
1.25"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.5"
3"
1.25"
2.5"
2"
1.25"
3" 3" 3"
3"
2.5"
1.25"
2"
1.25"
1.25"
1.25"
3"
3"
2.5"
2"
1.5"
1.5"
2.5"
2"
1.5"
Q
Q Q
20 20
20 20
B18
2"
B19
2"
B20
2"
B21
2"
B17
2"
B15
2"
B8
2"
20 20
20 20
20 20
20 20 2020
B13
2"
B12
2"
B16
2"
B14
2"
B11
2"
B10
2"
B9
2"
20 20
20 20
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI103
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
NORTH
IRRIGATION PLAN
MATCHLINE SEE SHEET LI101
M
ATC
H
LIN
E SEE SH
EET LI104
MATCHLINE SEE SHEET LI105 MATCHLINE SEE SHEET LI106
LI107
LI101 LI102
LI103 LI104
LI105 LI106
LI107
LEGEND
Q
C
2"
A B C
P
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
SECTION
6"
4"
4"
4"
6"
6"
6"
6"
6"
6"
2"
1.25"
1.25" 1.25" 1.25" 1.25" 1.25" 1.25"
3"
2.5"
2.5"
1.5"
1.5"
2.5"
1.5"
2"
1.5"
3" 2"
2"
1.5"
1.5"
3"
2"
2"
1.5"
1.5"
3" 2"
2"
1.25"
1.5"
3"2"
2"
1.25"
1.25"
3"
2.5"2"1.5"
3"
3"
2"
3" 2.5"2"1.5"
2.5"
1.25"
1.25"
3"
2"
2"
1.25"
1.25"
3"
1.25"
2.5"
2"
1.25"
3"
2.5"
1.25"
1.25"
1.25"
2" 1.25" 2.5" 2" 1.25" 2" 2"1.25" 1.25"
2"
1.25"
3"
2"
2"
1.25"
1.25"
3"
2.5"
1.25" 2"
1.25"1.25"
1.25"
3"
3" 2"
2"
1.25"
1.25"
2.5" 1.25"
2"
1.25"
2.5"
1.25"
2"
1.25"
2.5"
2"
1.25"
1.25"
2.5"
1.25"
2"
1.5"
2.5"2.5"
1.5"
2"
1.5"
3"1.5"
2.5"
2"
1.5"
20 20 20 20 20 20 20
20202020202020
Q
Q
Q
Q
Q
Q Q
2020202020
20 20202020
20 20202020
20 20 20202020
20 20 20202020
20 20 20202020
20 20 20202020
20 20 20202020
C30
2"
C29
2"
C28
2"
C31
2"
C25
2"
C26
2"
C27
2"
C24
2"
C23
2"
C22
2"
C21
2"
C20
2"
C19
2"
C18
2"
B8
2"
C12
2"
C13
2"
C14
2"
B12
2"
B11
2"
B10
2"
B9
2"
20 20 2020
20 20 20
C17
1.5"
C16
2"
C15
2"
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI104
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
NORTH
IRRIGATION PLAN
MATCHLINE SEE SHEET LI102
M
AT
C H
LI
N
E
SE
E
SH
EE
T
LI
MATCHLINE SEE SHEET LI106
LI107
LI101 LI102
LI103 LI104
LI105 LI106
LI107
LEGEND
Q
C
2"
A B C
P
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
4"
SECTION
SECTION
SECTION
8" 8"
8"
6"
3"2.5"2"1.25"
3"
2.5" 2.5" 2"
3"
1.5"
2.5"
2.5"
2"
2"
1.5"
3"
2.5"
2"
1.25"
3" 2.5" 2" 1.5"
3" 2.5" 2" 1.25"
3" 1.5"
2.5"
2"
1.5" 3"
2.5" 2" 1.5"
2"
1.5"
1.5"
3"
2.5"
2.5"
2"
2.5" 2" 1.25"2"
1.5"
2.5"2"1.5"
1"
1"
1"
1"
1"
1"
3"1.5"
2.5"
2" 1.5"
1.5"
1.25" 1.25"
2.5"2"1.5"
2.5"2" 1.5"
2.5"2"1.5"
3" 2.5"2"
1.5"
2"1.5"
20 20 20 20
2020 20 20
20 20 20
202020
Q
A
202020202020
2020202020
20202020
20 20 20 20
20 20 20
20 20 20 20
20 20 20 20 20
20 20 20 20 20
A10
2"
A11
2"
A12
2"
A13
2"
A1
2"
A2
2"
A3
2"
A4
2"
A7
2"
A6
1.5"
A5
2"
A8
2"
A9
1.5"
12 12
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI105
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
NORTH
IRRIGATION PLAN
MATCHLINE SEE SHEET LI103
M
ATC
H
LIN
E SEE SH
EET LI106
M
AT
C H
LI
N
E
SE
E
SH
EE
T
LI
LI107
LI101 LI102
LI103 LI104
LI105 LI106
LI107
LEGEND
Q
C
2"
A B C
P
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
SECTION
SECTION
SECTION
SECTION
8"
6"
4" 3"
3"
2"
2"
2"
1.25"
1.25"
2.5"
2"1.25"
3"
3"
3"
2.5"
2"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25"
2.5"
2"
1.25" 2"
1.5"
3"
2.5"
2"
1.25"
3"
2.5"
2"
1.25"
3"
2.5"
3"
2.5"
2"
1.25"
1.25"
3"
2"
2"
1.25"
1.25"
3" 2.5"2"
3"
1.25" 2.5"
2"
2"
1.25"
3"
2.5"
2.5"
2.5"
2.5"2"1.25"
3"
3"
3"
3"2.5"2"
2.5"
2.5"2"1.5"
20 20
Q
Q QQ
Q
20202020
20202020
20202020
20 20 20 20
20 20 20
20 20
A10
2"
A11
2"
A12
2"
A13
2"
A22
2"
A23
2"
A24
2"
A25
2"
A21
2"
A20
2"
A19
2"
A18
2"
A14
2"
A15
2"
A16
2"
A17
2"
20 20 20202020
20 20 20202020
C38
2"
C37
2"
C36
2"
C35
2"
C34
2"
C33
2"
C32
2"
2"
2"
2"
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI106
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
NORTH
IRRIGATION PLAN
M
AT
C H
LI
N
E
SE
E
SH
EE
T
LI
MATCHLINE SEE SHEET LI104
LI107
LI101 LI102
LI103 LI104
LI105 LI106
LI107
LEGEND
Q
C
2"
A B C
P
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
16 4" 10"
3"
2.5"
3"2.5"2.5"
2"
2.5"
2.5" 2" 2" 1.5" 1.5" 1.25" 1.25"
Q
QQQ
A
A1
2"
A2
2"
A3
2"
2"
2"
15 15
11 "
11 "
11 "
11 "
4 11 "
2"
15-32
1"
15-1
4" SECTION 14
10"10"2.5" 2.5" 2" 2" 1.5" 1.5" 1.25" 1.25" 2"1.5"1.5"1.25"1.25"
QQQ
2"
25 25 25 25
25 25 25 25
20 20
20 20
20 20 20 20
15 15 15
202020
3"3" 2"
11"
11 "
2"
11 "
11 "
2"
15-28
3" 2"
11 "
11 "
2"
11 "
11 "
3"
2"
11 "
11 "
2"
11 "
11 "
2"
15-26
2"
15-24
3"
3"
11 "
11"
2"
11"
211 "
2"
15-27
3"
2"
11 "
11 "
11 "
11 "
11 "
2"
15-31
3"
2 1 "
22"
11 "
11"
2"
15-30
- 3"3"
3"
2 1 "
2"
11 "
11"
2"
15-29
3"3"
2 1 "
2"2"11 "
2"
15-22
2"
11 "
2"
15-25
11 "
11 "
11"
11 "
4 11 "
3"
11 "
11 "
11 "
11 "
211 "
11 "
3"
3"
11 "
11 "
2"
11"
11 "
2"
15-23
2"
11 "
11 "
153"
W 4"
SECTION 15-18W
AR
AR
AR
AR
IRRIGATION PUMP "C" APPROX LOCATION,
COORDINATE EXACT LOCATION WITH CIVIL
110 MIN PSI, 1,000MIN GPM
480V 3PHASE
PUMP STATION C NEW INTAKE LOCATION
EXISTING BOTTOM ELEVATION AS BULTS SHOWN
AS 5418'
CAP MAINLINE PIPE AND LATERAL
PIPE. TERMINATE EXISTING
MAINLINE IN QUICK COUPLING
VALVE AND THRUST BLOCK
3"
2.5"
2"
1.25"
2"
2"
2"
1.25"
2.5"
2"
1.25"
1.25"
3" 3" 2.5" 2.5" 2" 2" 1.5" 1.5" 1.25" 1.25"
2.5"1.25"
1.25"
P
Q
2"
2"
1.5"
2"
2"
1"
3" 3" 3"
10"
10"
3"
INSTALL DR11 HDPE PIPE FROM PUMP STATION
DISCHARGE PIPE TO 10-INCH PVC PIPE ON THE
SOUTHERN PROPERTY BOUNDARY AS SHOWN.
USE DIRECTIONAL BORING METHODS TO AVOID
THE EXISTING IRRIGATION , STORM DRAIN AND
ROAD. MAKE THE PUMP STATION END
CONNECTION USING BUT WELDED HDPE FLANGE
ADAPTOR. CONNECT TO THE PVC END BY
TRANSITIONING FROM HDPE TO PVC WITH A
ROMAC HP COUPLING ADAPTOR PRIOR TO THE
DUCTILE IRON TEE.
COORDINATE THIS AREA WITH THE ROAD, NEW
MAINLINE AND STORM DRAIN CONSTRUCTION. IF
POSSIBLE IT WOULD BE BEST TO PROTECT IN
PLACE, CONTRACTOR IS RESPONSIBLE FOR
RECONSTRUCTION OF PIPE, WIRE, SPINKLERS,
VALVES AND RELATED IRRIGATION DUE TO
OTHER CONSTRUCTION ACTIVITIES. LINES
REPLACED WILL BE SLEEVED UNDER THE NEW
ROAD.
CONTRACTOR TO CONSTRUCT COFFER DAM OR ALTERNATE
APPROVED METHOD TO PLACE THE INTAKE PIPE AT THE INVERT
ELEVATION OF 5421' BACKFILL COFFER DAM AFTER PIPE
INSTALLATION TO EXISTING GRADE.
PHASE 1A BASE BID DOCUMENTS
APPROVED DRAWING TITLE
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod Henning
(713) 864-2910 OF 215
CCT RWB11-03-2022
LI107
Ce rti f ie d Irrigat ion Designer
I R R
I G AT I ON A S S OC I AT I O
NCID
46102
JO
HN D. LEONARD
NORTH
IRRIGATION PLAN
M
AT
C H
LI
N
E
TH
IS
S
H
EE
T A
M
AT
C H
LI
N
E
TH
IS
S
H
EE
T A
M
AT
C H
LI
N
E
TH
IS
S
H
EE
T B
M
AT
C H
LI
N
E
TH
IS
S
H
EE
T B
M
AT
C H
LI
N
E
SE
E
SH
EE
T
LI
LI107
LI101 LI102
LI103 LI104
LI105 LI106
LI107
LEGEND
Q
C
2"
A B C
P
PHASE 1A - ALTERNATE 1 BID DOCUMENTS
11 / 03 / 2022
FOR INFORMATION ONLY - NOT FOR BID
01 / 31 / 2023
DATE
LOCATION
CHECKED PROJECT NUMBER
DRAWING NUMBER
DESCRIPTION DATE
DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:
C
Office of Construction and Facilities Management
1 3 4 5 6
B
A
D
E
C
B
A
D
E
BUILDING NUMBER
DRAWN
SEAL:
MARK
DENVER, COLORADO
888-043
FORT LOGAN
NATIONAL CEMETERY
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
Cemetery Expertise:
Jacobs Bill Romzick
(989) 745-1048
Architect:
Fourfront James Lushbough
(605) 342-9470
Irrigation:
Aqua Engineering Bob Beccard
(970) 372-6104
MEP, Fire, Landscape RCDD:
APOGEE Consulting Mark Norris
(919) 535-3819
Surveying & GPS:
Survey Systems Matt Nichols
(303) 419-6343
Environmental & Geotechnical Engineering:
Terracon Consultants Jennifer Peters/John Haas
(210) 907-7648/(303) 454-5265
PHASE 1A DEVELOPMENT ON NEW LAND
PRELIMINARY
NOT FOR CONSTRUCTION
Cost Estimating:
OCMI
Kyle Veater
(757) 803-7517
Structural Engineer:
H2B, Inc Tod…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .