S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (1 of 6).pdf

PDF 31 MB Posted

Attached to
Y1PC--Ft. Logan National Cemetery - Phase 1A Expansion (Construction FY23 Re-procurement)
Solicitation number
36C10F23R0013
Issued by

About this file

This document summarizes a federal construction solicitation for Phase 1A expansion at Fort Logan National Cemetery. The Department of Veterans Affairs seeks a firm-fixed-price contract for construction services including labor, materials, equipment and supervision. The project is located at 4400 W Kenyon Ave. in Denver, Colorado. The solicitation is set aside exclusively for Service-Disabled Veteran Owned Small Businesses. The NAICS code is 237990 for other heavy and civil engineering construction up to $45 million. The construction cost is estimated between $20-50 million. A pre-proposal site visit is scheduled and proposals are due by May 16, 2023 at 3:00 PM Eastern Time.

View the file

Other files

File Type Posted
S06 - 36C10F23R0013 0001 Amendment -PPI Response.pdf PDF
S06 - DOL Wage Determination CO20230002 04-07-2023.pdf PDF
S06 - Pre-Proposal Conference slides FLNC 4-19.pdf PDF
S06 - Ft. Logan Sign-in 4-19-23.pdf PDF
Bid Docs - Reports - Phase 1 Expansion Geotechnical Report.pdf PDF
S06 - 36C10F23R0013 Pre-Proposal Inquiry Responses.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(5 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (4of5).pdf PDF
S02 FT LOGAN NC PHASE 1A SPECIFICATIONS - 2023 02 21.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(4 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(1 of 2).pdf PDF
S02 - DOL Wage Determination CO20230002 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(2 of 5).pdf PDF
S02 Pre-Proposal Inquiry (PPI) Form 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (6 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (3of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT3 - 2023 02 10(1 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (4 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (5 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (5of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(1 of 5).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT4 - 2023 02 10(3 of 5).pdf PDF
S02 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certification.pdf PDF
S02 - DOL Wage Determination CO20230009 2-24-2023.pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (3 of 6).pdf PDF
S02 Past Performance Questionnaire 36C10F23R0013.docx DOCX document
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (1of5).pdf PDF
S02 FT LOGAN NC PHASE 1A-Base - 2023 02 10 (2 of 6).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT2 - 2023 02 10(2 of 2).pdf PDF
S02 FT LOGAN NC PHASE 1A-ALT1 - 2023 02 10 (2of5).pdf PDF
S02 - 36C10F23R0013 - Final - RFP - Ft Logan Phase 1A.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS

S H

E R

ID

A

N B

O U

LE

V

A R

D

LO

W

E

LL

B O

U

LE

V A

R D

US HIGHWAY 285

QUINCY AVENUE

OXFORD AVENUE

MARSTON LAKE

FE

D

E R

A L

B O

U

LE

V A

R D

FORT LOGAN

NATIONAL CEMETERY

LOGAN BOULEVARD

© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS

DENVER DRIVE

OMAHA DRIVE

COLORADO STREET

NEW MEXICO STREET

S H

E R

ID

A

N B

O U

LE

V

A R

D

NORTH

VICINITY MAP LOCATION MAP

CONSULTANTS SITE DATA

CALIBRE ENGINEERING, INC. AQUA ENGINEERING APOGEE CONSULTING

SURVEY SYSTEMSFOURFRONT OCMI TERRACON CONSULTANTS

DEPARTMENT OF VETERANS AFFAIRS

FORT LOGAN NATIONAL CEMETERY

PHASE 1 DEVELOPMENT ON NEW LAND

VA PROJECT NO. 888-043

NORTH

JACOBS FORT LOGAN NATIONAL CEMETERYW.W. WHEELER & ASSOCIATES

INTERMENT SUMMARY

SECTION BURIAL TYPE CRYPTS

86 IN-GROUND CREMAINS 1,073

87 IN-GROUND CREMAINS 1,559

88 IN-GROUND CREMAINS 1,560

89 IN-GROUND CREMAINS 1,052

90 IN-GROUND CREMAINS 1,422

91 IN-GROUND CREMAINS 1,287

92 IN-GROUND CREMAINS 1,524

93 IN-GROUND CREMAINS 1,046

94 IN-GROUND CREMAINS 1,050

95 IN-GROUND CREMAINS 788

96 IN-GROUND CREMAINS 1,543

98 IN-GROUND CREMAINS 1,098

99 IN-GROUND CREMAINS 1,242

100 IN-GROUND CREMAINS 1,104

101 IN-GROUND CREMAINS 1,035

102 IN-GROUND CREMAINS 1,311

TOTAL IN-GROUND CREMAINS 19,694

97 OVERSIZED PPC 672

103 PPC 1,380

104 PPC 2,897

105 PPC 1,484

109 PPC 1,859

TOTAL PPC 7,620

COURT 4 COLUMBARIA 5,160

COURT 5 COLUMBARIA 5,400

TOTAL COLUMBARIA 10,560

TOTAL INTERMENT 38,546

OF

COVER SHEET

ETG RLB

G-001 1 215

H2B, INC

BASIS OF BEARINGS:

BENCHMARK:

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

ABBREVIATION LEGEND

1-800-922-1987

216217

11 / 03 / 2022

BRIAN STEPHENS-HOTOPP

01 / 31 / 2023 BASH02 / 10 / 2023

VOLUME I - BASE BID

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

SHEET INDEX

ETG JDS

G-002 2 215217

11 / 03 / 202201 / 31 / 2023 BASH02 / 10 / 2023

PHASE 1A BASE BID

FORT LOGAN NATIONAL CEMETERY

PHASE 1 DEVELOPMENT ON NEW LAND

GENERAL NOTES GRADING NOTES STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

COMPACTION NOTES

STORM WATER SEWER NOTES

PAVEMENT SUBGRADE

OF

GENERAL NOTES

ETG JDS

G-003 3 215

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 216217

GENERAL CONSTRUCTION NOTES EROSION CONTROL NOTES: 2020-EC-0000039

FLOODPLAIN/FLOODWAY NOTES

ENGINEER NOTES

STANDARD NOTES - DENVER

2.

OF

GENERAL NOTES

DRAINAGE IMPROVEMENTS

ETG JDS

G-004 4 215

FORT LOGAN NATIONAL CEMETERY

RE-DEVELOPMENT ON EXISTING LAND

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 216217

C.P.C.P.C.P.

M

M

M

M

M

MM

M

M

M

M

M

M

M

M

M

M

M

M

M

W

COMMITTAL B

COMMITTAL A

COMMITTAL C

PROJECT

BOUNDARY

PROJECT

BOUNDARY

PROJECT

BOUNDARY

ENTRANCE 1

ENTRANCE 2

ENTRANCE 3

PHASE 1A

BOUNDARY

P.I.C.

BUILDING

COMMITTAL C

PARKING

COMMITTAL B

PARKING

COMMITTAL A

PARKING

GRAVEL ACCESS ROAD

MONTANA ST

ROAD B

ROAD A

R O

A D

B

RO

AD

B

G R

A V

E L

A C

C E

S S

R O

A D

OKLAHOMA ST

DENVER DR

DE

NVE

R

DR

OMAHA DR

O M

A H

A D

R

LOGAN BLVD

L O

G A

N B

LV

D

K A

N S

A S

S T

W Y

O M

IN

G

S T

DENVER DR

UTAH ST

MEMORIAL LAKE

COLORADO ST

COLORADO ST

NEW MEXICO ST

W. KENYON AVE

S . S

H E

R

ID

A N

B

LV

D

VETERANS LAKE

OMAHA DR

QUINCY AVE

LO

W

E

LL

B

LV

D

EX DETENTION POND

(SOUTH POND)

STOCKPILE

PINEHURST

ESTATES

PHASE 1A

BOUNDARY LINE

(INTERMENT)

MAINTENANCE

BUILDING

PERMANENT MATERIAL

STORAGE YARD

NEBRASKA ST

SEE NOTE 4

BELOW

SEE NOTE 4

BELOW

SEE NOTE 4

BELOW

SEE NOTE 4

BELOW

SEE NOTE 4

BELOW

SEE NOTE 4

BELOW

DENVER DR

PHASE 1B

BOUNDARY LINE

(DRAINAGE)

PHASE 1A

BOUNDARY

PHASE 1B

BOUNDARY

OF

CONSTRUCTION PHASE PLAN

PHASE 1-7

ETG RLB

G-005 5 215

PHASING NOTES:

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1:

PHASE 2:

PHASE 3:

PHASE 4:

PHASE 5:

PHASE 6

PHASE 7

PHASE 8

KEYMAP

1-800-922-1987

FLNC PH1A

STREET PHASING:

NORTH

FLNC PH1B

216217

11 / 03 / 202201 / 31 / 202302 / 10 / 2023

THIS LINEWORK WAS GIVENT TO US FROM SURVEY SYSTEMS

LINES ARE NOT CONNECTED. WHAT YOU SEE IS WHAT YOU GET

C.P.C.P.C.P.

M

M

M

M

M

MM

M

M

M

M

M

M

M

M

M

M

M

M

M

G R

A V

E L

A C

C E

S S

R O

A D

COMMITTAL B

COMMITTAL A

PARKING

COMMITTAL C

W

ROAD B

R O

A D

A

RO

AD

B

D E

N V

E R

S T

CEMETERY

BOUNDARY

PROJECT

BOUNDARY

PROJECT

BOUNDARY

PROJECT

BOUNDARY

EXISTING

STOCKPILE

MAIN CONSTRUCTION

ACCESS

P.I.C.

BUILDING

ROAD B

ROAD A

ROAD B

R O

A D

B

RO

AD

B

R O

A D

A G R

A V

E L

A C

C E

S S

R O

A D

ACCESS ROAD

COMMITTAL A

OKLAHOMA ST

D

EN

V

ER

D R

DENVER DR

D E

N V

E R

D R

OMAHA DR

O M

A H

A D

R

LOGAN BLVD

L O

G A

N B

LV

D

MONTANA ST

DENVER DRDENVER DR

UTAH ST

MEMORIAL

LAKE

COLORADO ST

COLORADO ST

COLORADO ST

NEW MEXICO ST

S . S

H E

R

ID

A N

B

LV

D

KENYON AVE

S . S

H E

R

ID

A N

B

LV

D

VETERANS

LAKE

GRAVEL ACCESS ROAD

OMAHA DR

U T

A H

S T

R E

E T

W Y

O M

IN

G

S T

R E

E T

K A

N S

A S

S T

R E

E T

COMMITTAL B

PARKING

COMMITTAL C

PARKING

PROJECT

BOUNDARY

PHASE 1

BOUNDARY LINE

NEBRASKA ST

MAINTENANCE

BUILDING

EXISTING

BUILDING

TEMP P.I.C

TRAILER

TEMP

RESTROOMS

TEMPORARY MATERIAL

STORAGE YARD

EX

COLUMBARIA

COURTS

COLUMBARIA

WALL

W Y

O M

IN

G

ST

K A

N S

A S

S T

LOGAN BLVD

COLUMBARIA

WALL

PERMANENT MATERIAL

STORAGE YARD

COLUMBARIA

COURT (NEW)

EX DETENTION POND

(SOUTH POND)

EXISTING ACCESS TO REMAIN

OPEN UNTIL ROAD B CONSTRUCTION

IS COMPLETE

QUINCY AVE

MAINTENANCE

BUILDING

KENYON AVE

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

NORTH

OF

CONSTRUCTION ACCESS PLAN

ETG RLB

G-006 6 161

KEYMAP

1-800-922-1987

LEGEND

NOTES:

RE AND

CONTRACTOR YARD

RE: SHEET G-110

MAIN CONSTRUCTION

ACCESS

CONSTRUCTION ACCESS ROAD

(EXISTING GRAVEL)

LO

W

E

LL

B

LV

D

MAINTENANCE

BUILDING

KENYON AVE

PHASE 1A BASE BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910 OF

CONSTRUCTION TRAILER

PLAN

ETG JDS

G-008 7 161

NORTH

CONSTRUCTION TRAILER SITE

NORTH

TEMPORARY MATERIALS STORAGE BINS

1-800-922-1987

V-103 V-104 V-105

V-107

V-108 V-109

V-111 V-112 V-113 V-114

V-115

V-116 V-117 V-118 V-119

V-120

V-121

V-102

V-106 V-110

NORTH LINE S 1/2 NE 1/4 SEC. 6, T5S, R68W 6TH P.M.NORTH LINE S 1/2 NW 1/4 SEC. 6, T5S, R68W 6TH P.M.V-101

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS

CROSS ACCEPTED

NORTHEAST 1/4 CORNER SECTION 6 TOWNSHIP 5 SOUTH RANGE 68 WEST

FOUND AXLE IN RANGE BOX 3' BELOW SURFACE

ACCEPTED CONTROL POINT

NORTHWEST 1/4 CORNER SECTION 6 TOWNSHIP 5 SOUTH RANGE 68 WEST

FOUND 3.25" ALUMINUM CAP

"COLORADO DEPARTMENT OF TRANSPORTAITION PLS 13258"

ACCEPTED

NORTH 1/4 CORNER SECTION 6 TOWNSHIP 5 SOUTH RANGE 68 WEST

FOUND #3 REBAR IN 6" SQUARE CONCRETE COLLAR

N89°40'47"E 2580.99' S89°43'07"W 2649.20'

THE PROJECT COORDINATE SYSTEM UTIL

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

OF 217

PHASE 1A BASE BID DOCUMENTS

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-100

EXISTING CONDITIONS SURVEY

OVERALL SHEET

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

VETERAN'S

LAKE

MEMORIAL

LAKE

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1B

DRAINAGE

IMPROVEMENT

LIMITS

PHASE 1B

DRAINAGE

IMPROVEMENT

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

12/16/2022

01 / 31 / 202302 / 10 / 2023

ST

ST

ST

ST

ST

ST

ST

STORM MANHOLE

RIM=5386.33'

18" CORRUGATED PLASTIC INVERT OUT (E)=5379.99'

18" CORRUGATED PLASTIC INVERT IN (SW)=5379.77'

STORM MANHOLE

RIM=5387.25'

18" CORRUGATED PLASTIC INVERT OUT (NE)=5380.65'

18" CORRUGATED PLASTIC INVERT IN (SW)=5380.50'

STORM MANHOLE

RIM=5388.96'

18" CORRUGATED PLASTIC INVERT OUT (NE)=5381.80'

18" CORRUGATED PLASTIC INVERT IN (SW)=5382.12'

STORM MANHOLE

RIM=5390.70'

18" CORRUGATED PLASTIC INVERT OUT (NNE)=5383.88'

18" CORRUGATED PLASTIC INVERT IN (S)=5383.16'

STORM MANHOLE

RIM=5392.46'

18" CORRUGATED PLASTIC INVERT OUT (NNW)=5384.21'

18" CORRUGATED PLASTIC INVERT IN (S)=5384.35'

STORM INLET

FLOWLINE AT INLET=5402.50'

18" RCP INVERT OUT (S)=5399.47'

12" RCP INVERT=5371.23'

12" RCP INVERT=5371.24'

STORM MANHOLE

RIM=5394.72'

12" CORRUGATED PLASTIC INVERT OUT (N)

12" CORRUGATED PLASTIC INVERT IN (S)

BOTTOM OF MANHOLE=5390.44'

UNABLE TO COLLECT INVERTS

STORM MANHOLE

RIM=5395.68'

12" CORRUGATED PLASTIC INVERT OUT (N)=5391.58'

12" CORRUGATED PLASTIC INVERT IN (S)=5391.59'

6" CORRUGATED PLASTIC INVERT IN (SW)=5391.62'

6" CORRUGATED PLASTIC INVERT IN (W)=5391.65'

STORM MANHOLE

RIM=5396.89'

12" CORRUGATED PLASTIC INVERT OUT (N)=5392.39'

6" CORRUGATED PLASTIC INVERT IN (SW)=5392.49'

6" CORRUGATED PLASTIC INVERT IN (W)=5392.44'

DENVER DRIVE

OMAHA DRIVE

COLORADO STREET

FLOWLINE AT INLET=5379.64'

18" RCP INVERT OUT (NE)=5376.65'

CREMATORIUM

WALL

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1B

DRAINAGE

IMPROVEMENT

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-108

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-113MATCH LINE SEE SHEET V-113

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V -1

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

MATCH LINE SEE SHEET V-103 MATCH LINE SEE SHEET V-103

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

WW

ST

ST

ST

ST

ST

ST

ST

STORM MANHOLE

RIM=5371.57'

24" CORRUGATED PLASTIC INVERT OUT (N)=5362.23'

24" CORRUGATED PLASTIC INVERT IN (S)=5362.25'

4" PVC INVERT IN (E)=5362.67'

STORM MANHOLE

RIM=5376.78'

24" CORRUGATED PLASTIC INVERT OUT (N)=5364.98'

24" CORRUGATED PLASTIC INVERT IN (S)=5365.02'

4" PVC INVERT IN (SE)=5365.11'

STORM MANHOLE

RIM=5379.46'

24" CORRUGATED PLASTIC INVERT OUT (N)=5368.12'

24" CORRUGATED PLASTIC INVERT IN (SW)=5368.54'

4" PVC INVERT IN (SE)=5369.05'

STORM MANHOLE

RIM=5380.93'

24" CORRUGATED PLASTIC INVERT OUT (NE)=5373.93'

18" CORRUGATED PLASTIC INVERT IN (S)=5374.62'

18" CORRUGATED PLASTIC INVERT IN (SE)=5374.33'

FLOWLINE AT INLET=5382.10'

18" CORRUGATED PLASTIC INVERT OUT (NNW)=5377.95'

18" CORRUGATED PLASTIC INVERT IN (E)=5378.76'

18" CORRUGATED PLASTIC INVERT IN (SSE)=5378.64'

FLOWLINE AT INLET=5382.12'

18" CORRUGATED PLASTIC INVERT OUT

(NNW)=5378.91'

STORM MANHOLE

RIM=5382.85'

18" CORRUGATED PLASTIC INVERT OUT (NE)=5376.84'

18" CORRUGATED PLASTIC INVERT IN (SW)=5376.89'

FLOWLINE AT INLET=5346.16'

18" INVERT OUT (E)=5342.61'

18" INVERT IN (W)=5342.08'18" CORRUGATED PLASTIC INVERT OUT (N)=5341.47'

FLOWLINE AT INLET=5362.57'

18" CORRUGATED PLASTIC INVERT OUT (E)=5358.65'

18" CORRUGATED PLASTIC INVERT IN (NW)=5358.81'

FLOWLINE AT INLET=5385.11'

18" CORRUGATED PLASTIC INVERT OUT (NE)=5381.47'

FLOWLINE AT INLET=5385.17'

18" CORRUGATED PLASTIC INVERT OUT (NW)=5380.94'

18" CORRUGATED PLASTIC INVERT IN (SW)=5381.00'

STORM MANHOLE

RIM=5385.84'

18" CORRUGATED PLASTIC INVERT OUT (NW)=5380.24'

18" CORRUGATED PLASTIC INVERT IN (SE)=5380.44'

STORM MANHOLE

RIM=5384.88'

18" CORRUGATED PLASTIC INVERT OUT (W)=5379.72'

18" CORRUGATED PLASTIC INVERT IN (SE)=5379.92'

STORM MANHOLE

RIM=5383.31'

18" CORRUGATED PLASTIC INVERT OUT (W)

18" CORRUGATED PLASTIC INVERT IN (E)

BOTTOM OF MANHOLE=5379.35'

UNABLE TO COLLECT INVERTS

COLO

RADO STR

EET

ARIZONA STREET

NEW MEXICO STREET

OMAHA DRIVE

V-109

OM

AHA DRIVE

NEBRASKA STREET

OMAHA DRIVE

CONCRETE

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-109

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-114

MATCH LINE SEE SHEET V-104MATCH LINE SEE SHEET V-104

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

MATCH LINE SEE SHEET V-114

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

FLOWLINE AT INLET=5361.83'

18" INVERT OUT (NW)=5352.48'

18" INVERT IN (SE)=5352.76'

UNABLE TO DETERMINE PIPE TYPE

STORM MANHOLE

RIM=5361.80'

18" CORRUGATED PLASTIC INVERT OUT (N)=5350.55'

18" CORRUGATED PLASTIC INVERT IN (SE)=5350.75'

ST

18" FLARED END SECTION INVERT (N)=5372.27'

N0 0°

'28

"W

,3

.0 9'

LOGAN CIRCLE

NEW MEXICO STREET

COLORADO STREET

N0 0°

'56

"W

.38

CONCRETE

GARVEL

GATE

GARVEL

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-110

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-115

MATCH LINE SEE SHEET V-105

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

MATCH LINE SEE SHEET V-115

MATCH LINE SEE SHEET V-105

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

T

OUTLET STRUCTURE

18" CORRUGATED PLASTIC INVERT OUT (NW)=5385.66'

STORM INLET

FLOWLINE AT INLET=5402.42'

24" CMP INVERT OUT (W)=5399.19'

18" RCP INVERT IN (N)=5399.17'

4" PVC INVERT IN (N)=5400.33'

12" PVC INVERT IN (SE)=5399.07

STORM INLET

FLOWLINE AT INLET=5402.50'

18" RCP INVERT OUT (S)=5399.47'

STORM INLET

FLOWLINE AT INLET=5402.17'

12" PVC INVERT OUT (W)=APPROXIMATELY 5399.71' (DEBRIS IN PIPE)

4" PVC INVERT IN (SSE)=5400.47'

STORM MANHOLE

RIM=5404.31'

24" CMP INVERT (W)=5398.30'

24" CMP INVERT (E)=5398.35'

P INVERT OUT (N)=5396.28'

RRUGATED PLASTIC INVERT IN (W)=5404.07'

FOUND ILLEGIBLE 2" ALUMINUM CAP

OMAHA DRIVE

DENVER DRIVE

OMAHA DRIVE

N4 4°

'29

"W

.57

CONCRETE

CONCRETE

CONCRETE

LIMITS OF DUMP

GRAVEL

WALL

LIMITS OF DUMP

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-113

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-118

MATCH LINE SEE SHEET V-108 MATCH LINE SEE SHEET V-108

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

MATCH LINE SEE SHEET V-118

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

N55°37'02"E 290.46'

N3 2°

'52

"E

.30

OMAHA DRIVE

FLOWLINE SWALE

GATE

GRAVEL ROAD

LIMITS OF DUMP

LIMITS OF DUMP

GRAVEL

GRAVEL

LIMITS OF DUMP

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-114

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-119

MATCH LINE SEE SHEET V-109 MATCH LINE SEE SHEET V-109

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

MATCH LINE SEE SHEET V-119

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

24" FLARED END SECTION INVERT (NE)=5384.25'

24" FLARED END SECTION INVERT (NE)=5384.15'

24" FLARED END SECTION INVERT (SW)=5385.59'

24" FLARED END SECTION INVERT (SW)=5385.62'

18" FLARED END SECTION INVERT (N)=5372.27'

18" FLARED END SECTION INVERT (S)=5373.16'

S89°44'41"E 1,500.21'

WALL

GRAVEL

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-115

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-110MATCH LINE SEE SHEET V-110

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

GRAVEL

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

FLOWLINE AT INLET=5444.06'

16" PLASTIC INVERT OUT (NW)=5442.21'

16" PLASTIC INVERT (NW)=5441.84'

16" CMP INVERT (NW)=5430.18'

16" CMP INVERT (NW)=5428.24'

INVERT (E)=5431.06'

INVERT (E)=5430.96'

ACCEPTED FOUND 1.5" ALUMINUM CAP

"LS 5238"

S89°49'09"E 1,978.61'

7 TREES W/ 6"± TRUNKS

SH

RI

DA

N

BO

UL

EV

AR

D

OKLAHOMA STREET

WALL

ST

ST

ST

EL:5458.04

STORM MANHOLE

RIM=5446.05'

22" RCP INVERT (N)=5439.40'

15" RCP INVERT (E)=5441.20'

22" RCP INVERT (S)=5439.60'

STORM INLET

TOP=5445.97'

15" RCP INVERT (W)=5442.07'

STORM INLET

TOP=5448.66'

22" RCP INVERT (N)=5441.06'

STORM MANHOLE

RIM=5438.96'

22" RCP INVERT (S)=5433.46'

STORM MANHOLE

RIM=5438.94'

22" RCP INVERT (N)=5433.29'

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1B

DRAINAGE

IMPROVEMENT

LIMITS

PHASE 1B

DRAINAGE

IMPROVEMENT

LIMITS

VETERAN'S LAKE

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-116

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-111 MATCH LINE SEE SHEET V-111

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

STST

STORM MANHOLE

RIM=5440.72'

24" RCP INVERT (N)=5427.80'

24" RCP INVERT (E)=5428.24'

FLOWLINE AT INLET=5429.27'

24" RCP INVERT OUT (N)=5422.90'

24" RCP INVERT IN (S)=5423.12'

4" PVC INVERT IN (W)=5425.17'

4" PVC INVERT IN (E)=5425.25'

S89°49'09"E 1,978.61'

3 TREES W/ 4"± TRUNKS

2 TREES W/ 4"± TRUNKS

4 TREES W/ 4"± TRUNKS

DENVER DRIVE

OKLAHOMA STREET

TREE LINE TYPICAL

ASPHALT

STORM SEWER

STORM SEWER

SWALE

ST

ST

ST

STORM MANHOLE

RIM=5434.43'

24" RCP INVERT (N)=5424.18'

24" RCP INVERT (S)=5424.23''

STORM MANHOLE

RIM=5436.47'

24" RCP INVERT (W)=5432.47'

24" RCP INVERT (S)=5432.77'

STORM MANHOLE

RIM=5438.73'

24" RCP INVERT (N)=5434.58'

24" RCP INVERT (SW)=5435.33'

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

PROPOSED

BOUNDARY

PHASE 1A

CONSTRUCTION

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-117

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-112

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

MATCH LINE SEE SHEET V-112

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

FH

FH

ST

ST

ABANDONED FIRE HYDRANT

30" CMP INVERT=5429.86'

INVERT=5437.59'

ACCEPTED FOUND 3" BRASS CAP

S89°44'41"E 315.83'

FOUND 2.5" BRASS CAP IN CONCRETE COLLAR

"UNITED STATES NATIONAL CEMETARY DEPARTMENT OF THE ARMY"

CONCRETE

CONCRETE

GRAVEL

ASPHALT

CONCRETE

CONCRETE

ROCK PILE

ASPHALT

ASPHALT

ASPHALT

STORM SEWER

CONCRETE

CONCRETE CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

ROCK PILE

LIMITS OF DUMP

CONCRETE

CONCRETE

CONCRETE

CONCRETE

SWALE

STORM SEWER

ST

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

PHASE 1A

CONSTRUCTION

LIMITS

DENVER DRIVE

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-118

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-120

MATCH LINE SEE SHEET V-113MATCH LINE SEE SHEET V-113

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

MATCH LINE SEE SHEET V-120

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

V-119

N00°00'02"W 379.85'

GRAVEL

GRAVEL

LIMITS OF DUMP

STORM OUTLET

STORM SEWER

STORM SEWER

CONCRETE PAD

PHASE 1A

CONSTRUCTION

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-119

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-114 MATCH LINE SEE SHEET V-114

M A

TC

H

L

IN

E

SE

E

SH

EE

T

V-

M

A

TC

H L

IN

E

SE

E

SH

EE

T V-

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

CONCRETE

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

SS

SS

SS

ST

SANITARY SEWER MANHOLE

RIM = 5435.86'

E 6" CLAY INV = 5430.90'

W 6" CLAY INV = 5430.96'

SANITARY SEWER MANHOLE

RIM = 5442.99'

NE 6" CLAY INV = 5437.89'

NW 6" CLAY INV = 5437.89'

MANHOLE

RIM = 5443.07'

FULL OF WATER

POSSIBLE GREASE TRAP

18" CMP INVERT=5440.64'

18" CMP INVERT=5439.51'

18" CMP INVERT=5439.46'

8" INVERT=5437.24'

6" IRON INVERT=5433.82'

18" CMP INVERT=5440.02'

18" CMP INVERT=5439.17'

18" CMP INVERT=5439.36'

INVERT=5438.35'

INVERT=5437.59'

INVERT=5441.11'

12" CMP INVERT=5445.15'

WOOD POSTS

S0 0°

'14

"W

,7

.8 9'

N0 0°

'09

"E

,7

.5 8'

STORM SEWER

GRAVEL

ASPHALT

CONCRETE

ASPHALT

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

ASPHALT

GRAVEL

ASPHALT

GRAVEL

SWALE

CONCRETE

STORM SEWER

WALL

WALL

ASPHALT

WALL

STORM SEWER

STORM SEWER

CONCRETE

CONCRETE CONCRETE

PHASE 1A

CONSTRUCTION

LIMITS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 679-8122

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-120

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-121

MATCH LINE SEE SHEET V-118 MATCH LINE SEE SHEET V-118

MATCH LINE SEE SHEET V-121

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

W

W

ST

ST

STORM SEWER MANHOLE

RIM = 5457.81'

N 30" PIPE INV = 5452.01'

S PIPE INV = 5453.01'

W PIPE INV = 5452.41'

STORM SEWER MANHOLE

RIM = 5457.23'

E 12" RCP INV = 5453.28'

MANHOLE

RIM=5452.32'

BOTTOM OF MANHOLE=5443.87'

INVERT (S)

6" PLUG INVERT (SE)

MANHOLE

RIM=5452.38'

8" VERTICAL IRON PIPE

26" HDPE INVERT=5449.21'

INVERT=5446.77'

WOODEN BRIDGE

18" CMP INVERT=5440.64'

18" CMP INVERT=5440.72'

18" CMP INVERT=5439.51'

18" CMP INVERT=5439.46'

30" RCP INVERT=5451.52'

S89°41'08"E 876.02'

W. QUINCY AVENUE

W

W

W

RIP-RAP

ASPHALT

CONCRETE

STORM SEWER

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Enviromental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

JR MN

V-121

EXISTING CONDITIONS SURVEY

DETAIL SHEET

MATCH LINE SEE SHEET V-120 MATCH LINE SEE SHEET V-120

DRAWING INDEX

BENCHMARK:

#160A

CONTROL POINT :

BASIS OF BEARINGS:

NOTES:

ST

1-800-922-1987

NORTH

LEGEND

ST

SS

IP

S

C.P.

CROSS

T

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

OF 217

PHASE 1A DEVELOPMENT ON NEW LAND

PRELIMINARY

NOT FOR CONSTRUCTION

11 / 03 / 2022

SOIL BORING KEY MAP

JRB JDS

B-101 21 215

PHASE 1A BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

1-800-922-1987

SOIL BORING LOGS

PHASE 1

ETG JDS

B-102 22 215

PHASE 1A BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

1-800-922-1987

PHASE 1

ETG JDS

B-103 23 215

PHASE 1A BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

1-800-922-1987

PHASE 1

ETG JDS

B-104 24 215

PHASE 1A BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

1-800-922-1987

PAVEMENT CORE KEY MAP

ETG JDS

B-110 25 215

NORTH

GENERAL NOTES:

1-800-922-1987

PHASE 1A BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTSFOR INFORMATION ONLY - NOT FOR BID

PAVEMENT CORE LOGS

ETG JDS

B-111 26 215

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A - ALTERNATE 1 BID DOCUMENTS

FOR INFORMATION ONLY - NOT FOR BID

PAVEMENT CORE LOGS

ETG JDS

B-112 27 215

1-800-922-1987

PHASE 1A BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

PAVEMENT CORE LOGS

ETG JDS

B-113 28 215

1-800-922-1987

PHASE 1A BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

PAVEMENT CORE LOGS

ETG JDS

B-114 29 215

1-800-922-1987

PHASE 1A BID DOCUMENTS

APPROVED DRAWING TITLE

DATE

LOCATION

CHECKED PROJECT NUMBER

DRAWING NUMBER

DESCRIPTION DATE

DESIGN CONSULTANTS: ARCHITECT / ENGINEER OF RECORD:

C

Office of Construction and Facilities Management

1 3 4 5 6

B

A

D

E

C

B

A

D

E

BUILDING NUMBER

DRAWN

SEAL:

MARK

DENVER, COLORADO

888-043

FORT LOGAN

NATIONAL CEMETERY

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

Cemetery Expertise:

Jacobs Bill Romzick

(989) 745-1048

Architect:

Fourfront James Lushbough

(605) 342-9470

Irrigation:

Aqua Engineering Bob Beccard

(970) 372-6104

MEP, Fire, Landscape RCDD:

APOGEE Consulting Mark Norris

(919) 535-3819

Surveying & GPS:

Survey Systems Matt Nichols

(303) 419-6343

Environmental & Geotechnical Engineering:

Terracon Consultants Jennifer Peters/John Haas

(210) 907-7648/(303) 454-5265

PHASE 1A DEVELOPMENT ON NEW LAND

11-03-2022

PRELIMINARY

NOT FOR CONSTRUCTION

Cost Estimating:

OCMI

Kyle Veater

(757) 803-7517

Structural Engineer:

H2B, Inc Tod Henning

(713) 864-2910

PHASE 1A BASE BID DOCUMENTS

C.P.C.P.C.P.

M

M

M

M

M

MM

M

M

M

M

M

M

M

M

M

M

M

M

M

C.P.C.P.C.P.

M

M

M

M

M

MM

M

M

M

M

M

M

M

M

M

M

M

M

M

C.P.C.P.C.P.

M

M

M

M

M

MM

M

M

M

M

M

M

M

M

M

M

M

M

M

W

CD105

CD107CD108CD109

CD1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .