S02-Correct Piping Drawings MEP B5_Part2.pdf

PDF 4 MB Posted

Attached to
Z1NB--Project 614-18-106 Replace Plumbing and Piping Fixtures (FY-18 Plus-up)
Solicitation number
36C24920R0072
Issued by

View the file

Other files

File Type Posted
S06-36C24920R0072 Amendment 0008 09.03.2020.pdf PDF
S06-36C24920R0072 Amendment 0007.pdf PDF
S06-36C24920R0072 Amendment 0006.pdf PDF
S06-36C24920R0072 0005.pdf PDF
1-PP113 Rev1.pdf PDF
Bldg 5 - Memphis VAMC Final CD.pdf PDF
S06-614-18-106 Plumbing and Piping Addendum and RFI Responses.docx DOCX document
S06-Solicitation 36C24920R0072 0003.docx DOCX document
Bldg 9 - Memphis VAMC Final CD.pdf PDF
Bldg 1AC- Memphis VAMC Final CD Submittal.pdf PDF
36C24920R0072 0002.docx DOCX document
010000_General Requirements.pdf PDF
S02-Price Schedule (Proj 614-18-106) FY2020.xlsx XLSX spreadsheet
S05-Organized Site Visit Sign In Sheet (614-18-106).pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
Correct Piping Drawings MEP B1_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part6.pdf PDF
Correct Piping Drawings MEP B1_Part5.pdf PDF
Correct Piping Drawings GEN and ARCH_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part1.pdf PDF
Correct Piping Drawings MEP B7_Part2.pdf PDF
Correct Piping Drawings GEN and ARCH_Part3.pdf PDF
Correct Piping Drawings MEP B5_Part2.pdf PDF
Correct Piping Drawings MEP B5_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part3.pdf PDF
Correct Piping Drawings MEP B1_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part2.pdf PDF
Correct Piping Drawings MEP B1_Part4.pdf PDF
36C24920R0072 0001.docx DOCX document
Correct Piping Drawings GEN and ARCH_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part4.pdf PDF
S02-Contractor PPQ (3 Submission Reqd) (614-18-106)_Revision.pdf PDF
36C24920R0072 0001.docx DOCX document
S02-Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
S02-Correct Piping Drawings MEP B7_Part2.pdf PDF
S02-Correct Piping Drawings MEP B1_Part4.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1 02.pdf PDF
S02-Correct Piping Drawings MEP B1_Part5.pdf PDF
36C24920R0072_1.docx DOCX document
S02-Correct Piping Drawings MEP B1A_Part2.pdf PDF
C28-Project Specifications.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1.pdf PDF
S02-Correct Piping Drawings MEP B7_Part3.pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
S02-Contractor PPE (3 Submission Reqd) (614-18-106).pdf PDF
S02-Correct Piping Drawings MEP B5_Part1.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

20 22 23 26 28 29 30 31 32 34

L.

M

N

P

Q

R

O

24 27

H

J

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

O

F

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

D

N

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

5-PP102

GROUND FLOOR ZONE B

NEW WORK PIPING PLAN

ZONE A

ZONE C

C

B A

AutoCAD SHX Text

AutoCAD SHX Text 5149B

AutoCAD SHX Text

AutoCAD SHX Text 5149A

AutoCAD SHX Text 5148T

AutoCAD SHX Text

AutoCAD SHX Text 5136B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text STAIR No3

AutoCAD SHX Text 5136A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5137A

AutoCAD SHX Text 5137B

AutoCAD SHX Text 5133B

AutoCAD SHX Text 5133A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5139C

AutoCAD SHX Text 5138A

AutoCAD SHX Text 5139B

AutoCAD SHX Text 5139A

AutoCAD SHX Text

AutoCAD SHX Text 5140B

AutoCAD SHX Text 5140B

AutoCAD SHX Text 5140A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5130A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5129A

AutoCAD SHX Text 5129B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5146A

AutoCAD SHX Text

AutoCAD SHX Text 5126A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5125A

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

BOILER ROOM

AutoCAD SHX Text

SOILED UTILITY

AutoCAD SHX Text

ELEC 5138B

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-401

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

IA

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text 5144A

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

DCWS PIPING REMOVED IN WALL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

GROUND FLOOR PLAN - ZONE B

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

KEY PLAN BUILDING 5 GROUND FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, LOCATION, AND SIZING OF PIPING/VALVES PRIOR TO COMMENCEMENT OF WORK. B. UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL LAVATORY, SINKS, AND SHOWERS ARE 1/2". DOMESTIC COLD WATER PIPING TO URINALS IS 3/4" AND PIPING TO WATER CLOSETS IS 1". C. UNLESS NOTED OTHERWISE, INSTALL NEW INSULATION PER SPECIFICATIONS UNLESS NOTED OTHERWISE, INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND ANY EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED OR DAMAGED FOR DEAD END REMOVAL AND/OR TIE-IN OF NEW WORK. D. ALL DHWR LOOP PIPING SHALL BE 1/2" UNLESS INDICATED OTHERWISE. ALL DHWR LOOP PIPING SHALL BE 1/2" UNLESS INDICATED OTHERWISE. MAIN RETURN LINES TO BE SIZED AS INDICATED. E. REPAIR ALL PENETRATIONS IN FLOORS AND WALLS WHERE PIPE WAS REPAIR ALL PENETRATIONS IN FLOORS AND WALLS WHERE PIPE WAS REMOVED. FILL PENETRATIONS WITH CONCRETE OR APPROVED FIRE STOP MATERIALS. REPAIR WALL AS NEEDED TO MATCH EXISTING SURFACES. SEE ARCHITECTURAL SHEETS FOR WALL REPAIR.

AutoCAD SHX Text

PLUMBING NEW WORK NOTES:

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text INSTALL AND FIELD ROUTE NEW DOMESTIC PIPE AND FITTINGS TO RECONNECT EXISTING DHWS AND EXISTING DHWR WITH NEW DHWR LOOP. PROVIDE SLEEVES AND APPROVED FIRE STOP MATERIALS AT FLOOR ALL WALL PENETRATIONS. INSTALL NEW THERMOSTATIC BALANCING VALVE GROUP. PROVIDE 3/4" MINIMUM SIZE THERMOSTATIC BALANCING VALVE OR MATCH LARGER EXISTING SIZES. SEE DETAIL 4 ON SHEET PP401 AND PLUMBING SPECIALTIES SCHEDULE ON SHEET PP501. INSTALL NEW PIPE SECTION AND FITTINGS TO RECONNECT EXISTING DOMESTIC WATER PIPING. NOT USED. NOT USED. NOT USED. NOT USED. INSTALL NEW FAUCET AND SUPPLY LINES ON EXISTING FIXTURE. INSTALL NEW MV-1 MIXING VALVE IN SUPPLY LINES TO NEW FAUCET. SEE DETAIL 1 ON SHEET PP401 AND PLUMBING FIXTURE SCHEDULE ON SHEET PP501. NOT USED. ROUTE NEW DCW AND DHW PIPING FROM FOOT PEDAL CONTROL LOCATION TO NEW LOCATION BELOW FIXTURE. STUB OUT AND PROVIDE CHROME PLATED SUPPLY ANGLE STOPS. INSTALL NEW FAUCET, SUPPLIES, AND MV-1 MIXING VALVE ON EXISTING FIXTURE. SEE DETAIL 3 ON SHEET PP401 AND PLUMBING FIXTURE SCHEDULE ON SHEET PP501. SEE ARCHITECTURAL SHEETS FOR WALL REPAIR.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR LOBBY 5100

AutoCAD SHX Text

CORRIDOR 5150

AutoCAD SHX Text

MECH. EQUIP. 5165

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5152A

AutoCAD SHX Text 5152B

AutoCAD SHX Text 5152C

AutoCAD SHX Text

AutoCAD SHX Text 5152D

AutoCAD SHX Text 5152E

AutoCAD SHX Text 5152F

AutoCAD SHX Text 5152G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 5149C

AutoCAD SHX Text 5149B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text STAIR No1

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CORR.

AutoCAD SHX Text

CORR.

AutoCAD SHX Text

EMERGENCY GENERATOR

AutoCAD SHX Text

SVC COURT

AutoCAD SHX Text

DOCK

AutoCAD SHX Text

CORR.

AutoCAD SHX Text

CORR.

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

%%UP-516

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

%%UP-402

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UP-403

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 6"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 5"

AutoCAD SHX Text 4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3"

AutoCAD SHX Text 5"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text

AutoCAD SHX Text

PP201

AutoCAD SHX Text

MEP201

AutoCAD SHX Text

TO HVAC MAKE-UP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EEW

AutoCAD SHX Text

AutoCAD SHX Text

%%UX-5

AutoCAD SHX Text

GROUND FLOOR PLAN - ZONE C

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

KEY PLAN BUILDING 5 GROUND FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, LOCATION, AND SIZING OF PIPING/VALVES PRIOR TO COMMENCEMENT OF WORK. B. UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL LAVATORY, SINKS, AND SHOWERS ARE 1/2". DOMESTIC COLD WATER PIPING TO URINALS IS 3/4" AND PIPING TO WATER CLOSETS IS 1". C. UNLESS NOTED OTHERWISE, INSTALL NEW INSULATION PER SPECIFICATIONS UNLESS NOTED OTHERWISE, INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND ANY EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED OR DAMAGED FOR DEAD END REMOVAL AND/OR TIE-IN OF NEW WORK. D. ALL DHWR LOOP PIPING SHALL BE 1/2" UNLESS INDICATED OTHERWISE. ALL DHWR LOOP PIPING SHALL BE 1/2" UNLESS INDICATED OTHERWISE. MAIN RETURN LINES TO BE SIZED AS INDICATED. E. REPAIR ALL PENETRATIONS IN FLOORS AND WALLS WHERE PIPE WAS REPAIR ALL PENETRATIONS IN FLOORS AND WALLS WHERE PIPE WAS REMOVED. FILL PENETRATIONS WITH CONCRETE OR APPROVED FIRE STOP MATERIALS. REPAIR WALL AS NEEDED TO MATCH EXISTING SURFACES. SEE ARCHITECTURAL SHEETS FOR WALL REPAIR.

AutoCAD SHX Text

PLUMBING NEW WORK NOTES:

AutoCAD SHX Text

GENERAL NOTES:

INSTALL AND FIELD ROUTE NEW DOMESTIC PIPE AND FITTINGS TO RECONNECT EXISTING DHWS AND EXISTING DHWR WITH NEW DHWR LOOP. PROVIDE SLEEVES AND APPROVED FIRE STOP MATERIALS AT FLOOR ALL WALL PENETRATIONS. INSTALL NEW THERMOSTATIC BALANCING VALVE GROUP. PROVIDE 3/4" MINIMUM SIZE THERMOSTATIC BALANCING VALVE OR MATCH LARGER EXISTING SIZES. SEE DETAIL 4 ON SHEET PP401 AND PLUMBING SPECIALTIES SCHEDULE ON SHEET PP501. INSTALL NEW PIPE SECTION AND FITTINGS TO RECONNECT EXISTING DOMESTIC WATER PIPING. NOT USED. NOT USED. NOT USED. NOT USED. INSTALL NEW FAUCET AND SUPPLY LINES ON EXISTING FIXTURE. INSTALL NEW MV-1 MIXING VALVE IN SUPPLY LINES TO NEW FAUCET. SEE DETAIL 1 ON SHEET PP401 AND PLUMBING FIXTURE SCHEDULE ON SHEET PP501. NOT USED. NOT USED. NOT USED. NOT USED. NOT USED. NOT USED. INSTALL NEW FAUCET FOR EXISTING FIXTURE AND CONNECT TO EXISTING WALL MOUNT FITTINGS. INSTALL NEW MV-1 MIXING VALVE IN SUPPLY LINES TO NEW FAUCET. SEE DETAIL 2 ON SHEET PP401 AND PLUMBING FIXTURE ON SHEET PP501.

MECH EQUIP

AREA

WAY

MECH EQUIP

AREA

WAY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

AGRICULTURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

5-PP301

WATER HEATER PLUMBING PIPING

NEW WORK RISER DIAGRAM - PHASE 1

AutoCAD SHX Text Q

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

%%UEWH-1

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text P

AutoCAD SHX Text Q

AutoCAD SHX Text M

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 4"

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

6" DCWS SUPPLY

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text 2"

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 4"

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

%%URP-9

AutoCAD SHX Text

%%URP-10

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text Q

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text S

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

DHWR

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text B

AutoCAD SHX Text L

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

%%UNOTE:%%U REFER TO DRAWING 5-PP201, PHASE 1 FOR PLAN LAYOUT

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

AND DOMESTIC WATER HEATER ASSEMBLY - PHASE 1

AutoCAD SHX Text

PIPING RISER DIAGRAM - DOMESTIC WATER CIRCULATION PUMPS

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, ROUTING, AND SIZING OF PIPING PRIOR TO COMMENCEMENT OF WORK. B. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED FOR DEMOLITION OR TIE-IN OF NEW WORK. C. COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION SECTION 01.00.00 GENERAL REQUIREMENTS. NOTE THAT AFTER HOURS AND WEEKEND WORK SHALL BE REQUIRED FOR MOST SPACES. D. PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END OF EACH WORK SHIFT. COVER ALL EQUIPMENT AND PROTECT COURSE OF WORK. RUN HEPA-FILTER EXHAUST FILTRATION UNITS DURING ALL ACTIVE WORK ACTIVITIES. E. THE INTENT IS TO RELOCATE, TEST, AND OPERATE 1 EXISTING DOMESTIC WATER THE INTENT IS TO RELOCATE, TEST, AND OPERATE 1 EXISTING DOMESTIC WATER HEATER AND INSTALL/OPERATE 2 NEW CIRCULATION PUMPS FOR A PERIOD OF SEVEN (7) DAYS PRIOR TO COMMISSIONING. ONE DOMESTIC WATER HEATER AND EXISTING CIRCULATION PUMPS SHALL REMAIN OPERATIONAL AND ON-LINE AT ALL TIMES. RELOCATION OF REMAINING EXISTING WATER HEATER AND DEMOLITION OF REMAINING EXISTING RETURN PUMPS WILL BEGIN AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR RELOCATED EXISTING WATER HEATER AND NEW PUMPS ARE COMPLETE. ONLY ONE NEW PUMP SHALL OPERATE AT A TIME. ROTATE NEW PUMPS AND EXISTING WATER HEATERS OPERATION EVERY 24 HOURS DURING TEST PERIOD. AFTER SUCCESSFUL COMMISSIONING ACTIVITIES ARE COMPLETE, EXISTING WATER HEATER EWH-2 SHALL BE RELOCATED ONE HEATER AND ONE PUMP SHALL BE IN OPERATION. ONE HEATER SHALL BE OFFLINE AND DRAINED. ONE PUMP SHALL BE IN STAND-BY AND PUMP ROTATION SET TO 8 HOUR INTERVALS PER CONTROL SHEET P002. F. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. SCHEDULE REQUIRED TIE-INS TO MINIMIZE NUMBER AND DURATION OF OUTAGES. G. CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS AND SUPPORTS, INSULATION, EQUIPMENT, CONTROLS, BMS CONNECTIONS, ELECTRICAL ITEMS, ETC., TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. H. CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW PIPE, FITTINGS, VALVES, ETC., FOR A COMPLETE AND OPERABLE SYSTEM.

AutoCAD SHX Text PROVIDE NEW 6" THICK (MIN.) CONCRETE HOUSEKEEPING PAD WITH (2) TWO #4 REBAR MATS, 6" ON CENTER EACH DIRECTION. PLACE (1) MAT 2" FROM BOTTOM OF PAD AND (1) ONE MAT 2" FROM TOP OF PAD. PAD THICKNESS SHALL BE INCREASED AS REQUIRED TO PROVIDE POSITIVE GRAVITY DRAIN OF CONDENSATE FROM NEW WATER HEATERS TO EXISTING CP-1 CONDENSATE RECEIVER INLET CONNECTION. INSTALL EXISTING DOMESTIC INSTANTANEOUS STEAM WATER HEATER EWH-1 IN NEW LOCATION. SEE SECTIONS ON SHEET 5-PP201. SEE SHEET 5-MEP101 FOR STEAM, CONDENSATE RETURN, AND ELECTRICAL CONNECTIONS. SEE SHEET P002 FOR CONTROL CONNECTIONS. COORDINATE WITH ALL TRADES. PROVIDE SPOOL PIPE SECTIONS WITH UNIONS OR GROOVED FITTINGS AT ALL CONNECTIONS SUCH THAT HEATER OR HEATER SHELL CAN BE REMOVED FOR SERVICE OF INTERNAL COILS. EXISTING WATER HEATER EWH-1 SHALL BE INSTALLED, TESTED, AND ON-LINE FOR 7 DAYS PRIOR TO RELOCATION OF EXISTING WATER HEATER EWH-2. INSTALL NEW DOMESTIC VARIABLE SPEED HOT WATER CIRCULATING PUMPS RP-9 AND RP-10 ON NEW UNISTRUT RACK. USE FACTORY FABRICATED UNISTRUT ITEMS FOR ADDITIONAL SUPPORT. SEE SECTIONS ON SHEET 5-PP201 AND RECIRCULATING PUMP SCHEDULE ON SHEET PP501. SEE PLANS AND SECTIONS ON SHEET 5-PP201 FOR PIPING CONTINUATION. SEE SHEET 5-MEP201 FOR ELECTRICAL CONNECTIONS. SEE P002 FOR CONTROL CONNECTIONS. COORDINATE WITH ALL TRADES. INSTALL NEW DHWS FROM RELOCATED WATER HEATERS EWH-1 AND EWH-2 TO EXISTING DHWS TO BUILDING. INSTALL AND FIELD ROUTE ALL PIPE, FITTINGS, VALVES, ETC. AS SHOWN ON PLANS AND SECTIONS ON SHEET 5-PP201. INSTALL NEW DCWS TO RELOCATED WATER HEATERS EWH-1 AND EWH-2 FROM EXISTING DCWS FROM BUILDING. INSTALL AND FIELD ROUTE ALL PIPE, FITTINGS, VALVES, ETC. AS SHOWN ON PLANS AND SECTIONS ON SHEET 5-PP201. RELOCATED DOMESTIC WATER HEATERS AND NEW RECIRCULATION PUMPS SHALL BE CONNECTED TO BUILDING MANAGEMENT SYSTEM. COORDINATE WORK WITH CONTROL CONTRACTOR. PROVIDE, INSTALL, AND TEST PIPE, FITTINGS, AND CONTROL CONTRACTOR SUPPLIED THERMOWELLS FOR SENSORS. SEE SHEET P002 FOR REQUIRED LOCATIONS AND QUANTITIES. INSTALL AND FIELD ROUTE NEW EQUIPMENT DRAINS, PIPE DRAINS, AND RELIEF VALVE DISCHARGE PIPING TO FLOOR DRAIN IN MECHANICAL SPACE. ANCHOR ALL PIPE TO FLOOR WITH UNISTRUT AND CLAMPS. INSTALL AND FIELD ROUTE NEW FULL SIZE BYPASS LINE CONNECTING DCWS TO DHWS. PROVIDE (2) TWO LOCKABLE BALL VALVES ADJACENT TO EACH TIE-IN TEE WITH 3/4" THREADED, PLUGGED, BALL VALVE FOR BYPASS DRAIN DOWN AT MIDPOINT/LOW POINT BETWEEN VALVES. SEE PLANS AND SECTIONS ON SHEET 5-PP201. INSTALL NEW 1/2" THREADED BALL VALVE FOR DHWS OR DCWS CHLORINE MONITORING PORT FOR CONNECTION TO MONITORING EQUIPMENT SAMPLE LINES. SEE DETAIL 6 ON SHEET PP401. INSTALL NEW 1/2" THREADED BALL VALVE FOR SAMPLE COOLER CONNECTION ON CHLORINE MONITORING EQUIPMENT SAMPLE LINES. SEE DETAIL 6 ON SHEET PP401. . INSTALL NEW 1" THREADED BALL VALVE FOR FUTURE DHWS CHLORINE INJECTION PORT. SEE DETAIL 6 ON SHEET PP402. INSTALL NEW 1/2" THREADED BALL VALVE FOR FUTURE PRE CHLORINE INJECTION MONITORING PORT. SEE DETAIL 6 ON SHEET PP402. INSTALL NEW 1/2" THREADED BALL VALVE FOR FUTURE DHWS POST CHLORINE INJECTION SAMPLE PORT. SEE DETAIL 6 ON SHEET PP402. INSTALL TEMPORARY CAP ON REMAINING PIPING UNTIL PHASE 2 DEMOLITION.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING PHASE 1 NEW WORK NOTES:

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DRAWING NOTES:

AutoCAD SHX Text EXISTING FLOOR DRAIN (TYP). DRAIN VALVE. 1/2" DHWS PRE CHLORINE INJECTION SAMPLE PORT. (FUTURE CONNECTION TO TO EQUIPMENT BY OTHERS). 2" TO LAWN SPRINKLER. EXISTING CONCRETE PAD. 1/2" DHWS AND DCWS CHLORINE MONITORING PORTS. . 1" DHWS CHLORINE INJECTION PORT. (FUTURE CONNECTION TO EQUIPMENT BY . (FUTURE CONNECTION TO EQUIPMENT BY (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). 1/2" DHWS POST CHLORINE INJECTION SAMPLE PORT. (FUTURE CONNECTIONS TO EQUIPMENT BY OTHERS). BALL CHECK VALVE. PRESSURE/TEMPERATURE SENSOR (TYP). LOCKABLE BALL VALVE (NC). DIGITAL THERMOMETER (TYP). GROOVED JOINT (TYP). NEW UNISTRUT PUMP SUPPORT RACK. 1/2" CHLORINE MONITORING EQUIPMENT SAMPLE COOLER SUPPLY PORT. PETE'S PLUG. TEMPERATURE AND PRESSURE (T&P) RELIEF VALVE. PRESSURE GAUGE (TYP).

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text P

AutoCAD SHX Text Q

AutoCAD SHX Text R

S

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

5-PP302

WATER HEATER PLUMBING PIPING

NEW WORK RISER DIAGRAM - PHASE 2

AutoCAD SHX Text Q

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text

%%UEWH-1

AutoCAD SHX Text P

AutoCAD SHX Text Q

AutoCAD SHX Text M

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 4"

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 6"

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 6"

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text

6" DCWS SUPPLY

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

%%URP-9

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

%%URP-10

AutoCAD SHX Text 2"

AutoCAD SHX Text

DHWR

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text K

AutoCAD SHX Text M

AutoCAD SHX Text Q

AutoCAD SHX Text B

AutoCAD SHX Text S

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text K

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3"

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text N

AutoCAD SHX Text R

AutoCAD SHX Text Q

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text B

AutoCAD SHX Text L

AutoCAD SHX Text

%%UNOTE:%%U REFER TO DRAWING 5-PP201, PHASE 2 FOR PLAN LAYOUT

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

AND DOMESTIC WATER HEATER ASSEMBLY - PHASE 2

AutoCAD SHX Text

PIPING RISER DIAGRAM - DOMESTIC WATER CIRCULATION PUMPS

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, ROUTING, AND SIZING OF PIPING PRIOR TO COMMENCEMENT OF WORK. B. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED FOR DEMOLITION OR TIE-IN OF NEW WORK. C. COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION SECTION 01.00.00 GENERAL REQUIREMENTS. NOTE THAT AFTER HOURS AND WEEKEND WORK SHALL BE REQUIRED FOR MOST SPACES. D. PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END OF EACH WORK SHIFT. COVER ALL EQUIPMENT AND PROTECT COURSE OF WORK. RUN HEPA-FILTER EXHAUST FILTRATION UNITS DURING ALL ACTIVE WORK ACTIVITIES. E. THE INTENT IS TO RELOCATE, TEST, AND OPERATE 1 EXISTING DOMESTIC WATER THE INTENT IS TO RELOCATE, TEST, AND OPERATE 1 EXISTING DOMESTIC WATER HEATER AND INSTALL/OPERATE 2 NEW CIRCULATION PUMPS FOR A PERIOD OF SEVEN (7) DAYS PRIOR TO COMMISSIONING. ONE DOMESTIC WATER HEATER AND EXISTING CIRCULATION PUMPS SHALL REMAIN OPERATIONAL AND ON-LINE AT ALL TIMES. RELOCATION OF REMAINING EXISTING WATER HEATER AND DEMOLITION OF REMAINING EXISTING RETURN PUMPS WILL BEGIN AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR RELOCATED EXISTING WATER HEATER AND NEW PUMPS ARE COMPLETE. ONLY ONE NEW PUMP SHALL OPERATE AT A TIME. ROTATE NEW PUMPS AND EXISTING WATER HEATERS OPERATION EVERY 24 HOURS DURING TEST PERIOD. AFTER SUCCESSFUL COMMISSIONING ACTIVITIES ARE COMPLETE, EXISTING WATER HEATER EWH-2 SHALL BE RELOCATED ONE HEATER AND ONE PUMP SHALL BE IN OPERATION. ONE HEATER SHALL BE OFFLINE AND DRAINED. ONE PUMP SHALL BE IN STAND-BY AND PUMP ROTATION SET TO 8 HOUR INTERVALS PER CONTROL SHEET P002. F. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. SCHEDULE REQUIRED TIE-INS TO MINIMIZE NUMBER AND DURATION OF OUTAGES. G. CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS AND SUPPORTS, INSULATION, EQUIPMENT, CONTROLS, BMS CONNECTIONS, ELECTRICAL ITEMS, ETC., TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. H. CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW PIPE, FITTINGS, VALVES, ETC., FOR A COMPLETE AND OPERABLE SYSTEM.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text INSTALL EXISTING DOMESTIC INSTANTANEOUS STEAM WATER HEATER EWH-2 IN NEW LOCATION. SEE PLANS AND SECTIONS ON SHEET 5-PP201. SEE SHEET 5-MEP201 FOR STEAM, CONDENSATE RETURN, AND ELECTRICAL CONNECTIONS. SEE SHEET P002 FOR CONTROL CONNECTIONS. COORDINATE WITH ALL TRADES. PROVIDE SPOOL PIPE SECTIONS WITH UNIONS OR GROOVED FITTINGS AT ALL CONNECTIONS SUCH THAT HEATER OR HEATER SHELL CAN BE REMOVED FOR SERVICE OF INTERNAL COILS. EXISTING WATER HEATER EWH-1 SHALL BE INSTALLED, TESTED, AND ON-LINE FOR 7 DAYS PRIOR TO RELOCATION OF EXISTING WATER HEATER EWH-2. INSTALL NEW DCWS AND DHWS TO EXISTING WATER HEATER EWH-2 IN NEW LOCATION FROM NEW VALVE INSTALLED IN PHASE 1. INSTALL ALL PIPE, FITTINGS, VALVES, ETC. AS SHOWN ON PLANS AND SECTIONS ON SHEET 5-PP201. RELOCATED DOMESTIC WATER HEATER SHALL BE CONNECTED TO BUILDING MANAGEMENT SYSTEM. COORDINATE WORK WITH CONTROL CONTRACTOR. PROVIDE, INSTALL, AND TEST PIPE, FITTINGS, AND CONTROL CONTRACTOR SUPPLIED THERMOWELLS FOR SENSORS. SEE SHEET P002 FOR REQUIRED LOCATIONS AND QUANTITIES. INSTALL AND FIELD ROUTE NEW EQUIPMENT DRAINS, PIPE DRAINS, AND RELIEF VALVE DISCHARGE PIPING TO FLOOR DRAIN IN MECHANICAL SPACE. ANCHOR ALL PIPE TO FLOOR WITH UNISTRUT AND CLAMPS. PROVIDE AND INSTALL NEW CHLORINE MONITORING EQUIPMENT. SEE DETAIL 6 ON SHEET PP401. CONNECT MONITORING EQUIPMENT TO PORTS ON DCWS (DRAWING NOTE F,P) AND DHWS (DRAWING NOTE F) INSTALLED IN PHASE 1. COORDINATE WITH CONTROL CONTRACTOR AND ELECTRICAL CONTRACTOR FOR CONNECTIONS. TEMPERATURE SENSORS CONNECTED TO CHLORINE MONITORING EQUIPMENT AT THIS LOCATION NOT REQUIRED. TEMPERATURE WILL BE CONNECTED TO BMS AT THIS LOCATION AT POINTS INDICATED IN DOCUMENTS. INSTALL THREADED, PLUGGED, BALL VALVE AT ALL LOCATIONS WHERE ORIGINAL EQUIPMENT/PIPE WAS REMOVED.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING PHASE 2 NEW WORK NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DRAWING NOTES:

AutoCAD SHX Text EXISTING FLOOR DRAIN (TYP). DRAIN VALVE. 1/2" DHWS PRE CHLORINE INJECTION SAMPLE PORT. (FUTURE CONNECTION TO TO EQUIPMENT BY OTHERS). 2" TO LAWN SPRINKLER. NEW CONCRETE PAD. 1/2" DHWS AND DCWS CHLORINE MONITORING PORTS. . 1" DHWS CHLORINE INJECTION PORT. (FUTURE CONNECTION TO EQUIPMENT BY . (FUTURE CONNECTION TO EQUIPMENT BY (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). 1/2" DHWS POST CHLORINE INJECTION SAMPLE PORT. (FUTURE CONNECTIONS TO EQUIPMENT BY OTHERS). BALL CHECK VALVE. PRESSURE/TEMPERATURE SENSOR (TYP). LOCKABLE BALL VALVE (NC). DIGITAL THERMOMETER (TYP). GROOVED JOINT (TYP). NEW UNISTRUT PUMP SUPPORT RACK. 1/2" CHLORINE MONITORING EQUIPMENT SAMPLE COOLER SUPPLY PORT. PETE'S PLUG. TEMPERATURE AND PRESSURE (T&P) RELIEF VALVE. PRESSURE GAUGE (TYP).

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text P

AutoCAD SHX Text Q

AutoCAD SHX Text R

S

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

5-MEP201

MECHANICAL ROOM NEW WORK

STEAM AND ELECTRICAL PHASE 1 & 2

AutoCAD SHX Text

AREA WAY

AutoCAD SHX Text

%%UCP-1

AutoCAD SHX Text

CDR

AutoCAD SHX Text

(2)3/4" FROM CONDENSATE PUMP

AutoCAD SHX Text

1" STEEL

AutoCAD SHX Text

2" COPPER

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UEWH-1

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text

ST

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text

CDR

AutoCAD SHX Text

%%UST-9

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

CDR

AutoCAD SHX Text

ST

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text

3" STEAM SUPPLY

AutoCAD SHX Text 1"

AutoCAD SHX Text

30' FROM BOTTOM OF DROP TO 5" TEE @20 PSI

AutoCAD SHX Text

AutoCAD SHX Text

%%UFT-3

AutoCAD SHX Text

ST

AutoCAD SHX Text

CDR

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text 3"

AutoCAD SHX Text

%%URP-9

AutoCAD SHX Text

%%URP-10

AutoCAD SHX Text C

AutoCAD SHX Text F

AutoCAD SHX Text B

AutoCAD SHX Text

CDR

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text

CDR

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text 2"

AutoCAD SHX Text

MECH EQUIP 5165

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UST-8

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text

%%UEWH-1

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text

ST

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MECH EQUIP

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

%%UCP-1

AutoCAD SHX Text

CDR

AutoCAD SHX Text

(2)3/4" FROM CONDENSATE PUMP

AutoCAD SHX Text

1" STEEL

AutoCAD SHX Text

2" COPPER

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

ST

AutoCAD SHX Text

3" STEAM SUPPLY

AutoCAD SHX Text

%%UFT-3

AutoCAD SHX Text

ST

AutoCAD SHX Text

CDR

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text 3"

AutoCAD SHX Text

%%URP-9

AutoCAD SHX Text

%%URP-10

AutoCAD SHX Text

CDR

AutoCAD SHX Text

CDR

AutoCAD SHX Text

%%UST-9

AutoCAD SHX Text 2"

AutoCAD SHX Text

AutoCAD SHX Text

AREA WAY

AutoCAD SHX Text

%%UST-8

AutoCAD SHX Text

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text

SECTION B

AutoCAD SHX Text

%%UST-9

AutoCAD SHX Text

3"MPS

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text 2"

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

3"MPS

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text

%%UST-9

AutoCAD SHX Text

%%UEWH-1

AutoCAD SHX Text 2"

AutoCAD SHX Text 1"

AutoCAD SHX Text C

AutoCAD SHX Text

2 1/2" WYE STRAINER

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 2"

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

SECTION A

AutoCAD SHX Text

2"CDR

AutoCAD SHX Text

3/4" DRIP BLOW DOWN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text 3/4"

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1 1/2" CDR

AutoCAD SHX Text

LARGE SCALE GROUND FLOOR MECHANICAL ROOM PLAN - NEW WORK PHASE 1

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text 6'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'

AutoCAD SHX Text

LARGE SCALE GROUND FLOOR MECHANICAL ROOM PLAN - NEW WORK PHASE 2

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text 6'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, ROUTING, AND SIZING OF PIPING PRIOR TO COMMENCEMENT OF WORK. B. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED FOR DEMOLITION OR TIE-IN OF NEW WORK. C. COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION SECTION 01.00.00 GENERAL REQUIREMENTS. NOTE THAT AFTER HOURS AND WEEKEND WORK SHALL BE REQUIRED FOR MOST SPACES. D. PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END OF EACH WORK SHIFT. COVER ALL EQUIPMENT AND PROTECT COURSE OF WORK. RUN HEPA-FILTER EXHAUST FILTRATION UNITS DURING ALL ACTIVE WORK ACTIVITIES. E. THE INTENT IS TO RELOCATE, TEST, AND OPERATE 1 EXISTING DOMESTIC WATER HEATER THE INTENT IS TO RELOCATE, TEST, AND OPERATE 1 EXISTING DOMESTIC WATER HEATER AND INSTALL/OPERATE 2 NEW CIRCULATION PUMPS FOR A PERIOD OF SEVEN (7) DAYS PRIOR TO COMMISSIONING. ONE DOMESTIC WATER HEATER AND EXISTING CIRCULATION PUMPS SHALL REMAIN OPERATIONAL AND ON-LINE AT ALL TIMES. RELOCATION OF REMAINING EXISTING WATER HEATER AND DEMOLITION OF REMAINING EXISTING RETURN PUMPS WILL BEGIN AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR RELOCATED EXISTING WATER HEATER AND NEW PUMPS ARE COMPLETE. ONLY ONE NEW PUMP SHALL OPERATE AT A TIME. ROTATE NEW PUMPS AND EXISTING WATER HEATERS OPERATION EVERY 24 HOURS DURING TEST PERIOD. AFTER SUCCESSFUL COMMISSIONING ACTIVITIES ARE COMPLETE, EXISTING WATER HEATER EWH-2 SHALL BE RELOCATED ONE HEATER AND ONE PUMP SHALL BE IN OPERATION. ONE HEATER SHALL BE OFFLINE AND DRAINED. ONE PUMP SHALL BE IN STAND-BY AND PUMP ROTATION SET TO 8 HOUR INTERVALS PER CONTROL SHEET P002. F. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. SCHEDULE REQUIRED TIE-INS TO MINIMIZE NUMBER AND DURATION OF OUTAGES. G. CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS AND SUPPORTS, INSULATION, EQUIPMENT, CONTROLS, BMS CONNECTIONS, ELECTRICAL ITEMS, ETC., TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. H. CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW PIPE, CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW PIPE, FITTINGS, VALVES, ETC. COR/WATER SYSTEM MANAGE APPROVAL OF LOCATION IS REQUIRED PRIOR TO INSTALLATION.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text A

AutoCAD SHX Text NEW CONCRETE PAD. EXISTING CONDENSATE PUMP. STEAM PRESSURE GAUGE. RELOCATED ELECTRONIC MANUFACTURER SUPPLIED STEAM VALVE. EXISTING CONCRETE PAD.

AutoCAD SHX Text

DRAWING NOTES:

AutoCAD SHX Text A

AutoCAD SHX Text PROVIDE NEW MOTOR RATED SWITCH WITH FLEX CONNECTION TO WATER HEATERS. PROVIDE NEW SUPPORT. PROVIDE NEW 30AMP/2P NON-FUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE WITH FLEX CONNECTION TO CIRCULATION PUMPS. PROVIDE NEW 2#12, #12G; 3/4" CONDUIT TO EXISTING PANEL X-5. PROVIDE AND CONNECT TO NEW 20A/2P BREAKER. SEE SHEET 5-PP103, MECHANICAL ROOM 5165 FOR PANEL LOCATION. PROVIDE NEW 2#12, #12G; 3/4" CONDUIT TO EXISTING PANEL X-5. PROVIDE AND CONNECT TO NEW 20A/1P BREAKER. SEE SHEET 5-PP103, MECHANICAL ROOM 5165 FOR PANEL LOCATION. PROVIDE NEW 2#12, #12G; 3/4" CONDUIT TO NEW EQUIPMENT. PROVIDE FLEXIBLE CONDUIT CONNECTION TO NEW EQUIPMENT SUCH THAT EQUIPMENT CAN BE REMOVED OR SERVICED. EXISTING 208Y/120V, 3 , 4W PANEL X-5 TO REMAIN. PROVIDE 20A/2P CIRCUITBREAKER FOR NEW PUMPS RP-9 AND RP-10 AND ONE 20A/1P CIRCUIT BREAKER FOR EXISTING RELOCATED WATER HEATERS. BREAKERS SHALL BE COMPATIBLE WITH PANEL AND SHALL MATCH AIC RATING. SEE SHEET 5-PP103, MECHANICAL ROOM 5165 FOR PANEL LOCATION. .

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

MECHANICAL PHASE 1 NEW WORK NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text INSTALL RELOCATED EWH-1 DOMESTIC INSTANTANEOUS STEAM WATER HEATER. SEE SECTIONS ON THIS SHEET. PROVIDE UNIONS OR FLANGES AT ALL CONNECTIONS SUCH THAT HEATER OR HEATER SHELL CAN BE REMOVED FOR SERVICE OF INTERNAL COILS. SEE THIS SHEET FOR ELECTRICAL CONNECTIONS. CONNECT NEW MEDIUM PRESSURE STEAM TO EXISTING MEDIUM PRESSURE STEAM LINE. PROVIDE (2) NEW VALVES FOR DOUBLE ISOLATION OF STEAM SUPPLY. FIELD FABRICATE AND INSTALL PIPE SPOOL PIECE SUCH THAT VALVE HANDLES HAVE MINIMUM 3" CLEARANCE. VALVE HANDLE SHALL NOT TOUCH OR CREATE PINCH POINT. INSTALL AND FIELD ROUTE NEW 3" 20# MEDIUM PRESSURE STEAM SUPPLY LINE TO RELOCATED EXISTING DOMESTIC WATER HEATER MANUFACTURER SUPPLIED ELECTRONIC STEAM CONTROL VALVE. PROVIDE ALL PIPE, FITTINGS, VALVES, AND ACCESSORIES AS SHOWN AND MAKE CONNECTIONS FOR OPERABLE SYSTEM. INSTALL AND FIELD ROUTE NEW GRAVITY CONDENSATE RETURN LINE FROM RELOCATED EXISTING DOMESTIC WATER HEATERS TO EXISTING CONDENSATE PUMP RECEIVER. ALL PIPE MUST GRAVITY DRAIN TO RECEIVER. INSTALL NEW PIPE AND FITTINGS TO RECONNECT EXISTING. FIELD ROUTE NEW 3/4" CONDENSATE RETURN FROM MEDIUM PRESSURE STEAM SUPPLY TRAP ST-9 TO NEW FLASH TANK FT-3. PROVIDE NEW DRIP LEG CONDENSATE RETURN FROM MEDIUM PRESSURE STEAM VERTICAL DROP. SEE DETAIL 1 ON SHEET PP402 FOR DRIP LEG AND TRAP PIPING ARRANGEMENT. SEE STEAM TRAP SCHEDULE ON SHEET PP501. INSTALL NEW FLASH TANK FT-3. REFER TO DETAIL 5 ON SHEET PP402 AND FLASH TANK SCHEDULE ON SHEET PP501. FIELD ROUTE NEW CONDENSATE RETURN FROM NEW FLASH TANK FT-3 TO EXISTING CONDENSATE PUMP CP-1. FIELD ROUTE NEW FLASH TANK FT-3 1 1/4" VENT AND CONNECT TO EXISTING CONDENSATE PUMP RECEIVER CP-1 VENT. INSTALL NEW CAP ON EXISTING.

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL PHASE 1 NEW WORK NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text INSTALL RELOCATED EWH-2 DOMESTIC INSTANTANEOUS STEAM WATER HEATER. SEE SECTIONS ON THIS SHEET. PROVIDE UNIONS OR FLANGES AT ALL CONNECTIONS SUCH THAT HEATER OR HEATER SHELL CAN BE REMOVED FOR SERVICE OF INTERNAL COILS. SEE THIS SHEET FOR ELECTRICAL CONNECTIONS. CONNECT EWH-2 TO NEW MEDIUM PRESSURE STEAM LINE. INSTALL STORED EWH-2 ELECTRONIC STEAM VALVE REMOVED DURING RELOCATION TO MATCH EXISTING EWH-1 INSTALLATION. CONNECT EXISTING EWH-2 CONDENSATE OUTLET TO NEW 2" CONDENSATE RETURN HEADER. INSTALL NEW CAP ON EXISTING.

AutoCAD SHX Text

MECHANICAL PHASE 2 NEW WORK NOTES:

AutoCAD SHX Text PROVIDE NEW 2#12, #12G; 3/4" CONDUIT TO NEW EQUIPMENT. PROVIDE FLEXIBLE CONDUIT CONNECTION TO NEW EQUIPMENT SUCH THAT EQUIPMENT CAN BE REMOVED OR SERVICED.

AutoCAD SHX Text

ELECTRICAL PHASE 2 NEW WORK NOTES:

AutoCAD SHX Text G

AutoCAD SHX Text

WATER HEATER SECTIONS

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

Sheets and Views
5-PP102 GROUND FLOOR ZONE B NEW WORK PIPING PLAN
5-PP103 GROUND FLOOR ZONE C NEW WORK PIPING PLAN
5-PP104 FIRST FLOOR ZONE A NEW WORK PIPING PLAN
5-PP105 FIRST FLOOR ZONE B NEW WORK PIPING PLAN
5-PP106 FIRST FLOOR ZONE C NEW WORK PIPING PLAN
5-PP107 SECOND FLOOR NEW WORK PIPING PLAN
5-PP201 LARGE SCALE MECHANICAL ROOM NEW WORK PHASE 1 & 2

File details come from the government source that posted it. Updated .