S02-Contractor PPE (3 Submission Reqd) (614-18-106).pdf

PDF 198 KB Posted

Attached to
Z1NB--Project 614-18-106 Replace Plumbing and Piping Fixtures (FY-18 Plus-up)
Solicitation number
36C24920R0072
Issued by

View the file

Other files

File Type Posted
S06-36C24920R0072 Amendment 0008 09.03.2020.pdf PDF
S06-36C24920R0072 Amendment 0007.pdf PDF
S06-36C24920R0072 Amendment 0006.pdf PDF
S06-36C24920R0072 0005.pdf PDF
1-PP113 Rev1.pdf PDF
Bldg 5 - Memphis VAMC Final CD.pdf PDF
S06-614-18-106 Plumbing and Piping Addendum and RFI Responses.docx DOCX document
S06-Solicitation 36C24920R0072 0003.docx DOCX document
Bldg 9 - Memphis VAMC Final CD.pdf PDF
Bldg 1AC- Memphis VAMC Final CD Submittal.pdf PDF
36C24920R0072 0002.docx DOCX document
010000_General Requirements.pdf PDF
S02-Price Schedule (Proj 614-18-106) FY2020.xlsx XLSX spreadsheet
S05-Organized Site Visit Sign In Sheet (614-18-106).pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
Correct Piping Drawings MEP B1_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part6.pdf PDF
Correct Piping Drawings MEP B1_Part5.pdf PDF
Correct Piping Drawings GEN and ARCH_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part1.pdf PDF
Correct Piping Drawings MEP B7_Part2.pdf PDF
Correct Piping Drawings GEN and ARCH_Part3.pdf PDF
Correct Piping Drawings MEP B5_Part2.pdf PDF
Correct Piping Drawings MEP B5_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part3.pdf PDF
Correct Piping Drawings MEP B1_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part2.pdf PDF
Correct Piping Drawings MEP B1_Part4.pdf PDF
36C24920R0072 0001.docx DOCX document
Correct Piping Drawings GEN and ARCH_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part4.pdf PDF
S02-Contractor PPQ (3 Submission Reqd) (614-18-106)_Revision.pdf PDF
36C24920R0072 0001.docx DOCX document
S02-Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
S02-Correct Piping Drawings MEP B7_Part2.pdf PDF
S02-Correct Piping Drawings MEP B1_Part4.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1 02.pdf PDF
S02-Correct Piping Drawings MEP B1_Part5.pdf PDF
36C24920R0072_1.docx DOCX document
S02-Correct Piping Drawings MEP B1A_Part2.pdf PDF
C28-Project Specifications.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1.pdf PDF
S02-Correct Piping Drawings MEP B7_Part3.pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
S02-Correct Piping Drawings MEP B5_Part1.pdf PDF
S02-Correct Piping Drawings MEP B1_Part3.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2: PAST PERFORMANCE QUESTIONNAIRE

PAST PERFORMANCE QUESTIONNAIRE

SUBJECT: Past Performance Questionnaire for Project 614-18-106, Correct Plumbing, Piping & Replace Fixtures, Memphis VA Medical Center.

PAST PERFORMANCE INSTRUCTIONS

The NCO 9 Network Contracting Activity has issued a solicitation to Correct Plumbing, Piping & Replace Fixtures at the Memphis VA Medical Center, Project 614-18-106.

Past performance information will be used to evaluate proposals received. Section A is to be completed by the Offeror. Section A of the enclosed questionnaire lists the contractor who has identified your office as a source to evaluate their past performance. Section A also authorizes release of this information to NCO 9 Network Contracting Activity.

The Offeror must provide this entire document to each of its assessors. The Assessor shall only submit past performance questionnaires directly to the Contracting Officer-Roxie Ann Keese by way of email at roxie.keese@va.gov.

Section B in its entirety is to be completed by the assessor(s). An individual assessor knowledgeable of the contractor’s quality of supplies and services rendered is requested to verify, complete the questionnaire, and submit to the Contracting Office. If evaluating more than one contract for the same contractor, use a separate questionnaire for each contract being evaluated.

Because this information is critical to the evaluation process, your time and effort in providing your assessment is greatly appreciated. The questionnaire should be completed as soon as possible but not later than August 31, 2020 at 10:00am Eastern Time. Assessor is requested to send electronically to (Roxie. Keese@va.gov). Assessor: Please so not sent this information to the Offeror being evaluated.

Thank you in advance for your cooperation and expeditious response to this request.

PAST PERFORMANCE QUESTIONNAIRE

SECTION A: Contractor Information (to be completed by the contractor for who past performance information is being collected, prior to forwarding to assessors)

Solicitation Number 36C24920R0072 Project/Requirement 614-18-106 |Correct Plumbing, Piping & Replace Fixtures Customer/Agency Department of the Veteran Affairs, NCO 9, Memphis, TN 38104

1. Prospective Government Contractor’s______________________________________ Name and Address: ______________________________________

2. Contractor Point of Contact: ___________________________________________

3. Phone number (with area code): ___________________________________________

4. Assessor Contract Award number: _________________________________________

5. Description of Services provided under contract:

6. Contract award date: ___________ Contract Amount: Initial ___________Final ____

7. Period of Performance or Delivery Date: _________________________

ASSESSOR INFORMATION:

Assessor Name Title Phone Number/Email Address

8. Authorization is hereby granted to provide the information requested in this questionnaire to NCO 9 Network Contracting Activity, Murfreesboro, Tennessee (Signature)

(Name and Title of Authorizing Official) (Date)

SECTION B: Assessors Information (to be completed by assessors.

RATING SCALE Definitions

Past Performance Evaluation Ratings Rating Description ACCEPTABLE Based on the Offeror’s performance record, the

Government has a reasonable expectation that the offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note below.)

UNACCEPTABLE Based on the Offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

The questions on the survey (see below) shall be rated in accordance with the definitions provided in the Rating Scale. Any unsatisfactory or marginal rating shall be supplemented with an explanation in the space provided.

QUALITY OF SERVICE

1. Rate the contractor’s compliance with contractual requirements.

ACCEPTABLE ___ UNACCEPTABLE ___

2. Overall rating of contractor quality of service.

PLEASE PROVIDE RATIONALE FOR ASSIGNED RATING:

SCHEDULE

3. Delivery of service was within required time period specified by contract requirements.

4. Rate the contractor’s ability to control cost and submit invoices.

Are invoices complete, accurate, and timely?

BUSINESS RELATIONS

5. Overall rating of contractor’s business practices (e.g. maintaining A positive working relationship, business ethics, timely and effectively Resolution of any problems, etc.)

6. Rate the working relationship between contractor’s management, and your company (i.e. contractor’s history of reasonable and cooperative behavior, commitment of customer satisfaction; concern for the interest of the customer).

7. Rate the contractor's ability to submit required reports and/or invoices in a timely manner.

8. Rate the contractor’s responsiveness to customer complaint resolution.

9. Overall rating of contractor’s business relations.

How would you feel about awarding another contract to this contractor?

______ Would not hesitate to award another contract to this contractor.

______ Would most likely award another contract to this contractor.

______ Would think twice about awarding another contract to this contractor, but would do so if no better alternative existed.

______ Do not wish to award another contract to this contractor.

______ Would not award another contract to this contractor.

PLEASE PROVIDE RATIONALE FOR ASSIGNED RATING:

Overall Rating of Contractor’s performance (quality, schedule, business relations,) on contract being assessed.

ACCEPTABLE UNACCEPTABLE

VII. General Comments:

ASSESSOR:

Identify your role in the contract award or administration and the period of your involvement.

Role Period of Involvement

Contract Specialist/Contracting Officer

Technical Project Lead/Project Officer

OTHERS

(Signature) (Date)

(Typed or Printed Name) (Organization Name)

(Phone Number)

Assessor Name

File details come from the government source that posted it. Updated .