Bldg 1AC- Memphis VAMC Final CD Submittal.pdf

PDF 12 MB Posted

Attached to
Z1NB--Project 614-18-106 Replace Plumbing and Piping Fixtures (FY-18 Plus-up)
Solicitation number
36C24920R0072
Issued by

View the file

Other files

File Type Posted
S06-36C24920R0072 Amendment 0008 09.03.2020.pdf PDF
S06-36C24920R0072 Amendment 0007.pdf PDF
S06-36C24920R0072 Amendment 0006.pdf PDF
S06-36C24920R0072 0005.pdf PDF
1-PP113 Rev1.pdf PDF
Bldg 5 - Memphis VAMC Final CD.pdf PDF
S06-614-18-106 Plumbing and Piping Addendum and RFI Responses.docx DOCX document
S06-Solicitation 36C24920R0072 0003.docx DOCX document
Bldg 9 - Memphis VAMC Final CD.pdf PDF
36C24920R0072 0002.docx DOCX document
010000_General Requirements.pdf PDF
S02-Price Schedule (Proj 614-18-106) FY2020.xlsx XLSX spreadsheet
S05-Organized Site Visit Sign In Sheet (614-18-106).pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
Correct Piping Drawings MEP B1_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part6.pdf PDF
Correct Piping Drawings MEP B1_Part5.pdf PDF
Correct Piping Drawings GEN and ARCH_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part1.pdf PDF
Correct Piping Drawings MEP B7_Part2.pdf PDF
Correct Piping Drawings GEN and ARCH_Part3.pdf PDF
Correct Piping Drawings MEP B5_Part2.pdf PDF
Correct Piping Drawings MEP B5_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part3.pdf PDF
Correct Piping Drawings MEP B1_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part2.pdf PDF
Correct Piping Drawings MEP B1_Part4.pdf PDF
36C24920R0072 0001.docx DOCX document
Correct Piping Drawings GEN and ARCH_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part4.pdf PDF
S02-Contractor PPQ (3 Submission Reqd) (614-18-106)_Revision.pdf PDF
36C24920R0072 0001.docx DOCX document
S02-Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
S02-Correct Piping Drawings MEP B7_Part2.pdf PDF
S02-Correct Piping Drawings MEP B1_Part4.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1 02.pdf PDF
S02-Correct Piping Drawings MEP B1_Part5.pdf PDF
36C24920R0072_1.docx DOCX document
S02-Correct Piping Drawings MEP B1A_Part2.pdf PDF
C28-Project Specifications.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1.pdf PDF
S02-Correct Piping Drawings MEP B7_Part3.pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
S02-Contractor PPE (3 Submission Reqd) (614-18-106).pdf PDF
S02-Correct Piping Drawings MEP B5_Part1.pdf PDF
S02-Correct Piping Drawings MEP B1_Part3.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEC

G

F

E

D

C

B

A

27262524

23222120

D.1

C.1

B.1

A.1

E.1

DKB JEA

1AC-PD101

GROUND FLOOR

DEMOLITION PIPING PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

1AC

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

O

F

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

D

N

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

B L

A M

B U

L A

T O

R Y

C

R

E

B L

AutoCAD SHX Text

PD201

AutoCAD SHX Text

PD301

AutoCAD SHX Text

PD302

AutoCAD SHX Text

MED201

AutoCAD SHX Text STAIR No2

AutoCAD SHX Text

MECHANICAL 6017

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 5"

AutoCAD SHX Text

CORRIDOR 60-C3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR 60-C1

AutoCAD SHX Text

C0RR. 60-C2

AutoCAD SHX Text

AutoCAD SHX Text

CORR. 60-C4

AutoCAD SHX Text

AutoCAD SHX Text 6027A

AutoCAD SHX Text 6008A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6018A

AutoCAD SHX Text 6018B

AutoCAD SHX Text 6018C

AutoCAD SHX Text 6018D

AutoCAD SHX Text 6018E

AutoCAD SHX Text 6018F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6002B

AutoCAD SHX Text

AutoCAD SHX Text 6002A

AutoCAD SHX Text 6003A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6005A

AutoCAD SHX Text

AutoCAD SHX Text STAIR No3

AutoCAD SHX Text 2"

AutoCAD SHX Text 3"

AutoCAD SHX Text

5" UP 2" DN.

AutoCAD SHX Text

INCOMING DOMESTIC WATER

AutoCAD SHX Text

PHIGENICS MONITORING PANEL

AutoCAD SHX Text

TO WATER SOFTENER

AutoCAD SHX Text

2"@ FLOOR

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

UP TO 1" WHA

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text

TO EQUIPMENT

AutoCAD SHX Text

BFP

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/4"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 1/2

AutoCAD SHX Text

1/2" UP CAPPED ON FLOOR ABOVE

AutoCAD SHX Text

STUB-OUT NOT FOUND

AutoCAD SHX Text 1"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text

1" DHWR FROM BUILDING/PUMPS TO WATER HEATERS

AutoCAD SHX Text

3" DCWS TO WATER HEATERS

AutoCAD SHX Text

3" DHWS FROM WATER HEATERS TO BUILDING

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GROUND FLOOR DEMOLITION PLAN

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text DRAIN, DISCONNECT, REMOVE, AND DISCARD ALL PIPE AND FITTINGS TO INCLUDE CONNECTION POINT TEE. PREPARE EXISTING PIPE TO REMAIN FOR RECONNECTION. PLUG ALL FLOOR AND WALL PENETRATIONS WITH APPROVED FIRE STOP MATERIALS. NOT USED. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING FAUCET AND SUPPLY LINES. STOPS TO REMAIN FOR RECONNECTION TO NEW FAUCET. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING WALL MOUNTED FAUCET. IN-WALL CONNECTIONS TO REMAIN FOR RECONNECTION.

AutoCAD SHX Text

PLUMBING DEMOLITION NOTES:

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, LOCATION, AND SIZING OF PIPING/VALVES PRIOR TO COMMENCEMENT OF WORK. B. UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL LAVATORY, SINKS, AND SHOWERS ARE 1/2". DOMESTIC COLD WATER PIPING TO URINALS IS 3/4" AND PIPING TO WATER CLOSETS IS 1".

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

KEY PLAN BUILDING 1 GROUND FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

E

D

C

B

A

27262524

23222120

D.1

C.1

B.1

A.1

E.1

CANOPY ABOVE

SPECIMEN PASS-THRU CABINET,AC-15

BED PAN WASHER

DKB JEA

1AC-PD102

FIRST FLOOR

DEMOLITION PIPING PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

1AC

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

B L

M

B U

L A

T O

R

E

B L

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6112-A

AutoCAD SHX Text 6112-B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 61-C1A

AutoCAD SHX Text 61-C1B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 61-C17A

AutoCAD SHX Text 6153B

AutoCAD SHX Text

AutoCAD SHX Text 6153A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6151F

AutoCAD SHX Text 6151E

AutoCAD SHX Text 6151B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6151C

AutoCAD SHX Text 6147A

AutoCAD SHX Text 6147E

AutoCAD SHX Text 6147C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6142E

AutoCAD SHX Text 6142D

AutoCAD SHX Text 6143C

AutoCAD SHX Text 6143B

AutoCAD SHX Text 6143A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C1-C16A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 61-C11A

AutoCAD SHX Text 61-C11

AutoCAD SHX Text

AutoCAD SHX Text 6147D

AutoCAD SHX Text 6147B

AutoCAD SHX Text 6147F

AutoCAD SHX Text

AutoCAD SHX Text 6151A

AutoCAD SHX Text 6151D

AutoCAD SHX Text 6110A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text STAIR No1

AutoCAD SHX Text

CORR. 61-C8

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 6112-C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR 61-C2

AutoCAD SHX Text

CORR. 61-C8

AutoCAD SHX Text

CORR. 61-C7

AutoCAD SHX Text

CORRIDOR 61-C3

AutoCAD SHX Text

CORRIDOR 61-C1

AutoCAD SHX Text

CORRIDOR 61-C17

AutoCAD SHX Text

CORRIDOR 61-C14

AutoCAD SHX Text

CORR. 61-C12

AutoCAD SHX Text

CORRIDOR 61-C15

AutoCAD SHX Text

CORRIDOR 61-C16

AutoCAD SHX Text

CORR. 61-C9

AutoCAD SHX Text

CORR. 61-C6

AutoCAD SHX Text

CORR. 61-C5

AutoCAD SHX Text

CORRIDOR 61-C4

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6112-E

AutoCAD SHX Text 6112-G

AutoCAD SHX Text 6112-H

AutoCAD SHX Text 6112-L

AutoCAD SHX Text 6112-K

AutoCAD SHX Text 6112-F

AutoCAD SHX Text 6112-D

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 61- C9A

AutoCAD SHX Text 61- C5A

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text 1"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text

ICE

AutoCAD SHX Text STAIR No2

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 61- C4A

AutoCAD SHX Text STAIR No3

AutoCAD SHX Text 2"

AutoCAD SHX Text

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text

CORR. 61-C10

AutoCAD SHX Text 4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 6116A

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

OFF

AutoCAD SHX Text

OFF

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

IA

AutoCAD SHX Text

IA

AutoCAD SHX Text

AutoCAD SHX Text

IA

AutoCAD SHX Text

IA

AutoCAD SHX Text

AutoCAD SHX Text

IA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text A/P

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text A

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

IA

AutoCAD SHX Text

FIRST FLOOR DEMOLITION PLAN

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text DRAIN, DISCONNECT, REMOVE, AND DISCARD ALL PIPE AND FITTINGS TO INCLUDE CONNECTION POINT TEES. PREPARE EXISTING PIPE TO REMAIN FOR RECONNECTION. PLUG ALL FLOOR AND WALL PENETRATIONS WITH APPROVED FIRE STOP MATERIALS. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING MANUAL BALANCING VALVE GROUP. PREPARE EXISTING PIPE TO REMAIN FOR RECONNECTION. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING FAUCET AND SUPPLY LINES. STOPS TO REMAIN FOR RECONNECTION TO NEW FAUCET. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING WALL MOUNTED FAUCET. IN-WALL CONNECTIONS TO REMAIN FOR RECONNECTION. NOT USED DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING SHOWER OR TUB/SHOWER VALVE AND ASSOCIATED TRIM. PREPARE EXISTING IN-WALL PIPE FOR RECONNECTION. SEE ARCHITECTURAL SHEETS FOR WALL REMOVAL.

AutoCAD SHX Text

PLUMBING DEMOLITION NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, LOCATION, AND SIZING OF PIPING/VALVES PRIOR TO COMMENCEMENT OF WORK. B. UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL LAVATORY, SINKS, AND SHOWERS ARE 1/2". DOMESTIC COLD WATER PIPING TO URINALS IS 3/4" AND PIPING TO WATER CLOSETS IS 1".

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

KEY PLAN BUILDING 1 FIRST FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

PIPING CAPPED IN VERTICAL. CHASE WITH DHWS AND DHWR FROM BELOW.

AutoCAD SHX Text

DRAWING NOTES:

AutoCAD SHX Text A

B

DN

G

F

E

D

C

B

A

27262524

23222120

D.1

C.1

B.1

A.1

E.1

DKB JEA

1AC-PD103

SECOND FLOOR

DEMOLITION PIPING PLAN

B L

M

B U

L A

T O

R

E

B L

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

1AC

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6200H

AutoCAD SHX Text 6200K

AutoCAD SHX Text

CORRIDOR 6200I

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR 6200A

AutoCAD SHX Text

CORRIDOR 6200B

AutoCAD SHX Text

CORRIDOR 6200J

AutoCAD SHX Text 6200C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6222A

AutoCAD SHX Text 6222B

AutoCAD SHX Text 6222C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text STAIR No2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text STAIR No 1

AutoCAD SHX Text STAIRS No3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR 6200E

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

CORR. 6200D

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

1/2" CAPPED

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

NEW SINK LOCATION

AutoCAD SHX Text

NO FIXTURE UNDER

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

HVAC MAKE-UP

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 2"

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONTINUATION (TYP)

AutoCAD SHX Text 2"

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text

CONTINUATION (TYP)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECOND FLOOR DEMOLITION PLAN

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text DRAIN, DISCONNECT, REMOVE, AND DISCARD ALL PIPE AND FITTINGS TO INCLUDE CONNECTION POINT TEES. PREPARE EXISTING PIPE TO REMAIN FOR RECONNECTION. PLUG ALL FLOOR AND WALL PENETRATIONS WITH APPROVED FIRE STOP MATERIALS. NOT USED. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING FAUCET AND SUPPLY LINES. STOPS TO REMAIN FOR RECONNECTION TO NEW FAUCET.

AutoCAD SHX Text

PLUMBING DEMOLITION NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, LOCATION, AND SIZING OF PIPING/VALVES PRIOR TO COMMENCEMENT OF WORK. B. UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL UNLESS NOTED OTHERWISE, DOMESTIC WATER PIPE DROPS TO ALL LAVATORY, SINKS, AND SHOWERS ARE 1/2". DOMESTIC COLD WATER PIPING TO URINALS IS 3/4" AND PIPING TO WATER CLOSETS IS 1".

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

KEY PLAN BUILDING 1 SECOND FLOOR

PLAN NORTH

25 26 25 26

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

1AC

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

1AC-PD201

MECHANICAL ROOM DEMOLITION

PLUMBING PHASE 1 & 2

AutoCAD SHX Text

STAIR 2

AutoCAD SHX Text 5"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UERP-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text

%%UEWH-1

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

%%UFD

AutoCAD SHX Text

%%UFD

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text

%%UCO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text 60-C4

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

STAIR 2

AutoCAD SHX Text 5"

AutoCAD SHX Text 1"

AutoCAD SHX Text

%%UERP-1

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text

%%UWH-7

AutoCAD SHX Text D

AutoCAD SHX Text

%%UFD

AutoCAD SHX Text

%%UFD

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text

%%URP-7

AutoCAD SHX Text

%%URP-8

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text

1" DHWR

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UCO

AutoCAD SHX Text 3/4"

AutoCAD SHX Text D

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text 60-C4

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, ROUTING, AND SIZING OF PIPING PRIOR TO COMMENCEMENT OF WORK. B. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED FOR DEMOLITION OR TIE-IN OF NEW WORK. C. COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION SECTION 01.00.00 GENERAL REQUIREMENTS. NOTE THAT AFTER HOURS AND WEEKEND WORK SHALL BE REQUIRED FOR MOST SPACES. D. PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END OF EACH WORK SHIFT. COVER ALL EQUIPMENT AND PROTECT COURSE OF WORK. RUN HEPA-FILTER EXHAUST FILTRATION UNITS DURING ALL ACTIVE WORK ACTIVITIES. E. THE INTENT IS TO INSTALL, TEST, AND OPERATE 1 NEW WATER HEATER AND 2 THE INTENT IS TO INSTALL, TEST, AND OPERATE 1 NEW WATER HEATER AND 2 NEW CIRCULATION PUMPS FOR A PERIOD OF SEVEN (7) DAYS PRIOR TO COMMISSIONING. RELOCATION OF REMAINING EXISTING WATER HEATER AND DEMOLITION OF RETURN PUMP WILL BEGIN AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR NEW WATER HEATER AND NEW PUMPS ARE COMPLETE. ONLY ONE NEW PUMP SHALL OPERATE AT A TIME. ROTATE NEW PUMP OPERATION EVERY 24 HOURS DURING PHASE 1. REMAINING EXISTING WATER HEATER SHALL BE RELOCATED AND EXISTING PUMP SHALL BE DEMOLISHED. NEW PUMP OPERATION/ROTATION SHALL CONTINUE. AFTER SUCCESSFUL COMMISSIONING ACTIVITIES ARE COMPLETE, ONE HEATER AND ONE PUMP SHALL BE IN OPERATION. ONE HEATER SHALL BE OFFLINE AND DRAINED. ONE PUMP SHALL BE IN STAND-BY AND PUMP ROTATION SET TO 8 HOURS INTERVALS PER CONTROL SHEET P002. F. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. SCHEDULE REQUIRED TIE-INS TO MINIMIZE NUMBER AND DURATION OF OUTAGES. G. CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS AND SUPPORTS, INSULATION, EQUIPMENT, CONTROLS, BMS CONNECTIONS, ELECTRICAL ITEMS, ETC., TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. H. CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW PIPE, FITTINGS, VALVES, ETC. AS INDICATED. COR/WATER SYSTEM MANAGE APPROVAL OF LOCATION IS REQUIRED PRIOR TO INSTALLATION.

AutoCAD SHX Text SHUT OFF STEAM, CONDENSATE, DCWS, AND DHWS VALVES TO ISOLATE EWH-1. SEE SHEET 1AC-MED201 FOR STEAM, CONDENSATE, AND ELECTRICAL DEMOLITION. SEE THIS SHEET AND SHEET 1AC-PD301 FOR DOMESTIC WATER HEATER DEMOLITION. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTORS. EACH TRADE IS RESPONSIBLE FOR CONDUCTOR AND CONDUIT REMOVAL. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING FITTINGS AND PIPE AS INDICATED. PREPARE EXISTING TO REMAIN FOR RECONNECTION. SEE SHEET 1AC-PD301 FOR ADDITIONAL INFORMATION. EXISTING DOMESTIC WATER HEATER EWH-2 AND ASSOCIATED RETURN PUMP ERP-1 TO REMAIN IN OPERATION AND CONNECTED TO BUILDING UNTIL NEW DOMESTIC WATER HEATER WH-7 AND NEW RETURN PUMPS RP-7 AND RP-8 ARE INSTALLED, TESTED, APPROVED AND ON-LINE. DRAIN, DISCONNECT, REMOVE, AND TURN OVER TO GOVERNMENT/COR ALL EXISTING WATER HEATERS, PUMPS, EXPANSION TANK, AND MIXING VALVES AS INDICATED. TRANSPORT TO COR APPROVED STORAGE LOCATION ON-SITE. DEMOLISH, REMOVE, AND DISCARD EXISTING HOUSEKEEPING PAD. IF PAD IS POURED INTEGRAL WITH FLOOR, REMOVE CONCRETE MINIMUM 3" BELOW FINISHED FLOOR. REPAIR FLOOR TO MATCH EXISTING GRADE AND FINISH.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

PLUMBING PHASE 1 DEMOLITION NOTES:

AutoCAD SHX Text

DEMOLITION WATER HEATER AND PUMP INSTALLATION - PHASE 1

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text 6'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'

AutoCAD SHX Text

GROUND FLOOR MECHANICAL ROOM PLAN

AutoCAD SHX Text

DEMOLITION WATER HEATER AND PUMP INSTALLATION - PHASE 2

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text 6'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'

AutoCAD SHX Text

GROUND FLOOR MECHANICAL ROOM PLAN

AutoCAD SHX Text SHUT OFF STEAM, CONDENSATE, DCWS, AND DHWS VALVES TO ISOLATE EWH-2. SEE SHEET 1AC-MED201 FOR STEAM, CONDENSATE, AND ELECTRICAL DEMOLITION. SEE THIS SHEET AND SHEET 1AC-PD302 FOR DOMESTIC WATER HEATER DEMOLITION. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTORS. EACH TRADE IS RESPONSIBLE FOR CONDUCTOR AND CONDUIT REMOVAL. SEE SHEET 1AC-PP201, PHASE 2 FOR RELOCATION AND CONNECTION TO NEW PIPING. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING PIPING. PROVIDE THREADED, PLUGGED OUTLET AT ALL VALVES TO REMAIN. DRAIN, DISCONNECT, REMOVE, AND DISCARD PIPING ASSOCIATED WITH ORIGINAL DHWR PUMP. TURN OVER TO GOVERNMENT/COR ORIGINAL DHWR PUMPS. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTORS. EACH TRADE IS RESPONSIBLE FOR CONDUCTOR AND CONDUIT REMOVAL. TRANSPORT PUMP TO COR APPROVED STORAGE LOCATION ON-SITE. COORDINATE WITH CONTROLS CONTRACTOR TO REMOVE SENSORS ASSOCIATED WITH EXISTING DOMESTIC WATER PIPING. CONTROLS CONTRACTOR IS RESPONSIBLE FOR CONDUCTOR AND CONDUIT REMOVAL.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING PHASE 2 DEMOLITION NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text X

AutoCAD SHX Text A. DCWS TO WATER HEATERS. DCWS TO WATER HEATERS. B. DHWS FROM WATER HEATERS TO BUILDING. DHWS FROM WATER HEATERS TO BUILDING. C. DHWR FROM BUILDING/PUMPS TO WATER HEATERS. DHWR FROM BUILDING/PUMPS TO WATER HEATERS. D. 1" DCWS TO HVAC EQUIPMENT.1" DCWS TO HVAC EQUIPMENT.

DRAWING NOTES:

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

1AC

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

1AC-PD301

WATER HEATER PLUMBING PIPING

DEMOLITION RISER DIAGRAM - PHASE 1

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text S

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

%%UEWH-1

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text

1" RPZ BFP

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

%%UERP-1

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text 1"

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

HB

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 1"

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

%%UNOTE:%%U REFER TO DRAWING 1AC-PD201, PHASE 1 FOR PLAN LAYOUT

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

AND DOMESTIC WATER HEATER ASSEMBLY - PHASE 1

AutoCAD SHX Text

PIPING RISER DIAGRAM - DOMESTIC WATER CIRCULATION PUMPS

AutoCAD SHX Text

%%UDRAWING NOTES

AutoCAD SHX Text X

AutoCAD SHX Text A. DCWS TO WATER HEATERS. DCWS TO WATER HEATERS. B. DHWS FROM WATER HEATERS TO BUILDING. DHWS FROM WATER HEATERS TO BUILDING. C. DHWR FROM BUIDING/PUMPS TO WATER HEATERS. DHWR FROM BUIDING/PUMPS TO WATER HEATERS. D. 1" DCWS TO HVAC EQUIPMENT. 1" DCWS TO HVAC EQUIPMENT. E. AQUASTAT.AQUASTAT.

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, ROUTING, AND SIZING OF PIPING PRIOR TO COMMENCEMENT OF WORK. B. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED FOR DEMOLITION OR TIE-IN OF NEW WORK. C. COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION SECTION 01.00.00 GENERAL REQUIREMENTS. NOTE THAT AFTER HOURS AND WEEKEND WORK SHALL BE REQUIRED FOR MOST SPACES. D. PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END OF EACH WORK SHIFT. COVER ALL EQUIPMENT AND PROTECT COURSE OF WORK. RUN HEPA-FILTER EXHAUST FILTRATION UNITS DURING ALL ACTIVE WORK ACTIVITIES. E. THE INTENT IS TO INSTALL, TEST, AND OPERATE 1 NEW WATER HEATER AND 2 THE INTENT IS TO INSTALL, TEST, AND OPERATE 1 NEW WATER HEATER AND 2 NEW CIRCULATION PUMPS FOR A PERIOD OF SEVEN (7) DAYS PRIOR TO COMMISSIONING. RELOCATION OF REMAINING EXISTING WATER HEATER AND DEMOLITION OF RETURN PUMP WILL BEGIN AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR NEW WATER HEATER AND NEW PUMPS ARE COMPLETE. ONLY ONE NEW PUMP SHALL OPERATE AT A TIME. ROTATE NEW PUMP OPERATION EVERY 24 HOURS DURING PHASE 1. REMAINING EXISTING WATER HEATER SHALL BE RELOCATED AND EXISTING PUMP SHALL BE DEMOLISHED. NEW PUMP OPERATION/ROTATION SHALL CONTINUE. AFTER SUCCESSFUL COMMISSIONING ACTIVITIES ARE COMPLETE, ONE HEATER AND ONE PUMP SHALL BE IN OPERATION. ONE HEATER SHALL BE OFFLINE AND DRAINED. ONE PUMP SHALL BE IN STAND-BY AND PUMP ROTATION SET TO 8 HOURS INTERVALS PER CONTROL SHEET P002. F. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. SCHEDULE REQUIRED TIE-INS TO MINIMIZE NUMBER AND DURATION OF OUTAGES. G. CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS AND SUPPORTS, INSULATION, EQUIPMENT, CONTROLS, BMS CONNECTIONS, ELECTRICAL ITEMS, ETC., TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. H. CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW PIPE, FITTINGS, VALVES, ETC. AS INDICATED. COR/WATER SYSTEM MANAGE APPROVAL OF LOCATION IS REQUIRED PRIOR TO INSTALLATION.

AutoCAD SHX Text SHUT OFF STEAM, CONDENSATE, DCWS, AND DHWS VALVES TO ISOLATE EWH-1. SEE SHEET 1AC-MED201 FOR STEAM, CONDENSATE, AND ELECTRICAL DEMOLITION. SEE SHEET 1AC-PD201 FOR ADDITIONAL INFORMATION. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTORS. EACH TRADE IS RESPONSIBLE FOR CONDUCTOR AND CONDUIT REMOVAL. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING FITTINGS AND PIPE AS INDICATED. PREPARE EXISTING TO REMAIN FOR RECONNECTION. SEE SHEET 1AC-PD201 FOR ADDITIONAL INFORMATION. EXISTING DOMESTIC WATER HEATER EWH-2 AND ASSOCIATED RETURN PUMP ERP-1 TO REMAIN IN OPERATION AND CONNECTED TO BUILDING UNTIL NEW DOMESTIC WATER HEATER WH-7 AND NEW RETURN PUMPS RP-7 AND RP-8 ARE INSTALLED, TESTED, APPROVED AND ON-LINE. DRAIN, DISCONNECT, REMOVE, AND TURN OVER TO GOVERNMENT/COR ALL EXISTING WATER HEATERS, PUMPS, EXPANSION TANK, AND MIXING VALVES. TRANSPORT TO COR APPROVED STORAGE LOCATION ON-SITE. DEMOLISH, REMOVE, AND DISCARD EXISTING HOUSEKEEPING PAD. IF PAD IS POURED INTEGRAL WITH FLOOR, REMOVE CONCRETE MINIMUM 3" BELOW FINISHED FLOOR. REPAIR FLOOR TO MATCH EXISTING GRADE AND FINISH.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

PLUMBING PHASE 1 DEMOLITION NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

1AC

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

1AC-PD302

WATER HEATER PLUMBING PIPING

DEMOLITION RISER DIAGRAM - PHASE 2

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text S

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

%%UWH-7

AutoCAD SHX Text

HB

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text

1" RPZ BFP

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text

%%UERP-1

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text

DCWS

AutoCAD SHX Text P

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text U

AutoCAD SHX Text V

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text 3"

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text P

AutoCAD SHX Text

%%URP-8

AutoCAD SHX Text 1"

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text T

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text

DHWR

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWR

AutoCAD SHX Text Q

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text

DHWR

AutoCAD SHX Text K

AutoCAD SHX Text 1"

AutoCAD SHX Text L

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text O

AutoCAD SHX Text

DCWS

AutoCAD SHX Text 3"

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text K

AutoCAD SHX Text G

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%URP-7

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

DHWS

AutoCAD SHX Text

DCWS

AutoCAD SHX Text

%%UNOTE:%%U REFER TO DRAWING 1AC-PD201, PHASE 2 FOR PLAN LAYOUT

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

AND DOMESTIC WATER HEATER ASSEMBLY - PHASE 2

AutoCAD SHX Text

PIPING RISER DIAGRAM - DOMESTIC WATER CIRCULATION PUMPS

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, ROUTING, AND SIZING OF PIPING PRIOR TO COMMENCEMENT OF WORK. B. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED FOR DEMOLITION OR TIE-IN OF NEW WORK. C. COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION SECTION 01.00.00 GENERAL REQUIREMENTS. NOTE THAT AFTER HOURS AND WEEKEND WORK SHALL BE REQUIRED FOR MOST SPACES. D. PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END OF EACH WORK SHIFT. COVER ALL EQUIPMENT AND PROTECT COURSE OF WORK. RUN HEPA-FILTER EXHAUST FILTRATION UNITS DURING ALL ACTIVE WORK ACTIVITIES. E. THE INTENT IS TO INSTALL, TEST, AND OPERATE 1 NEW WATER HEATER AND 2 THE INTENT IS TO INSTALL, TEST, AND OPERATE 1 NEW WATER HEATER AND 2 NEW CIRCULATION PUMPS FOR A PERIOD OF SEVEN (7) DAYS PRIOR TO COMMISSIONING. RELOCATION OF REMAINING EXISTING WATER HEATER AND DEMOLITION OF RETURN PUMP WILL BEGIN AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR NEW WATER HEATER AND NEW PUMPS ARE COMPLETE. ONLY ONE NEW PUMP SHALL OPERATE AT A TIME. ROTATE NEW PUMP OPERATION EVERY 24 HOURS DURING PHASE 1. REMAINING EXISTING WATER HEATER SHALL BE RELOCATED AND EXISTING PUMP SHALL BE DEMOLISHED. NEW PUMP OPERATION/ROTATION SHALL CONTINUE. AFTER SUCCESSFUL COMMISSIONING ACTIVITIES ARE COMPLETE, ONE HEATER AND ONE PUMP SHALL BE IN OPERATION. ONE HEATER SHALL BE OFFLINE AND DRAINED. ONE PUMP SHALL BE IN STAND-BY AND PUMP ROTATION SET TO 8 HOURS INTERVALS PER CONTROL SHEET P002. F. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. SCHEDULE REQUIRED TIE-INS TO MINIMIZE NUMBER AND DURATION OF OUTAGES. G. CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS AND SUPPORTS, INSULATION, EQUIPMENT, CONTROLS, BMS CONNECTIONS, ELECTRICAL ITEMS, ETC., TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. H. CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW PIPE, FITTINGS, VALVES, ETC. AS INDICATED. COR/WATER SYSTEM MANAGE APPROVAL OF LOCATION IS REQUIRED PRIOR TO INSTALLATION.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text A. TO EXISTING FLOOR DRAIN. TO EXISTING FLOOR DRAIN. B. DRAIN VALVE. DRAIN VALVE. C. DHWS PRE CHLORINE INJECTION SAMPLE PORT TO MONITORING EQUIPMENT. DHWS PRE CHLORINE INJECTION SAMPLE PORT TO MONITORING EQUIPMENT. (FUTURE CONNECTION TO EQUIPMENT BY OTHERS) CONNECTION TO EQUIPMENT BY OTHERS) D. DCWS TO WATER HEATERS. DCWS TO WATER HEATERS. E. DHWS FROM WATER HEATERS TO BUILDING. DHWS FROM WATER HEATERS TO BUILDING. F. DHWS PRE CHLORINE INJECTION SAMPLE PORT. (FUTURE CONNECTION TO DHWS PRE CHLORINE INJECTION SAMPLE PORT. (FUTURE CONNECTION TO (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). G. 1" DHWS CHLORINE INJECTION PORT. (FUTURE CONNECTION TO EQUIPMENT 1" DHWS CHLORINE INJECTION PORT. (FUTURE CONNECTION TO EQUIPMENT . (FUTURE CONNECTION TO EQUIPMENT (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). H. 1/2" DHWS POST CHLORINE INJECTION SAMPLE PORT. (FUTURE CONNECTION TO 1/2" DHWS POST CHLORINE INJECTION SAMPLE PORT. (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). J. BALL CHECK VALVE. BALL CHECK VALVE. K. PRESSURE SENSOR. PRESSURE SENSOR. L. LOCKABLE BALL VALVE (NC). LOCKABLE BALL VALVE (NC). M. DIGITAL THERMOMETER (TYP). DIGITAL THERMOMETER (TYP). N. GROOVED JOINT (TYP). GROOVED JOINT (TYP). O. DHWR FROM BUILDING/PUMPS TO WATER HEATERS. DHWR FROM BUILDING/PUMPS TO WATER HEATERS. P. 1/2" CHLORINE MONITORING EQUIPMENT SAMPLE COOLER SUPPLY PORT. 1/2" CHLORINE MONITORING EQUIPMENT SAMPLE COOLER SUPPLY PORT. (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). FUTURE CONNECTION TO EQUIPMENT BY OTHERS). ). Q. 1" DCWS TO HVAC EQUIPMENT. 1" DCWS TO HVAC EQUIPMENT. R. 1/2" DCWS CHLORINE SAMPLE PORT. (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). 1/2" DCWS CHLORINE SAMPLE PORT. (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). CONNECTION TO EQUIPMENT BY OTHERS). S. 1/2" DHWR CHLORINE SAMPLE PORT. (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). 1/2" DHWR CHLORINE SAMPLE PORT. (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). (FUTURE CONNECTION TO EQUIPMENT BY OTHERS). CONNECTION TO EQUIPMENT BY OTHERS). T. PETE'S PLUG. PETE'S PLUG. U. TEMPERATURE AND PRESSURE RELIEF VALVE. TEMPERATURE AND PRESSURE RELIEF VALVE. V. SOLENOID VALVE. SOLENOID VALVE. W. EXISTING CONCRETE PAD.EXISTING CONCRETE PAD.

AutoCAD SHX Text

DRAWING NOTES:

AutoCAD SHX Text SHUT OFF STEAM, CONDENSATE, DCWS, AND DHWS VALVES TO ISOLATE EWH-2. SEE SHEET 1AC-MED201 FOR STEAM, CONDENSATE, AND ELECTRICAL DEMOLITION. SEE SHEET 1AC-PD201 FOR ADDITIONAL INFORMATION. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTORS. EACH TRADE IS RESPONSIBLE FOR CONDUCTOR AND CONDUIT REMOVAL. SEE SHEET 1AC-PP201, PHASE 2 FOR RELOCATION AND CONNECTION TO NEW PIPING. DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING PIPING. PROVIDE THREADED, PLUGGED OUTLET AT ALL VALVES TO REMAIN. DRAIN, DISCONNECT, REMOVE, AND DISCARD PIPING ASSOCIATED WITH ORIGINAL DHWR PUMP. TURN OVER TO GOVERNMENT/COR ORIGINAL DHWR PUMP. COORDINATE WITH ELECTRICAL AND CONTROLS CONTRACTORS. EACH TRADE IS RESPONSIBLE FOR CONDUCTOR AND CONDUIT REMOVAL. TRANSPORT PUMP TO COR APPROVED STORAGE LOCATION ON-SITE. COORDINATE WITH CONTROLS CONTRACTOR TO REMOVE SENSORS ASSOCIATED WITH EXISTING DOMESTIC WATER PIPING. CONTROLS CONTRACTOR IS RESPONSIBLE FOR CONDUCTOR AND CONDUIT REMOVAL.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING PHASE 2 DEMOLITION NOTES:

AutoCAD SHX Text

25 26 25 26

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

1AC

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

1AC-MED201

MECHANICAL ROOM DEMOLITION

STEAM AND ELECTRICAL PHASE 1 & 2

AutoCAD SHX Text

STAIR 2

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text

%%UEWH-1

AutoCAD SHX Text

%%UFD

AutoCAD SHX Text

%%UFD

AutoCAD SHX Text

AutoCAD SHX Text

CDR

AutoCAD SHX Text

%%UCP-1

AutoCAD SHX Text

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text 2"

AutoCAD SHX Text

MPS

AutoCAD SHX Text 2"

AutoCAD SHX Text

FROM FLASH TANK

AutoCAD SHX Text

2" TO FLASH TANK

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

TO VENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text 60-C4

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

STAIR 2

AutoCAD SHX Text

%%UFD

AutoCAD SHX Text

%%UFD

AutoCAD SHX Text A

AutoCAD SHX Text

%%UEWH-2

AutoCAD SHX Text

CDR

AutoCAD SHX Text

%%UCP-1

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text 2"

AutoCAD SHX Text

MPS

AutoCAD SHX Text 3"

AutoCAD SHX Text

FROM FLASH TANK

AutoCAD SHX Text

2" TO FLASH TANK

AutoCAD SHX Text 2"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

TO VENT

AutoCAD SHX Text B

AutoCAD SHX Text

%%UWH-7

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text

%%URP-7

AutoCAD SHX Text

%%URP-8

AutoCAD SHX Text 2"

AutoCAD SHX Text 3"

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text 60-C4

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 2"

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, ROUTING, AND SIZING OF PIPING PRIOR TO COMMENCEMENT OF WORK. B. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED FOR DEMOLITION OR TIE-IN OF NEW WORK. C. COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION SECTION 01.00.00 GENERAL REQUIREMENTS. NOTE THAT AFTER HOURS AND WEEKEND WORK SHALL BE REQUIRED FOR MOST SPACES. D. PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END OF EACH WORK SHIFT. COVER ALL EQUIPMENT AND PROTECT COURSE OF WORK. RUN HEPA-FILTER EXHAUST FILTRATION UNITS DURING ALL ACTIVE WORK ACTIVITIES. E. THE INTENT IS TO INSTALL, TEST, AND OPERATE 1 NEW WATER HEATER AND 2 THE INTENT IS TO INSTALL, TEST, AND OPERATE 1 NEW WATER HEATER AND 2 NEW CIRCULATION PUMPS FOR A PERIOD OF SEVEN (7) DAYS PRIOR TO COMMISSIONING. RELOCATION OF REMAINING EXISTING WATER HEATER AND DEMOLITION OF RETURN PUMP WILL BEGIN AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR NEW WATER HEATER AND NEW PUMPS ARE COMPLETE. ONLY ONE NEW PUMP SHALL OPERATE AT A TIME. ROTATE NEW PUMP OPERATION EVERY 24 HOURS DURING PHASE 1. REMAINING EXISTING WATER HEATER SHALL BE RELOCATED AND EXISTING PUMP SHALL BE DEMOLISHED. NEW PUMP OPERATION/ROTATION SHALL CONTINUE. AFTER SUCCESSFUL COMMISSIONING ACTIVITIES ARE COMPLETE, ONE HEATER AND ONE PUMP SHALL BE IN OPERATION. ONE HEATER SHALL BE OFFLINE AND DRAINED. ONE PUMP SHALL BE IN STAND-BY AND PUMP ROTATION SET TO 8 HOURS INTERVALS PER CONTROL SHEET P002. F. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. SCHEDULE REQUIRED TIE-INS TO MINIMIZE NUMBER AND DURATION OF OUTAGES. G. CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS AND SUPPORTS, INSULATION, EQUIPMENT, CONTROLS, BMS CONNECTIONS, ELECTRICAL ITEMS, ETC., TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. H. CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW CONNECT AND FIELD ROUTE ALL WATER QUALITY MONITORING PORTS WITH NEW PIPE, FITTINGS, VALVES, ETC. AS INDICATED. COR/WATER SYSTEM MANAGE APPROVAL OF LOCATION IS REQUIRED PRIOR TO INSTALLATION.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

DEMOLITION WATER HEATER AND PUMP INSTALLATION - PHASE 1

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text 6'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'

AutoCAD SHX Text

GROUND FLOOR MECHANICAL ROOM PLAN

AutoCAD SHX Text

DEMOLITION WATER HEATER AND PUMP INSTALLATION - PHASE 2

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text 6'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'

AutoCAD SHX Text

GROUND FLOOR MECHANICAL ROOM PLAN

AutoCAD SHX Text X

AutoCAD SHX Text A. EXISTING CONCRETE PAD. EXISTING CONCRETE PAD. B. EXISTING CONDENSATE PUMP.EXISTING CONDENSATE PUMP.

AutoCAD SHX Text

DRAWING NOTES:

AutoCAD SHX Text DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING STEAM AND CONDENSATE PIPE AND FITTINGS FOR EXISTING EWH-1 WATER HEATER. PREPARE EXISTING PIPING TO REMAIN FOR NEW CONNECTIONS. EXISTING WATER HEATER EWH-2 SHALL REMAIN IN OPERATION UNTIL NEW WATER HEATER IS INSTALLED, TESTED, AND ON-LINE.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MECHANICAL PHASE 1 DEMOLITION NOTES:

AutoCAD SHX Text DRAIN, DISCONNECT, REMOVE, AND DISCARD EXISTING STEAM AND CONDENSATE PIPE AND FITTINGS FOR EXISTING EWH-2 WATER HEATER. INSTALL CAP OR PIPE SECTION TO RECONNECT EXISTING. DRAIN, DISCONNECT, REMOVE, AND STORE EXISTING STEAM VALVE FOR FUTURE RELOCATION AND RECONNECTION. SEE SHEET MED201, PHASE 2 FOR ADDITIONAL INFORMATION.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .