S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf
PDF 748 KB Posted
- Solicitation number
- 36C24920R0072
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project 614-18-106 Correct Plumbing, Piping and Replace Fixtures Memphis VA Medical Center Solicitation #36C24920R0072
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
X
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
36C24920R0072
2. TYPE OF SOLICITATION
SEALED BID (IFB)
X NEGOTIATED (RFP)
3. DATE ISSUED
PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER
36C249-20-C- _
5. REQUISITION/PURCHASE REQUEST NUMBER
614-20-4-5565-0011
6. PROJECT NUMBER
614-18-106
7. ISSUED BY CODE 90C 8. ADDRESS OFFER TO
Department of Veterans Affairs Network Contracting Office (NCO) 9 1639 Medical Center Parkway, Ste 400 c/o: Roxie Ann Keese, CO Murfreesboro TN 37129
Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
9. FOR INFORMATION
CALL:
a. NAME Roxie Ann Keese
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS) 502.287.6108
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
FY18 Plus-Up Project #614-18-106
Memphis VA Medical Center 1030 Jefferson Avenue Memphis, TN 38104
NAICS Code 236220 is applicable to this project. The small business size standard is $39.5M.
This is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under the authority of 38 U.S.C. 8127 (d). To be eligible for award the contractor must be listed and have an active viewing in the Vendor Information Pages at https://vip.vetbiz.va.gov/. All offers submitted will be checked at the time of offer submission, as well as prior to award. In addition, all offers must have an active listing in both the SAM and VetBiz websites.
https://sam.gov. All veteran owned businesses must also provide evidence of VETS 4212 enrollment and the must provide evidence of the company's Experience Modification Rating (EMR) provided on the letterhead of its insurance company.
An organized site visit will take place on July 20, 2020 at 3:00pm. EST. Please see page 20, for specific location.
Questions/Request for Information (RFI) must be submitted in writing to the Contracting Officer. The solicitation number project number, project name shall be in the subject line of the email. RFI's must be chronologically ordered and references a specific statement, section, drawing relative to the solicitation document.
The last day to submit questions/RFI's relative to this solicitation is Friday July 24_, 2020 at _4:00pm.ET
This project is being procured in accordance with Federal Acquisition Regulation (FAR) Part 15 as a Lowest Price Technically Acceptable " source selection process, and in accordance with FAR 36.2 "Special Aspects of Contracting For Construction". Additional information may be found under the section heading titled "
"Instruction, Conditions and other Statements to Bidders/Offerors" on page 9 of this solicitation document.
Type text here
Offerors must review the solicitration, statement of work, specifications and drawings in its entirety. Self-Certifications Listed in section 3.3, 3.4 and 3.5 must be completed.
The estimated range of the cost of construction for this project is between $5,000,000.00 and $10,000,000.00 ***NOTE OF ALL OFFERORS***-Failure to sign and date the certification located in this solicitation shall render the offeror's submission as "Non-Responsive".***
11. The Contractor shall begin performance within Te_n (1_0) calendar days and complete it within _520 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See 52.211-10 ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and _1 digital copy (pdf) copies to perform the work required are due at the place specified in Item 8 by 1300 ,_Eastern Time (ET)
(hour) local time (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
X YES NO 10 Calendar Days
X X
July 9, 2020 63
August 10, 2020
Memphis VA Medical Center
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
614-36X0162-5565-85420-3220-23NR8JC08
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 90C 27. PAYMENT WILL BE MADE BY 90C
FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 Invoice must be submitted electronically
PHONE: Setup 1-877-489-6135 FAX:
Department of Veterans Affairs Network Contracting Office - 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further cont-ractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print) Roxie Ann Keese, FAC-C Level III /FE-C Contracting Officer
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. AWARD DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
Base Offer Item 1:
AMOUNTS Offer Item 2:
Offer Item 3:
Offer Item 4:
***All Offerors are hereby advised, that in order to have a responsive proposal, the offeror must fully complete all pricing line items in the "S02" Price Schedule provided with this solicitation. *** http://www.fsc.va.gov/fsc/einvoice.asp
Table of Contents
SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 52.228-1 BID GUARANTEE (SEP 1996)
1.2 SUPPLEMENTAL INSURANCE REQUIREMENTS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.0 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (JAN
2017)
2.1 EVALUATION OF OFFER/BASIS FOR AWARD
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (MAY 2014)
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
2.7 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
2.8 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) .. 23
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019)
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
3.4 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—
CERTIFICATION (JUN 2018)
3.5 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)
3.6 52.211-13 TIME EXTENSIONS (SEPT 2000)
3.7 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (OCT 2019) ALTERNATE I (MAY 2014)
https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000001 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000002 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000002 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000002 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000003 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000003 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000003 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000004 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000005 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000006 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000007 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000008 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000008 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000008 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000009 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000010 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000010 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000010 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000011 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000011 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000011 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000012 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000013 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000013 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000014 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000014 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000014 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000015 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000016 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000016 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000016 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000017 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000018 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000019 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000019 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000019 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000020 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000020 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000021 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000021 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000021 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000022 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000023 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000024 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000024 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000024
GENERAL CONDITIONS
4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)
4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
4.3 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,
AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER
COVERED ENTITIES (JUL 2018)
4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
4.5 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984) ALTERNATE I (APR 1984)
4.6 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(MAY 2020)
4.7 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
4.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
4.9 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)
4.10 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT
FOR EPA-DESIGNATED ITEMS (MAY 2008)
4.11 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)
4.12 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)
4.13 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND
COMPLIANCE (JUL 2018)
4.14 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.15 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)
4.16 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.17 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
ALTERNATE I (APR 2019)
4.19 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (APR 2019)
4.20 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.21 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN
2008)
4.22 MANDATORY WRITTEN DISCLOSURES
4.23 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.24 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL
2014) https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000025 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000026 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000027 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000027 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000027 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000028 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000028 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000028 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000028 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000028 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000029 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000029 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000029 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000030 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000030 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000030 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000031 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000031 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000031 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000032 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000033 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000033 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000033 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000034 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000034 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000034 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000035 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000035 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000035 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000036 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000037 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000037 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000037 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000038 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000038 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000038 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000039 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000040 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000040 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000040 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000041 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000041 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000041 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000042 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000042 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000042 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000044 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000044 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000044 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000045 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000045 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000045 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000046 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000046 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000046 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000047 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000047 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000047 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000048 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000049 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000050 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000050 https://vaww.aams.ecms.va.gov/AAMS_Production/DAV/hvrvyybjyn1pvp0y/36C24920R0072_1.docx#_Toc256000050
ATTACHMENTS
C28-Project Specifications.
S02-Correct Piping Drawings GEN and ARCH_Part1.
S02-Correct Piping Drawings GEN and ARCH_Part2.
S02-Correct Piping Drawings GEN and ARCH_Part3.
S02-Correct Piping Drawings GEN and ARCH_Part4.
S02-Correct Piping Drawings MEP B1_Part1.
S02-Correct Piping Drawings MEP B1_Part1 02.
S02-Correct Piping Drawings MEP B1_Part3.
S02-Correct Piping Drawings MEP B1_Part4.
S02-Correct Piping Drawings MEP B1_Part5.
S02-Correct Piping Drawings MEP B1_Part6.
S02-Correct Piping Drawings MEP B1A_Part1.
S02-Correct Piping Drawings MEP B1A_Part2.
S02-Correct Piping Drawings MEP B1A_Part3.
S02-Correct Piping Drawings MEP B1A_Part4.
S02-Correct Piping Drawings MEP B5_Part1.
S02-Correct Piping Drawings MEP B5_Part2.
S02-Correct Piping Drawings MEP B7_Part1.
S02-Correct Piping Drawings MEP B7_Part2.
S02-Correct Piping Drawings MEP B7_Part3.
P07-General Wage Decision (Shelby Cty-TN) 02282020 02.
S02-Price Schedule (Project 614 18-106) FY2020.
S02-Contractor PPE (3 Submission Reqd) (614-18-106).
STATEMENT OF WORK
A. GENERAL INFORMATION
1. Project Number: 614-19-108
2. Title of Project: Correct Plumbing Piping and Replace Fixtures
2. Scope of Work: Contractor shall completely prepare site for building operations, including demolition and removal of existing, and furnish labor and materials and perform work for Plumbing Corrections and Fixture Replacement as required by drawings and specifications.
Contractor employees shall not be considered government employees for any purpose under this contract.
3. Background: The medical center campus has numerous plumbing deficiencies that need to be corrected. Changes to the medical center have left unused water branches and dead legs.
These dead legs are an area of stagnant water where legionella and other bacteria can grow.
VA Directive 1061 requires continuous monitoring of pressure, temperature, pH, dissolved solids, and oxidant residual of the water incoming from the utility. It also requires anti-scald devices installed at all showers and lavatories. These mixing valves must limit the hot water temperature at showers and lavatories to at or below 110°F.
4. Performance Period: The contractor shall complete the work required under this SOW in a total of 520 calendar days or less from date of award/Notice to Proceed, unless otherwise directed by the Contracting Officer (CO).
All work shall be performed during the medical center’s regular operating hours of 7:30am till 4:00pm, Monday through Friday. Any work performed outside of normal operating hours must be facilitated through the project’s COR. Work at other normal hours are required for activities that impact the normal operations of the Medical Center, i.e., work in clinical areas, utility shutdown, work that generates excessive noise and vibration.
B. CONTRACT AWARD MEETING
The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kickoff meeting or has advised the contractor that a kickoff meeting is waived.
C. GENERAL REQUIREMENTS
A. Base Offer: Work includes all work as described in contract documents for general construction, plumbing, electrical, monitoring equipment, controls, architectural, and related trades as necessary for a complete project as related to dead end removal, water heater replacement, hot water circulation pump replacement, balancing valve replacement, new medium pressure steam supply pipe, new condensate return pipe, new high pressure steam to medium pressure steam pressure reducing station, new steam pressure relief valve vent piping, new cold water pipe for heater replacement, new hot water pipe for heater replacement, new hot water return pipe for heater replacement, and new insulation for all associated pipe. Water heaters shall be installed, tested, and operational at one location/building before start of construction at any subsequent location/building. Building/location sequence will be coordinated and scheduled with VA COR. BASE OFFER ITEM 1 also includes additional installed ball valves, blocking valves, insulation footage of existing domestic water pipe, and asbestos containing materials removal and disposal identified as quantity allowances.
THE WORK DESCRIBED IN THE BASE OFFER ITEM 1 (ABOVE) DOES NOT INCLUDE:
All work described for chlorine monitoring stations, monitoring station controls, and associated monitoring station items.
All work described for Building 5.
B. Base Offer Item NO. 2: Provide all work described for chlorine monitoring stations, monitoring station controls, and associated monitoring station items at 6 locations.
C. Base Offer Item NO. 3: Provide all work described for Building 5
D. Base Offer Item NO. 4: Provide all work described for chlorine monitoring stations, monitoring station controls, and associated monitoring station items at remaining locations shown on contract drawings.
E. UNIT PRICED ITEMS:
Provide cost of items if additional unforeseen work is not included in the drawing information under Work: Section 01 27 50, UNIT PRICES AND QUANTITY ALLOWANCES.
1.. New three-piece ball valves (separate line item for each size – P-1 thru P-9);
a. 50 units each of ½”, ¾”, 1”, 1 ¼”, 1½”, 2” & 2½”
b. 25 units each of 3” & 4”
2. New Pipe-block valves (separate line item for each size – P-10 thru P-15);
a. 25 units each of ½”, ¾”, 1”, 1 ¼”, 1½”, & 2”
3. ACM abatement values (using the specified “Glove-Bag methodology – H-1):
a. 100 pipe fittings
4.. Insulation of uninsulated piping not affected by new work (I-1 thru I-3):
a. 1/2" – 1” domestic water pipe size insulation and complete installation.
Provide 500 linear feet. Provide price per linear foot.
b. 1-1/4” – 2” domestic water pipe size insulation and complete installation. Provide 500 linear feet. Provide price per linear foot.
c. 2-1/2” – 4” domestic water pipe size insulation and complete installation. Provide 500 linear feet. Provide price per linear foot.
F. The government reserves the right to include bid items number(s) 2-4, to the total base offer and/or modify the resulting contract to include bid items 2-4 no later than December 31,2020.
G. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES
Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables associated with this statement of work within 520 calendar days from receipt of Notice to Proceed.
Note to Offerors: All pricing must be entered on the S02 price schedule attached to this solicitation.
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, shall be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be Twenty (20%) percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
1.2 SUPPLEMENTAL INSURANCE REQUIREMENTS
In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:
OO
(a) Workers' compensation and employer’s liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability: $500,000.00 per occurrences.
(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.
(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.
(End of Clause)
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.0 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (JAN 2017)
(a) Definitions. As used in this provision—
Discussions are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
In writing, writing, or written means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Proposal modification is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals.
(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show—
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, revision, and withdrawal of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals.
Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall—
(1) Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award.
(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government’s interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint.
The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
2.1 EVALUATION OF OFFERS/BASIS FOR AWARD
This section describes the evaluation process, proposal preparation, the significant factors and sub-factors and criteria to be used in the evaluation process. This procurement action is a Lowest Price Technically Acceptable source selection process in accordance with FAR 15.101-
2. Proposals will be evaluated for acceptability, but not ranked using the non-price factors/sub-factors. In order to be considered for award, an offeror must have an “acceptable” rating in every non-price factor/sub-factor under consideration.
The Government intends to award a single contract to a qualified Service Disabled Veteran Owned Small Business (SDVOSB) determined responsible in accordance with the Federal Acquisition Regulation (FAR), whose proposal conforms to all the requirements in this solicitation, and is further determined to meet or exceed the standards of acceptability at the lowest offered price. The Government intends to evaluate proposals and award a contract without discussions with Offerors. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from both a technical and cost standpoint.
The evaluation of offers submitted in response to this Request for Proposal (RFP) solicitation will be conducted utilizing the Lowest Price Technically Acceptable (LPTA) selection process.
Utilization of this source selection process may result in not all offers being evaluated. The Contracting Officer upon receipt of offers, will determine eligibility and compliance to the solicitation requirements. The Vendor Information Pages (vetbiz registry) will be checked to ensure that any offeror submitting a proposal to perform the work is both listed and verified. All proposals received will also be checked for an active registration in the System for Award Management (SAM). Thereafter, the Contracting Officer will review all proposals to ensure that the minimum proposal submission requirements have been met. Once these requirements have been satisfied, the Contracting Officer will select and submit for review to the Technical Evaluation Board (TEB) the technical proposal of the lowest priced offeror for consideration.
Initially, the TEB will not receive any pricing information, only the technical portion of the
Offeror’s proposal. The Offeror’s proposal will be rated against each evaluation factor as set forth in this solicitation.
If the selected Offeror’s proposal is determined to be acceptable based on the standards of acceptability, and that Offeror’s price is the lowest of all offers submitted, then no further evaluation of offers shall occur and the Contracting Officer will document these findings, and proceed with the responsibility determination of the offeror. Pricing information will only be provided to the TEB upon notification to the Contracting Officer that the technical proposal as submitted meets or exceeds the acceptability standard necessary to fulfill the objective of the requirement.
Should the initial Offeror’s proposal be determined to be unacceptable according to the standards of acceptability, then the TEB will be required to provide to the Contracting Officer a summary evaluation sheet that documents how the Offeror’s proposal fails to meet the standards of acceptability, and request to the Contracting Officer that another selection be made for consideration of award. This process shall continue until such time that an award is made.
Offerors shall respond in writing to the evaluation factors listed below, in the same order as they appear in this solicitation document. Failure to provide all information will adversely affect the evaluation of an offer. The information contained in the technical proposal should be complete, concise, and address each factor. If information is applicable to more than one evaluation factor, it must be repeated for each factor, unless stated otherwise.
Technical and Price sections of an Offeror’s proposal will be evaluated independently. Offeror shall separately bind each section. All pages containing text shall be consecutively numbered, type-written on 8-1/2x11 inch paper with margins of at least once inch and created using a Times New Roman 12-point font. The submitted package should contain two sections, separately bind: a.) Technical Proposal b.) Price Proposal. The Offeror’s Technical proposal shall be no more than 50 pages total, which is not inclusive of the solicitation and any amendments issued thereof. The Offeror’s Price Proposal shall be no more than 25 pages inclusive of the bid bonds required. The Offeror is hereby advised that the “S02-Price Schedule” attached worksheet shall be considered as one page, regardless of the overall total.
Each section must therefore be labeled with the following:
1. Construction Company Name
2. Physical Address of the Company
3. Telephone Number
4. Email address
5. VA Project Number (Project 614-18-106)
6. VA Project Name (Correct Plumbing, Piping & Replace Fixtures)
7. Solicitation number (36C24920R0072)
The Technical Evaluation Board (TEB) shall evaluate the Offeror’s proposal against all non-price factors/sub-factors to determine whether the proposal is acceptable or unacceptable, using the “ACCEPTABLE” or “UNACCEPTABLE” ratings based upon the standard of acceptability that follows each factor/sub-factor below. In order to obtain a “ACCEPTABLE” rating an offeror must meet the standard of acceptability that is listed for each factor/sub-factor.
The evaluation process and criteria stated in this section will be strictly adhered to. Evaluators will make no assumptions regarding an Offeror’s proposal. Therefore, an Offeror must demonstrate understanding by the thoroughness, soundness, comprehensiveness and price reasonableness of technical approach. There will be no public opening of offers.
The following evaluation factors and sub-factors will apply to this procurement:
Project #614-18-106, CORRECT PLUMBING, PIPING & REPLACE FIXTURES
The evaluation factors are: 1.) Qualifications 2.) Technical Approach, Methods & Procedures 3.) Previous Experience 4.) Construction Management 5.) Proposed Construction Schedule 6.) Price
FACTOR 1: QUALIFICATIONS
1.1 Sub-factor: Licensure
The Prime Contractor or the sub-contractor must possess a current and valid state Mechanical License.
Standard for Acceptability: This standard is met when the Offeror as the Prime Contractor or it’s sub-contractor can provide a current and valid Mechanical license from any of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .