Correct Piping Drawings GEN and ARCH_Part3.pdf

PDF 12 MB Posted

Attached to
Z1NB--Project 614-18-106 Replace Plumbing and Piping Fixtures (FY-18 Plus-up)
Solicitation number
36C24920R0072
Issued by

View the file

Other files

File Type Posted
S06-36C24920R0072 Amendment 0008 09.03.2020.pdf PDF
S06-36C24920R0072 Amendment 0007.pdf PDF
S06-36C24920R0072 Amendment 0006.pdf PDF
S06-36C24920R0072 0005.pdf PDF
1-PP113 Rev1.pdf PDF
Bldg 5 - Memphis VAMC Final CD.pdf PDF
S06-614-18-106 Plumbing and Piping Addendum and RFI Responses.docx DOCX document
S06-Solicitation 36C24920R0072 0003.docx DOCX document
Bldg 9 - Memphis VAMC Final CD.pdf PDF
Bldg 1AC- Memphis VAMC Final CD Submittal.pdf PDF
36C24920R0072 0002.docx DOCX document
010000_General Requirements.pdf PDF
S02-Price Schedule (Proj 614-18-106) FY2020.xlsx XLSX spreadsheet
S05-Organized Site Visit Sign In Sheet (614-18-106).pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
Correct Piping Drawings MEP B1_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part6.pdf PDF
Correct Piping Drawings MEP B1_Part5.pdf PDF
Correct Piping Drawings GEN and ARCH_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part1.pdf PDF
Correct Piping Drawings MEP B7_Part2.pdf PDF
Correct Piping Drawings MEP B5_Part2.pdf PDF
Correct Piping Drawings MEP B5_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part3.pdf PDF
Correct Piping Drawings MEP B1_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part2.pdf PDF
Correct Piping Drawings MEP B1_Part4.pdf PDF
36C24920R0072 0001.docx DOCX document
Correct Piping Drawings GEN and ARCH_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part4.pdf PDF
S02-Contractor PPQ (3 Submission Reqd) (614-18-106)_Revision.pdf PDF
36C24920R0072 0001.docx DOCX document
S02-Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
S02-Correct Piping Drawings MEP B7_Part2.pdf PDF
S02-Correct Piping Drawings MEP B1_Part4.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1 02.pdf PDF
S02-Correct Piping Drawings MEP B1_Part5.pdf PDF
36C24920R0072_1.docx DOCX document
S02-Correct Piping Drawings MEP B1A_Part2.pdf PDF
C28-Project Specifications.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1.pdf PDF
S02-Correct Piping Drawings MEP B7_Part3.pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
S02-Contractor PPE (3 Submission Reqd) (614-18-106).pdf PDF
S02-Correct Piping Drawings MEP B5_Part1.pdf PDF
S02-Correct Piping Drawings MEP B1_Part3.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 43 5 6 7

M

L

K

J

L.5

P

O

ZONE A

ZONE C

Z O

N E

A

Z O

B

CORRIDOR

STAIR

CONFERENCE

OFFICE

OFFICE

OFFICE

COR

FF:CARPET

FF:CARPET

FF:CARPET FF:CARPET

FF:CARPET

FF:RUBBER TILE

FF:VCT

F

SHARED

CONFERENCE

ROOM

COM

WO

RO

CLINICLINICAL

STAFF

TLT

CLINICALCLINICAL

CLINICAL

BREAK

ROOM

ROOF

AREA

CHIEF

STAFF

TLT

STUDENT

ASSIST

CHIEF SUPER SUPER S

STAFF

CORRIDOR

STAFF

CORRIDOR

WAITING

RECEPT /

PROGRAM

SUPPORT

STUDENT

CONSULT CONSULT

ELEV

MACHINE

ROOM

DRY-PIPE

C1-30

G140

G147G146

G142

G145

C

STAIR /

ELEVATOR

LOBBY

MECHANICAL

C3 C3

1A

1A

H

MATCH LINE

ZONE B

ZONE D

MATCH LINE

ZONE A

ZONE C

A

M A

T C

H

L

I N

E

Z O

O

A

T C

H

L

I N

E

Z O

C

O

D

FLOOR PLAN LEGEND

S S

BUILDING 1A - FIRST FLOOR - ZONE A

1A-A107

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEMPHIS TENNESSEE

614-18-106

1A Project Director

MARCH 31, 2020 JLH EORevisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS

OC

CREMM

E

AGRICULTURE

AutoCAD SHX Text 1A-A108

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

BUILDING 1A - FIRST FLOOR - ZONE A - PLAN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text F102

AutoCAD SHX Text F106

AutoCAD SHX Text F114

AutoCAD SHX Text F113

AutoCAD SHX Text F112

AutoCAD SHX Text F111

AutoCAD SHX Text F110

AutoCAD SHX Text F104

AutoCAD SHX Text F103

AutoCAD SHX Text F100E

AutoCAD SHX Text F120

AutoCAD SHX Text F107

AutoCAD SHX Text F108

AutoCAD SHX Text F119

AutoCAD SHX Text F118

AutoCAD SHX Text F117

AutoCAD SHX Text F116

AutoCAD SHX Text

STAFF CORRIDOR

AutoCAD SHX Text C1-34

AutoCAD SHX Text C1-36

AutoCAD SHX Text C1-35

AutoCAD SHX Text F101

AutoCAD SHX Text F105

AutoCAD SHX Text F109

AutoCAD SHX Text

AutoCAD SHX Text F100

AutoCAD SHX Text I.T.

AutoCAD SHX Text F100A

AutoCAD SHX Text F105C

AutoCAD SHX Text F105B

AutoCAD SHX Text

ELECT

AutoCAD SHX Text F100B

AutoCAD SHX Text F100C

AutoCAD SHX Text

KEY PLAN BUILDING 1A - FIRST FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text TYPICAL RESTROOM - @ SINK TYPICAL RESTROOM - @ SHOWER TYPICAL RESTROOM - @ TUB TYPICAL KITCHENETTE - @ SINK TYPICAL CORRIDOR TYPICAL OFFICE/EXAM/PATIENT ROOM TYPICAL OFFICE TYPICAL H.A.C. TYPICAL UTILITY ROOM TYPICAL MECHANICAL ROOM TYPICAL LABORATORY SPACE PLUMBING CHASE NOTES: THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. SEE SHEET G003 FOR FULL DEFINITION OF WORK REQUIREMENTS.

AutoCAD SHX Text EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION AREA/WALL WITH PROPOSED WORK CEILING WITH PROPOSED WORK 1 HOUR FIRE RATED PARTITION 2 HOUR FIRE RATED PARTITION SMOKE RATED PARTITION

AutoCAD SHX Text FLOOR PLAN GENERAL NOTES A. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. B. AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, REMOVE/REINSTALL AS NEEDED ALL HANDRAILS, CORNER GUARDS AND CRASH RAILS. C. OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER POSSIBLE. D. PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 3/A601. E. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 2/A601. F. AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN 2-HOUR RATED SOFFIT. SEE DETAIL 1/A601. G. REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO COMPLETE WORK INSIDE AND BEHIND WALLS. H. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. I. REFER TO SHEET A601 FOR ALL PARTITION TYPES. REFER TO SHEET A601 FOR ALL PARTITION TYPES.

AutoCAD SHX Text

CEILING KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text CEILING AREA OPEN WHERE PLUMBING WORK IS TO BE COMPLETED. NO CEILING WORK ANTICIPATED. REMOVE GWB CEILING AND INSTALL NEW/REPAIR AS NECESSARY. INSTALL MIN 24"X24" ACCESS PANEL IN GWB CEILING IN VALVE AND OTHER LOCATIONS AS COORDINATED WITH AND APPROVED BY COR. SEE DETAIL 2/A601. WHERE GWB CEILING IS REPAIRED/INSTALLED, PAINT ENTIRE CEILING TO MATCH EXISTING. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. REMOVE ACT AND GRID AS NEEDED FOR PLUMBING WORK. REINSTALL UNDAMAGED ACT AND GRID TO MATCH EXISTING TILE. NEW TILE TO MATCH EXISTING. WHERE NOT AVAILABLE, REUSE UNDAMAGED TILE IN OTHER SPACES AND INSTALL NEW TILE IN ENTIRE SPACE. CEILING IS COMBINATION OF ACT AND GWB. REMOVE AND REINSTALL ACT AS NECESSARY, REFER TO NOTE "C3" FOR WORK AT ACT CEILING. REFER TO NOTE "C2" FOR WORK AT GWB CEILING. REMOVE/REPLACE PORTIONS OF GWB SOFFIT AS NEEDED TO CONDUCT WORK. PAINT ENTIRE SOFFIT TO MATCH EXIST. AREA OPEN TO LEVEL BELOW.

AutoCAD SHX Text

FLOOR PLAN KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O.

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1/8"=1'-0"

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 24'

8 9 10 11 128.7 9.5 11.59.7

L

K

J

L.5

P

Q

O

9.4

ZONE B

ZONE D

Z O

O

ROOF

ROOF

QUALITY

MANAGEMENT

STAIR

IMAGECORRIDOR

CORRIDOR

MECH

BREAK RMOFFICEOFFICEOFFICE

CONFERENCE

OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

OFFICE

OFFICE

OFFICE

CORRIDOR

CORRIDOR

RECEPTION

TOILET

CLOSET

OFFICE

CLASSROOM

CORRIDOR

CLOSET

ON-CALL

BATH

OFFICE

OFFICE

OFFICE

OFFICEOFFICE

OFFICE OFFICE

CORRIDOR

ON-CALL

ON-CALL

BATH

ON-CALL

CORRIDOR

CORRIDOR

BATH

ON-CALL

LOUNGE

LIN

HAC

ON-CALLON-CALL

BATH BATH

ON-CALLON-CALL

CORRIDOR

NVT MED

STORAGE

RADW

STOR

RES

OFFICE

HAC

IMAGE

LOUNGE

STOR

NON IMAGE

RADIO

PHARM

CORRIDOR

FF:VINYL SHEETFF:VINYL SHEET

FF:VCT

FF:VCT

FF:VCT

FF:CERAMIC TILE

FF:CARPET

FF:VCT

FF:VCT

FF:CARPET FF:CARPET

FF:CERAMIC TILEFF:CERAMIC TILE

FF:CARPET FF:CARPET

FF:CERAMIC TILE

FF:VCT

FF:CARPET

FF:CARPET

FF:CERAMIC TILE

FF:VCT

FF:VCT

FF:CARPET

FF:CERAMIC TILE

FF:CARPET

FF:CARPET

FF:VCT

FF:CARPETFF:CARPET

FF:CARPET FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CERAMIC TILE

FF:CARPET

FF:VCT

FF:VCT

FF:CARPET

FF:CARPET

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:CARPET

FF:CARPET

FF:CARPET

FF:VCT

FF:VCT

FF:VCT

FF:CARPET

FF:CARPET

FF:CARPET FF:CARPET FF:CARPET FF:CARPET

FF:CONCRETE

FF:VCT

FF:VCT

FF:VINYL SHEET

FF:RUBBER TILE

FF:VCT

COMMON

WORK

ROOM

CLINICALAL

R SUPER

H.K.

STAFF

CORRIDOR

RECEPT /

PROGRAM

SUPPORT

CONSULT CONSULT

EXISTING

CORRIDOR

C1-2

G109C1-2

C1-3

G119

G136G137G138G139

G140

G148

C1-28

C1-31

C1-32

G154

G151

G150 C1-27

C1-33

G129

G149 G152

G153

G149

C1-7

G121

G122

G122A

G141

G135

G134

G130G133

G132 G131

C1-4

G123

G125

G125A

G127

C1-6

C1-5

G117A

G117

G114

G118 G120

G124G116

G115A G124A

G126G115

C1-8

G104

G102

G100

G110

G103

G101

G112 G111

C1-29

C3

C3

C3

C2

C3

1C

C2

C2

1A

1B

C2

1A

1B

1A

1B

C2

1A

C3

H

MATCH LINE

ZONE B

ZONE D

MATCH LINE

ZONE A

ZONE C

B

M A

T C

H

L

I N

E

Z O

O

A

T C

H

L

I N

E

Z O

O

S S

BUILDING 1A - FIRST FLOOR - ZONE B

1A-A108

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEMPHIS TENNESSEE

614-18-106

1A Project Director

MARCH 31, 2020 JLH EORevisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS

OC

CREMM

E

AGRICULTURE

AutoCAD SHX Text 1A-A108

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

BUILDING 1A - FIRST FLOOR - ZONE B - PLAN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text F106

AutoCAD SHX Text F114

AutoCAD SHX Text F113

AutoCAD SHX Text F117

AutoCAD SHX Text F116

AutoCAD SHX Text F115

AutoCAD SHX Text C1-33

AutoCAD SHX Text F105

AutoCAD SHX Text F105B

AutoCAD SHX Text F105A

AutoCAD SHX Text P-512

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

KEY PLAN BUILDING 1A - FIRST FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text TYPICAL RESTROOM - @ SINK TYPICAL RESTROOM - @ SHOWER TYPICAL RESTROOM - @ TUB TYPICAL KITCHENETTE - @ SINK TYPICAL CORRIDOR TYPICAL OFFICE/EXAM/PATIENT ROOM TYPICAL OFFICE TYPICAL H.A.C. TYPICAL UTILITY ROOM TYPICAL MECHANICAL ROOM TYPICAL LABORATORY SPACE PLUMBING CHASE NOTES: THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. SEE SHEET G003 FOR FULL DEFINITION OF WORK REQUIREMENTS.

AutoCAD SHX Text EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION AREA/WALL WITH PROPOSED WORK CEILING WITH PROPOSED WORK 1 HOUR FIRE RATED PARTITION 2 HOUR FIRE RATED PARTITION SMOKE RATED PARTITION

AutoCAD SHX Text FLOOR PLAN GENERAL NOTES A. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. B. AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, REMOVE/REINSTALL AS NEEDED ALL HANDRAILS, CORNER GUARDS AND CRASH RAILS. C. OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER POSSIBLE. D. PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 3/A601. E. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 2/A601. F. AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN 2-HOUR RATED SOFFIT. SEE DETAIL 1/A601. G. REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO COMPLETE WORK INSIDE AND BEHIND WALLS. H. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. I. REFER TO SHEET A601 FOR ALL PARTITION TYPES. REFER TO SHEET A601 FOR ALL PARTITION TYPES.

AutoCAD SHX Text

CEILING KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text CEILING AREA OPEN WHERE PLUMBING WORK IS TO BE COMPLETED. NO CEILING WORK ANTICIPATED. REMOVE GWB CEILING AND INSTALL NEW/REPAIR AS NECESSARY. INSTALL MIN 24"X24" ACCESS PANEL IN GWB CEILING IN VALVE AND OTHER LOCATIONS AS COORDINATED WITH AND APPROVED BY COR. SEE DETAIL 2/A601. WHERE GWB CEILING IS REPAIRED/INSTALLED, PAINT ENTIRE CEILING TO MATCH EXISTING. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. REMOVE ACT AND GRID AS NEEDED FOR PLUMBING WORK. REINSTALL UNDAMAGED ACT AND GRID TO MATCH EXISTING TILE. NEW TILE TO MATCH EXISTING. WHERE NOT AVAILABLE, REUSE UNDAMAGED TILE IN OTHER SPACES AND INSTALL NEW TILE IN ENTIRE SPACE. CEILING IS COMBINATION OF ACT AND GWB. REMOVE AND REINSTALL ACT AS NECESSARY, REFER TO NOTE "C3" FOR WORK AT ACT CEILING. REFER TO NOTE "C2" FOR WORK AT GWB CEILING. REMOVE/REPLACE PORTIONS OF GWB SOFFIT AS NEEDED TO CONDUCT WORK. PAINT ENTIRE SOFFIT TO MATCH EXIST. AREA OPEN TO LEVEL BELOW.

AutoCAD SHX Text

FLOOR PLAN KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O.

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1/8"=1'-0"

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

ZONE C

ZONE A

1 2 43 5 6 7

H

G

F

E

D

C

B

D.5

E.5

A

A.5

Z O

O

AUDIOLOGY AND SPEECH PATHOLOGY

SEC

CORRIDOR

CORRIDOR

LOBBY

WTG

CORRIDOR

SURGICAL

BLOCK RM

PROCEDURE

EXAMEXAM

AUDIO

ENT

STAFF TOILET

TOILET

TOILET

CORRIDOR

CORRIDOR

CORRIDOR

STAFF/

TECH

CLERICAL

REC/SEC

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

SOUND

BOOTH

AUDIO

HAC

SOUND

SUITE

STOR

EXAMEXAM

SOUND

SUITE

AURAL

REHAB

AUDIO

GT RM

VIEWTRAIN

COMM

ELEC

AUDIOLOGYSPEECH

GT RM

SPEECH

OFFICE

EXAM

PHYS REHAB

PHYS REHAB AUDIO AUDIO AUDIO

ACOUST

IMP

OFFICE

EXAM

OFFICE

EXAM AUDIO AUDIO AUDIO

INST

CALB

STOR

EAR

MOLD

ELEC

COMPUTER

MECH

STAIR

MECH

SUPPLY

IRMS

CHIEF

ASST

CHIEF

MULTI

PROGRAM

FF:CARPET

FF:CARPET

FF:CARPET FF:CARPET

FF:VCT

FF:CONCRETE

FF:RUBBER TILE

FF:CONCRETE

FF:CLEAN TILE

FF:CONCRETE

FF:VCT

FF:VCT

FF:CARPETFF:CARPETFF:CARPETFF:CARPETFF:CARPETFF:CARPETFF:CARPETFF:CARPETFF:CARPET

FF:CONCRETE

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:RUBBER TILE

FF:CONCRETE

FF:CONCRETE

FF:CARPET FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:VCT

FF:VCT

FF:VCT

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CONCRETE

FF:VCT

FF:CARPET

FF:CARPETFF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:VCT

FF:CARPET

FF:CERAMIC TILE

FF:CERAMIC TILE

FF:CERAMIC TILE

FF:CARPET

FF:CARPET

FF:VCT FF:VCT

FF:VCT

FF:CARPET

FF:CARPET

FF:CONCRETEFF:CONCRETE

FF:CONCRETE

FF:CONCRETE

FF:VCT

FF:CARPET

SHARED

CONFERENCE

ROOM

COMMON

WORK

ROOM

CLINICAL

BREAK

ROOM

STAFF

TLT

STUDENT

STAFF

CORRIDOR

STAFF

CORRIDOR

WAITING

RECEPT /

PROGRAM

SUPPORT

STUDENT

EXISTING

CORRIDOR

CONSULT CONSULT CONSULT

DRY-PIPE

VALVE

E108A

C1-26

C1-1

C1-1B

E100

C1-18

D116

D123

D124D126

C1-18A

E104

E103

E102

E101

C1-21

C1-19 C1-20

E108

E113 C1-25

C1-24

C1-23

C1-22

E122B

E122D E122C

E122A

E120

E138

E118B

E118D

E118A

E118C

E136

D125D127

E137

E135

E134

E133E132

E131

E130 E129

E129

E128

E127

E126

E125 E124 E123 E121 E119 E117 E116 E115 E114 E112

E111

E110

E109

E107

D115

E105

E106

E108BE108C

E108D

E108E

STAIR /

ELEVATOR

LOBBY

MECHANICAL

C3

C2

C3

C3

C3

C3

C3

1A

MATCH LINE

ZONE B

ZONE D

MATCH LINE

ZONE A

ZONE C

C

M A

T C

H

L

I N

E

Z O

O

A

T C

H

L

I N

E

Z O

O

S S

BUILDING 1A - FIRST FLOOR - ZONE C

1A-A109

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEMPHIS TENNESSEE

614-18-106

1A Project Director

MARCH 31, 2020 JLH EORevisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS

OC

CREMM

E

AGRICULTURE

AutoCAD SHX Text 1A-A110

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

BUILDING 1A - FIRST FLOOR - ZONE C - PLAN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text F102

AutoCAD SHX Text F106

AutoCAD SHX Text F104

AutoCAD SHX Text F103

AutoCAD SHX Text F107

AutoCAD SHX Text F108

AutoCAD SHX Text C1-36

AutoCAD SHX Text C1-35

AutoCAD SHX Text F101

AutoCAD SHX Text F105

AutoCAD SHX Text F109

AutoCAD SHX Text C1-1

AutoCAD SHX Text

AutoCAD SHX Text F100

AutoCAD SHX Text I.T.

AutoCAD SHX Text F100A

AutoCAD SHX Text F105C

AutoCAD SHX Text F105B

AutoCAD SHX Text F105A

AutoCAD SHX Text F100D

AutoCAD SHX Text

KEY PLAN BUILDING 1A - FIRST FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text TYPICAL RESTROOM - @ SINK TYPICAL RESTROOM - @ SHOWER TYPICAL RESTROOM - @ TUB TYPICAL KITCHENETTE - @ SINK TYPICAL CORRIDOR TYPICAL OFFICE/EXAM/PATIENT ROOM TYPICAL OFFICE TYPICAL H.A.C. TYPICAL UTILITY ROOM TYPICAL MECHANICAL ROOM TYPICAL LABORATORY SPACE PLUMBING CHASE NOTES: THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. SEE SHEET G003 FOR FULL DEFINITION OF WORK REQUIREMENTS.

AutoCAD SHX Text EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION AREA/WALL WITH PROPOSED WORK CEILING WITH PROPOSED WORK 1 HOUR FIRE RATED PARTITION 2 HOUR FIRE RATED PARTITION SMOKE RATED PARTITION

AutoCAD SHX Text FLOOR PLAN GENERAL NOTES A. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. B. AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, REMOVE/REINSTALL AS NEEDED ALL HANDRAILS, CORNER GUARDS AND CRASH RAILS. C. OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER POSSIBLE. D. PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 3/A601. E. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 2/A601. F. AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN 2-HOUR RATED SOFFIT. SEE DETAIL 1/A601. G. REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO COMPLETE WORK INSIDE AND BEHIND WALLS. H. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. I. REFER TO SHEET A601 FOR ALL PARTITION TYPES. REFER TO SHEET A601 FOR ALL PARTITION TYPES.

AutoCAD SHX Text

CEILING KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text CEILING AREA OPEN WHERE PLUMBING WORK IS TO BE COMPLETED. NO CEILING WORK ANTICIPATED. REMOVE GWB CEILING AND INSTALL NEW/REPAIR AS NECESSARY. INSTALL MIN 24"X24" ACCESS PANEL IN GWB CEILING IN VALVE AND OTHER LOCATIONS AS COORDINATED WITH AND APPROVED BY COR. SEE DETAIL 2/A601. WHERE GWB CEILING IS REPAIRED/INSTALLED, PAINT ENTIRE CEILING TO MATCH EXISTING. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. REMOVE ACT AND GRID AS NEEDED FOR PLUMBING WORK. REINSTALL UNDAMAGED ACT AND GRID TO MATCH EXISTING TILE. NEW TILE TO MATCH EXISTING. WHERE NOT AVAILABLE, REUSE UNDAMAGED TILE IN OTHER SPACES AND INSTALL NEW TILE IN ENTIRE SPACE. CEILING IS COMBINATION OF ACT AND GWB. REMOVE AND REINSTALL ACT AS NECESSARY, REFER TO NOTE "C3" FOR WORK AT ACT CEILING. REFER TO NOTE "C2" FOR WORK AT GWB CEILING. REMOVE/REPLACE PORTIONS OF GWB SOFFIT AS NEEDED TO CONDUCT WORK. PAINT ENTIRE SOFFIT TO MATCH EXIST. AREA OPEN TO LEVEL BELOW.

AutoCAD SHX Text

FLOOR PLAN KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O.

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1/8"=1'-0"

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

ZONE B

ZONE D

86 7 10 121198.7 9.5 11.9

A.5

G

F

E

D

C

B

A

D.5

E.5

11.7

Z O

O

HOSPITAL

TO EX

CORRIDOR

STAFF

TOILET

HAC

EQUIP

LINEN

IMAGE

CORRIDOR

LOBBY

CORRIDOR

CORRIDOR

CORRIDOR

PASS ELEVATOR

LOBBY

SERVICE

ELEVATOR

LOBBY

ELEVATORELEVATOR

TRASH

CHUTE

BATT

ELEVATORELEVATOR

LINEN

CHUTE

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

EQUIP

CALIB

NVT MED

STORAGE

STOR

COMM ELECTRICAL

IMAGE

LOUNGE

STRET

IMAGE

CARDIAC

NUCLEAR

IMAGE

CONFER

STAIR

SOIL

HOLD

EXERCISE

STRESS TEST

ELEVATOR

ELEVATOR

ELEVATOR

DW

DW

IMAGE

PROCESS

& READ

EXAM

PAT

DOSE

CORRIDOR

TOILET

TOILET

WAIT

PHYS

TECHNUCLEAR

MEDICINE

FILE

WORK

AREA

CHIEFCORRIDOR

CORRIDOR

SURGICAL

BLOCK RM

PROCEDURE

MICRO PREP/STOR

OFFICE

SWALLOW

EXAM

EXAM

EXAMEXAM

AUDIO

ENT

STAFF TOILET

TOILET

TOILET

EXAMEXAM

BIO MED LAB

STORAGETOILETLOCKERS

LOCKERS

TOILET

LOUNGE

OFFICE

SURGICAL

MECH

STAIR

FF:RUBBER TILE

FF:CONCRETE

FF:CARPET

FF:CARPET

FF:VCT

FF:CERAMIC TILE

FF:VCT

FF:VCT FF:CERAMIC TILE FF:VCT

FF:VCT

FF:VCT

FF:CERAMIC TILE

FF:CERAMIC TILE

FF:CERAMIC TILE

FF:CARPET

FF:CARPET

FF:VCT FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:CARPET

FF:VCT

FF:VCT

FF:VCT

FF:CARPET

FF:CARPET

FF:VCT

FF:VCT

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:CARPET

FF:VCT

FF:CERAMIC TILE

FF:CERAMIC TILE

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:CERAMIC TILE

FF:VCT

FF:RUBBER TILE

FF:CARPET

FF:VINYL SHEET

FF:VINYL SHEET

FF:VCT

FF:VCT

FF:VCT

FF:CONCRETEFF:CONCRETE

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:VCT

FF:CONCRETE

FF:VCT

FF:VCT

FF:VCT

FF:CONCRETE

FF:CONCRETE

FF:VINYL SHEET

FF:VCT

FF:CERAMIC TILE

FF:VCT

HARED

FERENCE

OOM

WAITING

CONSULT CONSULT CONSULT

EXISTING

CORRIDOR

C1-2

C1-16

D101

D104B

D129

C1-11A

G109

C1-1

C1-1B

C1-14

C1-15

C1-2

C1-1A

C1-10

P2 P1

D130

D132

P3 P4

D131

C1-12

C1-11

C1-9

C1-8

G106

G105

G104

G107 G108

G110

G103

C1-13B

D100

D102

D106

D103

D104

S5

S6

S7

D128

D104A

D105

D107

C1-13

D108

D109

C1-13A

D110A

D110B D110

D110D

D110CC1-17

C1-18

D116

D123

D117 D118

D119

D120

D121

D122 D124D126

C1-18A

E104

E103

E102

E101

D125D127

D111D112BD112A

D112C

D112D

D112

D113

D114

D115

C3

C3

1A

1A

1A

C2

C3

C3

1A

C3

C3

C2

MATCH LINE

ZONE A

ZONE D

MATCH LINE

ZONE A

ZONE C

D

M A

T C

H

L

I N

E

Z O

O

A

T C

H

L

I N

E

Z O

O

S S

BUILDING 1A - FIRST FLOOR - ZONE D

1A-A110

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEMPHIS TENNESSEE

614-18-106

1A Project Director

MARCH 31, 2020 JLH EORevisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS

OC

CREMM

E

AGRICULTURE

AutoCAD SHX Text 1A-A110

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

BUILDING 1A - FIRST FLOOR - ZONE D - PLAN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text F102

AutoCAD SHX Text F101

AutoCAD SHX Text F105C

AutoCAD SHX Text F105B

AutoCAD SHX Text F105A

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

KEY PLAN BUILDING 1A - FIRST FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text TYPICAL RESTROOM - @ SINK TYPICAL RESTROOM - @ SHOWER TYPICAL RESTROOM - @ TUB TYPICAL KITCHENETTE - @ SINK TYPICAL CORRIDOR TYPICAL OFFICE/EXAM/PATIENT ROOM TYPICAL OFFICE TYPICAL H.A.C. TYPICAL UTILITY ROOM TYPICAL MECHANICAL ROOM TYPICAL LABORATORY SPACE PLUMBING CHASE NOTES: THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. SEE SHEET G003 FOR FULL DEFINITION OF WORK REQUIREMENTS.

AutoCAD SHX Text EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION AREA/WALL WITH PROPOSED WORK CEILING WITH PROPOSED WORK 1 HOUR FIRE RATED PARTITION 2 HOUR FIRE RATED PARTITION SMOKE RATED PARTITION

AutoCAD SHX Text FLOOR PLAN GENERAL NOTES A. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. B. AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, REMOVE/REINSTALL AS NEEDED ALL HANDRAILS, CORNER GUARDS AND CRASH RAILS. C. OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER POSSIBLE. D. PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 3/A601. E. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 2/A601. F. AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN 2-HOUR RATED SOFFIT. SEE DETAIL 1/A601. G. REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO COMPLETE WORK INSIDE AND BEHIND WALLS. H. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. I. REFER TO SHEET A601 FOR ALL PARTITION TYPES. REFER TO SHEET A601 FOR ALL PARTITION TYPES.

AutoCAD SHX Text

CEILING KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text CEILING AREA OPEN WHERE PLUMBING WORK IS TO BE COMPLETED. NO CEILING WORK ANTICIPATED. REMOVE GWB CEILING AND INSTALL NEW/REPAIR AS NECESSARY. INSTALL MIN 24"X24" ACCESS PANEL IN GWB CEILING IN VALVE AND OTHER LOCATIONS AS COORDINATED WITH AND APPROVED BY COR. SEE DETAIL 2/A601. WHERE GWB CEILING IS REPAIRED/INSTALLED, PAINT ENTIRE CEILING TO MATCH EXISTING. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. REMOVE ACT AND GRID AS NEEDED FOR PLUMBING WORK. REINSTALL UNDAMAGED ACT AND GRID TO MATCH EXISTING TILE. NEW TILE TO MATCH EXISTING. WHERE NOT AVAILABLE, REUSE UNDAMAGED TILE IN OTHER SPACES AND INSTALL NEW TILE IN ENTIRE SPACE. CEILING IS COMBINATION OF ACT AND GWB. REMOVE AND REINSTALL ACT AS NECESSARY, REFER TO NOTE "C3" FOR WORK AT ACT CEILING. REFER TO NOTE "C2" FOR WORK AT GWB CEILING. REMOVE/REPLACE PORTIONS OF GWB SOFFIT AS NEEDED TO CONDUCT WORK. PAINT ENTIRE SOFFIT TO MATCH EXIST. AREA OPEN TO LEVEL BELOW.

AutoCAD SHX Text

FLOOR PLAN KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O.

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1/8"=1'-0"

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

OPEN

1 2 43 5 86 7 9 10 11 12

A.5

M

L

K

J

H

G

F

E

D

C

B

A

D.5

E.5

8.7 9.5 11.5

L.5

9.7

P

Q

O

9.4

ROOF COURT

1032 1211976 8541 8.7 9.5 11.9

A.5

M

L

K

J

H

G

F

E

D

C

B

A

D.5

E.5

L.5

P

Q

O

11.7

G224A

C2-3B

C2-3

G225

C2-20

C2-16

C2-18

C2-17

C2-19

C2-21

C2-25

C2-23

G224

G225A

G221B G221

G221C

G221A

G225B

G235 G227

G226

G225E

G225F

G225C

G225D

G231

G229

G233

G230

G228

G210

G204

G203

G202

G234 G201

G205A

G205

G200

G206

C2-24 G207A

G209 G208

G207

G212

G211

G211A

C2-19A

C2-20A

C2-16A

F215

F214 F213

F211

C2-17A

F211A

C2-17B F208

F200 F240

F239

F238

F237

F236

F234

F231

F224 F220

F231A

F231B

F232

G217 G216

G216A

G215A

C2-21A

G215

G213

G214

F216A

F216

F233

F235

F200A

F201

F206

F202F203

F204

F205

F209

F210

F212

F217

F218

F219

F221

C2-22A

G222

G223

G219

G220

G218

F229

F230 F228F227F226F225F223F222

C2-12A

E209 E225

C2-14

C2-10B

C2-13

C2-9C2-10

C2-13A

C2-11

C2-2

C2-8

C2-6

C2-5

C2-1

C2-1C

C2-4

C2-15

C2-1D C2-1A

D224

D231

C2-1B

D232

NO P2NO P1

NO P4 NO P3

D226

D225

D208

D223

D206

NO 1

C2-12

C2-10C

NO S7

D204

NO S6

NO S5

NO 14

D221

D228

D228A D227

D216

D222 D219

D220 D218

D217

D215

C2-3A

D214

D212

D213

D211

D209

D210

D207

D205

D203

D201

C2-6A

C2-6B

D202

D200

G232

D230AE214

E213BE213

E213A

C2-10A

E210

E211

E212

E212B

E212A

E210A

E208A

E208

E204A

E206

E203A

E204

E203

E200

C2-13B

E205

E207 E227

E202

E201

E236

E229

E231

E233

E235

NO 16

E232A

E228A

E234

E232

E230

E228

E224A

E226

E224

D229

NO15

E215A

E215E216

E217A

E217E218

E219A

E219E220E221E222

E223 C2-7

ELECTRICAL

FORMS

STG

CHART

CORRIDOR

SCRUB

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CATH

LAB

CORRIDOR

CONT/DATACATH

LAB

SU

ELECTRICAL

FILM

VIEW

STG

HAC

STAFF

TOILET

S U

TOILET

LOCKER

LOCKER

TOILET

MULTIPURPOSE

STUDY

ELECTRICAL

CONF

RES OFF

STUDY

CONS

VIEW

SPUTUM

SPUTUM

PATIENT

TOILET

COMMPATIENT

FILE

PATIENT

FILE

REPORT

BREAK RM

LOUNGE

CORRIDOR

SEC

SUPERVISORS

STG

CHIEF

CLEAN

UP

STOR

SUPPLIES

CONTROL

CONTROL

MICU

CLEAN UTILITY

ON CALL

S U

ON CALL

STRETCH/

WHEELCHR

BATH

PORT

X-RAY

OFFICE

SAT

PHARM

PRACTICE RM

CICU

PATIENT

RM

CICU

PATIENT

RM

CICU

PATIENT

RM

CICU

PATIENT

RM

CICU

PATIENT

RM

LOUNGE

COMP

EQUIP

EQUIP

LOCKER

STAFF

TOILET

STAFF

TOILET

BLOOD

GAS

SPEC

PROC

BRONCH

VIEWING

S U

STRETCH

EXERCISE

SPIRO

SPIRO

NOURISHMENT

CLEAN

UTILITY

EQUIP

CLEAN

LINEN

STERILE

PREP

FAMILY

CONSULT

FILM

VIEWING

CONSULTHAC

PHYS

OFFICE

PHYS

OFFICE

ANTE

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

C U

OFFICE

ELECTRICAL

NUR/

TECH

OFFICE

MECH

STAIR

ANTE

CLASS/CONFERENCE RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

C0RRIDOR

NOUR

MED

CORRIDOR

CORRIDOR

C0RRIDOR

CORRIDORC0RRIDOR

ALCOVE

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

SVC

ELEVATOR

LOBBY

CORRIDOR

WAITING

CORRIDOR

CORRIDOR

CRIT CARE

WAITING PASS ELEVATOR

LOBBY

TRASH

CHUTE

TOILET

WOMENS

TOILET

ELEVATORELEVATOR

ELEVATOR ELEVATOR

HAC

LINEN

CHUTE

NURSE/TECH

WORK

DW

VIEW /

READ

DW

NURSE

STATION

ELEVATOR

HAC

ELEVATOR

ELEVATOR

STAIR

OFFICE

CARDIO/PULMONARY REHAB

TOILET/SHOWER

TOILET FILE STORAGE

BIOMED

PRINTER

EXAM

EXAM EXAM

EXAM

SUPPLY

CHART

EXAM

EXAM

EXAM

EXAM

LAB

EXAM

PACEMAKER

ECG

ECHO

ECHO

CARDIOLOGY

CARDIOLOGY

LIPID CLINIC

RECEPTION

WAITING

PATIENT

TOILET

TOILET

EXERCISE

CLERICAL/

TECH

SUPV

REHAB

OFFICESTORE

BATHANTE

ISO

ALCOVE

WORK RM

ELECTRICAL

ANTE

BATH

ISO

DICT

BATH

PATIENT

BATH

PATIENT

BATH

PATIENT

MEDICINE

CLASS RM

ALCOVE

LOUNGE/

LKRS

CLEAN LINEN

CU

EXAM

PHYS

CONS

COMM

SU

TOILET

HAC

ELECTRICAL

STAIR

BATH

BATH

HYDRO

PATIENT

PATIENT

PATIENT

BATH

PATIENT

PATIENT

MECH

STAIR

BATH

PATIENTPATIENT

BATH

PATIENTPATIENT

BATH

PATIENTPATIENTHEADDAY RM

VENT

ASST

CORRIDOR

CORRIDOR

C2-22

Z O

O

ZONE B

Z O

O

ZONE A

MATCH LINE

ZONE B

ZONE D

MATCH LINE

ZONE A

ZONE C

OVERALL

M A

T C

H

L

I N

E

Z O

O

A

T C

H

L

I N

E

Z O

O

BUILDING 1A - SECOND FLOOR -

OVERALL PLAN

1A-A111

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEMPHIS TENNESSEE

614-18-106

1A Project Director

MARCH 31, 2020 JLH EORevisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS

OC

CREMM

E

AGRICULTURE

FLOOR PLAN LEGEND

S S

AutoCAD SHX Text 1A-A111

AutoCAD SHX Text

AutoCAD SHX Text 1/16" = 1'-0"

AutoCAD SHX Text

BUILDING 1A - SECOND FLOOR - OVERALL - PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

GATE

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

KEY PLAN BUILDING 1A - SECOND FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O.

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 32'

AutoCAD SHX Text 48'

AutoCAD SHX Text OVERALL FLOOR PLAN GENERAL NOTES A. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. B. AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, REMOVE/REINSTALL AS NEEDED ALL HANDRAILS, CORNER GUARDS AND CRASH RAILS. C. OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER POSSIBLE. D. PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 3/A601. E. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 2/A601. F. AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN 2-HOUR RATED SOFFIT. SEE DETAIL 1/A601. G. REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO COMPLETE WORK INSIDE AND BEHIND WALLS. H. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. I. REFER TO SHEET A601 FOR ALL PARTITION TYPES. REFER TO SHEET A601 FOR ALL PARTITION TYPES.

EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION AREA/WALL WITH PROPOSED WORK CEILING WITH PROPOSED WORK 1 HOUR FIRE RATED PARTITION 2 HOUR FIRE RATED PARTITION SMOKE RATED PARTITION

O

O

ZONE C

1 2 43 5 6

M

L

K

J

L.5

O

H

OPEN

C2-20

C2-16

C2-18

C2-17

C2-19

C2-19A

C2-20A

C2-16A

F215

F214 F213

F211

C2-17A

F211A

C2-17B F208

F239

F238

F237

F236

F234

F231

F224 F220

F231A

F231B

F232

G217

F216A

F216

F233

F235

F205

F209

F210

F212

F217

F218

F219

F221

F229

F230 F228F227F226F225F223F222

FORMS

STG

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CONTROL

CONTROL

MICU

CLEAN UTILITY

ON CALL

S U

ON CALL

STRETCH/

WHEELCHR

BATH

PORT

X-RAY

OFFICE

CICU

PATIENT

RM

CICU

PATIENT

RM

CICU

PATIENT

RM

CICU

PATIENT

RM

CICU

PATIENT

RM

LOUNGE

COMP

EQUIP

EQUIP

LOCKER

STAFF

TOILET

STAFF

TOILET

BLOOD

GAS

S P

BR

NOURISHMENT

CLEAN

UTILITY

EQUIP

CLEAN

LINEN

PHYS

OFFICE

ANTE

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

STAIR

ANTE

CLASS/CONFERENCE RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

MICU

PATIENT

RM

4 4 4

1A

C3

C2

1B

1A

C3

MATCH LINE

ZONE B

ZONE D

MATCH LINE

ZONE A

ZONE C

A

M A

T C

H

L

I N

E

Z O

O

A

T C

H

L

I N

E

Z O

O

S S

BUILDING 1A - SECOND FLOOR -

ZONE A

1A-A112

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEMPHIS TENNESSEE

614-18-106

1A Project Director

MARCH 31, 2020 JLH EORevisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS

OC

CREMM

E

AGRICULTURE

AutoCAD SHX Text 1A-A113

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

BUILDING 1A - SECOND FLOOR - ZONE A - PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

KEY PLAN BUILDING 1A - SECOND FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text TYPICAL RESTROOM - @ SINK TYPICAL RESTROOM - @ SHOWER TYPICAL RESTROOM - @ TUB TYPICAL KITCHENETTE - @ SINK TYPICAL CORRIDOR TYPICAL OFFICE/EXAM/PATIENT ROOM TYPICAL OFFICE TYPICAL H.A.C. TYPICAL UTILITY ROOM TYPICAL MECHANICAL ROOM TYPICAL LABORATORY SPACE PLUMBING CHASE NOTES: THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. SEE SHEET G003 FOR FULL DEFINITION OF WORK REQUIREMENTS.

AutoCAD SHX Text EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION AREA/WALL WITH PROPOSED WORK CEILING WITH PROPOSED WORK 1 HOUR FIRE RATED PARTITION 2 HOUR FIRE RATED PARTITION SMOKE RATED PARTITION

AutoCAD SHX Text FLOOR PLAN GENERAL NOTES A. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. B. AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, REMOVE/REINSTALL AS NEEDED ALL HANDRAILS, CORNER GUARDS AND CRASH RAILS. C. OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER POSSIBLE. D. PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 3/A601. E. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 2/A601. F. AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN 2-HOUR RATED SOFFIT. SEE DETAIL 1/A601. G. REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO COMPLETE WORK INSIDE AND BEHIND WALLS. H. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. I. REFER TO SHEET A601 FOR ALL PARTITION TYPES. REFER TO SHEET A601 FOR ALL PARTITION TYPES.

AutoCAD SHX Text

CEILING KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text CEILING AREA OPEN WHERE PLUMBING WORK IS TO BE COMPLETED. NO CEILING WORK ANTICIPATED. REMOVE GWB CEILING AND INSTALL NEW/REPAIR AS NECESSARY. INSTALL MIN 24"X24" ACCESS PANEL IN GWB CEILING IN VALVE AND OTHER LOCATIONS AS COORDINATED WITH AND APPROVED BY COR. SEE DETAIL 2/A601. WHERE GWB CEILING IS REPAIRED/INSTALLED, PAINT ENTIRE CEILING TO MATCH EXISTING. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. REMOVE ACT AND GRID AS NEEDED FOR PLUMBING WORK. REINSTALL UNDAMAGED ACT AND GRID TO MATCH EXISTING TILE. NEW TILE TO MATCH EXISTING. WHERE NOT AVAILABLE, REUSE UNDAMAGED TILE IN OTHER SPACES AND INSTALL NEW TILE IN ENTIRE SPACE. CEILING IS COMBINATION OF ACT AND GWB. REMOVE AND REINSTALL ACT AS NECESSARY, REFER TO NOTE "C3" FOR WORK AT ACT CEILING. REFER TO NOTE "C2" FOR WORK AT GWB CEILING. REMOVE/REPLACE PORTIONS OF GWB SOFFIT AS NEEDED TO CONDUCT WORK. PAINT ENTIRE SOFFIT TO MATCH EXIST. AREA OPEN TO LEVEL BELOW.

AutoCAD SHX Text

FLOOR PLAN KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O.

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1/8"=1'-0"

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

Z O

O

86 7 9 10 11 128.7 9.5 11.59.7

M

L

K

J

L.5

P

Q

O

9.4

H

OPEN

G224A

G225

C2-21

C2-25

C2-23

G224

G225A

G221B G221

G221C

G221A

G225B

G235 G227

G226

G225E

G225F

G225C

G225D

G229G228

G210

G204 C2-24

G207A

G209 G208

G207

G212

G211

G211A

G217 G216

G216A

G215A

C2-21A

G215

G213

G214

C2-22A

G222

G223

G219

G220

G218

ELECTRICAL

SCRUB

CORRIDOR

CORRIDOR

CORRIDOR

CATH

LAB

CORRIDOR

CONT/DATACATH

LAB

SU

ELECTRICAL

FILM

VIEW

STG

HAC

STAFF

TOILET

S U

TOILET

LOCKER

LOCKER

TOILET

STUDY

RES OFF

STUDY

CONS

VIEW

SPUTUM

SPUTUMREPORTLOUNGE

CORRIDOR

SEC

SUPERVISORS

STG

CHIEF

CLEAN

UP

STOR

SUPPLIES

BLOOD

GAS

SPEC

PROC

BRONCH

VIEWING

S U

STRETCH

EXERCISE

SPIRO

SPIRO

C U

OFFICE

ELECTRICAL

NUR/

TECH

OFFICE

MECH

STAIR

CORRIDOR

C2-22

C2

1A

C3

C2

1A

C3

1A

C3

C3

C3

C3

C3

C3

C3

C2

1A

C3

C3

MATCH LINE

ZONE B

ZONE D

MATCH LINE

ZONE A

ZONE C

B

M A

T C

H

L

I N

E

Z O

O

O

A

T C

H

L

I N

E

Z O

S S

BUILDING 1A - SECOND FLOOR -

ZONE B

1A-A113

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEMPHIS TENNESSEE

614-18-106

1A Project Director

MARCH 31, 2020 JLH EORevisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS

OC

CREMM

E

AGRICULTURE

AutoCAD SHX Text 1A-A113

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

BUILDING 1A - SECOND FLOOR - ZONE B - PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

GATE

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

CONNECTION TO BUILDING 1

AutoCAD SHX Text

KEY PLAN BUILDING 1A - SECOND FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text TYPICAL RESTROOM - @ SINK TYPICAL RESTROOM - @ SHOWER TYPICAL RESTROOM - @ TUB TYPICAL KITCHENETTE - @ SINK TYPICAL CORRIDOR TYPICAL OFFICE/EXAM/PATIENT ROOM TYPICAL OFFICE TYPICAL H.A.C. TYPICAL UTILITY ROOM TYPICAL MECHANICAL ROOM TYPICAL LABORATORY SPACE PLUMBING CHASE NOTES: THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. SEE SHEET G003 FOR FULL DEFINITION OF WORK REQUIREMENTS.

AutoCAD SHX Text EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION AREA/WALL WITH PROPOSED WORK CEILING WITH PROPOSED WORK 1 HOUR FIRE RATED PARTITION 2 HOUR FIRE RATED PARTITION SMOKE RATED PARTITION

AutoCAD SHX Text FLOOR PLAN GENERAL NOTES A. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. B. AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, AT WALL WORK IN CORRIDORS AND AS NOTED ELSEWHERE ON PLANS, REMOVE/REINSTALL AS NEEDED ALL HANDRAILS, CORNER GUARDS AND CRASH RAILS. C. OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER OPEN WALL ON SIDE AWAY FROM PLUMBING FIXTURES AND TILE FINISH WHENEVER POSSIBLE. D. PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS PROVIDE 24"x24", 2-HOUR RATED ACCESS PANELS IN RATED WALL LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 3/A601. E. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. PROVIDE 16"x16", ACCESS PANELS IN CEILING LOCATIONS DESIGNATED BY PLUMBING. FINAL POSITION COORDINATED WITH COR. SEE DETAIL 2/A601. F. AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN AT ALL ELECTRICAL ROOMS RECEIVING WORK, ENCLOSE NEW PIPES ABOVE IN 2-HOUR RATED SOFFIT. SEE DETAIL 1/A601. G. REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO REMOVE AND REINSTALL PLUMBING FIXTURES AS NOTED ON PLUMBING DRAWINGS TO COMPLETE WORK INSIDE AND BEHIND WALLS. H. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. SEE SHEETS G004 & G005 FOR OVERALL PHASING OF WORK. I. REFER TO SHEET A601 FOR ALL PARTITION TYPES. REFER TO SHEET A601 FOR ALL PARTITION TYPES.

AutoCAD SHX Text

CEILING KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text CEILING AREA OPEN WHERE PLUMBING WORK IS TO BE COMPLETED. NO CEILING WORK ANTICIPATED. REMOVE GWB CEILING AND INSTALL NEW/REPAIR AS NECESSARY. INSTALL MIN 24"X24" ACCESS PANEL IN GWB CEILING IN VALVE AND OTHER LOCATIONS AS COORDINATED WITH AND APPROVED BY COR. SEE DETAIL 2/A601. WHERE GWB CEILING IS REPAIRED/INSTALLED, PAINT ENTIRE CEILING TO MATCH EXISTING. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. REMOVE ACT AND GRID AS NEEDED FOR PLUMBING WORK. REINSTALL UNDAMAGED ACT AND GRID TO MATCH EXISTING TILE. NEW TILE TO MATCH EXISTING. WHERE NOT AVAILABLE, REUSE UNDAMAGED TILE IN OTHER SPACES AND INSTALL NEW TILE IN ENTIRE SPACE. CEILING IS COMBINATION OF ACT AND GWB. REMOVE AND REINSTALL ACT AS NECESSARY, REFER TO NOTE "C3" FOR WORK AT ACT CEILING. REFER TO NOTE "C2" FOR WORK AT GWB CEILING. REMOVE/REPLACE PORTIONS OF GWB SOFFIT AS NEEDED TO CONDUCT WORK. PAINT ENTIRE SOFFIT TO MATCH EXIST. AREA OPEN TO LEVEL BELOW.

AutoCAD SHX Text

FLOOR PLAN KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text J.

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O.

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text 0'

AutoCAD SHX Text

SCALE: 1/8"=1'-0"

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

1 2 43 5 6 7

H

G

F

E

D

C

B

D.5

E.5

A

A.5

Z O

O

ROOF COURT

C2-17

C2-17A

F200 F240

F239

F200A

F201

F206

F202F203

F204

F205

F209

C2-12A

E209 E225

C2-14

C2-10B

C2-13

C2-10

C2-13A

C2-11

C2-15

C2-

C2-12

C2-10C

E214

E213BE213

E213A

C2-10A

E210

E211

E212

E212B

E212A

E210A

E208A

E208

E204A

E206

E203A

E204

E203

E200

C2-13B

E205

E207 E227

E202

E201

E236

E229

E231

E233

E235

NO 16

E232A

E228A

E234

E232

E230

E228

E224A

E226

E224

NO15

E215A

E215E216

E217A

E217E218

E219A

E219E220E221E222

E223

CORRIDOR

SAT

PHARM

PRACTICE RM

CICU

PATIENT

RM

STERILE

PREP

FAMILY

CONSULT

FILM

VIEWING

CONSULTHAC

PHYS

OFFICE

PHYS

OFFICE

ANTE

C0RRIDOR

NOUR

MED

CORRIDOR

CORRIDOR

C0RRIDOR

C0RRIDOR

ALCOVE

CORRIDOR

CORRIDOR

CRIT

WAIT

NURSE

STATION

STORE

BATHANTE

ISO

ALCOVE

WORK RM

ELECTRICAL

ANTE

BATH

ISO

DICT

BATH

PATIENT

BATH

PATIENT

BATH

PATIENT

MEDICINE

CLASS RM

ALCOVE

LOUNGE/

LKRS

CLEAN LINEN

CU

EXAM

PHYS

CONS

COMM

SU

TOILET

HAC

ELECTRICAL

STAIR

BATH

BATH

HYDRO

PATIENT

PATIENT

PATIENT

BATH

PATIENT

PATIENT

STAIR

BATH

PATIENTPATIENT

BATH

PATIENTPATIENT

BATH

PATIENTPATIENTHEADDAY RM

VENT

ASST

4 4

1A

C2

1B 4 4

1A

C2

1B 4 4

1A

C2

1B

C3

C3

C3

C3

1B

1B

C2

1A

1A

C3

1B

1A

C2

1A

1A

1B

1B

C2

C2

1B

1A

C2

1B

1A

C2

1B

1A

1A

1A

C3

C3

C3

C2

C2

C2

C3

C3

MATCH LINE

ZONE B

ZONE D

MATCH LINE

ZONE A

ZONE C

C

M A

T C

H

L

I N

E

Z O

O

A

T C

H

L

I N

E

Z O

N E

A

Z O

S S

BUILDING 1A - SECOND FLOOR -

ZONE C

1A-A114

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEMPHIS TENNESSEE

614-18-106

1A Project Director

MARCH 31, 2020 JLH EORevisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

VA Memphis Correct Plumbing Piping and Replace FixturesBID DOCUMENTS

OC

CREMM

E

AGRICULTURE

AutoCAD SHX Text 1A-A115

AutoCAD SHX Text

AutoCAD SHX Text 1/8" = 1'-0"

AutoCAD SHX Text

BUILDING 1A - SECOND FLOOR - ZONE C - PLAN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

KEY PLAN BUILDING 1A - SECOND FLOOR

AutoCAD SHX Text

PLAN NORTH

AutoCAD SHX Text

TRUE NORTH

AutoCAD SHX Text TYPICAL RESTROOM - @ SINK TYPICAL RESTROOM - @ SHOWER TYPICAL RESTROOM - @ TUB TYPICAL KITCHENETTE - @ SINK TYPICAL CORRIDOR TYPICAL OFFICE/EXAM/PATIENT ROOM TYPICAL OFFICE TYPICAL H.A.C. TYPICAL UTILITY ROOM TYPICAL MECHANICAL ROOM TYPICAL LABORATORY SPACE PLUMBING CHASE NOTES: THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. THESE NOTES IDENTIFY TYPICAL DEMOLITION AND REPAIR CONDITIONS. SEE SHEET G003 FOR FULL DEFINITION OF WORK REQUIREMENTS.

AutoCAD SHX Text EXISTING CONSTRUCTION TO REMAIN NEW CONSTRUCTION AREA/WALL WITH PROPOSED WORK CEILING WITH PROPOSED WORK 1 HOUR FIRE RATED PARTITION 2 HOUR FIRE RATED PARTITION SMOKE RATED PARTITION

AutoCAD SHX Text FLOOR PLAN GENERAL NOTES A. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF ALL PLUMBING WORK. B.