Z1NB--Project 614-18-106 Replace Plumbing and Piping Fixtures (FY-18 Plus-up)
Solicitation number
36C24920R0072
Issued by

View the file

Other files

File Type Posted
S06-36C24920R0072 Amendment 0008 09.03.2020.pdf PDF
S06-36C24920R0072 Amendment 0006.pdf PDF
S06-36C24920R0072 0005.pdf PDF
1-PP113 Rev1.pdf PDF
Bldg 5 - Memphis VAMC Final CD.pdf PDF
S06-614-18-106 Plumbing and Piping Addendum and RFI Responses.docx DOCX document
S06-Solicitation 36C24920R0072 0003.docx DOCX document
Bldg 9 - Memphis VAMC Final CD.pdf PDF
Bldg 1AC- Memphis VAMC Final CD Submittal.pdf PDF
36C24920R0072 0002.docx DOCX document
010000_General Requirements.pdf PDF
S02-Price Schedule (Proj 614-18-106) FY2020.xlsx XLSX spreadsheet
S05-Organized Site Visit Sign In Sheet (614-18-106).pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
Correct Piping Drawings MEP B1_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part6.pdf PDF
Correct Piping Drawings MEP B1_Part5.pdf PDF
Correct Piping Drawings GEN and ARCH_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part1.pdf PDF
Correct Piping Drawings MEP B7_Part2.pdf PDF
Correct Piping Drawings GEN and ARCH_Part3.pdf PDF
Correct Piping Drawings MEP B5_Part2.pdf PDF
Correct Piping Drawings MEP B5_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part3.pdf PDF
Correct Piping Drawings MEP B1_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part2.pdf PDF
Correct Piping Drawings MEP B1_Part4.pdf PDF
36C24920R0072 0001.docx DOCX document
Correct Piping Drawings GEN and ARCH_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part4.pdf PDF
S02-Contractor PPQ (3 Submission Reqd) (614-18-106)_Revision.pdf PDF
36C24920R0072 0001.docx DOCX document
S02-Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
S02-Correct Piping Drawings MEP B7_Part2.pdf PDF
S02-Correct Piping Drawings MEP B1_Part4.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1 02.pdf PDF
S02-Correct Piping Drawings MEP B1_Part5.pdf PDF
36C24920R0072_1.docx DOCX document
S02-Correct Piping Drawings MEP B1A_Part2.pdf PDF
C28-Project Specifications.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1.pdf PDF
S02-Correct Piping Drawings MEP B7_Part3.pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
S02-Contractor PPE (3 Submission Reqd) (614-18-106).pdf PDF
S02-Correct Piping Drawings MEP B5_Part1.pdf PDF
S02-Correct Piping Drawings MEP B1_Part3.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0007 08-31-2020 614-20-4-5565-0011 614-18-106

Department of Veterans Affairs Network Contracting Office 9 (90C) c/o: Roxie Ann Keese 1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129

90C

Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129

To all Offerors/Bidders

36C24920R0072

07-09-2020

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: September 8, 2020 at 0900ET

614-36X0162-5565-85420-3220-23NR8JC08

X

The purpose of this amendment is to extend the solicitation response date to Sept 8, 2020 at 9:00amET. This solicitation is also extended to provide all interested offerors, and opportunity to submit a "best and final" price, based on revi-sions to the Statement of Work as provided herein in this Amendment 0007.

Based on the statement of work as provided in solicitation number #36C24920R0072 dated July 9, 2020, a "Best and Final" offer on the following project work:

Based upon your offer submission:

Deduct Alternate 1.) Exclude the pricing for all work associated with the plumbing and piping corrections and fixture replacements for Building #7. $______________________________________ (continue on page 2, next page)

Roxie Ann Keese FAC-C Level III, FE-C

PAGE NO.

CONTRACT NO. ORDER NO. MODIFICATION NO.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)

STANDARD FORM 30 (CONTINUATION)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTINUATION PAGE

Deduct Alternate 2.): Exclude all work covering the plumbing, piping corrections and fixture replacements associated with Building #5 $__________________________________.

Deduct Alternate 3.): Exclude all work covering the plumbing, piping corrections and fixture replacement associated with building #1AC. $____________________________________.

Deduct Alternate 4.): Exclude the work associated with the planned monitoring stations. $______________________________

All other provisions and clause of this solicitation remain unchanged. Offerors shall submit their "Best and Final " and submit to the Contracting Officer electronically via email at roxie.keese@va.gov.

All work in building 1, and 1A shall remain in the project work including the plumbing, piping corrections and the fix-ture replacement and the hot water heater replacements. The valve, fitting and asbestos abatement (Unit Price Items), s shall remain as part of the project and all offered items shall be clearly restated below:

Base Offer Item 1: $___________________________________________

Base Offer Item 2: $___________________________________________

Base Offer Item 3: $___________________________________________

Base Offer Item 4: $___________________________________________

All offerors shall be responsible for confirming the Contracting Officer's, receipt said "Best and Final".

See attached document: S02-Unit Priced Items.

File details come from the government source that posted it. Updated .