Correct Piping Drawings MEP B1_Part6.pdf

PDF 1 MB Posted

Attached to
Z1NB--Project 614-18-106 Replace Plumbing and Piping Fixtures (FY-18 Plus-up)
Solicitation number
36C24920R0072
Issued by

View the file

Other files

File Type Posted
S06-36C24920R0072 Amendment 0008 09.03.2020.pdf PDF
S06-36C24920R0072 Amendment 0007.pdf PDF
S06-36C24920R0072 Amendment 0006.pdf PDF
S06-36C24920R0072 0005.pdf PDF
1-PP113 Rev1.pdf PDF
Bldg 5 - Memphis VAMC Final CD.pdf PDF
S06-614-18-106 Plumbing and Piping Addendum and RFI Responses.docx DOCX document
S06-Solicitation 36C24920R0072 0003.docx DOCX document
Bldg 9 - Memphis VAMC Final CD.pdf PDF
Bldg 1AC- Memphis VAMC Final CD Submittal.pdf PDF
36C24920R0072 0002.docx DOCX document
010000_General Requirements.pdf PDF
S02-Price Schedule (Proj 614-18-106) FY2020.xlsx XLSX spreadsheet
S05-Organized Site Visit Sign In Sheet (614-18-106).pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
Correct Piping Drawings MEP B1_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part5.pdf PDF
Correct Piping Drawings GEN and ARCH_Part1.pdf PDF
Correct Piping Drawings MEP B1_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part1.pdf PDF
Correct Piping Drawings MEP B7_Part2.pdf PDF
Correct Piping Drawings GEN and ARCH_Part3.pdf PDF
Correct Piping Drawings MEP B5_Part2.pdf PDF
Correct Piping Drawings MEP B5_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part3.pdf PDF
Correct Piping Drawings MEP B7_Part3.pdf PDF
Correct Piping Drawings MEP B1_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part2.pdf PDF
Correct Piping Drawings MEP B1_Part4.pdf PDF
36C24920R0072 0001.docx DOCX document
Correct Piping Drawings GEN and ARCH_Part2.pdf PDF
Correct Piping Drawings MEP B1A_Part1.pdf PDF
Correct Piping Drawings MEP B1A_Part4.pdf PDF
S02-Contractor PPQ (3 Submission Reqd) (614-18-106)_Revision.pdf PDF
36C24920R0072 0001.docx DOCX document
S02-Correct Piping Drawings GEN and ARCH_Part4.pdf PDF
S02-Correct Piping Drawings MEP B7_Part2.pdf PDF
S02-Correct Piping Drawings MEP B1_Part4.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1 02.pdf PDF
S02-Correct Piping Drawings MEP B1_Part5.pdf PDF
36C24920R0072_1.docx DOCX document
S02-Correct Piping Drawings MEP B1A_Part2.pdf PDF
C28-Project Specifications.pdf PDF
S02-Correct Piping Drawings MEP B1_Part1.pdf PDF
S02-Correct Piping Drawings MEP B7_Part3.pdf PDF
S02-36C24920R0072_solicitation_Final Revision_07.09.2020.pdf PDF
S02-Contractor PPE (3 Submission Reqd) (614-18-106).pdf PDF
S02-Correct Piping Drawings MEP B5_Part1.pdf PDF
S02-Correct Piping Drawings MEP B1_Part3.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

L

K

5 6 7

L

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA Memphis Correct Plumbing Piping and Replace Fixtures

MEMPHIS TENNESSEE

614-18-106

Project Director

MARCH 31, 2020Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

BID DOCUMENTS

FINAL SUBMITTAL

S

T

A

T

E

O

F

T

E

N

N

E

S

S

E

E

R E

G

I

S

T

E

R

D

N

G

I

N

E

E

R

N o

C

O

M

M E

R

C

E

AGRICULTURE

DKB JEA

1-MEP201

MECHANICAL ROOM NEW WORK

STEAM & ELECTRICAL PHASE 1

AutoCAD SHX Text

FD

AutoCAD SHX Text A

AutoCAD SHX Text

STV

AutoCAD SHX Text 6"

AutoCAD SHX Text

MPS

AutoCAD SHX Text 3"

AutoCAD SHX Text

STV

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 5"

AutoCAD SHX Text 3"

AutoCAD SHX Text

HPS

AutoCAD SHX Text

CDR

AutoCAD SHX Text

EXISTING CONDENSATE PUMPS

AutoCAD SHX Text

CDR

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text

EXISTING PUMP

AutoCAD SHX Text

LIEBERT UNIT

AutoCAD SHX Text

5" @110 PSI

AutoCAD SHX Text

BWG-1

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

%%UWH-2

AutoCAD SHX Text

%%UWH-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CP-1

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text

%%URP-2

AutoCAD SHX Text

%%URP-1

AutoCAD SHX Text B

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text

%%UBAC

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

STV

AutoCAD SHX Text

AutoCAD SHX Text

%%U1-SV1

AutoCAD SHX Text

CDR

AutoCAD SHX Text

CDR

AutoCAD SHX Text

CDR

AutoCAD SHX Text

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text 2"

AutoCAD SHX Text

STV

AutoCAD SHX Text

STV

AutoCAD SHX Text

STV

AutoCAD SHX Text 6"

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text

HPS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HPS

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text B

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UFT-1

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CDR

AutoCAD SHX Text

CDR

AutoCAD SHX Text 4"

AutoCAD SHX Text

MPS

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text

SECTION B

AutoCAD SHX Text

%%UST-3

AutoCAD SHX Text

4"MPS

AutoCAD SHX Text

2"CDR

AutoCAD SHX Text 1"

AutoCAD SHX Text 3"

AutoCAD SHX Text

3/4" DRIP BLOW DOWN

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

4"MPS

AutoCAD SHX Text

%%UWH-2

AutoCAD SHX Text

1"CDR

AutoCAD SHX Text

%%UST-3

AutoCAD SHX Text

%%UWH-1

AutoCAD SHX Text 3"

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

3" WYE STRAINER

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

SECTION A

AutoCAD SHX Text

%%UWH-2

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

WATER HEATER SECTIONS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2"CDR

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

%%UCP-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

2" VENT

AutoCAD SHX Text

%%UDETAIL 1 NOTES:

AutoCAD SHX Text 8"x8"x1/2" STEEL BASE PLATE WITH (4)1/2"x4" DRIVE-IN ANCHORS. 3" SCHEDULE 40 STEEL PIPE. ADJUST LENGTH FOR FIELD CONDITIONS. 2"x2"x1/4" ANGLE IRON PIPE SUPPORTS (TYP). FIELD ADJUST HEIGHT AND QUANTITY AS NEEDED TO SUPPORT ALL HORIZONTAL PIPE RUNS. PROVIDE LENGTH 1" BEYOND U-BOLT AND ROUND ALL CORNERS. PROVIDE INSULATION CONTINUOUS THROUGH 1/2" U-BOLT. PROVIDE INSULATION INSERT AND SADDLE PER SPECIFICATIONS. TYPICAL OF 4.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

DETAIL 2 - PIPE STANCHION

AutoCAD SHX Text

%%UDETAIL 2 NOTES:

AutoCAD SHX Text 8"x8"x1/2" STEEL BASE PLATE WITH (4)1/2"x4" DRIVE-IN ANCHORS. 3" SCHEDULE 40 STEEL PIPE. ADJUST LENGTH FOR FIELD CONDITIONS. 4"x6"x1/2" ANGLE IRON PIPE ROLLER SUPPORT. FIELD CUT TO LENGTH AS NEEDED. STEEL PIPE ROLLER SUPPORT TO FIT PIPE SIZE AS NEEDED.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UDETAIL 3 NOTES:

AutoCAD SHX Text 8"x8"x1/2" STEEL BASE PLATE WITH (4)1/2"x4" DRIVE-IN ANCHORS. 3" SCHEDULE 40 STEEL PIPE. ADJUST LENGTH FOR FIELD CONDITIONS. 2"x2"x1/4" ANGLE IRON PIPE SUPPORTS (TYP). FIELD ADJUST HEIGHT AND QUANTITY AS NEEDED TO SUPPORT ALL HORIZONTAL PIPE RUNS. PROVIDE LENGTH 1" BEYOND U-BOLT AND ROUND ALL CORNERS. PROVIDE INSULATION CONTINUOUS THROUGH 1/2" U-BOLT. PROVIDE INSULATION INSERT AND SADDLE PER SPECIFICATIONS. PROVIDE PIPE CAP ON TOP OF SUPPORT.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

DETAIL 1 - PIPE STANCHION

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

DETAIL 3 - PIPE STANCHION

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

10' MIN.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BASEMENT MECHANICAL ROOM PLAN - NEW WORK PHASE 1

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text 6'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'

AutoCAD SHX Text A. ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A ALL EXISTING PIPING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM A COMBINATION OF ON-SITE SURVEY AND CONSTRUCTION DOCUMENTS PROVIDED BY OTHERS. CONTRACTOR SHALL FIELD VERIFY EXISTENCE, ROUTING, AND SIZING OF PIPING PRIOR TO COMMENCEMENT OF WORK. B. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER UNLESS OTHERWISE NOTED, CONTRACTOR SHALL INSTALL NEW INSULATION PER SPECIFICATIONS ON ALL NEW PIPE, NEW FITTINGS, AND EXISTING PIPE AND FITTINGS WHERE INSULATION WAS REMOVED FOR DEMOLITION OR TIE-IN OF NEW WORK. C. COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN COORDINATE ALL WORK WITH PHASING PLANS AND NOTES INCLUDING IN SPECIFICATION SECTION 01.00.00 GENERAL REQUIREMENTS. NOTE THAT AFTER HOURS AND WEEKEND WORK SHALL BE REQUIRED FOR MOST SPACES. D. PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND PROVIDE COMPLETE CLEAN-UP AND REMOVAL OF DEMOLITION DEBRIS AND DUST AT END OF EACH WORK SHIFT. COVER ALL EQUIPMENT AND PROTECT COURSE OF WORK. RUN HEPA-FILTER EXHAUST FILTRATION UNITS DURING ALL ACTIVE WORK ACTIVITIES. E. THE INTENT IS TO INSTALL, TEST, AND OPERATE 2 NEW WATER HEATERS AND 2 THE INTENT IS TO INSTALL, TEST, AND OPERATE 2 NEW WATER HEATERS AND 2 NEW CIRCULATION PUMPS FOR A PERIOD OF SEVEN (7) DAYS PRIOR TO COMMISSIONING. DEMOLITION OF EXISTING WATER HEATERS AND EXISTING RETURN PUMPS WILL BEGIN AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR NEW WATER HEATERS AND NEW PUMPS ARE COMPLETE. ONLY ONE NEW PUMP SHALL OPERATE AT A TIME. ROTATE NEW PUMP OPERATION EVERY 24 HOURS DURING PHASE 1. REMAINING EXISTING WATER HEATERS AND PUMPS SHALL BE DEMOLISHED. NEW PUMP OPERATION/ROTATION SHALL CONTINUE. AFTER SUCCESSFUL COMMISSIONING ACTIVITIES FOR NEW WATER HEATERS ARE COMPLETE, ONE HEATER AND ONE PUMP SHALL BE IN OPERATION. ONE HEATER SHALL BE OFFLINE AND DRAINED. ONE PUMP SHALL BE IN STAND-BY AND PUMP ROTATION SET TO 8 HOURS INTERVALS PER CONTROL SHEET P002. F. COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO COORDINATE ALL REQUIRED SHUT DOWNS AND OUTAGES WITH COR PRIOR TO WORK. SCHEDULE REQUIRED TIE-INS TO MINIMIZE NUMBER AND DURATION OF OUTAGES. G. CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, CONTRACTOR SHALL PROVIDE AND INSTALL ALL VALVES, PIPE, FITTINGS, HANGERS AND SUPPORTS, INSULATION, EQUIPMENT, CONTROLS, BMS CONNECTIONS, ELECTRICAL ITEMS, ETC., TO PROVIDE A COMPLETE AND OPERABLE SYSTEM.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text A. 2 NEW CONDENSATE PUMPS, SEE SCHEDULE (ONLY ONE PUMP WILL OPERATE AT 2 NEW CONDENSATE PUMPS, SEE SCHEDULE (ONLY ONE PUMP WILL OPERATE AT A TIME). B. STEAM PRESSURE GAUGE. STEAM PRESSURE GAUGE. C. ELECTRONIC STEAM VALVE. SEE DOMESTIC WATER HEATER SCHEDULE ON SHEET ELECTRONIC STEAM VALVE. SEE DOMESTIC WATER HEATER SCHEDULE ON SHEET PP501 FOR SIZE.

AutoCAD SHX Text A

AutoCAD SHX Text PROVIDE NEW MOTOR RATED SWITCH WITH FLEX CONNECTION TO WATER HEATER. PROVIDE 30AMP/2P NON-FUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE WITH FLEX CONNECTION TO RECIRCULATION PUMP. PROVIDE 2#12, #12G; 3/4" CONDUIT TO EXISTING PANEL BAC. PROVIDE AND CONNECT TO NEW 20A/2P BREAKER. PROVIDE 2#12, #12G; 3/4" CONDUIT TO EXISTING PANEL BAC. PROVIDE AND CONNECT TO NEW 20A/1P BREAKER. 2#12, #12G; 3/4" CONDUIT TO NEW EQUIPMENT. PROVIDE FLEXIBLE CONDUIT CONNECTION TO NEW EQUIPMENT SUCH THAT EQUIPMENT CAN BE REMOVED OR SERVICED. EXISTING 208Y/120V, 3 , 4W PANEL BAC TO REMAIN. PROVIDE 20A/2P CIRCUITBREAKER FOR NEW PUMPS RP-1 AND RP-2. PROVIDE 20A/1P BREAKER FOR NEW WATER HEATERS WH-1 AND WH-2. PROVIDE 20A/1P BREAKER FOR NEW CONDENSATE PUMP CP-1. BREAKERS SHALL BE COMPATABLE WITH EXISTING PANEL AND SHALL MATCH AIC RATING.

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text CONNECT NEW HIGH PRESSURE STEAM TO EXISTING AT THIS LOCATION. PROVIDE TWO(2) NEW VALVES FOR DOUBLE ISOLATION OF STEAM SUPPLY. FIELD FABRICATE AND INSTALL PIPE SPOOL PIECE SUCH THAT VALVE HANDLES HAVE MINIMUM 3" CLEARANCE. VALVE HANDLE SHALL NOT TOUCH OR CREATE PINCH POINT. FIELD ROUTE NEW HIGH PRESSURE STEAM LINE IN APPROXIMATE LOCATION INDICATED TO NEW MEDIUM PRESSURE STEAM REDUCING STATION. PROVIDE STANCHION PIPE SUPPORT (TYP) WHEN PIPING CANNOT BE SUPPORTED FROM STRUCTURE ABOVE. SEE DETAIL 2 ON THIS SHEET. PROVIDE NEW DUPLEX STEAM PRESSURE REGULATOR STATION. SEE DETAIL 3 ON SHEET PP402 AND STEAM PRESSURE REGULATOR SCHEDULE ON SHEET PP501. PROVIDE AND ROUTE NEW CONDENSATE RETURN COLLECTION HEADER FROM NEW MEDIUM PRESSURE STEAM STATION TRAPS AND TIE-IN TO INLET CONNECTION ON NEW FLASH TANK FT-1. TIE NEW STEAM STATION TRAPS TO NEW CONDENSATE RETURN HEADER (TYP). PROVIDE FIELD FABRICATED PIPE SUPPORT (TYP). SEE DETAIL 3 ON THIS SHEET. INSTALL ALL NEW STEAM AND CONDENSATE PIPING TO NEW WH-1 AND WH-2 WATER HEATERS. SEE SECTIONS ON THIS SHEET AND WATER HEATER SCHEDULE ON SHEET PP501. PROVIDE UNIONS OR FLANGES AT ALL CONNECTIONS SUCH THAT HEATER OR HEATER SHELL CAN BE REMOVED FOR SERVICE OF INTERNAL COILS. SEE THIS SHEET FOR ELECTRICAL CONNECTIONS. INSTALL AND FIELD ROUTE NEW 30# MEDIUM PRESSURE STEAM SUPPLY LINE TO NEW DOMESTIC WATER HEATER MANUFACTURER SUPPLIED ELECTRONIC STEAM CONTROL VALVE. PROVIDE ALL PIPE, FITTINGS, VALVES, AND ACCESSORIES AS SHOWN AND MAKE CONNECTIONS FOR OPERABLE SYSTEM. SEE SECTION ON THIS SHEET. INSTALL AND FIELD ROUTE NEW GRAVITY CONDENSATE RETURN LINE FROM NEW DOMESTIC WATER HEATERS TO NEW CONDENSATE RETURN HEADER. TIE NEW CONDENSATE RETURN HEADER TO NEW CONDENSATE PUMP RECEIVER. ALL PIPE MUST GRAVITY DRAIN TO RECEIVER. INSTALL NEW STEAM RELIEF VALVE 1-SV1 AND FIELD ROUTE RELIEF VALVE VENT PIPE AS INDICATED. TIE-IN TO EXISTING STEAM VENT TO ATMOSPHERE. PIPE SHALL NOT BE TRAPPED. PROVIDE PIPE SUPPORT PER SPECIFICATIONS. SEE DETAIL 2 ON SHEET PP402 AND STEAM PRESSURE RELIEF VALVE SCHEDULE ON SHEET PP501 FOR RELIEF VALVE ASSEMBLY. FIELD ROUTE NEW CONDENSATE RETURN FROM MEDIUM PRESSURE STEAM SUPPLY TRAP AND TIE-IN TO NEW COLLECTION HEADER TO NEW FLASH TANK FT-1. PROVIDE NEW DRIP LEG CONDENSATE RETURN FROM MEDIUM PRESSURE STEAM VERTICAL DROP. SEE DETAIL 1 ON SHEET PP402 FOR DRIP LEG AND TRAP PIPING ARRANGEMENT. SEE STEAM TRAP SCHEDULE ON SHEET PP501. INSTALL NEW CP-1 CONDENSATE RECEIVER AND PUMPS ON NEW CONCRETE PAD. SEE DETAIL 4 ON SHEET PP402 AND STEAM CONDENSATE PUMP SCHEDULE ON SHEET PP501. SEE THIS SHEET FOR ELECTRICAL CONNECTIONS. INSTALL NEW TEE AND CONNECT NEW PUMPED CONDENSATE RETURN TO EXISTING. FIELD ROUTE NEW PUMPED CONDENSATE RETURN LINE FROM NEW PUMPS TO NEW TIE-IN. COORDINATE WITH PLUMBING CONTRACTOR AND ROUTE PIPE IN NEW PIPE STANCHIONS. SEE DETAIL 1 ON THIS SHEET. NEW CONCRETE PAD. SEE SHEET 1-PP201 FOR CONSTRUCTION. INSTALL AND FIELD ROUTE NEW CONDENSATE PUMP VENT AS INDICATED. DRAIN, DISCONNECT, REMOVE AND DISCARD EXISTING PIPE SECTION. TIE-IN TO EXISTING STEAM VENT TO ATMOSPHERE. PIPE SHALL NOT BE TRAPPED. PROVIDE PIPE SUPPORT PER SPECIFICATIONS. INSTALL NEW FLASH TANK FT-1. REFER TO DETAIL 5 ON SHEET PP402 AND FLASH TANK SCHEDULE ON SHEET PP501. FIELD ROUTE NEW CONDENSATE RETURN FROM NEW FLASH TANK FT-1 TO NEW CONDENSATE PUMP CP-1.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL PHASE 1 NEW WORK NOTES:

AutoCAD SHX Text

MECHANICAL PHASE 1 NEW WORK NOTES:

AutoCAD SHX Text

DRAWING NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
1-MEP201 MECHANICAL ROOM NEW WORK STEAM & ELECTRICAL PHASE 1

File details come from the government source that posted it. Updated .