This document provides details for a federal construction contract opportunity issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks construction services for infrastructure upgrades at central western Massachusetts veterans healthcare facilities. Small businesses, including veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUBZone small businesses, are encouraged to respond. Responses are due by January 15, 2023, with the contract to be awarded by March 31, 2023. The construction work includes upgrades to mechanical, electrical, and plumbing systems. The period of performance is 365 calendar days from the notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Infrastructure Upgrades Construction - Central Western Massachusetts, newest first.
File Type Posted
Technical Questions Cont. - CWM EHRM.pdf PDF
36C77623R0051 0006 - CWM EHRM - RFIs Cont and Language.pdf PDF
Attachment 5 - GC402-REVISED_07_19_2023_ADDENDUM2.pdf PDF
Attachment 3 - BASEMENT LEVEL ELECTRICAL PLAN - WEST - LIBERTY BLDG.pdf PDF
Attachment 2 - EHRM CWM - Geotechnical Engineering Report.pdf PDF
Attachment 4 - BASEMENT LEVEL ELECTRICAL PLAN - EAST - LIBERTY BLDG.pdf PDF
Attachment 6 - 1-AE120-REVISED_07_19_2023_ADDENDUM2.pdf PDF
36C77623R0051 0005 - EHRM CWM - Extension and RFIs.pdf PDF
Attachment 1 - Technical Questions - CWM EHRM VA Response.pdf PDF
Site Visit 2 Sign-in Sheet - CWM EHRM.pdf PDF
Site Visit 2 Sign-in Sheet - CWM EHRM.pdf PDF
EHRM EP601 Addendum 1 6-15-2023 .pdf PDF
36C77623R0051 0004 - EHRM CWM.pdf PDF
Updated Book 1.pdf PDF
Updated Book 3.pdf PDF
Second Site Visit Instructions.pdf PDF
36C77623R0051 0003 - CWM - Second Site Visit and Extension of RFIs.pdf PDF
36C77623R0051 0002 - CWM EHRM - Extend Deadline for RFIs.pdf PDF
Site Visit Sign In Sheet - Central Western Massachusetts.pdf PDF
36C77623R0051 0001 - CWM Sign In Sheet.pdf PDF
S02 - Solicitation - 36C77623R0051 - CWM EHRM.pdf PDF
S02 - ATTACHMENT 2 - SPEC BOOK 2.pdf PDF
S02 - ATTACHMENT 7 - COMBINED-MEP_FP_IT_06012023_Part3.pdf PDF
S02 - ATTACHMENT 8 - COMBINED-MEP_FP_IT_06012023_Part4.pdf PDF
S02 - ATTACHMENT 10 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 2.pdf PDF
S02 - ATTACHMENT 12 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 4.pdf PDF
S02 - ATTACHMENT 14 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 6.pdf PDF
S02 - ATTACHMENT 24 - Contractor Safety - Environmental Form.pdf PDF
S02 - ATTACHMENT 26 - Hampshire County Wage Rates 03.31.2023.pdf PDF
S02 - ATTACHMENT 27 - Site Visit Instructions.pdf PDF
S02 - ATTACHMENT 17 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 9.pdf PDF
S02 - ATTACHMENT 3 - SPEC BOOK 3.pdf PDF
S02 - ATTACHMENT 4 - SPEC BOOK 4.pdf PDF
S02 - ATTACHMENT 13 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 5.pdf PDF
S02 - ATTACHMENT 5 - COMBINED-MEP_FP_IT_06012023_Part1.pdf PDF
S02 - ATTACHMENT 11 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 3.pdf PDF
S02 - ATTACHMENT 16 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 8.pdf PDF
S02 - ATTACHMENT 18 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 10.pdf PDF
S02 - ATTACHMENT 19 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 11.pdf PDF
S02 - ATTACHMENT 20 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 12.pdf PDF
S02 - ATTACHMENT 1 - SPEC BOOK 1.pdf PDF
S02 - ATTACHMENT 6 - COMBINED-MEP_FP_IT_06012023_Part2.pdf PDF
S02 - ATTACHMENT 15 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 7.pdf PDF
S02 - ATTACHMENT 21 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 13.pdf PDF
S02 - ATTACHMENT 22 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 14.pdf PDF
S02 - ATTACHMENT 23 - Brand Name Justification - CWM EHRM - Redacted.pdf PDF
S02 - ATTACHMENT 25 - Limitations on Subcontracting.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

421 N. MAIN ST.

LEEDS, MA. 01053

A

6/1 4/2 9 1 2:3 9:0 3 P M

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management U.S. Department of Veterans Affairs

PhaseARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

VA U.S. Department of Veterans Affairs

PROJECT CONTACT DIRECTORY

LOCATION MAP

CONTRACT SPECIALIST CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103

Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com

APPROVALS

PROJECT INFORMATION

NO

T

FO

R

CO

NS

TR

UC

TI

ON

ACELAJLH

C :\U se rs

\A Ah m ed

\D oc um en ts \6

-2

1-

0_

-0 5-

_k sc hn ec kE

VB

M

P.

rv t

GI101

COVER SHEET

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

Edward P. Boland VA Medical Center

ISSUED FOR BID

421 North Main Street, Leeds, MA 01053

Josee Goldin josee.goldin@va.gov Cell: 413-585-4040

Anthony Wilson anthony.wilson3@va.gov

21-USDVA-15

EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

PROJECT #: 621-21-700

Revisions: Date:

malbitz Image

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

Office of Construction and Management

C U s e rs

\A A h m e d

\D o c u m e n ts \6

-2

-7

-0

-2 k s c h n e c k E

V B

M P

.r v t

/2

/2

:2

:0

P M

GI102

DRAWING SHEET LISTS

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

ISSUED FOR BID

21-USDVA-15

GENERAL INFORMATION

GI101 COVER SHEET

GI102 DRAWING SHEET LISTS

GI103 GENERAL INFORMATION

GI201 LIFE SAFETY CODE SUMMARY

GENERAL CONTRACT

GC301 ICRA & ABATEMENT DETAILS & NOTES

GC401 INTERIOR PARTITION TYPES

GC402 EXTERIOR WALL TYPES

GC501 DOOR SCHEDULES

GC502 DOOR DETAILS

GC601 ACCESSIBILITY STANDARDS & TYPICAL DETAILS

CIVIL SHEETS

GI001 GENERAL NOTES

GC001 OVERALL PHASING PLAN

CD100 OVERAL EXISTING FEATURES & DEMOLITION PLAN

CD101 EXISTING FEATURES & DEMOLITION PLAN 'A'

CD102 EXISTING FEATURES & DEMOLITION PLAN 'B'

CD103 EXISTING FEATURES & DEMOLITION PLAN 'C'

CD104 EXISTING FEATURES & DEMOLITION PLAN 'D'

CD105 EXISTING FEATURES & DEMOLITION PLAN 'E'

CD106 EXISTING FEATURES & DEMOLITION PLAN F'

CU100 OVERALL UTILITY LAYOUT PLAN

CU101 UTILITY LAYOUT PLAN 'A'

CU102 UTILITY LAYOUT PLAN 'B'

CU103 UTILITY LAYOUT PLAN 'C'

CU104 UTILITY LAYOUT PLAN 'D'

CU105 UTILITY LAYOUT PLAN 'E'

CU106 UTILITY LAYOUT PLAN 'F'

CU107 UTILITY PLAN & PROFILE 'A'

CU108 UTILITY PLAN & PROFILE 'B'

CU109 UTILITY PLAN & PROFILE 'C'

CU110 UTILITY PLAN & PROFILE 'D'

CU111 UTILITY PLAN & PROFILE 'E'

CU112 UTILITY PLAN & PROFILE 'F'

CU113 UTILITY PLAN & PROFILE 'G'

CU114 UTILITY PLAN & PROFILE 'H'

CU115 UTILITY PLAN & PROFILE 'I'

CU116 UTILITY PLAN & PROFILE 'J'

CU117 UTILITY PLAN & PROFILE 'K'

CU118 UTILITY PLAN & PROFILE 'L'

CU119 UTILITY PLAN & PROFILE 'M'

CU120 UTILITY PLAN & PROFILE 'N'

CU121 UTILITY PLAN & PROFILE 'O'

CU122 UTILITY PLAN & PROFILE 'P'

CU123 UTILITY PLAN & PROFILE 'Q'

CU124 UTILITY PLAN & PROFILE 'R'

CU125 UTILITY PLAN & PROFILE 'S'

CU126 UTILITY PLAN & PROFILE 'T'

CU127 UTILITY PLAN & PROFILE 'U'

CU128 UTILITY PLAN & PROFILE 'V'

CG100 BUILDING ADDITION GRADING PLAN

CS100 OVERALL E&S PLAN

CS101 E&S PLAN 'A'

CS102 E&S PLAN 'B'

CS103 E&S PLAN 'C'

CS104 E&S PLAN 'D'

CS105 E&S PLAN 'E'

CS106 E&S PLAN 'F'

CS501 EROSION + SEDIMENTATON DETAIL SHEET 'A'

CS502 EROSION + SEDIMENTATON DETAIL SHEET 'B'

CS503 CONSTRUCTION DETAIL SHEET 'A'

CS504 CONSTRUCTION DETAIL SHEET 'B'

CS505 CONSTRUCTION DETAIL SHEET 'C'

CS506 CONSTRUCTION DETAIL SHEET 'D'

TH101 TEST HOLE LOCATION PLAN 'A'

TH102 TEST HOLE LOCATION PLAN 'B'

TH103 TEST HOLE LOCATION PLAN 'C'

TH104 TEST HOLE LOCATION PLAN 'D'

TH105 TEST HOLE LOCATION PLAN 'E'

TH106 TEST HOLE LOCATION PLAN 'F'

TH107 TEST HOLE NOTES PLAN 'A'

TH108 TEST HOLE NOTES PLAN 'B'

TH109 TEST HOLE NOTES PLAN 'C'

TH110 TEST HOLE NOTES PLAN 'D'

TH111 TEST HOLE NOTES PLAN 'E'

TH112 TEST HOLE NOTES PLAN 'F'

TH113 TEST HOLE NOTES PLAN 'G'

TH114 TEST HOLE NOTES PLAN 'H'

STRUCTURAL SHEETS

SF001 GENERAL NOTES

SF002 GENERAL NOTES

SF201 TYPICAL CONCRETE DETAILS

SF202 TYPICAL STEEL DETAILS

SF203 TYPICAL MASONRY DETAILS

1-SF101 BUILDING 1 FRAMING PLAN AND DETAILS

8-SF101 BUILDING 8 FRAMING PLANS

8-SF102 BUILDING 8 SECTIONS AND DETAILS

8-SF103 BUILDING 8 SECTIONS AND DETAILS

9-SF101 BUILDING 9 STRUCTURAL PLANS

9-SF102 BUILDING 9 SECTIONS AND DETAILS

22-SF101 BUILDING 22A FOUNDATION PLAN

22-SF102 BUILDING 22A FIRST FLOOR FRAMING PLAN

22-SF103 BUILDING 22A SECOND FLOOR / LOW ROOF FRAMING PLAN

22-SF104 BUILDING 22A ROOF FRAMING PLAN

22-SF201 BUILDING 22A SECTIONS AND DETAILS

22-SF202 BUILDING 22A SECTIONS AND DETAILS

22-SF203 BUILDING 22A SECTIONS AND DETAILS

ARCHITECTURAL ELEMENTS SHEETS

1-AE101 BUILDING 1 (LIBERTY) BASEMENT & FIRST FLOOR COMPOSITE PLANS - AREA OF WORK

1-AE102 BUILDING 1 (LIBERTY) SECOND FLOOR COMPOSITE PLAN - AREA OF WORK

1-AE103 BUILDING 1 BASEMENT & FIRST FLOOR LIFE SAFETY PLANS

1-AE104 BUILDING 1 SECOND FLOOR LIFE SAFETY PLAN

1-AE105 BUILDING 1 BASEMENT FLOOR PLANS - TR B017

1-AE106 BUILDING 1 BASEMENT FLOOR PLANS - TR B241

1-AE107 BUILDING 1 BASEMENT FLOOR PLANS - B108A

1-AE108 BUILDING 1 BASEMENT FLOOR PLANS - B111

1-AE109 BUILDING 1 FIRST FLOOR PLANS - TR 1071

1-AE110 BUILDING 1 FIRST FLOOR PLANS - STORAGE 1203

1-AE111 BUILDING 1 FIRST FLOOR PLANS - TR 1260

1-AE112 BUILDING 1 SECOND FLOOR PLANS - TR 2103

1-AE113 BUILDING 1 SECOND FLOOR PLANS - RECEPTION 2111

1-AE114 BUILDING 1 SECOND FLOOR PLANS - TR 2238

1-AE115 BUILDING 1 SECOND FLOOR DEMO PLAN & DEMO RCP - TR 2WC - 37A

1-AE116 BUILDING 1 SECOND FLOOR NEW WORK PLANS - TR 2WC - 37A

1-AE117 BUILDING 1 SECOND FLOOR NEW WORK RCP & PARTIAL ROOF PLAN - TR 1-2W-37C

1-AE118 BUILDING 1 ENLARGED ELEVATIONS

1-AE119 BUILDING 1 PARTIAL EXTERIOR ELEVATIONS

1-AE120 BUILDING 1 SECTIONS

1-AE121 EXTERIOR WALL DETAILS

1-AE122 EXTERIOR WALL DETAILS

1-AE123 AXONOMETRIC VIEW

2-AE101 BUILDING 2 (MEADOW) BASEMENT, FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK

2-AE102 BUILDING 2 FIRST & SECOND FLOOR LIFE SAFETY PLANS

2-AE103 BUILDING 2 FIRST FLOOR PLANS - TR 115

2-AE104 BUILDING 2 SECOND FLOOR PLANS - TR 209

2-AE105 BUILDING 2 SECOND FLOOR PLANS - OFFICE 213

2-AE106 BUILDING 2 SECOND FLOOR PLANS - OFFICE 208

3-AE101 BUILDING 3 (MAPLE) FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK

3-AE102 BUILDING 3 FIRST & SECOND FLOOR LIFE SAFETY PLANS

3-AE103 BUILDING 3 FIRST FLOOR PLANS - TR 120

3-AE104 BUILDING 3 FIRST FLOOR PLANS - HAC 124

3-AE105 BUILDING 3 SECOND FLOOR PLANS - TR 218

4-AE101 BUILDING 4 (HORIZON) BASEMENT, FIRST FLOOR & SECOND FLOOR COMPOSITE PLANS - AREA OF

WORK

4-AE102 BUILDING 4 FIRST FLOOR & SECOND FLOOR LIFE SAFETY PLANS

4-AE103 BUILDING 4 FIRST FLOOR PLANS - TR 105

4-AE104 BUILDING 4 SECOND FLOOR PLANS - TR 233

4-AE105 BUILDING 4 SECOND FLOOR PLANS - CLOSET 224

4-AE106 BUILDING 4 SECOND FLOOR PLANS - PATIENT LAUNDRY 212

5-AE101 BUILDING 5 (PINE) BASEMENT COMPOSITE PLANS - AREA OF WORK

5-AE102 BUILDING 5 BASEMENT LIFE SAFETY PLANS

5-AE103 BUILDING 5 BASEMENT PLANS - TR 017A

6-AE101 BUILDING 6 (CASCADES) FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK

6-AE102 BUILDING 6 FIRST & SECOND FLOOR LIFE SAFETY PLANS

6-AE103 BUILDING 6 FIRST FLOOR PLANS - TR 117

6-AE104 BUILDING 6 FIRST FLOOR NEW WORK PLANS - TR 117

6-AE105 BUILDING 6 SECOND FLOOR PLANS - TR 217

7-AE101 BUILDING 7 (LAKE) FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK

7-AE102 BUILDING 7 FIRST & SECOND FLOOR LIFE SAFETY PLANS

7-AE103 BUILDING 7 SECOND FLOOR PLANS - TR 201

8-AE101 BUILDING 8 (RIVER) BASEMENT, FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK

8-AE102 BUILDING 8 FIRST FLOOR & SECOND FLOOR LIFE SAFETY PLANS

8-AE103 BUILDING 8 FIRST FLOOR PLANS - TR 121

8-AE104 BUILDING 8 SECOND FLOOR PLANS - TR 200

8-AE105 BUILDING 8 ROOF PLAN

8-AE106 BUILDING 8 ADDITION ELEVATIONS

8-AE107 BUILDING 8 DEMOLITION SECTIONS

8-AE108 BUILDING 8 BUILDING SECTIONS

8-AE109 BUILDING 8 BUILDING SECTIONS

8-AE110 BUILDING 8 BUILDING SECTIONS

8-AE111 BUILDING 8 DETAILS

8-AE112 BUILDING 8 DETAILS

9-AE101 BUILDING 9 (HARBOR) BASEMENT, FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK

9-AE102 BUILDING 9 BASEMENT & FIRST FLOOR LIFE SAFETY PLANS

9-AE103 BUILDING 9 BASEMENT FLOOR PLANS - TR B100

9-AE104 BUILDING 9 FIRST FLOOR PLANS - TR 100

9-AE105 BUILDING 9 ROOF PLAN AND ELEVATIONS

9-AE106 BUILDING 9 BUILDING SECTIONS

11-AE101 BUILDING 11 (MOUNTAIN) BASEMENT COMPOSITE PLANS - AREA OF WORK

11-AE102 BUILDING 11 BASEMENT LIFE SAFETY PLAN

11-AE103 BUILDING 11 BASEMENT FLOOR PLANS - TR B002A

12-AE101 BUILDING 12 (BIRCH) BASEMENT, FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK

12-AE102 BUILDING 12 BASEMENT, FIRST FLOOR & SECOND FLOOR LIFE SAFETY

12-AE103 BUILDING 12 BASEMENT FLOOR PLANS - TR 009B

12-AE104 BUILDING 12 FIRST FLOOR PLANS - TR 147

12-AE105 BUILDING 12 SECOND FLOOR PLANS - TR 255

13-AE101 BUILDING 13 FIRST FLOOR COMPOSITE PLANS - AREA OF WORK

13-AE102 BUILDING 13 FIRST FLOOR LIFE SAFETY PLAN

13-AE103 BUILDING 13 FIRST FLOOR PLANS - STAFF AREA 112A

14-AE101 BUILDING 14 FIRST FLOOR COMPOSITE PLAN - AREA OF WORK

14-AE102 BUILDING 14 FIRST FLOOR LIFE SAFETY PLAN

14-AE103 BUILDING 14 FIRST FLOOR PLANS - TR 3

16-AE101 BUILDING 16 BASEMENT & FIRST FLOOR COMPOSITE PLANS - AREA OF WORK

16-AE102 BUILDING 16 BASEMENT & FIRST FLOOR LIFE SAFETY PLANS

16-AE103 BUILDING 16 BASEMENT PLANS - TR B101

16-AE104 BUILDING 16 FIRST FLOOR PLANS - TR 101A

20-AE101 BUILDING 20 (MONUMENT) BASEMENT, FIRST, & SECOND FLOOR COMPOSITE PLANS - AREA OF

WORK

20-AE102 BUILDING 20 BASEMENT, FIRST, & SECOND FLOOR LIFE SAFETY PLANS

20-AE103 BUILDING 20 FIRST FLOOR PLANS - TR 131

20-AE104 BUILDING 20 SECOND FLOOR PLANS - TR 212

22-AE101 BUILDING 22A BASEMENT, FIRST & SECOND FLOOR LIFE SAFETY PLANS

22-AE102 BUILDING 22 BASEMENT DEMO PLAN

22-AE103 BUILDING 22 FIRST FLOOR DEMO PLAN

22-AE104 BUILDING 22 SECOND FLOOR DEMO PLAN

22-AE105 BUILDING 22 DEMOLITION ROOF

22-AE106 BUILDING 22 DEMOLITION EXTERIOR ELEVATIONS

22-AE107 BUILDING 22A BASEMENT NEW WORK PLAN & ELEVATIONS

22-AE108 BUILDING 22A FIRST FLOOR NEW WORK PLAN & ELEVATIONS

22-AE109 BUILDING 22A SECOND FLOOR NEW WORK PLAN & ELEVATIONS

22-AE110 BUILDING 22A ROOF PLANS

22-AE111 BUILDING 22A BASEMENT, FIRST & SECOND FLOOR REFLECTED CEILING PLANS

22-AE401 BUILDING 22A EXTERIOR ELEVATIONS

22-AE501 BUILDING 22A SECTIONS

22-AE502 BUILDING 22A SECTIONS

22-AE601 BUILDING 22A WALL SECTIONS & DETAILS

22-AE602 BUILDING 22A DETAILS

22-AE603 BUILDING 22A DETAILS

22-AE604 BUILDING 22A DETAILS

22-AE605 BUILDING 22A DOOR DETAILS & SCHEDULE

22-AE606 BUILDING 22A DETAILS

22-AE----- ARCHITECTURAL SITE PLAN

25-AE101 BUILDING 25 (EAGLE) BASEMENT COMPOSITE PLAN - AREA OF WORK

25-AE102 BUILDING 25 BASEMENT LIFE SAFETY PLAN

25-AE103 BUILDING 25 BASEMENT FLOOR PLANS - TR B02A

60-AE101 BUILDING 60 (CHAPEL) BASEMENT & FIRST COMPOSITE PLANS - AREA OF WORK

60-AE102 BUILDING 60 FIRST FLOOR LIFE SAFFETY PLAN

60-AE103 BUILDING 60 FLOOR PLANS - TR 111

FIRE PROTECTION SHEETS

FP001 FIRE PROTECTION - SYMBOLS , ABBREVATIONS, NOTES

1-FP101 BUILDING 1 - FIRE PROTECTION FLOOR PLANS

1-FP102 BUILDING 1 - FIRE PROTECTION FLOOR PLANS

2-FP101 BUILDING 2 - FIRE PROTECTION FLOOR PLANS

3-FP101 BUILDING 3 - FIRE PROTECTION FLOOR PLANS

4-FP101 BUILDING 4 - FIRE PROTECTION FLOOR PLANS

5-FP101 BUILDING 5 - FIRE PROTECTION FLOOR PLANS

6-FP101 BUILDING 6 - FIRE PROTECTION FLOOR PLANS

7-FP101 BUILDING 7 - FIRE PROTECTION FLOOR PLANS

8-FP101 BUILDING 8 - FIRE PROTECTION FLOOR PLANS

9-FP101 BUILDING 9 - FIRE PROTECTION FLOOR PLANS

11-FP101 BUILDING 11 - FIRE PROTECTION FLOOR PLANS

12-FP101 BUILDING 12 - FIRE PROTECTION FLOOR PLANS

14-FP101 BUILDING 14 - FIRE PROTECTION FLOOR PLANS

16-FP101 BUILDING 16 - FIRE PROTECTION FLOOR PLANS

20-FP101 BUILDING 20 - FIRE PROTECTION FLOOR PLANS

22-FP101 BUILDING 22A - FIRE PROTECTION FLOOR PLANS

22-FP102 BUILDING 22A - FIRE PROTECTION NOTES, DETAIL, & SCHEDULE

25-FP101 BUILDING 25 - FIRE PROTECTION FLOOR PLANS

60-FP101 BUILDING 60 - FIRE PROTECTION FLOOR PLANS

PLUMBING SHEETS

P001 PLUMBING - SYMBOLS , ABBREVATIONS, NOTES

1-P101 BUILDING 1 -PLUMBING FLOOR PLANS

2-P101 BUILDING 2 - PLUMBING FLOOR PLANS

3-P101 BUILDING 3 - PLUMBING DEMOLITION FLOOR PLAN

4-P101 BUILDING 4 - PLUMBING DEMOLITION FLOOR PLAN

5-P101 BUILDING 5 - PLUMBING DEMOLITION FLOOR PLAN

6-P101 BUILDING 6 - PLUMBING DEMOLITION FLOOR PLAN

7-P101 BUILDING 7 - PLUMBING DEMOLITION FLOOR PLAN

11-P101 BUILDING 11 - PLUMBNING FLOOR PLANS

14-P101 BUILDING 14 - PLUMBING FLOOR PLANS

16-P101 BUILDING 16 - PLUMBING DEMOLITION FLOOR PLAN

22-PD101 BUILDING 22 - PLUMBING DEMOLITION PLANS

22-P101 BUILDING 22A - PLUMBING FLOOR PLAN - TR109

22-P102 BUILDING 22A - PLUMBING RISER DIAGRAMS

MECHANICAL SHEETS

M001 MECHANICAL LEGEND

M501 MECHANICAL CONTROL DIAGRAMS

M601 MECHANICAL DETAILS

M602 MECHANICAL DETAILS

M701 MECHANICAL SCHEDULES

1-M101 BUILDING 1 - BASEMENT FLOOR MECHANICAL PLANS - TR B241

1-M102 BUILDING 1 - BASEMENT FLOOR MECHANICAL PLANS - B111A - TR B017

1-M103 BUILDING 1 - 1ST FLOOR MECHANICAL PLANS - TR 1260 - TR 1071A

1-M104 BUILDING 1 - 2ND FLOOR MECHANICAL PLANS - TR 2238 - 2111

1-M105 BUILDING 1 - 2ND FLOOR MECHANICAL PLANS - TR 2105 - TR B021

2-M101 BUILDING 2 MECHANICAL PLANS - TR 2-115

2-M102 BUILDING 2 MECHANICAL PLANS - TR 2-209

2-M103 BUILDING 2 MECHANICAL PLANS - 213

2-M104 BUILDING 2 MECHANICAL PLANS - 208

3-M101 BUILDING 3 MECHANICAL PLANS - TR 3-120 - TR 3-218

4-M101 BUILDING 4 MECHANICAL PLANS - TR 4-105 - TR 4-233

5-M101 BUILDING 5 MECHANICAL PLANS - TR 5-017A - TR 5-127

6-M101 BUILDING 6 MECHANICAL PLANS - TR 6-117 - TR 6-217

7-M101 BUILDING 7 MECHANICAL PLANS - TR 7-201

8-M101 BUILDING 8 MECHANICAL PLANS - TR 121 - TR 8-200

9-M101 BUILDING 9 MECHANICAL PLANS TR 9-B-100 - TR 9-100

11-M101 BUILDING 11 MECHANICAL PLANS - TR 11-B002A

12-M101 BUILDING 12 MECHANICAL PLANS - TR 12-009B - TR 12-147 - TR 12-255

13-M101 BUILDING 13 MECHANICAL PLANS - TE 13-112A

14-M101 BUILDING 14 MECHANICAL PLANS - TR 14-3

16-M101 BUILDING 16 MECHANICAL PLANS - TR 16-B101 - TR 16-101A - TR 16-107

20-M101 BUILDING 20 MECHANICAL PLANS - TR 20-034

20-M102 BUILDING 20 MECHANICAL PLANS - TR 20-131 & 20-212

22-M101 BUILDING 22A MECHANICAL BASEMENT PLAN

22-M102 BUILDING 22A MECHANICAL FIRST FLOOR PLAN

22-M103 BUILDING 22A MECHANICAL SECOND FLOOR PLAN

25-M101 BUILDING 25 MECHANICAL PLANS - TR 25-B02A

60-M101 BUILDING 60 MECHANICAL PLANS - TR 111

ELECTRICAL SHEETS

EP001 ELECTRICAL LEGEND AND NOTES

EP501 ELECTRICAL DETAILS

EP502 ELECTRICAL DETAILS

EP601 MEDIUM VOLTAGE ONE-LINE DIAGRAM

EP602 SCHEUDLES

ESS501 GROUNDING DETAILS

ESS502 TRENCH DETAILS

ESS503 MEDIUM VOLTAGE DETAILS

ESS504 MEDIUM VOLTAGE EQUIPMENT DETAILS

ESS505 SITE LIGHTING ELECTRICAL DETAILS

01-EP101 BASEMENT LEVEL ELECTRICAL PLAN - EAST - LIBERTY BLDG

01-EP102 BASMENT LEVEL ELECTRICAL PLAN - SOUTH - LIBERTY BLDG

01-EP103 BASEMENT LEVEL ELECTRICAL PLAN - WEST - LIBERTY BLDG

01-EP104 FIRST LEVEL ELECTRICAL PLAN - EAST - LIBERTY BLDG

01-EP105 FIRST LEVEL ELECTRICAL PLAN - SOUTH - LIBERTY BLDG

01-EP106 FIRST LEVEL ELECTRICAL PLAN - WEST - LIBERTY BLDG

01-EP107 SECOND LEVEL ELECTRICAL PLAN - EAST - LIBERTY BLDG

01-EP108 SECOND LEVEL ELECTRICAL PLAN - SOUTH - LIBERTY BLDG

01-EP109 SECOND LEVEL ELECTRICAL PLAN - WEST - LIBERTY BLDG

01-EP401 BUILDING 1 ENLARGED TR ROOM PLANS

01-EP402 BUILDING 1 ENLARGED TR ROOM PLANS

01-EP601 BUILDING 01 WEST & SOUTH ONE-LINE DIAGRAM

01-EP602 BUILDING 01 EAST ONE-LINE DIAGRAM - LIBERTY BLDG

01-EP603 PANEL SCHEDULES - LIBERTY BLDG

01-EP604 PANEL SCHEDULES - LIBERTY BLDG

01-EP605 BUILDING NO. 01 PANEL SCHEDULES

1C-EP101 BUILDING NO. 1C - ELECTRICAL PLAN

1EA-EP101 BUILDING NO. 1EA - ELECTRICAL PLAN

1WA-EP101 BUILDING NO. 1WA - ELECTRICAL PLAN

02-EP101 BUILDING NO. 02 BASEMENT LEVEL ELECTRICAL PLAN

02-EP102 BUILDING NO. 02 FIRST AND SECOND LEVEL ELECTRICAL PLAN

02-EP401 BUILDING NO. 02 ENLARGED TR ROOM PLANS

02-EP601 BUILDING NO. 02 ONE-LINE DIAGRAM

03-EP101 BUILDING NO. 03 BASEMENT LEVEL ELECTRICAL PLAN

03-EP102 BUILDING NO. 03 FIRST AND SECOND LEVEL ELECTRICAL PLANS

03-EP401 BUILDING NO. 03 ENLARGED TR ROOM PLANS

03-EP601 BUILDING NO. 03 ELECTRICAL ONE-LINE

04-EP101 BUILDING NO. 04 BASEMENT LEVEL ELECTRICAL PLAN

04-EP102 BUILDING NO. 04 FIRST LEVEL ELECTRICAL PLAN

04-EP103 BUILDING NO. 04 SECOND LEVEL ELECTRICAL PLAN

04-EP401 BUILDING NO. 04 ENLARGED TR ROOMS

04-EP601 BUILDING NO. 04 ELECTRICAL ONE-LINE

04-EP602 BUILDING NO. 04 - PANEL SCHEDULES

4A-EP101 BUILDING NO. 04 - ELECTRICAL PLAN

4A-EP601 BUILDING NO. 04A - ELECTRICAL ONE-LINE AND SCHEDULES

05-EP101 BASEMENT NO. 05 BASEMENT LEVEL ELECTRICAL PLAN

05-EP102 BUILDING NO. 05 FIRST AND ATTIC LEVEL ELECTRICAL PLANS

05-EP401 BUILDING NO. 05 BASEMENT LEVEL ELECTRICAL PLAN

05-EP601 BUILDING NO. 05 ELECTRICAL ONE-LINE

05-EP602 BUILDING NO. 5 PANEL SCHEDULES

06-EP401 BUILDING NO. 06 ENLARGED TR ROOM PLANS

06-EP601 BUILDING NO. 06 ELECTRICAL ONE-LINE

6A-EP101 BUILDING NO. 06A - ELECTRICAL PLAN

07-EP401 BUILDING NO. 07 ENLARGED TR ROOM PLANS

07-EP601 BUILDING NO. 7A - PANEL SCHEDULES

7A-EP101 BUILDING NO. 7A - ELECTRICAL PLAN

7A-EP601 BUILDING NO. 7A - PANEL SCHEDULES

08-EP101 BUILDING NO. 08 - BASEMENT, FIRST & SECOND FLOOR PLANS

08-EP401 BUILDING NO. 08 ENLARGED TR ROOM PLANS

08-EP601 BUILDING NO. 08 - ELECTRICAL ONE-LINE

08-EP602 BUILDING NO. 08 - PANEL SCHEDULES

8A-EP101 BUILDING NO. 08A - ELECTRICAL PLAN

8A-EP601 BUILDING NO. 08A - ONE-LINE AND PANEL SHCEDULES

09-EP101 BUILDING NO. 09 - BASEMENT AND FIRST FLOOR PLANS

09-EP401 BUILDING NO. 09 ENLARGED TR ROOM PLANS

09-EP601 BUILDING NO. 09 - ELECTRICAL ONE-LINE DIAGRAM

11-EP101 BUILDING NO. 11 - BASEMENT & FIRST FLOOR PLANS

11-EP401 BUILDING NO. 11 ENLARGED TR ROOM PLANS

11-EP601 BUILDING NO. 11 ELECTRICAL ONE-LINE

12-EP101 BUILDING NO. 12 - BASEMENT LEVEL ELECTRICAL PLANS

12-EP102 BUILDING NO. 12 - FLOOR PLANS

12-EP401 BUILDING NO. 12 ENLARGED TR ROOM PLANS

12-EP601 BUILDING NO. 12 - ELECTRICAL ONE-LINE DIAGRAM

12-EP602 BUILDING NO. 12 - PANEL SCHEDULES

12A-EP101 BUILDING NO. 12A - ELECTRICAL PLAN

12A-EP601 BUILDING NO. 12A - ONE-LINE AND SCHEDULES

13-EP101 BUILDING NO. 13 - ELECTRICAL PLAN

14-EP101 BUILDING NO. 14 - FIRST LEVEL ELECTRICAL PLAN

14-EP401 BUILDING NO. 14 - ENLARGED TR ROOM PLANS

16-EP101 BUILDING NO. 16 FIRST & SECOND LEVEL ELECTRICAL PLANS

16-EP401 BUILDING NO. 16 ENLARGED TR ROOM PLANS

16-EP601 BUILDING NO. 16 - ONE-LINE DIAGRAM

20-EP401 BUILDING NO. 20 ENLARGED TR ROOM PLANS

22A-EP101 BUILDING NO. 22A -ELECTRICAL PLANS

22A-EP102 BUILDING NO. 22A ELECTRICAL PLANS

22A-EP103 BUILDING NO. 22A - LIGHTING PLANS

22A-EP601 BUILDING NO. 22A ONE-LINE DIAGRAM

22A-EP602 BUILDING NO. 22A - PANEL SCHEDULES

22A-ESS101 BUILDING NO. 22A - ELECTRICAL SITE PLAN

22A-ESS102 BUILDING NO. 22A - SITE LIGHTING PLAN

25-EP101 BUILDING NO. 25 ELECTRICAL PLANS

25-EP401 BUILDING NO. 25 ENLARGED TR ROOM PLANS

25-EP601 BUILDING NO. 25 - ONE-LINE DIAGRAM

26-EP101 BUILDING NO. 26 - BASEMENT AND FIRST FLOOR PLANS

26-EP102 BUILDING NO. 26 SECOND FLOOR PLAN

26-EP601 BUILDING NO. 26 ONE-LINE DIAGRAM

28-EP101 BUILDING NO. 28 - ELECTRICAL PLAN

29-EP101 BUILDING NO. 29 ELECTRICAL PLAN

60-EP101 BUILDING NO. 60 - BASEMENT & FIRST FLOOR PLANS

60-EP401 BUILDING NO. 60 ENLARGED TR ROOM PLANS

60-EP601 BUILDING NO. 60 - ONE-LINE DIAGRAM

65-EP101 BUILDING NO. 65 - ELECTRICAL PLAN

TECHNOLOGY SHEETS

0-T000 TECHNOLOGY COVER SHEET 27 TECHNOLOGY 1

0-T010 TECHNOLOGY SITE PLAN - FIBER 27 TECHNOLOGY 3

0-T011 TECHNOLOGY SITE PLAN - COPPER 27 TECHNOLOGY 4

0-T020 TECHNOLOGY DETAILS 27 TECHNOLOGY 5

0-T021 TECHNOLOGY DETAILS 27 TECHNOLOGY 6

0-T022 TECHNOLOGY DETAILS 27 TECHNOLOGY 6

0-T030 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 7

0-T031 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 8

0-T032 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 9

0-T033 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 10

0-T034 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 11

0-T035 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 12

0-T036 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 13

0-T050 TECHNOLOGY SCHEDULES 27 TECHNOLOGY 19

0-T051 TECHNOLOGY SCHEDULES 27 TECHNOLOGY 20

B01-T100 BUILDING 1 (LIBERTY) BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 21

B01-T100A BUILDING 1 (LIBERTY) BASEMENT DEMOLITION PLAN - TECHNOLOGY- AREA A 27 TECHNOLOGY 22

B01-T100B BUILDING 1 (LIBERTY) BASEMENT DEMOLITION PLAN - TECHNOLOGY- AREA B 27 TECHNOLOGY 23

B01-T100C BUILDING 1 (LIBERTY) BASEMENT DEMOLITION PLAN - TECHNOLOGY- AREA C 27 TECHNOLOGY 24

B01-T101 BUILDING 1 (LIBERTY) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 25

B01-T101A BUILDING 1 (LIBERTY) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA A 27 TECHNOLOGY 26

B01-T101B BUILDING 1 (LIBERTY) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA B 27 TECHNOLOGY 27

B01-T101C BUILDING 1 (LIBERTY) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA C 27 TECHNOLOGY 28

B01-T102 BUILDING 1 (LIBERTY) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 29

B01-T102A BUILDING 1 (LIBERTY) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA A 27 TECHNOLOGY 30

B01-T102B BUILDING 1 (LIBERTY) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA B 27 TECHNOLOGY 31

B01-T102C BUILDING 1 (LIBERTY) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA C 27 TECHNOLOGY 32

B01-T103 BUILDING 1 (LIBERTY) ATTIC FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 32

B01-T200 BULDING 1 (LIBERTY) BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 33

B01-T200A BULDING 1 (LIBERTY) BASEMENT PLAN - TECHNOLOGY AREA A 27 TECHNOLOGY 34

B01-T200B BULDING 1 (LIBERTY) BASEMENT PLAN - TECHNOLOGY AREA B 27 TECHNOLOGY 35

B01-T200C BULDING 1 (LIBERTY) BASEMENT PLAN - TECHNOLOGY AREA C 27 TECHNOLOGY 36

B01-T201 BULDING 1 (LIBERTY) FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 37

B01-T201A BULDING 1 (LIBERTY) FIRST FLOOR PLAN - TECHNOLOGY AREA A 27 TECHNOLOGY 38

B01-T201B BULDING 1 (LIBERTY) FIRST FLOOR PLAN - TECHNOLOGY AREA B 27 TECHNOLOGY 39

B01-T201C BULDING 1 (LIBERTY) FIRST FLOOR PLAN - TECHNOLOGY AREA C 27 TECHNOLOGY 40

B01-T202 BULDING 1 (LIBERTY) SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 41

B01-T202A BULDING 1 (LIBERTY) SECOND FLOOR PLAN - TECHNOLOGY AREA A 27 TECHNOLOGY 42

B01-T202B BULDING 1 (LIBERTY) SECOND FLOOR PLAN - TECHNOLOGY AREA B 27 TECHNOLOGY 43

B01-T202C BULDING 1 (LIBERTY) SECOND FLOOR PLAN - TECHNOLOGY AREA C 27 TECHNOLOGY 44

B01-T203 BULDING 1 (LIBERTY) ATTIC FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 44

B01-T203A BULDING 1 (LIBERTY) ATTIC FLOOR PLAN - TECHNOLOGY - AREA A 27 TECHNOLOGY 44

B01-T203B BULDING 1 (LIBERTY) ATTIC FLOOR PLAN - TECHNOLOGY - AREA B 27 TECHNOLOGY 44

B01-T203C BULDING 1 (LIBERTY) ATTIC FLOOR PLAN - TECHNOLOGY - AREA C 27 TECHNOLOGY 44

B01-T300 BUILDING 1 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 45

B01-T301 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 46

B01-T302 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 47

B01-T303 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 48

B02-T100 BUILDING 2 (MEADOW) BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 49

B02-T101 BUILDING 2 (MEADOW) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 50

B02-T102 BUILDING 2 (MEADOW) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 51

B02-T200 BUILDING 2 (MEADOW) BASEMENT TECHNOLOGY PLAN - TECHNOLOGY 27 TECHNOLOGY 52

B02-T201 BUILDING 2 (MEADOW) FIRST FLOOR TECHNOLOGY PLAN - TECHNOLOGY 27 TECHNOLOGY 53

B02-T202 BUILDING 2 (MEADOW) SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 54

B02-T300 BUILDING 2 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 55

B03-T100 BUILDING 3 BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 60

B03-T101 BUILDING 3 FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 61

B03-T102 BUILDING 3 SECOND FLOOR - TECHNOLOGY 27 TECHNOLOGY 62

B03-T300 BUILDING 3 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 63

B04-T100 BUILDING 4 (HORIZON) BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 63

B04-T101 BUILDING 4 (HORIZON) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 64

B04-T102 BUILDING 4 (HORIZON) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 65

B04-T200 BUILDING 4 (HORIZON) BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 66

B04-T201 BUILDING 4 (HORIZON) FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 67

B04-T202 BUILDING 4 (HORIZON) SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 68

B04-T300 BUILDING 4 TECHNOLOGY ROOM - ENLARGEMENTS 27 TECHNOLOGY 69

B05-T100 BUILDING 5 BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 70

B05-T101 BUILDING 5 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 71

B05-T200 BUILDING 5 BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 72

B05-T201 BUILDING 5 - FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 72

B05-T300 BUILDING 5 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 73

B06-T100 BUILDING 6 (CASCADES) BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 74

B06-T101 BUILDING 6 (CASCADES) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 75

B06-T102 BUILDING 6 (CASCADES) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 75

B06-T200 BUILDLING 6 (CASCADES) BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 76

B06-T201 BUILDING 6 (CASCADES) FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 77

B06-T202 BUILDING 6 (CASCADES) SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 78

B06-T300 BUILDING 6 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 79

B07-T100 BUILDING 7 BASEMENT DEMOLITION - TECHNOLOGY 27 TECHNOLOGY 80

B07-T101 BUILDING 7 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 81

B07-T102 BUILDING 7 SECOND FLOOR DEMOLITION - TECHNOLOGY 27 TECHNOLOGY 82

B07-T200 BUILDING 7 BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 83

B07-T201 BUILDING 7 FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 84

B07-T202 BUILDING 7 SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 85

B07-T300 BUILDING 7 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 86

B08-T200 BUILDING 8 (RIVER) BASEMENT PLANS - TECHNOLOGY 27 TECHNOLOGY 87

B08-T201 BUILDING 8 (RIVER) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 88

B08-T202 BUILDING 8 (RIVER) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 89

B08-T300 BUILDING 8 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 90

B09-T200 BUILDING 9 (HARBOR) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 91

B09-T201 BUILDING 9 (HARBOR) FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 92

B09-T300 BUILDING 9 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 93

B11-T200 BUILDING 11 (MOUNTAIN) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 94

B11-T201 BUILDING 11 (MOUNTAIN) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 95

B11-T202 BUILDING 11 (MOUNTAIN) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 96

B11-T300 BUILDING 11 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 97

B12-T100 BUILDING 12 (BIRCH) BASEMENT DEMOLITION PLANS - TECHNOLOGY 27 TECHNOLOGY 98

B12-T101 BUILDING 12 (BIRCH) FIRST FLOOR DEMOLITION PLANS - TECHNOLOGY 27 TECHNOLOGY 99

B12-T102 BUILDING 12 (BIRCH) SECOND FLOOR DEMOLITION PLANS - TECHNOLOGY 27 TECHNOLOGY 100

B12-T200 BUILDING 12 (BIRCH) BASEMENT PLANS - TECHNOLOGY 27 TECHNOLOGY 101

B12-T201 BUILDING 12 (BIRCH) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 102

B12-T202 BUILDING 12 (BIRCH) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 103

B12-T300 BUILDING 12 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 104

B12-T301 BUILDING 12 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 105

B13-T201 BUILDING 13 FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 106

B14-T101 BUILDING 14 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 107

B14-T201 BUILDING 14 FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 108

B14-T300 BUILDING 14 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 109

B16-T200 BUILDING 16 BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 111

B16-T201 BUILDING 16 FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 112

B16-T300 BUILDING 16 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 113

B20-T200 BUILDING 20 (MONUMENT) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 114

B20-T201 BUILDING 20 (MONUMENT) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 115

B20-T202 BUILDING 20 (MONUMENT) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 116

B20-T300 BUILDING 20 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 117

B20-T301 BUILDING 20 TECHNOLOGY ENLARGEMENTS 27 TECHNOLOGY 118

B22-T200 BUILDING 22 (VA CALL CENTER) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 119

B22-T201 BUILDING 22 (VA CALL CENTER) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 120

B22-T202 BUILDING 22 (VA CALL CENTER) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 121

B22-T300 BUILDING 22 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 122

B22A-T200 DATA CENTER BUILDING FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 123

B22A-T300 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 124

B22A-T301 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 125

B22A-T302 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 126

B22A-T500 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 127

B25-T200 BUILDING 25 (EAGLE) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 128

B25-T201 BUILDING 25 (EAGLE) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 129

B25-T202 BUILDING 25 (EAGLE) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 130

B25-T300 BUILDING 25 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 131

B26-T200 BUILDING 26 BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 132

B28-T201 BUILDING 28 (BOILER PLANT) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 133

B60-T200 BUILDING 60 (CHAPEL) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 134

B60-T201 BUILDING 60 (CHAPEL) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 135

B60-T300 BUILDING 60 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 136

Revisions: Date:

22-AS102

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

THE CONTRACTOR SHALL COORDINATE WITH THE VA HOSPITAL'S JCAHO INSPECTION SCHEDULE WITH THE COR. NO CONTRACTOR WORK SHALL

BE PERFORMED DURING TWO WEEKS IN EACH YEAR DURING A JCAHO INSPECTION

PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR

WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS

BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND RESIDENCE

DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION

IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT

DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION

RATIO

WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO

RECEIVE NEW FINISHES DESIGNATED

WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK

WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED TO

MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN

IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHE3D TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE

NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE

WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR

ITEMS OR SURFACES

A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED, AND INCLUDED IN THE SPECIFICATIONS AND REPORTS.

AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR FOR REVIEW OF EXISTING CONDITIONS

PATCH AND FIRE STOP AT ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS, WALLS, AND ROOF DECK

& AND

@ AT

C CENTERLINE

# NUMBER

AB ANCHOR BOLT

ABV ABOVE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BOT BOTTOM

BRG BEARING

BEL BELOW

BR BUMPER RAIL

BRK BRICK

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CCT CUBICLE CURTAIN TRACK

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CT CERAMIC TILE

CLG CEILING

CL CLOSET

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CPT CARPET

CU CUBIC

DBL DOUBLE

DEMOLITION DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DOZ DOZEN

DP DAMPPROOFING

DR DOOR

DWG DRAWING

DWGS DRAWINGS

DWR DRAWER

E EAST

EA EXHAUST AIR, EACH

EL ELEVATION

ELEV ELEVATION

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EP ELECTRICAL PANELBOARD

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXP EXPANSION

EJ EXPANSION JOINT

EXIST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FACE

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FO __ FACE OF __

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOW FACE OF WALL

FPRF FIREPROOF(ING)

FR FIRE RATING, FRAME

FRMG FRAMING

FS FULL SIZE

FT FOOT OR FEET

FTG FOOTING

FUR FURRING

FUT FUTURE

GC GENERAL CONTRACTOR

GA GAUGE

GAL GALLON

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM WALLBOARD

GYP BD GYPSUM WALLBOARD

HAZ HAZARDOUS

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDWR HARDWARE

HDWD HARDWOOD

HT HEIGHT

HNDRL HANDRAIL

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HR HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER / DIMENSION

IN INCH

INCL INCLUDE(D)

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JST JOIST

JT JOINT

KP KICK PLATE

KO KNOCKOUT

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUND

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LH LEFT HAND

LIN LINEAR

LIQ LIQUID

LKR LOCKER

LG LONG

LL LEAD LINED

LLV LONG LEG VERTICAL

LP LOW POINT

LRG LARGE

LT LIGHT

LT WT LIGHTWEIGHT

LVR LOUVER

MATL MATERIAL

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOP PLATE

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OFF OFFICE

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OH OVERHEAD

OZ OUNCE

PAV PAVING

PC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PLBG PLUMBING

PMF PREMOLDED FILLER

PR PAIR

PT POINT

PTN PARTITION

QT QUARRY TILE

R RADIUS, RISER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE, RUBBER

BASE

RD ROOF DRAIN

RL ROOF LEADER

REF REFERENCE

REFR REFRIGERATOR

REQ'D REQUIRED

REV REVISION

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

RWC RAIN WATER CONDUIT

S SOUTH

SA SUPPLY AIR

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SECT SECTION

SH SPRINKLER HEAD

SHT SHEET

SIM SIMILAR

SM SMOKE

SPEC SPECIFICATION

SPKR SPEAKER

SQ SQUARE

STA STATION

STD STANDARD

STO STORAGE

STL STEEL

SS STAINLESS STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TEL TELEPHONE

TEMP TEMPERED

T&G TONGUE AND GROOVE

THK THICK

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TOW TOP OF WALL

TV TELEVISION

TYP TYPICAL

UNFIN UNFINISHED

UON UNLESS OTHERWISE

NOTED

VB VAPOR BARRIER

VERT VERTICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VTR VET THRU ROOF

W WEST

W/ WITH

WD WOOD

W/O WITHOUT

WP WATERPROOF

WT WEIGHT

WWF WELDED WIRE FRAME

NOTE: ALL ABBREVIATIONS

SHOWN MAY NOT BE USED ON

THIS PROJECT. CERTAIN COMMON

ABBREVIATIONS MAY NOT BE

SHOWN.

CENTER LINE

DETAIL INDICATOR

DIMENSION LINE

NEW DOOR OPENING

- SEE DOOR SCHEDULE, DETAILS AND

ELEVATIONS SHEET

DRAWING BLOCK TITLE, TYPICAL

CORRIDOR ELEVATION INDICATOR

BUILDING SECTION INDICATOR

TYPICAL DETAIL INDICATOR

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

EXISTING ROOM TAG - ROOM NAME AND NUMBER

COLUMN GRID

ARCHITECTURAL KEYNOTE TAG

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

CG

FEC

X1234

DETAIL NUMBER

SHEET NUMBER

XX-XX

1"

XX-XX

CL

XX-XX

x'-x" SPOT ELEVATION

1 REVISION

BREAK LINE

DD ROOM TAG - ROOM NAME AND NUMBER

X

EXISTING DOOR OPENING

1 View Name 1/8" = 1'-0"

AE888

Room name

Room name

150 SF

SD ROOM TAG - ROOM NAME AND AREA

Room name

SHEET NUMBERDETAIL

NUMBER

DETAIL

NUMBER

SHEET NUMBER

88 88

HW

-X X

HARDWARE TAG

SEE SPECIFICATIONS

PLACE DOOR

TAG HERE

A101 BUILDING ELEVATION

SHEET NUMBERDETAIL

NUMBER

XXXXX

HRDW

XXXXX

HRDW

XXXXX EXISTING DOOR TAG

NEW DOOR TAG

N P N

LIFE SAFTEY ROOM TAG - ROOM NAME, NUMBER AND AREARoom name

150 SF

REFLECTED CEILING KEYNOTE TAGX

WINDOW TYPE TAG#

RESTROOM ACCESSORY TAGX

INTERIOR SIGNAGE TAGS#

AREA GENERALLY NOT IN CONTRACT

WOOD

WOOD FINISH

ALUMINUM

STEEL

EARTH

GYPSUM - PLASTER

MASONRY - CONCRETE BLOCK

RIGID INSULATION

BATT INSULATION

PLYWOOD

CONCRETE

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

REFER TO SPECIFICATIONS SECTION 02 41 19 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND

INFORMATION.

PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION WILL BE REQUIRED OUTSIDE OF THIS LINE. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF

DEMOLITION WORK REQUIRED FOR THE PROJECT.

EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK.

REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.

COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.

THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL

PRESSURE MONITORING DEVICE AT DUST PROOF BARRICADE TO CONFIRM PRESSURE.

THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE. WHERE EXISTING CEILING IN THE NEW OR EXPANDED TR ROOMS ARE BEING REMOVED, G.C.

TO COORDINATE THE REPLACEMENT OR MODIFICATION OF SPRINKLER SYSTEM WITH NEW UPRIGHT SPRINKLER

HEADS AT THE SAME TIME OF CEILING REMOVAL TO MAINTAIN SPRINKLER PROTECTION.

ALL TEMPORARY BARRIERS ARE TO BE 1 HOUR FIRE BARRIERS WHERE CEILING TILES IN THE CORRIDORS CANNOT BE REPLACED AT THE END OF THE WORK SHIFT OR PROVIDE TEMPORARY UPRIGHT SPRINKLER HEAD FOR THE

DURATION OF THE WORK BEING PERFORMED IN THE CORRIDOR.

ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF.

COORDINATE LOCATION OF BARRIERS WITH OWNER.

REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.

PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND DEVICES LOCATED WITHIN AREAS SCHEDULED TO

BE DEMOLISHED.

SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO

COMPLETE THE INTENDED WORK OF THE OVERALL PROJECT.

FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE

BY THE INSTALLING CONTRACTOR.

REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE

SALVAGED.

DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AND RELATED ITEMS. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL OF DIFFUSERS GRILLS, AND RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.

PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY SOUND TO CARRY FLOOR LOAD OF 100 LBS. / SQ. FT. UNLESS NOTED OTHERWISE.

ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED.

MATCH EXISTING FIRE RATING UNLESS NOTED OTHERWISE.

REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION. PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR

RELOCATION PRIOR TO COMMENCING DEMOLITION.

WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR.

PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE

SURFACES FOR SCHEDULED FINISHES.

PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.

AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY

CONSTRUCTION AND MATCH EXISTING FINISHES.

REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES NOT REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH PLUMBING PLANS FOR ADDITIONAL INFORMATION.

REMOVE ALL ACCESSORIES ASSOCIATED WITH PLUMBING, INCLUDING PARTITIONS, GRAB BARS, DISPENSERS, RACKS, SHELVING, SINK BASE, DISPOSALS, ETC.

GC TO PERFORM SURVEY OF EXISTING SERVICE LINES IN SCOPE OF WORK PRIOR TO START OF WORK. REPORT

FINDINGS TO COR AND ARCHITECT.

HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD HAVE BEEN IDENTIFIED IN BUILDINGS THROUGHOUT THE CAMPUS. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2 SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL

WORK AND NOTIFY THE COR IMMEDIATELY.

1.

2.

3.

4.

5.

6.

7.

COORDINATE DEMOLITION WITH NEW WORK INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, MEP, FIRE PROTECTION

AND COMMUNICATION WORK.

PATCH EXISTING CONDITIONS AS REQUIRED FOR NEW FINISHES AFTER NEW WORK IS INSTALLED.

COORDINATE DEMOLITION WITH ARCHITECTURAL PHASING PLANS.

REMOVE EXISTING ACOUSTICAL CEILING TILE SYSTEM IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO: ACOUSTICAL

TILE, GRID AND SUSPENSION WIRE.

MODIFY EXISTING ACOUSTICAL CEILING TILE SYSTEM AS REQUIRED FOR NEW WORK. REMOVE EXISTING SYSTEM AS

INDICATED. PATCH AND REPAIR EXISTING TO REMAIN.

REMOVE EXISTING LIGHT FIXTURES IN AREA OF RENOVATION. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL

REQUIREMENTS.

REMOVE ALL CEILING MOUNTED ITEMS INCLUDING BUT NOT LIMITED TO SIGNAGE, BANNERS, & EQUIPMENT MOUNTS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN

TO FACE OF FINISH SURFACE

DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS

THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE

PROJECT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS

THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT

THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH THE

CONDITIONS AFFECTING THE WORK

ALL WORKMANSHIP IS TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN

USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE

WORK AREA THOROUGHLY

ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE

SPECIFICATIONS

PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD

AND VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.

ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES. CODES INCLUDE BUT

ARE NOT LIMITED TO:

VA PLUMBING DESIGN GUIDE - 2021

11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING

JURISDICTION. CODES INCLUDE, BUT ARE NOT LIMITED TO:

NFPA 101 - 2021

NFPA 70 - 2020

NFPA 90A - 2021

NFPA 99 - 2021

NFPA 101 - 2021

VA HVAC DESIGN GUIDE - 2021

13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT

LIMITED TO:

NFPA 70 - 2021

NFPA 101 - 2021

VA ELECTRICAL DESIGN GUIDE - 2019

VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY

BUILDINGS - 2015

VA LIGHTING DESIGN MANUAL - 2022

VA RADIOLOGY DESIGN MANUAL - 2008

VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2021

14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT LIMITED TO:

NFPA 101 - 2021

NFPA 13 - 2022

NFPA 72 - 2022

VA FIRE PROTECTION DESIGN GUIDE - 2021

15. PRIOT TO ANY EXISTING TELECOMMUNICATION ROOM BEING TAKEN OFF-LINE, THE FOLLOWING ITEMS MUST BE COMPLETE, FUNCTIONAL, AND TESTED:

A. THE COMPLETE SITE FIBER OPTIC LINE (FO) SYSTEM.

B. DATA CENTER (ADDITION TO BUIDLING 22)

C. NEW INDIVIDUAL BUILDING TELECOMMUNICATION ROOMS AND ADDITIONS (BUILDINGS 1, 8, AND 9).

A.

B.

C.

2.

A.

B.

C.

D.

E.

3.

4.

A.

B.

C.

D.

E.

F.

G.

5.

A.

B.

C.

D.

6.

A.

B.

C.

D.

7.

A. Project Phasing/Sequencing:

1. Works starts on new Data Center, Fiber Optic Duct Bank, and new Telecommunications Room locations.

Where existing TR rooms are to remain, existing equipment to be protected in place and replaced/modified as per electrical and technology sequencing and documents.

Areas where new TRs/TEs are required to be constructed demolish and renovate these spaces completely per drawings and specifications.

All other new work to support Data Center and TEs/TRs.

Data Center at Building 22A is occupied by VA. Requires the following:

Temporary data/communication line to be established between new data center 22A and existing data center at building 2. Line must be operational.

Cabinets/Racks, all contract equipment must be installed and fully functional.

All required utilities are connected to Data Center thru entrance room DEMARC.

Commissioned mechanical system.

Complete Punchlist – after substantial occupancy there will be no unescorted access by contractor to Data Center

VA moves existing server network equipment to new data center and makes operational (estimating 6 months).

New and Existing to Remain TRs and TEs Ready for Activation. This requires:

Exterior Fiber Optic/Copper Backbone to be finalized and fully tested.

Racks, all contract equipment must be installed and fully functional.

Security System Equipment moved.

All cabling connected to well labeled patch panels.

Punchlist complete on all TRs/TEs.

Charrette for Activation with VA and Contractor per specifications.

TR/TE activation schedule provided by VA to GC.

Activate New TEs/TRs. This requires:

Temporary network switches are provided and brought to individual building TR by VA.

Patch cables provided by Contractor.

Three TRs/TEs will be brought online per month, requiring mix between on and off hour work. The contractor must support the transition by providing patch cables, labor to patch to switch, connecting all WAO/data devices/WAPs to new TR/TE switch.

All connections to the switches at the TR/TE data…