S02 - ATTACHMENT 9 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 1.pdf
PDF 16 MB Posted
- Attached to
- EHRM Infrastructure Upgrades Construction - Central Western Massachusetts Federal contract opportunity
- Solicitation number
- 36C77623R0051
About this file
This document provides details for a federal construction contract opportunity issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks construction services for infrastructure upgrades at central western Massachusetts veterans healthcare facilities. Small businesses, including veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUBZone small businesses, are encouraged to respond. Responses are due by January 15, 2023, with the contract to be awarded by March 31, 2023. The construction work includes upgrades to mechanical, electrical, and plumbing systems. The period of performance is 365 calendar days from the notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
421 N. MAIN ST.
LEEDS, MA. 01053
A
6/1 4/2 9 1 2:3 9:0 3 P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
VA U.S. Department of Veterans Affairs
PROJECT CONTACT DIRECTORY
LOCATION MAP
CONTRACT SPECIALIST CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103
Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com
APPROVALS
PROJECT INFORMATION
NO
T
FO
R
CO
NS
TR
UC
TI
ON
ACELAJLH
C :\U se rs
\A Ah m ed
\D oc um en ts \6
-2
1-
0_
-0 5-
_k sc hn ec kE
VB
M
P.
rv t
GI101
COVER SHEET
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
Edward P. Boland VA Medical Center
ISSUED FOR BID
421 North Main Street, Leeds, MA 01053
Josee Goldin josee.goldin@va.gov Cell: 413-585-4040
Anthony Wilson anthony.wilson3@va.gov
21-USDVA-15
EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
PROJECT #: 621-21-700
Revisions: Date:
malbitz Image
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
Office of Construction and Management
C U s e rs
\A A h m e d
\D o c u m e n ts \6
-2
-7
-0
-2 k s c h n e c k E
V B
M P
.r v t
/2
/2
:2
:0
P M
GI102
DRAWING SHEET LISTS
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
ISSUED FOR BID
21-USDVA-15
GENERAL INFORMATION
GI101 COVER SHEET
GI102 DRAWING SHEET LISTS
GI103 GENERAL INFORMATION
GI201 LIFE SAFETY CODE SUMMARY
GENERAL CONTRACT
GC301 ICRA & ABATEMENT DETAILS & NOTES
GC401 INTERIOR PARTITION TYPES
GC402 EXTERIOR WALL TYPES
GC501 DOOR SCHEDULES
GC502 DOOR DETAILS
GC601 ACCESSIBILITY STANDARDS & TYPICAL DETAILS
CIVIL SHEETS
GI001 GENERAL NOTES
GC001 OVERALL PHASING PLAN
CD100 OVERAL EXISTING FEATURES & DEMOLITION PLAN
CD101 EXISTING FEATURES & DEMOLITION PLAN 'A'
CD102 EXISTING FEATURES & DEMOLITION PLAN 'B'
CD103 EXISTING FEATURES & DEMOLITION PLAN 'C'
CD104 EXISTING FEATURES & DEMOLITION PLAN 'D'
CD105 EXISTING FEATURES & DEMOLITION PLAN 'E'
CD106 EXISTING FEATURES & DEMOLITION PLAN F'
CU100 OVERALL UTILITY LAYOUT PLAN
CU101 UTILITY LAYOUT PLAN 'A'
CU102 UTILITY LAYOUT PLAN 'B'
CU103 UTILITY LAYOUT PLAN 'C'
CU104 UTILITY LAYOUT PLAN 'D'
CU105 UTILITY LAYOUT PLAN 'E'
CU106 UTILITY LAYOUT PLAN 'F'
CU107 UTILITY PLAN & PROFILE 'A'
CU108 UTILITY PLAN & PROFILE 'B'
CU109 UTILITY PLAN & PROFILE 'C'
CU110 UTILITY PLAN & PROFILE 'D'
CU111 UTILITY PLAN & PROFILE 'E'
CU112 UTILITY PLAN & PROFILE 'F'
CU113 UTILITY PLAN & PROFILE 'G'
CU114 UTILITY PLAN & PROFILE 'H'
CU115 UTILITY PLAN & PROFILE 'I'
CU116 UTILITY PLAN & PROFILE 'J'
CU117 UTILITY PLAN & PROFILE 'K'
CU118 UTILITY PLAN & PROFILE 'L'
CU119 UTILITY PLAN & PROFILE 'M'
CU120 UTILITY PLAN & PROFILE 'N'
CU121 UTILITY PLAN & PROFILE 'O'
CU122 UTILITY PLAN & PROFILE 'P'
CU123 UTILITY PLAN & PROFILE 'Q'
CU124 UTILITY PLAN & PROFILE 'R'
CU125 UTILITY PLAN & PROFILE 'S'
CU126 UTILITY PLAN & PROFILE 'T'
CU127 UTILITY PLAN & PROFILE 'U'
CU128 UTILITY PLAN & PROFILE 'V'
CG100 BUILDING ADDITION GRADING PLAN
CS100 OVERALL E&S PLAN
CS101 E&S PLAN 'A'
CS102 E&S PLAN 'B'
CS103 E&S PLAN 'C'
CS104 E&S PLAN 'D'
CS105 E&S PLAN 'E'
CS106 E&S PLAN 'F'
CS501 EROSION + SEDIMENTATON DETAIL SHEET 'A'
CS502 EROSION + SEDIMENTATON DETAIL SHEET 'B'
CS503 CONSTRUCTION DETAIL SHEET 'A'
CS504 CONSTRUCTION DETAIL SHEET 'B'
CS505 CONSTRUCTION DETAIL SHEET 'C'
CS506 CONSTRUCTION DETAIL SHEET 'D'
TH101 TEST HOLE LOCATION PLAN 'A'
TH102 TEST HOLE LOCATION PLAN 'B'
TH103 TEST HOLE LOCATION PLAN 'C'
TH104 TEST HOLE LOCATION PLAN 'D'
TH105 TEST HOLE LOCATION PLAN 'E'
TH106 TEST HOLE LOCATION PLAN 'F'
TH107 TEST HOLE NOTES PLAN 'A'
TH108 TEST HOLE NOTES PLAN 'B'
TH109 TEST HOLE NOTES PLAN 'C'
TH110 TEST HOLE NOTES PLAN 'D'
TH111 TEST HOLE NOTES PLAN 'E'
TH112 TEST HOLE NOTES PLAN 'F'
TH113 TEST HOLE NOTES PLAN 'G'
TH114 TEST HOLE NOTES PLAN 'H'
STRUCTURAL SHEETS
SF001 GENERAL NOTES
SF002 GENERAL NOTES
SF201 TYPICAL CONCRETE DETAILS
SF202 TYPICAL STEEL DETAILS
SF203 TYPICAL MASONRY DETAILS
1-SF101 BUILDING 1 FRAMING PLAN AND DETAILS
8-SF101 BUILDING 8 FRAMING PLANS
8-SF102 BUILDING 8 SECTIONS AND DETAILS
8-SF103 BUILDING 8 SECTIONS AND DETAILS
9-SF101 BUILDING 9 STRUCTURAL PLANS
9-SF102 BUILDING 9 SECTIONS AND DETAILS
22-SF101 BUILDING 22A FOUNDATION PLAN
22-SF102 BUILDING 22A FIRST FLOOR FRAMING PLAN
22-SF103 BUILDING 22A SECOND FLOOR / LOW ROOF FRAMING PLAN
22-SF104 BUILDING 22A ROOF FRAMING PLAN
22-SF201 BUILDING 22A SECTIONS AND DETAILS
22-SF202 BUILDING 22A SECTIONS AND DETAILS
22-SF203 BUILDING 22A SECTIONS AND DETAILS
ARCHITECTURAL ELEMENTS SHEETS
1-AE101 BUILDING 1 (LIBERTY) BASEMENT & FIRST FLOOR COMPOSITE PLANS - AREA OF WORK
1-AE102 BUILDING 1 (LIBERTY) SECOND FLOOR COMPOSITE PLAN - AREA OF WORK
1-AE103 BUILDING 1 BASEMENT & FIRST FLOOR LIFE SAFETY PLANS
1-AE104 BUILDING 1 SECOND FLOOR LIFE SAFETY PLAN
1-AE105 BUILDING 1 BASEMENT FLOOR PLANS - TR B017
1-AE106 BUILDING 1 BASEMENT FLOOR PLANS - TR B241
1-AE107 BUILDING 1 BASEMENT FLOOR PLANS - B108A
1-AE108 BUILDING 1 BASEMENT FLOOR PLANS - B111
1-AE109 BUILDING 1 FIRST FLOOR PLANS - TR 1071
1-AE110 BUILDING 1 FIRST FLOOR PLANS - STORAGE 1203
1-AE111 BUILDING 1 FIRST FLOOR PLANS - TR 1260
1-AE112 BUILDING 1 SECOND FLOOR PLANS - TR 2103
1-AE113 BUILDING 1 SECOND FLOOR PLANS - RECEPTION 2111
1-AE114 BUILDING 1 SECOND FLOOR PLANS - TR 2238
1-AE115 BUILDING 1 SECOND FLOOR DEMO PLAN & DEMO RCP - TR 2WC - 37A
1-AE116 BUILDING 1 SECOND FLOOR NEW WORK PLANS - TR 2WC - 37A
1-AE117 BUILDING 1 SECOND FLOOR NEW WORK RCP & PARTIAL ROOF PLAN - TR 1-2W-37C
1-AE118 BUILDING 1 ENLARGED ELEVATIONS
1-AE119 BUILDING 1 PARTIAL EXTERIOR ELEVATIONS
1-AE120 BUILDING 1 SECTIONS
1-AE121 EXTERIOR WALL DETAILS
1-AE122 EXTERIOR WALL DETAILS
1-AE123 AXONOMETRIC VIEW
2-AE101 BUILDING 2 (MEADOW) BASEMENT, FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK
2-AE102 BUILDING 2 FIRST & SECOND FLOOR LIFE SAFETY PLANS
2-AE103 BUILDING 2 FIRST FLOOR PLANS - TR 115
2-AE104 BUILDING 2 SECOND FLOOR PLANS - TR 209
2-AE105 BUILDING 2 SECOND FLOOR PLANS - OFFICE 213
2-AE106 BUILDING 2 SECOND FLOOR PLANS - OFFICE 208
3-AE101 BUILDING 3 (MAPLE) FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK
3-AE102 BUILDING 3 FIRST & SECOND FLOOR LIFE SAFETY PLANS
3-AE103 BUILDING 3 FIRST FLOOR PLANS - TR 120
3-AE104 BUILDING 3 FIRST FLOOR PLANS - HAC 124
3-AE105 BUILDING 3 SECOND FLOOR PLANS - TR 218
4-AE101 BUILDING 4 (HORIZON) BASEMENT, FIRST FLOOR & SECOND FLOOR COMPOSITE PLANS - AREA OF
WORK
4-AE102 BUILDING 4 FIRST FLOOR & SECOND FLOOR LIFE SAFETY PLANS
4-AE103 BUILDING 4 FIRST FLOOR PLANS - TR 105
4-AE104 BUILDING 4 SECOND FLOOR PLANS - TR 233
4-AE105 BUILDING 4 SECOND FLOOR PLANS - CLOSET 224
4-AE106 BUILDING 4 SECOND FLOOR PLANS - PATIENT LAUNDRY 212
5-AE101 BUILDING 5 (PINE) BASEMENT COMPOSITE PLANS - AREA OF WORK
5-AE102 BUILDING 5 BASEMENT LIFE SAFETY PLANS
5-AE103 BUILDING 5 BASEMENT PLANS - TR 017A
6-AE101 BUILDING 6 (CASCADES) FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK
6-AE102 BUILDING 6 FIRST & SECOND FLOOR LIFE SAFETY PLANS
6-AE103 BUILDING 6 FIRST FLOOR PLANS - TR 117
6-AE104 BUILDING 6 FIRST FLOOR NEW WORK PLANS - TR 117
6-AE105 BUILDING 6 SECOND FLOOR PLANS - TR 217
7-AE101 BUILDING 7 (LAKE) FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK
7-AE102 BUILDING 7 FIRST & SECOND FLOOR LIFE SAFETY PLANS
7-AE103 BUILDING 7 SECOND FLOOR PLANS - TR 201
8-AE101 BUILDING 8 (RIVER) BASEMENT, FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK
8-AE102 BUILDING 8 FIRST FLOOR & SECOND FLOOR LIFE SAFETY PLANS
8-AE103 BUILDING 8 FIRST FLOOR PLANS - TR 121
8-AE104 BUILDING 8 SECOND FLOOR PLANS - TR 200
8-AE105 BUILDING 8 ROOF PLAN
8-AE106 BUILDING 8 ADDITION ELEVATIONS
8-AE107 BUILDING 8 DEMOLITION SECTIONS
8-AE108 BUILDING 8 BUILDING SECTIONS
8-AE109 BUILDING 8 BUILDING SECTIONS
8-AE110 BUILDING 8 BUILDING SECTIONS
8-AE111 BUILDING 8 DETAILS
8-AE112 BUILDING 8 DETAILS
9-AE101 BUILDING 9 (HARBOR) BASEMENT, FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK
9-AE102 BUILDING 9 BASEMENT & FIRST FLOOR LIFE SAFETY PLANS
9-AE103 BUILDING 9 BASEMENT FLOOR PLANS - TR B100
9-AE104 BUILDING 9 FIRST FLOOR PLANS - TR 100
9-AE105 BUILDING 9 ROOF PLAN AND ELEVATIONS
9-AE106 BUILDING 9 BUILDING SECTIONS
11-AE101 BUILDING 11 (MOUNTAIN) BASEMENT COMPOSITE PLANS - AREA OF WORK
11-AE102 BUILDING 11 BASEMENT LIFE SAFETY PLAN
11-AE103 BUILDING 11 BASEMENT FLOOR PLANS - TR B002A
12-AE101 BUILDING 12 (BIRCH) BASEMENT, FIRST & SECOND FLOOR COMPOSITE PLANS - AREA OF WORK
12-AE102 BUILDING 12 BASEMENT, FIRST FLOOR & SECOND FLOOR LIFE SAFETY
12-AE103 BUILDING 12 BASEMENT FLOOR PLANS - TR 009B
12-AE104 BUILDING 12 FIRST FLOOR PLANS - TR 147
12-AE105 BUILDING 12 SECOND FLOOR PLANS - TR 255
13-AE101 BUILDING 13 FIRST FLOOR COMPOSITE PLANS - AREA OF WORK
13-AE102 BUILDING 13 FIRST FLOOR LIFE SAFETY PLAN
13-AE103 BUILDING 13 FIRST FLOOR PLANS - STAFF AREA 112A
14-AE101 BUILDING 14 FIRST FLOOR COMPOSITE PLAN - AREA OF WORK
14-AE102 BUILDING 14 FIRST FLOOR LIFE SAFETY PLAN
14-AE103 BUILDING 14 FIRST FLOOR PLANS - TR 3
16-AE101 BUILDING 16 BASEMENT & FIRST FLOOR COMPOSITE PLANS - AREA OF WORK
16-AE102 BUILDING 16 BASEMENT & FIRST FLOOR LIFE SAFETY PLANS
16-AE103 BUILDING 16 BASEMENT PLANS - TR B101
16-AE104 BUILDING 16 FIRST FLOOR PLANS - TR 101A
20-AE101 BUILDING 20 (MONUMENT) BASEMENT, FIRST, & SECOND FLOOR COMPOSITE PLANS - AREA OF
WORK
20-AE102 BUILDING 20 BASEMENT, FIRST, & SECOND FLOOR LIFE SAFETY PLANS
20-AE103 BUILDING 20 FIRST FLOOR PLANS - TR 131
20-AE104 BUILDING 20 SECOND FLOOR PLANS - TR 212
22-AE101 BUILDING 22A BASEMENT, FIRST & SECOND FLOOR LIFE SAFETY PLANS
22-AE102 BUILDING 22 BASEMENT DEMO PLAN
22-AE103 BUILDING 22 FIRST FLOOR DEMO PLAN
22-AE104 BUILDING 22 SECOND FLOOR DEMO PLAN
22-AE105 BUILDING 22 DEMOLITION ROOF
22-AE106 BUILDING 22 DEMOLITION EXTERIOR ELEVATIONS
22-AE107 BUILDING 22A BASEMENT NEW WORK PLAN & ELEVATIONS
22-AE108 BUILDING 22A FIRST FLOOR NEW WORK PLAN & ELEVATIONS
22-AE109 BUILDING 22A SECOND FLOOR NEW WORK PLAN & ELEVATIONS
22-AE110 BUILDING 22A ROOF PLANS
22-AE111 BUILDING 22A BASEMENT, FIRST & SECOND FLOOR REFLECTED CEILING PLANS
22-AE401 BUILDING 22A EXTERIOR ELEVATIONS
22-AE501 BUILDING 22A SECTIONS
22-AE502 BUILDING 22A SECTIONS
22-AE601 BUILDING 22A WALL SECTIONS & DETAILS
22-AE602 BUILDING 22A DETAILS
22-AE603 BUILDING 22A DETAILS
22-AE604 BUILDING 22A DETAILS
22-AE605 BUILDING 22A DOOR DETAILS & SCHEDULE
22-AE606 BUILDING 22A DETAILS
22-AE----- ARCHITECTURAL SITE PLAN
25-AE101 BUILDING 25 (EAGLE) BASEMENT COMPOSITE PLAN - AREA OF WORK
25-AE102 BUILDING 25 BASEMENT LIFE SAFETY PLAN
25-AE103 BUILDING 25 BASEMENT FLOOR PLANS - TR B02A
60-AE101 BUILDING 60 (CHAPEL) BASEMENT & FIRST COMPOSITE PLANS - AREA OF WORK
60-AE102 BUILDING 60 FIRST FLOOR LIFE SAFFETY PLAN
60-AE103 BUILDING 60 FLOOR PLANS - TR 111
FIRE PROTECTION SHEETS
FP001 FIRE PROTECTION - SYMBOLS , ABBREVATIONS, NOTES
1-FP101 BUILDING 1 - FIRE PROTECTION FLOOR PLANS
1-FP102 BUILDING 1 - FIRE PROTECTION FLOOR PLANS
2-FP101 BUILDING 2 - FIRE PROTECTION FLOOR PLANS
3-FP101 BUILDING 3 - FIRE PROTECTION FLOOR PLANS
4-FP101 BUILDING 4 - FIRE PROTECTION FLOOR PLANS
5-FP101 BUILDING 5 - FIRE PROTECTION FLOOR PLANS
6-FP101 BUILDING 6 - FIRE PROTECTION FLOOR PLANS
7-FP101 BUILDING 7 - FIRE PROTECTION FLOOR PLANS
8-FP101 BUILDING 8 - FIRE PROTECTION FLOOR PLANS
9-FP101 BUILDING 9 - FIRE PROTECTION FLOOR PLANS
11-FP101 BUILDING 11 - FIRE PROTECTION FLOOR PLANS
12-FP101 BUILDING 12 - FIRE PROTECTION FLOOR PLANS
14-FP101 BUILDING 14 - FIRE PROTECTION FLOOR PLANS
16-FP101 BUILDING 16 - FIRE PROTECTION FLOOR PLANS
20-FP101 BUILDING 20 - FIRE PROTECTION FLOOR PLANS
22-FP101 BUILDING 22A - FIRE PROTECTION FLOOR PLANS
22-FP102 BUILDING 22A - FIRE PROTECTION NOTES, DETAIL, & SCHEDULE
25-FP101 BUILDING 25 - FIRE PROTECTION FLOOR PLANS
60-FP101 BUILDING 60 - FIRE PROTECTION FLOOR PLANS
PLUMBING SHEETS
P001 PLUMBING - SYMBOLS , ABBREVATIONS, NOTES
1-P101 BUILDING 1 -PLUMBING FLOOR PLANS
2-P101 BUILDING 2 - PLUMBING FLOOR PLANS
3-P101 BUILDING 3 - PLUMBING DEMOLITION FLOOR PLAN
4-P101 BUILDING 4 - PLUMBING DEMOLITION FLOOR PLAN
5-P101 BUILDING 5 - PLUMBING DEMOLITION FLOOR PLAN
6-P101 BUILDING 6 - PLUMBING DEMOLITION FLOOR PLAN
7-P101 BUILDING 7 - PLUMBING DEMOLITION FLOOR PLAN
11-P101 BUILDING 11 - PLUMBNING FLOOR PLANS
14-P101 BUILDING 14 - PLUMBING FLOOR PLANS
16-P101 BUILDING 16 - PLUMBING DEMOLITION FLOOR PLAN
22-PD101 BUILDING 22 - PLUMBING DEMOLITION PLANS
22-P101 BUILDING 22A - PLUMBING FLOOR PLAN - TR109
22-P102 BUILDING 22A - PLUMBING RISER DIAGRAMS
MECHANICAL SHEETS
M001 MECHANICAL LEGEND
M501 MECHANICAL CONTROL DIAGRAMS
M601 MECHANICAL DETAILS
M602 MECHANICAL DETAILS
M701 MECHANICAL SCHEDULES
1-M101 BUILDING 1 - BASEMENT FLOOR MECHANICAL PLANS - TR B241
1-M102 BUILDING 1 - BASEMENT FLOOR MECHANICAL PLANS - B111A - TR B017
1-M103 BUILDING 1 - 1ST FLOOR MECHANICAL PLANS - TR 1260 - TR 1071A
1-M104 BUILDING 1 - 2ND FLOOR MECHANICAL PLANS - TR 2238 - 2111
1-M105 BUILDING 1 - 2ND FLOOR MECHANICAL PLANS - TR 2105 - TR B021
2-M101 BUILDING 2 MECHANICAL PLANS - TR 2-115
2-M102 BUILDING 2 MECHANICAL PLANS - TR 2-209
2-M103 BUILDING 2 MECHANICAL PLANS - 213
2-M104 BUILDING 2 MECHANICAL PLANS - 208
3-M101 BUILDING 3 MECHANICAL PLANS - TR 3-120 - TR 3-218
4-M101 BUILDING 4 MECHANICAL PLANS - TR 4-105 - TR 4-233
5-M101 BUILDING 5 MECHANICAL PLANS - TR 5-017A - TR 5-127
6-M101 BUILDING 6 MECHANICAL PLANS - TR 6-117 - TR 6-217
7-M101 BUILDING 7 MECHANICAL PLANS - TR 7-201
8-M101 BUILDING 8 MECHANICAL PLANS - TR 121 - TR 8-200
9-M101 BUILDING 9 MECHANICAL PLANS TR 9-B-100 - TR 9-100
11-M101 BUILDING 11 MECHANICAL PLANS - TR 11-B002A
12-M101 BUILDING 12 MECHANICAL PLANS - TR 12-009B - TR 12-147 - TR 12-255
13-M101 BUILDING 13 MECHANICAL PLANS - TE 13-112A
14-M101 BUILDING 14 MECHANICAL PLANS - TR 14-3
16-M101 BUILDING 16 MECHANICAL PLANS - TR 16-B101 - TR 16-101A - TR 16-107
20-M101 BUILDING 20 MECHANICAL PLANS - TR 20-034
20-M102 BUILDING 20 MECHANICAL PLANS - TR 20-131 & 20-212
22-M101 BUILDING 22A MECHANICAL BASEMENT PLAN
22-M102 BUILDING 22A MECHANICAL FIRST FLOOR PLAN
22-M103 BUILDING 22A MECHANICAL SECOND FLOOR PLAN
25-M101 BUILDING 25 MECHANICAL PLANS - TR 25-B02A
60-M101 BUILDING 60 MECHANICAL PLANS - TR 111
ELECTRICAL SHEETS
EP001 ELECTRICAL LEGEND AND NOTES
EP501 ELECTRICAL DETAILS
EP502 ELECTRICAL DETAILS
EP601 MEDIUM VOLTAGE ONE-LINE DIAGRAM
EP602 SCHEUDLES
ESS501 GROUNDING DETAILS
ESS502 TRENCH DETAILS
ESS503 MEDIUM VOLTAGE DETAILS
ESS504 MEDIUM VOLTAGE EQUIPMENT DETAILS
ESS505 SITE LIGHTING ELECTRICAL DETAILS
01-EP101 BASEMENT LEVEL ELECTRICAL PLAN - EAST - LIBERTY BLDG
01-EP102 BASMENT LEVEL ELECTRICAL PLAN - SOUTH - LIBERTY BLDG
01-EP103 BASEMENT LEVEL ELECTRICAL PLAN - WEST - LIBERTY BLDG
01-EP104 FIRST LEVEL ELECTRICAL PLAN - EAST - LIBERTY BLDG
01-EP105 FIRST LEVEL ELECTRICAL PLAN - SOUTH - LIBERTY BLDG
01-EP106 FIRST LEVEL ELECTRICAL PLAN - WEST - LIBERTY BLDG
01-EP107 SECOND LEVEL ELECTRICAL PLAN - EAST - LIBERTY BLDG
01-EP108 SECOND LEVEL ELECTRICAL PLAN - SOUTH - LIBERTY BLDG
01-EP109 SECOND LEVEL ELECTRICAL PLAN - WEST - LIBERTY BLDG
01-EP401 BUILDING 1 ENLARGED TR ROOM PLANS
01-EP402 BUILDING 1 ENLARGED TR ROOM PLANS
01-EP601 BUILDING 01 WEST & SOUTH ONE-LINE DIAGRAM
01-EP602 BUILDING 01 EAST ONE-LINE DIAGRAM - LIBERTY BLDG
01-EP603 PANEL SCHEDULES - LIBERTY BLDG
01-EP604 PANEL SCHEDULES - LIBERTY BLDG
01-EP605 BUILDING NO. 01 PANEL SCHEDULES
1C-EP101 BUILDING NO. 1C - ELECTRICAL PLAN
1EA-EP101 BUILDING NO. 1EA - ELECTRICAL PLAN
1WA-EP101 BUILDING NO. 1WA - ELECTRICAL PLAN
02-EP101 BUILDING NO. 02 BASEMENT LEVEL ELECTRICAL PLAN
02-EP102 BUILDING NO. 02 FIRST AND SECOND LEVEL ELECTRICAL PLAN
02-EP401 BUILDING NO. 02 ENLARGED TR ROOM PLANS
02-EP601 BUILDING NO. 02 ONE-LINE DIAGRAM
03-EP101 BUILDING NO. 03 BASEMENT LEVEL ELECTRICAL PLAN
03-EP102 BUILDING NO. 03 FIRST AND SECOND LEVEL ELECTRICAL PLANS
03-EP401 BUILDING NO. 03 ENLARGED TR ROOM PLANS
03-EP601 BUILDING NO. 03 ELECTRICAL ONE-LINE
04-EP101 BUILDING NO. 04 BASEMENT LEVEL ELECTRICAL PLAN
04-EP102 BUILDING NO. 04 FIRST LEVEL ELECTRICAL PLAN
04-EP103 BUILDING NO. 04 SECOND LEVEL ELECTRICAL PLAN
04-EP401 BUILDING NO. 04 ENLARGED TR ROOMS
04-EP601 BUILDING NO. 04 ELECTRICAL ONE-LINE
04-EP602 BUILDING NO. 04 - PANEL SCHEDULES
4A-EP101 BUILDING NO. 04 - ELECTRICAL PLAN
4A-EP601 BUILDING NO. 04A - ELECTRICAL ONE-LINE AND SCHEDULES
05-EP101 BASEMENT NO. 05 BASEMENT LEVEL ELECTRICAL PLAN
05-EP102 BUILDING NO. 05 FIRST AND ATTIC LEVEL ELECTRICAL PLANS
05-EP401 BUILDING NO. 05 BASEMENT LEVEL ELECTRICAL PLAN
05-EP601 BUILDING NO. 05 ELECTRICAL ONE-LINE
05-EP602 BUILDING NO. 5 PANEL SCHEDULES
06-EP401 BUILDING NO. 06 ENLARGED TR ROOM PLANS
06-EP601 BUILDING NO. 06 ELECTRICAL ONE-LINE
6A-EP101 BUILDING NO. 06A - ELECTRICAL PLAN
07-EP401 BUILDING NO. 07 ENLARGED TR ROOM PLANS
07-EP601 BUILDING NO. 7A - PANEL SCHEDULES
7A-EP101 BUILDING NO. 7A - ELECTRICAL PLAN
7A-EP601 BUILDING NO. 7A - PANEL SCHEDULES
08-EP101 BUILDING NO. 08 - BASEMENT, FIRST & SECOND FLOOR PLANS
08-EP401 BUILDING NO. 08 ENLARGED TR ROOM PLANS
08-EP601 BUILDING NO. 08 - ELECTRICAL ONE-LINE
08-EP602 BUILDING NO. 08 - PANEL SCHEDULES
8A-EP101 BUILDING NO. 08A - ELECTRICAL PLAN
8A-EP601 BUILDING NO. 08A - ONE-LINE AND PANEL SHCEDULES
09-EP101 BUILDING NO. 09 - BASEMENT AND FIRST FLOOR PLANS
09-EP401 BUILDING NO. 09 ENLARGED TR ROOM PLANS
09-EP601 BUILDING NO. 09 - ELECTRICAL ONE-LINE DIAGRAM
11-EP101 BUILDING NO. 11 - BASEMENT & FIRST FLOOR PLANS
11-EP401 BUILDING NO. 11 ENLARGED TR ROOM PLANS
11-EP601 BUILDING NO. 11 ELECTRICAL ONE-LINE
12-EP101 BUILDING NO. 12 - BASEMENT LEVEL ELECTRICAL PLANS
12-EP102 BUILDING NO. 12 - FLOOR PLANS
12-EP401 BUILDING NO. 12 ENLARGED TR ROOM PLANS
12-EP601 BUILDING NO. 12 - ELECTRICAL ONE-LINE DIAGRAM
12-EP602 BUILDING NO. 12 - PANEL SCHEDULES
12A-EP101 BUILDING NO. 12A - ELECTRICAL PLAN
12A-EP601 BUILDING NO. 12A - ONE-LINE AND SCHEDULES
13-EP101 BUILDING NO. 13 - ELECTRICAL PLAN
14-EP101 BUILDING NO. 14 - FIRST LEVEL ELECTRICAL PLAN
14-EP401 BUILDING NO. 14 - ENLARGED TR ROOM PLANS
16-EP101 BUILDING NO. 16 FIRST & SECOND LEVEL ELECTRICAL PLANS
16-EP401 BUILDING NO. 16 ENLARGED TR ROOM PLANS
16-EP601 BUILDING NO. 16 - ONE-LINE DIAGRAM
20-EP401 BUILDING NO. 20 ENLARGED TR ROOM PLANS
22A-EP101 BUILDING NO. 22A -ELECTRICAL PLANS
22A-EP102 BUILDING NO. 22A ELECTRICAL PLANS
22A-EP103 BUILDING NO. 22A - LIGHTING PLANS
22A-EP601 BUILDING NO. 22A ONE-LINE DIAGRAM
22A-EP602 BUILDING NO. 22A - PANEL SCHEDULES
22A-ESS101 BUILDING NO. 22A - ELECTRICAL SITE PLAN
22A-ESS102 BUILDING NO. 22A - SITE LIGHTING PLAN
25-EP101 BUILDING NO. 25 ELECTRICAL PLANS
25-EP401 BUILDING NO. 25 ENLARGED TR ROOM PLANS
25-EP601 BUILDING NO. 25 - ONE-LINE DIAGRAM
26-EP101 BUILDING NO. 26 - BASEMENT AND FIRST FLOOR PLANS
26-EP102 BUILDING NO. 26 SECOND FLOOR PLAN
26-EP601 BUILDING NO. 26 ONE-LINE DIAGRAM
28-EP101 BUILDING NO. 28 - ELECTRICAL PLAN
29-EP101 BUILDING NO. 29 ELECTRICAL PLAN
60-EP101 BUILDING NO. 60 - BASEMENT & FIRST FLOOR PLANS
60-EP401 BUILDING NO. 60 ENLARGED TR ROOM PLANS
60-EP601 BUILDING NO. 60 - ONE-LINE DIAGRAM
65-EP101 BUILDING NO. 65 - ELECTRICAL PLAN
TECHNOLOGY SHEETS
0-T000 TECHNOLOGY COVER SHEET 27 TECHNOLOGY 1
0-T010 TECHNOLOGY SITE PLAN - FIBER 27 TECHNOLOGY 3
0-T011 TECHNOLOGY SITE PLAN - COPPER 27 TECHNOLOGY 4
0-T020 TECHNOLOGY DETAILS 27 TECHNOLOGY 5
0-T021 TECHNOLOGY DETAILS 27 TECHNOLOGY 6
0-T022 TECHNOLOGY DETAILS 27 TECHNOLOGY 6
0-T030 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 7
0-T031 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 8
0-T032 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 9
0-T033 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 10
0-T034 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 11
0-T035 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 12
0-T036 TECHNOLOGY DIAGRAMS 27 TECHNOLOGY 13
0-T050 TECHNOLOGY SCHEDULES 27 TECHNOLOGY 19
0-T051 TECHNOLOGY SCHEDULES 27 TECHNOLOGY 20
B01-T100 BUILDING 1 (LIBERTY) BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 21
B01-T100A BUILDING 1 (LIBERTY) BASEMENT DEMOLITION PLAN - TECHNOLOGY- AREA A 27 TECHNOLOGY 22
B01-T100B BUILDING 1 (LIBERTY) BASEMENT DEMOLITION PLAN - TECHNOLOGY- AREA B 27 TECHNOLOGY 23
B01-T100C BUILDING 1 (LIBERTY) BASEMENT DEMOLITION PLAN - TECHNOLOGY- AREA C 27 TECHNOLOGY 24
B01-T101 BUILDING 1 (LIBERTY) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 25
B01-T101A BUILDING 1 (LIBERTY) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA A 27 TECHNOLOGY 26
B01-T101B BUILDING 1 (LIBERTY) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA B 27 TECHNOLOGY 27
B01-T101C BUILDING 1 (LIBERTY) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA C 27 TECHNOLOGY 28
B01-T102 BUILDING 1 (LIBERTY) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 29
B01-T102A BUILDING 1 (LIBERTY) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA A 27 TECHNOLOGY 30
B01-T102B BUILDING 1 (LIBERTY) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA B 27 TECHNOLOGY 31
B01-T102C BUILDING 1 (LIBERTY) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY- AREA C 27 TECHNOLOGY 32
B01-T103 BUILDING 1 (LIBERTY) ATTIC FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 32
B01-T200 BULDING 1 (LIBERTY) BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 33
B01-T200A BULDING 1 (LIBERTY) BASEMENT PLAN - TECHNOLOGY AREA A 27 TECHNOLOGY 34
B01-T200B BULDING 1 (LIBERTY) BASEMENT PLAN - TECHNOLOGY AREA B 27 TECHNOLOGY 35
B01-T200C BULDING 1 (LIBERTY) BASEMENT PLAN - TECHNOLOGY AREA C 27 TECHNOLOGY 36
B01-T201 BULDING 1 (LIBERTY) FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 37
B01-T201A BULDING 1 (LIBERTY) FIRST FLOOR PLAN - TECHNOLOGY AREA A 27 TECHNOLOGY 38
B01-T201B BULDING 1 (LIBERTY) FIRST FLOOR PLAN - TECHNOLOGY AREA B 27 TECHNOLOGY 39
B01-T201C BULDING 1 (LIBERTY) FIRST FLOOR PLAN - TECHNOLOGY AREA C 27 TECHNOLOGY 40
B01-T202 BULDING 1 (LIBERTY) SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 41
B01-T202A BULDING 1 (LIBERTY) SECOND FLOOR PLAN - TECHNOLOGY AREA A 27 TECHNOLOGY 42
B01-T202B BULDING 1 (LIBERTY) SECOND FLOOR PLAN - TECHNOLOGY AREA B 27 TECHNOLOGY 43
B01-T202C BULDING 1 (LIBERTY) SECOND FLOOR PLAN - TECHNOLOGY AREA C 27 TECHNOLOGY 44
B01-T203 BULDING 1 (LIBERTY) ATTIC FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 44
B01-T203A BULDING 1 (LIBERTY) ATTIC FLOOR PLAN - TECHNOLOGY - AREA A 27 TECHNOLOGY 44
B01-T203B BULDING 1 (LIBERTY) ATTIC FLOOR PLAN - TECHNOLOGY - AREA B 27 TECHNOLOGY 44
B01-T203C BULDING 1 (LIBERTY) ATTIC FLOOR PLAN - TECHNOLOGY - AREA C 27 TECHNOLOGY 44
B01-T300 BUILDING 1 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 45
B01-T301 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 46
B01-T302 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 47
B01-T303 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 48
B02-T100 BUILDING 2 (MEADOW) BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 49
B02-T101 BUILDING 2 (MEADOW) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 50
B02-T102 BUILDING 2 (MEADOW) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 51
B02-T200 BUILDING 2 (MEADOW) BASEMENT TECHNOLOGY PLAN - TECHNOLOGY 27 TECHNOLOGY 52
B02-T201 BUILDING 2 (MEADOW) FIRST FLOOR TECHNOLOGY PLAN - TECHNOLOGY 27 TECHNOLOGY 53
B02-T202 BUILDING 2 (MEADOW) SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 54
B02-T300 BUILDING 2 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 55
B03-T100 BUILDING 3 BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 60
B03-T101 BUILDING 3 FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 61
B03-T102 BUILDING 3 SECOND FLOOR - TECHNOLOGY 27 TECHNOLOGY 62
B03-T300 BUILDING 3 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 63
B04-T100 BUILDING 4 (HORIZON) BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 63
B04-T101 BUILDING 4 (HORIZON) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 64
B04-T102 BUILDING 4 (HORIZON) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 65
B04-T200 BUILDING 4 (HORIZON) BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 66
B04-T201 BUILDING 4 (HORIZON) FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 67
B04-T202 BUILDING 4 (HORIZON) SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 68
B04-T300 BUILDING 4 TECHNOLOGY ROOM - ENLARGEMENTS 27 TECHNOLOGY 69
B05-T100 BUILDING 5 BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 70
B05-T101 BUILDING 5 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 71
B05-T200 BUILDING 5 BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 72
B05-T201 BUILDING 5 - FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 72
B05-T300 BUILDING 5 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 73
B06-T100 BUILDING 6 (CASCADES) BASEMENT DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 74
B06-T101 BUILDING 6 (CASCADES) FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 75
B06-T102 BUILDING 6 (CASCADES) SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 75
B06-T200 BUILDLING 6 (CASCADES) BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 76
B06-T201 BUILDING 6 (CASCADES) FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 77
B06-T202 BUILDING 6 (CASCADES) SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 78
B06-T300 BUILDING 6 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 79
B07-T100 BUILDING 7 BASEMENT DEMOLITION - TECHNOLOGY 27 TECHNOLOGY 80
B07-T101 BUILDING 7 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 81
B07-T102 BUILDING 7 SECOND FLOOR DEMOLITION - TECHNOLOGY 27 TECHNOLOGY 82
B07-T200 BUILDING 7 BASEMENT PLAN - TECHNOLOGY 27 TECHNOLOGY 83
B07-T201 BUILDING 7 FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 84
B07-T202 BUILDING 7 SECOND FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 85
B07-T300 BUILDING 7 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 86
B08-T200 BUILDING 8 (RIVER) BASEMENT PLANS - TECHNOLOGY 27 TECHNOLOGY 87
B08-T201 BUILDING 8 (RIVER) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 88
B08-T202 BUILDING 8 (RIVER) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 89
B08-T300 BUILDING 8 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 90
B09-T200 BUILDING 9 (HARBOR) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 91
B09-T201 BUILDING 9 (HARBOR) FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 92
B09-T300 BUILDING 9 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 93
B11-T200 BUILDING 11 (MOUNTAIN) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 94
B11-T201 BUILDING 11 (MOUNTAIN) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 95
B11-T202 BUILDING 11 (MOUNTAIN) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 96
B11-T300 BUILDING 11 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 97
B12-T100 BUILDING 12 (BIRCH) BASEMENT DEMOLITION PLANS - TECHNOLOGY 27 TECHNOLOGY 98
B12-T101 BUILDING 12 (BIRCH) FIRST FLOOR DEMOLITION PLANS - TECHNOLOGY 27 TECHNOLOGY 99
B12-T102 BUILDING 12 (BIRCH) SECOND FLOOR DEMOLITION PLANS - TECHNOLOGY 27 TECHNOLOGY 100
B12-T200 BUILDING 12 (BIRCH) BASEMENT PLANS - TECHNOLOGY 27 TECHNOLOGY 101
B12-T201 BUILDING 12 (BIRCH) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 102
B12-T202 BUILDING 12 (BIRCH) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 103
B12-T300 BUILDING 12 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 104
B12-T301 BUILDING 12 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 105
B13-T201 BUILDING 13 FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 106
B14-T101 BUILDING 14 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY 27 TECHNOLOGY 107
B14-T201 BUILDING 14 FIRST FLOOR PLAN - TECHNOLOGY 27 TECHNOLOGY 108
B14-T300 BUILDING 14 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 109
B16-T200 BUILDING 16 BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 111
B16-T201 BUILDING 16 FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 112
B16-T300 BUILDING 16 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 113
B20-T200 BUILDING 20 (MONUMENT) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 114
B20-T201 BUILDING 20 (MONUMENT) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 115
B20-T202 BUILDING 20 (MONUMENT) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 116
B20-T300 BUILDING 20 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 117
B20-T301 BUILDING 20 TECHNOLOGY ENLARGEMENTS 27 TECHNOLOGY 118
B22-T200 BUILDING 22 (VA CALL CENTER) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 119
B22-T201 BUILDING 22 (VA CALL CENTER) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 120
B22-T202 BUILDING 22 (VA CALL CENTER) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 121
B22-T300 BUILDING 22 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 122
B22A-T200 DATA CENTER BUILDING FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 123
B22A-T300 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 124
B22A-T301 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 125
B22A-T302 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 126
B22A-T500 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 127
B25-T200 BUILDING 25 (EAGLE) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 128
B25-T201 BUILDING 25 (EAGLE) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 129
B25-T202 BUILDING 25 (EAGLE) SECOND FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 130
B25-T300 BUILDING 25 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 131
B26-T200 BUILDING 26 BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 132
B28-T201 BUILDING 28 (BOILER PLANT) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 133
B60-T200 BUILDING 60 (CHAPEL) BASEMENT FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 134
B60-T201 BUILDING 60 (CHAPEL) FIRST FLOOR PLANS - TECHNOLOGY 27 TECHNOLOGY 135
B60-T300 BUILDING 60 TECHNOLOGY ROOM ENLARGEMENTS 27 TECHNOLOGY 136
Revisions: Date:
22-AS102
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
THE CONTRACTOR SHALL COORDINATE WITH THE VA HOSPITAL'S JCAHO INSPECTION SCHEDULE WITH THE COR. NO CONTRACTOR WORK SHALL
BE PERFORMED DURING TWO WEEKS IN EACH YEAR DURING A JCAHO INSPECTION
PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR
WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS
BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND RESIDENCE
DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION
IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT
DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION
RATIO
WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO
RECEIVE NEW FINISHES DESIGNATED
WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK
WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED TO
MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN
IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHE3D TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE
NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE
WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR
ITEMS OR SURFACES
A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED, AND INCLUDED IN THE SPECIFICATIONS AND REPORTS.
AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR FOR REVIEW OF EXISTING CONDITIONS
PATCH AND FIRE STOP AT ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS, WALLS, AND ROOF DECK
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CU CUBIC
DBL DOUBLE
DEMOLITION DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HAZ HAZARDOUS
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INCLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RWC RAIN WATER CONDUIT
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB VAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS
SHOWN MAY NOT BE USED ON
THIS PROJECT. CERTAIN COMMON
ABBREVIATIONS MAY NOT BE
SHOWN.
CENTER LINE
DETAIL INDICATOR
DIMENSION LINE
NEW DOOR OPENING
- SEE DOOR SCHEDULE, DETAILS AND
ELEVATIONS SHEET
DRAWING BLOCK TITLE, TYPICAL
CORRIDOR ELEVATION INDICATOR
BUILDING SECTION INDICATOR
TYPICAL DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
EXISTING ROOM TAG - ROOM NAME AND NUMBER
COLUMN GRID
ARCHITECTURAL KEYNOTE TAG
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
CG
FEC
X1234
DETAIL NUMBER
SHEET NUMBER
XX-XX
1"
XX-XX
CL
XX-XX
x'-x" SPOT ELEVATION
1 REVISION
BREAK LINE
DD ROOM TAG - ROOM NAME AND NUMBER
X
EXISTING DOOR OPENING
1 View Name 1/8" = 1'-0"
AE888
Room name
Room name
150 SF
SD ROOM TAG - ROOM NAME AND AREA
Room name
SHEET NUMBERDETAIL
NUMBER
DETAIL
NUMBER
SHEET NUMBER
88 88
HW
-X X
HARDWARE TAG
SEE SPECIFICATIONS
PLACE DOOR
TAG HERE
A101 BUILDING ELEVATION
SHEET NUMBERDETAIL
NUMBER
XXXXX
HRDW
XXXXX
HRDW
XXXXX EXISTING DOOR TAG
NEW DOOR TAG
N P N
LIFE SAFTEY ROOM TAG - ROOM NAME, NUMBER AND AREARoom name
150 SF
REFLECTED CEILING KEYNOTE TAGX
WINDOW TYPE TAG#
RESTROOM ACCESSORY TAGX
INTERIOR SIGNAGE TAGS#
AREA GENERALLY NOT IN CONTRACT
WOOD
WOOD FINISH
ALUMINUM
STEEL
EARTH
GYPSUM - PLASTER
MASONRY - CONCRETE BLOCK
RIGID INSULATION
BATT INSULATION
PLYWOOD
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
REFER TO SPECIFICATIONS SECTION 02 41 19 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND
INFORMATION.
PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION WILL BE REQUIRED OUTSIDE OF THIS LINE. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF
DEMOLITION WORK REQUIRED FOR THE PROJECT.
EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK.
REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.
COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.
THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.
CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL
PRESSURE MONITORING DEVICE AT DUST PROOF BARRICADE TO CONFIRM PRESSURE.
THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE. WHERE EXISTING CEILING IN THE NEW OR EXPANDED TR ROOMS ARE BEING REMOVED, G.C.
TO COORDINATE THE REPLACEMENT OR MODIFICATION OF SPRINKLER SYSTEM WITH NEW UPRIGHT SPRINKLER
HEADS AT THE SAME TIME OF CEILING REMOVAL TO MAINTAIN SPRINKLER PROTECTION.
ALL TEMPORARY BARRIERS ARE TO BE 1 HOUR FIRE BARRIERS WHERE CEILING TILES IN THE CORRIDORS CANNOT BE REPLACED AT THE END OF THE WORK SHIFT OR PROVIDE TEMPORARY UPRIGHT SPRINKLER HEAD FOR THE
DURATION OF THE WORK BEING PERFORMED IN THE CORRIDOR.
ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF.
COORDINATE LOCATION OF BARRIERS WITH OWNER.
REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.
PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND DEVICES LOCATED WITHIN AREAS SCHEDULED TO
BE DEMOLISHED.
SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO
COMPLETE THE INTENDED WORK OF THE OVERALL PROJECT.
FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE
BY THE INSTALLING CONTRACTOR.
REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE
SALVAGED.
DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AND RELATED ITEMS. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL OF DIFFUSERS GRILLS, AND RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.
PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY SOUND TO CARRY FLOOR LOAD OF 100 LBS. / SQ. FT. UNLESS NOTED OTHERWISE.
ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED.
MATCH EXISTING FIRE RATING UNLESS NOTED OTHERWISE.
REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION. PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR
RELOCATION PRIOR TO COMMENCING DEMOLITION.
WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR.
PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE
SURFACES FOR SCHEDULED FINISHES.
PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.
AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY
CONSTRUCTION AND MATCH EXISTING FINISHES.
REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES NOT REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH PLUMBING PLANS FOR ADDITIONAL INFORMATION.
REMOVE ALL ACCESSORIES ASSOCIATED WITH PLUMBING, INCLUDING PARTITIONS, GRAB BARS, DISPENSERS, RACKS, SHELVING, SINK BASE, DISPOSALS, ETC.
GC TO PERFORM SURVEY OF EXISTING SERVICE LINES IN SCOPE OF WORK PRIOR TO START OF WORK. REPORT
FINDINGS TO COR AND ARCHITECT.
HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD HAVE BEEN IDENTIFIED IN BUILDINGS THROUGHOUT THE CAMPUS. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2 SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL
WORK AND NOTIFY THE COR IMMEDIATELY.
1.
2.
3.
4.
5.
6.
7.
COORDINATE DEMOLITION WITH NEW WORK INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, MEP, FIRE PROTECTION
AND COMMUNICATION WORK.
PATCH EXISTING CONDITIONS AS REQUIRED FOR NEW FINISHES AFTER NEW WORK IS INSTALLED.
COORDINATE DEMOLITION WITH ARCHITECTURAL PHASING PLANS.
REMOVE EXISTING ACOUSTICAL CEILING TILE SYSTEM IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO: ACOUSTICAL
TILE, GRID AND SUSPENSION WIRE.
MODIFY EXISTING ACOUSTICAL CEILING TILE SYSTEM AS REQUIRED FOR NEW WORK. REMOVE EXISTING SYSTEM AS
INDICATED. PATCH AND REPAIR EXISTING TO REMAIN.
REMOVE EXISTING LIGHT FIXTURES IN AREA OF RENOVATION. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
REMOVE ALL CEILING MOUNTED ITEMS INCLUDING BUT NOT LIMITED TO SIGNAGE, BANNERS, & EQUIPMENT MOUNTS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN
TO FACE OF FINISH SURFACE
DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS
THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE
PROJECT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS
THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT
THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH THE
CONDITIONS AFFECTING THE WORK
ALL WORKMANSHIP IS TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN
USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE
WORK AREA THOROUGHLY
ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE
SPECIFICATIONS
PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD
AND VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.
ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES. CODES INCLUDE BUT
ARE NOT LIMITED TO:
VA PLUMBING DESIGN GUIDE - 2021
11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING
JURISDICTION. CODES INCLUDE, BUT ARE NOT LIMITED TO:
NFPA 101 - 2021
NFPA 70 - 2020
NFPA 90A - 2021
NFPA 99 - 2021
NFPA 101 - 2021
VA HVAC DESIGN GUIDE - 2021
13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT
LIMITED TO:
NFPA 70 - 2021
NFPA 101 - 2021
VA ELECTRICAL DESIGN GUIDE - 2019
VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY
BUILDINGS - 2015
VA LIGHTING DESIGN MANUAL - 2022
VA RADIOLOGY DESIGN MANUAL - 2008
VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2021
14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT LIMITED TO:
NFPA 101 - 2021
NFPA 13 - 2022
NFPA 72 - 2022
VA FIRE PROTECTION DESIGN GUIDE - 2021
15. PRIOT TO ANY EXISTING TELECOMMUNICATION ROOM BEING TAKEN OFF-LINE, THE FOLLOWING ITEMS MUST BE COMPLETE, FUNCTIONAL, AND TESTED:
A. THE COMPLETE SITE FIBER OPTIC LINE (FO) SYSTEM.
B. DATA CENTER (ADDITION TO BUIDLING 22)
C. NEW INDIVIDUAL BUILDING TELECOMMUNICATION ROOMS AND ADDITIONS (BUILDINGS 1, 8, AND 9).
A.
B.
C.
2.
A.
B.
C.
D.
E.
3.
4.
A.
B.
C.
D.
E.
F.
G.
5.
A.
B.
C.
D.
6.
A.
B.
C.
D.
7.
A. Project Phasing/Sequencing:
1. Works starts on new Data Center, Fiber Optic Duct Bank, and new Telecommunications Room locations.
Where existing TR rooms are to remain, existing equipment to be protected in place and replaced/modified as per electrical and technology sequencing and documents.
Areas where new TRs/TEs are required to be constructed demolish and renovate these spaces completely per drawings and specifications.
All other new work to support Data Center and TEs/TRs.
Data Center at Building 22A is occupied by VA. Requires the following:
Temporary data/communication line to be established between new data center 22A and existing data center at building 2. Line must be operational.
Cabinets/Racks, all contract equipment must be installed and fully functional.
All required utilities are connected to Data Center thru entrance room DEMARC.
Commissioned mechanical system.
Complete Punchlist – after substantial occupancy there will be no unescorted access by contractor to Data Center
VA moves existing server network equipment to new data center and makes operational (estimating 6 months).
New and Existing to Remain TRs and TEs Ready for Activation. This requires:
Exterior Fiber Optic/Copper Backbone to be finalized and fully tested.
Racks, all contract equipment must be installed and fully functional.
Security System Equipment moved.
All cabling connected to well labeled patch panels.
Punchlist complete on all TRs/TEs.
Charrette for Activation with VA and Contractor per specifications.
TR/TE activation schedule provided by VA to GC.
Activate New TEs/TRs. This requires:
Temporary network switches are provided and brought to individual building TR by VA.
Patch cables provided by Contractor.
Three TRs/TEs will be brought online per month, requiring mix between on and off hour work. The contractor must support the transition by providing patch cables, labor to patch to switch, connecting all WAO/data devices/WAPs to new TR/TE switch.
All connections to the switches at the TR/TE data…