S02 - ATTACHMENT 5 - COMBINED-MEP_FP_IT_06012023_Part1.pdf

PDF 18 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction - Central Western Massachusetts Federal contract opportunity
Solicitation number
36C77623R0051
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal construction solicitation. The solicitation number is 36C77623R0051 and seeks construction services for EHRM Infrastructure Upgrades - Central Western Massachusetts. The solicitation is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin as a design-bid-build project. Responses are due on June 1, 2023. Construction services will include upgrades to infrastructure at medical centers in Central Western Massachusetts. Interested parties should monitor the Federal Business Opportunities website for additional details.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Infrastructure Upgrades Construction - Central Western Massachusetts, newest first.
File Type Posted
Technical Questions Cont. - CWM EHRM.pdf PDF
36C77623R0051 0006 - CWM EHRM - RFIs Cont and Language.pdf PDF
Attachment 5 - GC402-REVISED_07_19_2023_ADDENDUM2.pdf PDF
Attachment 3 - BASEMENT LEVEL ELECTRICAL PLAN - WEST - LIBERTY BLDG.pdf PDF
Attachment 2 - EHRM CWM - Geotechnical Engineering Report.pdf PDF
Attachment 4 - BASEMENT LEVEL ELECTRICAL PLAN - EAST - LIBERTY BLDG.pdf PDF
Attachment 6 - 1-AE120-REVISED_07_19_2023_ADDENDUM2.pdf PDF
36C77623R0051 0005 - EHRM CWM - Extension and RFIs.pdf PDF
Attachment 1 - Technical Questions - CWM EHRM VA Response.pdf PDF
Site Visit 2 Sign-in Sheet - CWM EHRM.pdf PDF
Site Visit 2 Sign-in Sheet - CWM EHRM.pdf PDF
EHRM EP601 Addendum 1 6-15-2023 .pdf PDF
36C77623R0051 0004 - EHRM CWM.pdf PDF
Updated Book 1.pdf PDF
Updated Book 3.pdf PDF
Second Site Visit Instructions.pdf PDF
36C77623R0051 0003 - CWM - Second Site Visit and Extension of RFIs.pdf PDF
36C77623R0051 0002 - CWM EHRM - Extend Deadline for RFIs.pdf PDF
36C77623R0051 0001 - CWM Sign In Sheet.pdf PDF
Site Visit Sign In Sheet - Central Western Massachusetts.pdf PDF
S02 - ATTACHMENT 3 - SPEC BOOK 3.pdf PDF
S02 - ATTACHMENT 4 - SPEC BOOK 4.pdf PDF
S02 - ATTACHMENT 13 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 5.pdf PDF
S02 - ATTACHMENT 9 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 1.pdf PDF
S02 - Solicitation - 36C77623R0051 - CWM EHRM.pdf PDF
S02 - ATTACHMENT 2 - SPEC BOOK 2.pdf PDF
S02 - ATTACHMENT 7 - COMBINED-MEP_FP_IT_06012023_Part3.pdf PDF
S02 - ATTACHMENT 8 - COMBINED-MEP_FP_IT_06012023_Part4.pdf PDF
S02 - ATTACHMENT 10 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 2.pdf PDF
S02 - ATTACHMENT 12 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 4.pdf PDF
S02 - ATTACHMENT 14 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 6.pdf PDF
S02 - ATTACHMENT 24 - Contractor Safety - Environmental Form.pdf PDF
S02 - ATTACHMENT 26 - Hampshire County Wage Rates 03.31.2023.pdf PDF
S02 - ATTACHMENT 27 - Site Visit Instructions.pdf PDF
S02 - ATTACHMENT 17 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 9.pdf PDF
S02 - ATTACHMENT 11 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 3.pdf PDF
S02 - ATTACHMENT 16 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 8.pdf PDF
S02 - ATTACHMENT 18 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 10.pdf PDF
S02 - ATTACHMENT 19 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 11.pdf PDF
S02 - ATTACHMENT 20 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 12.pdf PDF
S02 - ATTACHMENT 1 - SPEC BOOK 1.pdf PDF
S02 - ATTACHMENT 6 - COMBINED-MEP_FP_IT_06012023_Part2.pdf PDF
S02 - ATTACHMENT 15 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 7.pdf PDF
S02 - ATTACHMENT 21 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 13.pdf PDF
S02 - ATTACHMENT 22 - COMBINED-ARCH_CIVIL_STRUCTURAL_PART 14.pdf PDF
S02 - ATTACHMENT 23 - Brand Name Justification - CWM EHRM - Redacted.pdf PDF
S02 - ATTACHMENT 25 - Limitations on Subcontracting.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PROTECTION ABBREVIATIONSFIRE PROTECTION NOTES

GENERAL SYMBOLS

FIRE PROTECTION SYMBOLS

POINT OF CONNECTION (NEW TO

EXISTING)

EXTENT OF DEMOLITION

DIAMETERØ

POINT OF CONNECTION TO EQUIPMENT

SUPPLIED BY CONTRACTOR

BREAK LINE (SINGLE LINE)

EQUIPMENT TAG - SEE EQUIPMENT DATA SHEET:

EQPM = EQUIPMENT ABBREVIATION

# = EQUIPMENT NUMBER

SIM

DETAIL BUBBLE:

1 = DENOTES DETAIL NUMBER

# = DENOTES DRAWING NUMBER OF DETAIL LOCATION

SIM SECTION CUT ARROW:

A = DENOTES SECTION IDENTIFICATION

# = DENOTES DRAWING NUMBER OF SECTION DETAIL

EQP

CO2

FSCP

CO2

FHV

VS

XXX

XX

XXX

XX

XXX

ABORT SWITCH (INDICATE TYPE)

ABORT SWITCH - CO2

FLUSH FIRE DEPARTMENT CONNECTION

FREESTANDING SIAMESE FIRE DEPTARTMENT CONNECTION

SIAMESE FIRE DEPARTMENT CONNECTION

FIRE SUPPRESSION CONTROL PANEL

FESTANDING TEST HEADER

WALL-MOUNTED TEST HEADER

METER

MANUAL STATION (INDICATE TYPE)

MANUAL STATION (INDICATE TYPE)

MANUAL STATION - CARBON DIOXIDE

MONITOR SWITCH (INDICATE TYPE)

PIPE CAP

CONCENTRIC REDUCER

ECCENTRIC REDUCER

PIPE FLOW DIRECTION

MECHANICAL PIPE COUPLING

PIPE DROP

PIPE RISE

PIPE TEE

PIPE TRACE HEATER

PIPE CONTINUATION

POINT OF CONNECTION - NEW/EXISTING

POINT OF CONNECTION - DEMOLITION

HORIZONTAL FIRE PUMP

VERTICAL FIRE PUMP

SRINKLER

SIDEWALL SPRINKLER

UPRIGHT SPRINKLER

WINDOW SPRINKLER

RISER CHECK VALVE

ANGLE VALVE

CHECK VALVE

BACKFLOW PREVENTOR - DOUBLE CHECK TYPE

DELUGE VALVE

DRY PIPE VALVE

DRY PIPE VALVE W/ QUICK OPENING DEVICE

PREACTION VALVE

FIRE HOSE VALVE

VALVE (GENERAL)

OUTSIDE SCREW & YOKE (OS&Y) VALVE

POST-INDICATOR VAVLE

PRESSURE RELIEF VALVE

PRESSURE REGULATING VALVE

CONTROL VALVE W/ TAMPER SWITCH

WALL CABINET (INDICATE TYPE)

ABOVE FINISHED FLOOR

APPROXIMATE

BACK FLOW PREVENTER- (TYPE)

BRAKE HORSEPOWER

CENTERLINE

CARBON DIOXIDE

COMBINATION

CONNECTION

DRY CHEMICAL

DEPARTMENT

DELUGE SPRINKLER SYSTEM

DETAIL

DEGREE

DEGREES FAHRENHEIT

DIAMETER

DISCHARGE

DOWN

DRAIN

DRY STANDPIPE

DRY SPRINKLER SYSTEM

DRAWING

EACH

ELEVATION

ELECTRICAL

FIRE MAIN - UNDERGROUND

FLOOR CONTROL VALVE ASSEMBLY

FIRE DEPARTMENT CONNECTION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FIRE HOSE VALVE CABINET

FIRE HOSE RACK

FIRE HOSE VALVE

FLOOR

FOAM SYSTEM

FIRE PUMP

FEET PER SECOND

FLOW SWITCH

FIRE SUPRESSION CONTROL PANEL

FEET

GAUGE

GALLON

GALVANIZED

GALLONS PER MINUTE

HAZARDOUS

HORIZONTAL

HORSEPOWER

HOUR

HERTZ

JOCKEY PUMP

KILOWATT

LITER

LITERS PER MINUTE

MECHANICAL

MANUFACTURER

MINIMUM

NUMBER

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

OUTSIDE SCREW AND YOKE

PHASE

POST INDICATOR VALVE

PENTHOUSE

PRESSURE

POUNDS PER SQUARE INCH

POUNDS PER SQUARE INCH GAUGE

PREACTION SPRINKLER SYSTEM

QUICK RESPONSE

QUANTITY

ROOM

SPECIFICATION

SQUARE FOOT

SQUARE METER

SPRINKLER

STAINLESS STEEL

SUCTION

SYSTEM

TEMPERATURE

TAMPER SWITCH

TYPICAL

UNLESS NOTED OTHERWISE

VOLTS

WITH

WITHOUT

WATER FLOW SWITCH

WET STANDPIPE

WET SPRINKLER RISER

WET SPRINKLER SYSTEM

AFF

APPROX

BFP- ()

BHP

COMB

CONN

DCH

DEPT

DESS

DET

DEG

DEG F

DIA

DISC

DN

DR

DSP

DSS

DWG

EA

EL

ELEC

F

FCVA

FDC

FE

FEC

FHVC

FHR

FHV

FLR

FOM

FP

FPS

FS

FSCP

FT

GA

GAL

GALV

GPM

HAZ

HORIZ

HP

HR

HZ

JP

KW

L

LPM

MECH

MFR

MIN

NO.

NC

NIC

NO

NTS

OS&Y

PH

PIV

PNTHSE

PRESS

PSI

PSIG

PSS

QR

QTY

RM

SPEC

SQ FT

SQ M

SPKR

SS

SUCT

SYS

TEMP

TS

TYP

UNO

V W/ W/O

WFS

WSP

WSR

WSS

NOTE - NOT ALL ABBREVIATIONS MAY BE USED

1. PROVIDE THE SPRINKLER SYSTEM MODIFICATIONS IN ACCORDANCE WITH THE VA FIRE

PROTECTION DESIGN MANUAL - EIGTH EDITION - JUNE 1, 2021 AND NFPA 13 2022.

2. FIRE PROTECTION SYSTEM MATERIALS SHALL BE UL LISTED(FM GLOBAL APPROVED IF

APPLICABLE, VERIFY WITH INSURANCE UNDERWRITER).

3. SURVEY EXISTING SPRINKLER SYSTEM TO VERIFY PIPING LOCATIONS AND SIZES PRIOR TO

BEGINNING PROJECT WORK. COORDINATE THE INSTALLATION OF FIRE PROTECTION PIPING

WITH EXISTING CONDITIONS AND WORK OF ALL OTHER TRADES PRIOR TO COMMENCING

INSTALLATION.

4. IN EXISTING SPACES, TO BE RENOVATED, THROUGHOUT THE PROJECT THE FIRE

PROTECTION SCOPE SHALL BE THE RELOCATION AND REPLACEMENT OF EXISTING

SPRINKLER HEADS AND BRANCH PIPING TO ACCOMMODATE THE REVISED ARCHITECTURAL

LAYOUT. HEAD RELOCATION AND REPLACEMENT SHALL BE ON A ONE FOR ONE BASIS AND

SHALL NOT REQUIRE HYDRAULIC CALCULATION.

5. IN BUILDINGS WITH ADDITIONS, AND BUILDINGS WHERE ENTIRE SYSTEM IS NEW SCOPE OF

WORK SHALL BE TO PROVIDE A HYDRAULICALLY CALCULATED SYSTEM TO PROVIDE

COMPLETE COVERAGE THROUGHOUT THE PROJECT WORK AREA.

6. WHERE HYDRAULIC CALCULATIONS ARE REQUIRED, THE FIRE PROTECTION CONTRACTOR

SHALL PERFORM FLOW TEST TO OBTAIN REQUIRED DATA FOR HYDRAULIC CALCULATIONS.

SCHEDULE FLOW TEST WITH THE VA COR.

7. SYSTEM DESIGN SHALL BE BASED ON THE COVERAGE REQUIREMENTS OF THE VA FIRE

PROTECTION DESIGN MANUAL. ALL SPACES WITHIN THE PROJECT SCOPE OF WORK SHALL

BE LIGHT HAZARD EXCEPT ELECTRICAL ROOMS, STORAGE ROOMS, AND MECHANICAL

ROOMS; WHICH SHALL BE ORDINARY HAZARD.

* ALL SCOPE OF WORK ROOMS WHERE THE NUMBER OF SPRINKLER HEADS DOES NOT CHANGE

(OR IS REDUCED) HYDRAULIC CALCULATIONS ARE NOT REQUIRED.

8. PROVIDE COMPLETE WORKING PLANS, INCLUDING HYDRAULIC CALCULATIONS (WHERE

REQUIRED), TO CLEARLY DEFINE THE WORK FOR THE SPRINKLER SYSTEM MODIFICATIONS

WITHIN THE DEFINED SCOPE OF WORK AREA. THE PLANS SHALL INCLUDE INDICATION OF

PIPE SIZES, LOCATIONS AND ROUTING. LOCATION AND ROUTING SHALL BE AS REQUIRED TO

SATISFY THE DESIGN CRITERIA AS SPECIFIED IN THE VA FIRE PROTECTION DESIGN MANUAL.

EXISTING PIPING LOCATIONS, SIZES AND ROUTING SHALL BE INDICATED (INCLUDING NON-

SCOPE AREA) WITH HYDRAULIC NODE POINTS (AS NEEDED) BACK TO SOURCE OF FIRE

PROTECTION WATER TO COMPLEMENT THE HYDRAULIC CALCULATIONS.

9. A MINIMUM TEN (10) PERCENT OR TEN (10) PSI PRESSURE SAFETY FACTOR (WHICHEVER IS

GREATER) SHALL BE MAINTAINED BETWEEN AVAILABLE WATER SUPPLY

AND COMBINED DEMAND OF SPRINKLER SYSTEM AND HOSE STREAM ALLOWANCE TO

ACCOUNT FOR FUTURE DETERIORATION.

10. PIPE VELOCITIES SHALL BE LIMITED TO 20 FPS IN BRANCHLINES AND 25 FPS IN MAINS.

11. CONTRACTOR SHALL PROVIDE PROTECTION FOR PIPING AGAINST DAMAGE BY

EARTHQUAKES IN ACCORDANCE WITH NFPA 13 AND ASCE/SEI 7-05 “MINIMUM DESIGN LOADS

FOR BUILDINGS AND OTHER STRUCTURES”.

12. EXCEPT IN DATA CENTER, NEW SPRINKLERS HEADS SHALL BE ORDINARY TEMPERATURE,

QUICK RESPONSE. IN DATA CENTER HEAD SHALL BE ORDINARY RESPONSE. K FACTOR SHALL

MATCH EXISTING REMOVED HEAD OR SHALL BE SELECTED BASED ON HYDRAULIC

CALCULATIONS AS REQUIRED.

13. PIPING SIZE CHANGES SHALL BE MADE WITH REDUCING FITTINGS. FLUSH OR HEX BUSHINGS

ARE NOT ACCEPTABLE.

14. FLUSHING CONNECTIONS CONSISTING OF A THREADED CAPPED NIPPLE OR APPROVED

MECHANICAL GROOVED END CAP SHALL BE PROVIDED ON THE END(S) OF

ALL CROSS-MAINS. THE NIPPLE SHALL BE THE SAME DIAMETER AS THE END PIPE BUT NOT

LARGER THAN 2 INCHES.

15. PROVIDE SPECIAL SPRINKLER WRENCHES, SPARE SPRINKLER HEADS, AND STORAGE

CABINETS IN ACCORDANCE WITH NFPA 13.

16. DO NOT RUN PIPING OVER ELECTRICAL EQUIPMENT. FOR ELECTRICAL EQUIPMENT ROOMS

AND ELEVATOR MACHINE ROOMS, ONLY SPRINKLERS AND PIPING WHICH ARE DIRECTLY AND

EXCLUSIVELY PROVIDING PROTECTION TO THESE SPACES MAY ENTER THESE SPACES.

17. LOCATE PIPING SO THAT ACCESS TO AND CLEARANCE AROUND EQUIPMENT AND MINIMUM

HEADROOM OF 8 FEET ARE MAINTAINED. RUN PIPING IN THE MOST DIRECT MANNER,

FORMING RIGHT ANGLES WITH OR PARALLEL TO BUILDING LINES.

18. SPRINKLER DISCHARGE SHALL NOT BE OBSTRUCTED IN ANY WAY. WHERE OBSTRUCTIONS

TO SPRINKLER DISCHARGE EXIST, LOCATE SPRINKLERS WITH RESPECT TO THESE

OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13.

19. INSTALL DRAIN PIPING FOR GRAVITY DRAINAGE IN ACCORDANCE WITH NFPA 13. ALL

SPRINKLER PIPING SHALL BE INSTALLED SO THAT THE FIRE PROTECTION SYSTEMS MAY BE

DRAINED. ALL DROPS TO MORE THAN ONE SPRINKLER HEAD AND ALL CHANGES IN

ELEVATION THAT CREATE TRAPPED SECTIONS SHALL BE PROVIDED WITH AUXILIARY DRAINS

IN ACCORDANCE WITH NFPA 13.

20. SUBMIT SHOP DRAWINGS, AND CATALOG CUTS BEARING THIS APPROVAL TO THE OWNER

AND DESIGN PROFESSIONAL FOR APPROVAL. SUBMIT DRAWINGS, CUTS AND CATALOG

INFORMATION SHOWING DIMENSIONS, WEIGHT PERFORMANCE, ETC. OF ALL EQUIPMENT.

SUBMIT ALL SHOP DRAWINGS, CALCULATIONS AND CATALOG CUTS AT ONE TIME. PARTIAL

SUBMISSIONS WILL NOT BE ACCEPTED.

21. TEST NEW AND MODIFIED SPRINKLER PIPING IN ACCORDANCE WITH NFPA 13.

22. ALL NEW SPRINKLER PIPING SHALL BE TESTED AND FLUSHED IN ACCORDANCE WITH NFPA

13. REPAIR ALL DAMAGE CAUSED BY LEAKS, FLOODING, OR DRAINING DURING OR TESTING

WORK.

23. SPRINKLER SYSTEM SHUTDOWNS SHALL BE KEPT TO A MINIMUM. COORDINATE SHUTDOWNS

WITH VA COR.

24. COMPLETE AND FORWARD CONTRACTOR'S MATERIAL AND TEST CERTIFICATE(S) TO VA COR.

25. WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE BEING PERMANENTLY

REMOVED, THAT WORK SHALL BE COORDINATED TO OCCUR AT THE SAME TIME AS

REPLACEMENT OF THE EXISTING SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID

LOSS OF SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.

NOTE - NOT ALL SYMBOLS MAY BE USED

NOTE - NOT ALL SYMBOLS MAY BE USED

1. WITHIN THE AREAS DESIGNATED FOR DEMOLITION THE SPRINKLER SYSTEM AFFECTED

BY THIS WORK SHALL MEET ALL REQUIREMENTS OF THE VA FIRE PROTECTION MANULA -

EIGTH EDITION - JUNE 1, 2021

2. WHEN AREA'S OF THE FIRE PROTECTION SYSTEM NEED TP BE OUT OF SERVICE,

THE OUTAGE SHALL BE COORDINATED W/ THE VA COR. AND AN APPROVED FIRE

WATCH SHALL BE PROVIDED FOR UNPROTECTED ARE FOR THE DURATION OF

THE OUTAGE.

3. WHERE UTILIZED, FIRE WATCH PERSONNEL SHALL BE DEDICATED TO PROVIDE THE

FIRE WATCH AND SHALL BE PROVIDED WITH AT LEAST ONE APPROVED MEANS FOR

NOTIFICATION OF THE FIRE DEPARTMENT.

4. A TAG SHALL BE USED TO INDICATE THAT A SYSTEM, OR PORTION THEREOF, HAS

BEEN REMOVED FROM SERVICE. THE TAG SHALL BE POSTED AT EACH FIRE DEPARTMENT

CONNECTION, SYSTEM CONTROL VALVE, FIRE ALARM CONTROL UNIT, FIRE ALARM

ENUNCIATOR AND FIRE COMMAND CENTER, INDICATING WHICH SYSTEM, OR PART THEREOF,

HAS BEEN REMOVED FROM SERVICE.

5. OUTAGES SHALL BE AUTHORIZED BY THE VA COR. BEFORE AUTHORIZATION IS GIVEN,

A DESIGNATED INDIVIDUAL FROM THE FIRE PROTECTION CONTRACTOR SHALL

BE RESPONSIBLE FOR VERIFYING THAT ALL OF THE FOLLOWING PROCEDURES HAVE

BEEN IMPLEMENTED:

a. THE EXTENT AND EXPECTED DURATION OF THE IMPAIRMENT HAVE BEEN

DETERMINED.

b. THE AREAS OF BUILDINGS INVOLVED HAVE BEEN INSPECTED AND THE

INCREASED RISKS DETERMINED.

c. RECOMMENDATIONS HAVE BEEN SUBMITTED TO, REVIEWED BY AND

ACCEPTED BY THE VA CORE.

d. THE FIRE DEPARTMENT HAS BEEN NOTIFIED. THE INSURANCE CARRIER, THE ALARM COMPANY, VA CORE, HAVE BEEN NOTIFIED.

e. THE SUPERVISOR IN THE AREAS TO BE AFFECTED HAVE BEEN NOTIFIED.

f. AN OUTAGE TAG SYSTEM HAS BEEN IMPLEMENTED

g. NECESSARY TOOLS AND REQUIRED MATERIALS HAVE BEEN ASSEMBLED

AT THE OUTAGE SITE.

6. WHEN SERVICE IS RESTORED TO NORMAL WORKING ORDER, THE CONTRACTOR AND

VA COR SHALL VERIFY THAT ALL THE FOLLOWING PROCEDURES HAVE BEEN IMPLEMENTED:

a. NECESSARY INSPECTIONS AND TESTS HAVE BEEN CONDUCTED TO VERIFY THAT

AFFECTED SYSTEMS ARE OPERATIONAL.

b. VA CORE HAS BEEN ADVISED THAT PROTECTION IS RESTORED.

c. THE FIRE DEPARTMENT ALARM COMPANY, AND OTHER INVOLVED PARTIES HAVE

BEEN ADVISED THAT PROTECTION IS RESTORED.

d. THE OUTAGE TAG HAS BEEN REMOVED.

7. THE EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED AS REQUIRED FOR TEMPORARY

COVERAGE DURING CONSTRUCTION. THE EXISTING SPRINKLER HEADS AND

DROPS SHALL BE REMOVED. A TEMPORARY 1" DIAMETER SPIG SHALL BE INSTALLED

WITH A 1/2" DIAMETER ORIFICE, 165° UPRIGHT BRASS SPRINKLER.

SPRINKLER DEMOLITION NOTES

LAYOUT DRAWING APROVAL NOTE

CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE DETAIL

LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA.

BOTTOM OF

DECK

NIPPLE AS

REQUIRED

FINISH CEILING

TEE

EXISTING BRANCH

SUPPLY LINE

REDUCER AS

REQUIRED

1" SUPPLY LINE

SEMI-RECESSED

SPRINKLER HEAD

ARM-OVER

SEE NOTE BELOW

CUP

RETAINER

TEE

UPRIGHT PENDENT

SPRINKLER HEAD

REDUCER AS

REQUIRED

BRANCH SUPPLY LINE

1" SUPPLY LINE

NEW SEMI RECESSED

SPRINKLER HEAD

IN NEW LOCATION

CEILING

1"

HANGER

3/8" ROD

SUPPORT HANGER FROM

CONCRETE INSERT OR TOP

BEAM CLAMP

SPRINKLER TO BE

DEMOLISHED

TO BE

REMOVED

CONNECT TO (E) 1" FITTING AND

EXTEND 1" THREADED SCH.40 STEEL

PIPE TO NEW LOCATION

(E) BRANCH PIPE

NEW UPRIGHT PENDENTSPRINKLER

HEAD IN NEW LOCATION

1"

HANGER

3/8" ROD

SUPPORT HANGER FROM

CONCRETE INSERT OR TOP

BEAM CLAMP

SPRINKLER TO BE

DEMOLISHED

TO BE

REMOVED

CONNECT TO (E) 1" FITTING AND

EXTEND 1" THREADED SCH.40 STEEL

PIPE TO NEW LOCATION

(E) BRANCH PIPE

SEMI-RECESSED SPRINKLER

UPRIGHT PENDENT SPRINKLER

CODE COMPLIANCE

COMPLY WITH U.S. DEPARTMENT OF VETERANS AFFAIRS FIRE

PROTECTION DESIGN MANUAL & CURRENT NFPA CODES AS NOTED.

SEISMIC DESIGN NOTE

THIS PROJECT HAS BEEN ASSESSED AT RISK CATEGORY IV,

SEISMIC DESIGN CATEGORY C. ALL EQUIPMENT AND COMPONENTS

BEING INSTALLED UNDER THIS CONTRACT SHALL BE INSTALLED

AND RESTRAINED TO COMPLY WITH APPLICABLE CODES AND THE

VA PUBLICATION H-18-8, SEISMIC DESIGN HANDBOOK.

HAZARDOUS MATERIALS NOTE

HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO

ASBESTOS AND/OR LEAD HAVE BEEN IDENTIFIED IN BUILDINGS

THROUGHOUT THE CAMPUS. REFER TO HAZARDOUS MATERIALS

REPORT AND DIVISION 2 SPECIFICATIONS SECTIONS 02, 82, 11

(ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT REMOVAL

AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT

OF MATERIALS PRESENT, AND THE REQUIRED ABATEMENT

PROCESS. IF HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE

HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL

WORK AND NOTIFY THE COR IMMEDIATELY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

FO

R

BI

DC:

\U se rs\

AA

hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck

EV

BM

P.

rvt

6/1 /20 :59 :14 P M

FP001

FIRE PROTECTION - SYMBOLS , ABBREVATIONS,

NOTES

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

ISSUED FOR BID

21-USDVA-15

NTS

1 SEMI RECESSED SPRINKLER HEAD DETAIL

NTS

2 UPRIGHT PENDENT SPRINKLER HEAD DETAIL

NTS

3 ARM OVER SPRINKLER HEAD DETAIL

NOTE: WHEN ARM-OVER IS MORE THEN 24" IN LENGTH, IT MUST BE SUPPORTED

WITH A PIPE HANGER.

Revisions: Date:

malbitz Image

H

23"

8.5"

8'-2"

8.5"

4'-11" 4'-9.5"

22"

APPROX 4"

DIA DRAIN

COVERS (TYP)

VISIBLE

ACTIVE DRAIN

DEPARTMENT Area

Major Vertical Penetrations Primary Circulation Area Bldg Core & Service Area

Common Space (Total) 15141

OXYGEN

TANK

Reserve Tanks

Emergency Oxy Valve Box

MAIN STREET GRILL

5th

AVE.

DELI

JUICE

GRILL

SD (1-35) tag 13

SS (M1-35) tag 12

SS (M1-45) tag 14

SD (1-45) tag 15

SD (1-79) tag 19

SS (M1-79) tag 18

SS (M1-19) tag 20

SD (1-19) tag 21

SD (1-54A) tag 2

SS (M1-54) tag 1

SD (1-54B) tag 10

SS (M1-52) tag 2

SS (M1-82) no tag #

SS (M1-5) tag 3 SS (M1-6) tag ?

SS (M1-7) tag 4 SS (M1-8) tag 5

SD (1-8) tag 6

SD (1-52) Inspector's test valve for steam chase room B-PC-2

M e ta

F A C P

Building Core & Service Area (Part of Common Space)

(7664 GSF)

Major Vertical Penetrations (Part of Common Space)

(2,011 GSF)

Primary Circulation Area (Part of Common Space)

(5,466 GSF) Beds NHC (Nursing Home Beds storage) 527 GSF

Prosthetics

(1068 GSF)

Pathology

(579 GSF)

Audiology

(2206 GSF)

Linen Service

(568 GSF)

Canteen Service

(9,359 GSF)

Rehab Medicine

(7,585 GSF)

SPD Service

(3,520 GSF)

Library

(3610 SF)

A&MM Administration

(614 GSF)

Credit Union

(314 GSF)

Medical Admin (MAS & Records

4,286 GSF)

Human Resource (Union Office)

(1128 GSF)

C.A.I.

Capital Asset Inventory

Engineering (1168 GSF)

Building Core & Service Area

(Part of Common Space)

Major Vertical Penetrations

(Part of Common Space)

Primary Circulation Area (Part of Common Space)

(4829 GSF) Beds NHC (Nursing Home

Beds storage) 536 GSF

Pathology

(306 GSF)

Audiology

Linen Service

Canteen Service

207 SF

Rehab Medicine

(7,549 GSF)

SPD Service

3,523 SF

Library

A&MM Administration

(605 GSF)

Credit Union

(314 GSF)

Medical Admin (MAS & Records)

Human Resource (Union Office)

C.A.I.

Capital Asset Inventory

Engineering

351 SF

(3,874 GSF)

131 SF

694 SF

249 SF

Prosthetics

141 SF

150 SF

179 SF

244 SF

(929 GSF)7975 SF

(9256 GSF)

607 SF

66 SF

419 SF

466 SF

111 SF

(7267 GSF)

588 SF

42 SF

3225 SF

28 SF

74 SF

199 SF

112 SF

123 SF

315 SF

295 SF

413 SF

(2045 GSF)

292 SF

268 SF

371 SF

239 SF

366 SF

269 SF

240 SF

(1556 GSF)

379 SF

1099 SF

78 SF

(480 GSF)

177 SF

(366) GSF

115 SF

566 SF

(3151 GSF)

2470 SF

184 SF

261 SF

204 SF

691 SF

(1156 GSF)

215 SF

141 SF

303 SF

(3144 GSF)

4673 SF

SPS Space

813 SF

CONSTRUCTION

4673 SF

FAR EAST

CENTER

EAST

CENTER

WEST

FAR WEST

RAMP

UP

RAMP

UP

STEP

UP

EXAM

ROOM

B151B

CONTROL

ROOM

B151A

EXAM

ROOM

B153B

CONTROL

ROOM

B153A

ROOM DESCRIPTIONS

ME - Mechcnical Room EL - Electrical Room HK - House Keeping Room PC - Pipe Chase FC - Fire Closet TC - Telephone Closet (IRM)

- Handicapped Restroom

Clean Room

M e c h a n ic a l R o o m

Sterilization Room

Clean Room

Clean Room

D e c o m ta m in a ti o n a re a

D e c o m ta m in a ti o n a re a

Office

Break-out bulk area restroom

Bulk room

W o rk

F lo w D ir ty to c le a n fo r c o n ta m in a te d

It e m s.

P e o p le

F lo w C le a n to d ir ty

A ir

F lo w C le a n P o si ti ve

A ir e xc h a n g e s p e r h o u r

D ir ty

N e g a ti ve w it h a ir e xc h a n g e s p e r h o u r

3184 SF

256 SF

215 SF

220 SF

614 SF

692 SF

80 SF

76 SF

5466 SF

1832 SF

593 SF

199 SF

188 SF

420 SF

66 SF

480 SF

142 SF

222 SF

51 SF

239 SF

587 SF

122 SF

112 SF314 SF348 SF

295 SF

2836 SF

7976 SF

268 SF

694 SF

250 SF

130 SF

314 SF

2206 SF

566 SF

365 SF

3520 SF

239 SF

351 SF 177 SF

378 SF

272 SF

117 SF

302 SF

527 SF 435 SF

356 SF

102 SF

202 SF

91 SF

366 SF

119 SF

516 SF

1856 SF

579 SF

208 SF 179 SF

271 SF

142 SF

141 SF

7585 SF

274 SF

3225SF

261SF

215SF

204SF

605SF

691SF

78SF

74SF

4829SF

588SF

199SF

184SF

419SF

66SF

466SF

141SF

147SF

42SF 607SF

123SF

112SF315SF413SF

295SF

2470SF

7975SF

269SF

694SF

249SF

131SF

314SF

2112SF

566SF

366SF

3523SF

240SF

351SF

177SF 379SF

244SF

115SF

239SF

536SF

371SF 111SF

813SF

366SF

120SF

514SF

287SF

207SF 179SF

268SF

150SF

141SF

7549SF

292SF

28SF

1032SF

1099SF

1032SF

303SF

(5627 GSF)

306SF

DEPARTMENT Area

Beds NHC (Nursing Home Beds-storage) Audiology Pathology Prosthetics Rehab Medicine Canteen Service Linen Service (Automated Staff Laundry) Library SPD Service A&MM Administration (patient effects) Engineering Medical Admin (MAS & Records/IRM) Credit Union Human Resource (Union Office) Common Space (total in red)

TOTAL

15141

51673

DEPARTMENT AREA DEPARTMENT AREA

Beds NHC (Nursing Home Beds-storage)

Audiology Pathology Prosthetics Rehab Medicine Canteen Serivce Linen Service (Automated Staff Laundry

Library SPD Service A&MM Administration (Patient Effects)

Engineering Medical Admin (MAS & Records/IRM)

Credit Union Human Resources (Union Office)

Common Space (total of Red)

TOTAL SF THIS FLOOR

536 SF

3144 SF

306 SF

929 SF

7549 SF

9256 SF

366 SF

3151 SF

3874 SF

605 SF

1156 SF

1556 SF

314 SF

480 SF

14141 SF

Major Vertical Penetrations

Primary Circulation Area Bldg Core & Service Area

Common Space (total)

2045 SF

4829 SF

7267 SF

14141 SF

53277 SF

CONSTRUCTION ((SPS Space)) 5627 SF

NHC (Nursing Home Care Unit East)

NHC (Nursing Home Care Unit East)

(287 GSF)

287 SF

B111A

P

P P

P

P PP

P

P

P P

P

P

P

P

P P PP P

P

P

P

P

P

P

P

P PPPP

P

P

P

P

PPP

P

P

P

P

P

P

P

P

PP

PAGING SYSTEM

P = Paging System Speaker

P

P

P

SPACE SURVEY

Canteen Store Storage

Canteen Store

ENG

Vending Machine Area Break Room

Credit Union

ENG

Library Storage

File/Records Room

Medical Library

Prosthetic Storage

PM

Storage

Prosth Storage

Elec Storage

Patient Effects

ENG

Bio-Med Shop

Uniform Storage Valet

General Library

Chief, Canteen Office

Engineering

SPD

Office

StorageStorage Canteen

Bio Storage Hazard

Fire Pump Rm

Storage

NHCU

Soiled Linen

MASS Nurse Assoc

AFGE Local 218

Sanitation Storage

Print Shop

Postal Mail Room

Prosthetic Storage

Storage

Morgue ENG

Barber Shop

Prosthetic Rep

Kitchen

Occupational Therapy

Rehab Mgr.

Catie Blake-Burnette

OT Office

Maryanne Kotran

Cris Valest PT Super

Physical Therapy

PT Secratary

Audiology Speech Therapy

Storage

Prostetics

Spinal Cord Clinic

Prosth.

Storage

Kitchen

Canteen Cafeteria

Canteen Cafeteria

Storage Library

SPD

SPD

SPD

SPD

SPD

SPD

SPDSPD

Union

NAGE

R1-274

Union R-107

Storage

ENG

Chief, PM&RS Dr. Karagh

ENG

ENGENG

ENG

ENG

Bio-Med Shop

ENG

File/Records Room

Storage

Storage

Medical Library Supervisor

Storage

Audiology Booth

Morgue

Furniture Plan

1EB-8

1EB-7

Normal Emergency

1E

MDP-2

MDP-1

X-Ray C/B

E1E

E1E

EB

E1E-B1

1EB-9

1EB-10

1EB-2

1EB-3

1EB-4

1EB-5

1EB-6

1EB-12

1EB-11

EPB

PPB-1

PPB-2

1EB-13

1WB-11

E1W-B2 1WB-8

1WB-9

1WB-7

1WB-5

1WB-3

1WB-4

E1WB-1

1WB-2

1WB-1

EMER

HOLD

RELAYS

E1W-LS

E1W

E1W-CB

E1W-EB

1WB-14

MDP

1WB-13EDP

EX

EDPLS

ELB

EDPCB

ATS2

ATS1

MDP

X-RAYRM

2108 LB

FIRE

PUMP

NORM.C/B

OLP

1EB-1

1E

1EB

OLP

CB

LS

E1E

1S

1S

1S

1S

1S

1S

1S

1S

STREET

LIGHT

1W

ETD

1W-GH

1EB-14

E1E-B2

1S

1S

1S

1W-B6

1WB

Electrical Utility Panel Plan

M e c h R M in su b b sm n t O

O Low PressureEmergency Connection

FACP

META

Utilitiy Location Plan Shutoff Valves and Switches

W

HS LS

W

W

ED

ED

N

E 1-E/1-S of ctr Bldg 1 for East of ctr

Bldg 1 for West of ctr

Bldg 1 N

E

F for West of ctr Bldg 1 for West of ctr Bldg 1 for South of ctr Bldg 1N for South of ctr Bldg

FDP

DV

Fire Pump Controler & Transfer Switch

W O Low pressure line

Crawl Space

(3,347 GSF)

Crawl Space

(3,347 GSF)

OLD LAYOUT FOR AUDIOLOGY

B152

VA

MC

NO

RT

HA

MP

TO

N

V A

V e te ra n s A ff a ir s

D e p a rt m e n t o f

Revisions Date Professional Seal

Checked

VAMC, NORTHAMPTON

Drawing Title

Approved: Service Chief

Approved: Project Manager

BASEMENT FLOOR

Project Title

Location

Building Number

Date

DrawnDrawing No.

Project No.

MASS.

TREATMENT, WARD AND

ADMINISTRATION

NORTH

E

W

S

03/2021

10' 15' 25' 50'

THIS WILL BE THE MAIN SCREEN WITH CCS

OVERALL LENGTH OF BUILDING 536' 6-3/16"

G.Tatro

THIS WILL BE THE MAIN SCREEN WITH CCS

EXT. GROSS : 55101.67 SQ. FT.

INT. GROSS : 51093.39 SQ. FT.

B280D

B280C

B282

B-FC-3

B280E

B280

B280B

B280A

B260A B260

B268

B266

B246

B245 MEC

B244 B240 B221

B243

B040

B040C

B100

B012

B108 B106

B107 B105

B103

B-FC-1

B042

B013 B015 B015A

B014 B016

B017

B040A

B-EL-1

B021

B018

B-FC2

B044

B046

B047

B060E

B040B

B060C

B060A

B060F

B060D

B060B

B041

B060

B043

PATIO

FREEZER

B241

B223

B242 B222

B224

B225

B226

B227

B229

B228 B230

B232

B110 B116 B114 B112

B111

B113 B109 underdeck access

B-ME-1

B201

B204

B203

B203C

B226A

Audiology test booth

B108A

HK

B202

B203D

B250

B252 EL EL

EL EL

ME

ME

ME

ME

B271

ME

CRAWL SPACE

Elevator Mechanical Room

Elevator Mechanical Room water valve

B104

B125

B102

B171A

B168

B169

B171

B170

B A

B167B166

B165

B162B

B A

B

B164

B161B

B 1A

B

B163

B160

B111

B050 MEC

B P C

B121

B123

B124

B126

B127

B128

B130

B129

B129A

EL

EL

B146

B148

B

B

B

B

B141

HK

B151

ELEC

MEC

MEC

MEC

MEC

MEC

B260B

B260C

ELEC RM

B153

B153B

B153A

B153C

B151A B151B

B151C B151D

B153D

B203B

B203A

B-PC-1

B272

B273

B274

B275

B276

B272A

B280

B279

B278

B277

B281

B

B203E

E

LE

V A T O R

P

IT P

IT

E

LE

V A T O R

D N

D N

UP

U P

U P

U P

UP

U P

U P

U P

D N

U P

U P

S

HH

TR

1-B017

(N)

SEE DETAILS

FP001

2 & 3

FP001

SM

TR

1-B241

FP001

SEE DETAILS

& FP001

3(N)

NO CEILING

TR

1-1260

FP001

SEE DETAILS

(N)

FP001

(E)

STORAGE

1-1270

STAFF TOILET

(E)

1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS

2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR

IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING

CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE

PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD

LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.

4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE

RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON

DRAWING FP001.

5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF

SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO

INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION

IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO

LONGER NEEDED.

6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE

WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.

7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.

8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.

9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS

& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE

PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE

INSTRUCTED BY VA COR.

DRAWING NOTES

HAZARD RATING NOTE

SPRINKLER LEGEND

SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD

REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.

(E) - EXISTING TO REMAIN

(R) - EXISTING TO BE REMOVED

(N) - NEW

ALL (E) SPRINKLER

HEAD(S) TO BE

REMOVED - VIF

(R)

(R) B017

SM

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R) (R)

B241

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED

(R)(R)

(R)(R)

(R) EXISTING HOSE

CABINET SUPPLY

PIPING & VALVE TO

BE REMOVED

(SEE NOTE BELOW)

SM

(R)

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R)

(E) 1270

1270A

(E)

B111

B111A

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R)(R)

AT-1

8' - 0"

FP001

SEE DETAILS

& FP001

(N) (N)

(TYP.)

B111

STAFF LOUNGE

OFFICE

1-1071

TR

1-1071B

AT-1

8' - 6"

CORRIDOR

C100

AT-1

8' - 6"

FP001

SEE DETAILS

FP001

3&

(N)

(N)

(N)

(N)

SEE DETAIL

FP001

(TYP.)

FP001

3&SM

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING

CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)

EXISTING 45 MIN.EXISTING

ONE HOUR1HR

SM

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.

FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER

LOCATIONS

INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)

EXISTING 90 MIN.2HR

EXISTING

TWO HOUR

CEILING DEMOLITION NOTE

WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE

BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED

TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING

SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF

SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.

AREA OF

WORK

(ROOM 1071)

N

P NAREA OF WORK

(ROOM 1260)

AREA OF WORK (ROOM 1203)

HAZARDOUS MATERIALS NOTE

SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS

INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.

REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)

AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR

INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF

HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE

HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP

ALL WORK AND NOTIFY THE COR IMMEDIATELY.

NOTE 1

GENERAL AREA

OF WORK

N

P N

AREA OF WORK

(B241)

AREA OF WORK

(B111)

STORAGE

1-1203

FP001

SEE DETAILS

(N)

FP001

3&

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

FO

R

BI

DC:

\U se rs\

AA

hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck

EV

BM

P.

rvt

6/1 /20 :57 :23 P M

1-FP101

BUILDING 1 - FIRE PROTECTION FLOOR PLANS

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

ISSUED FOR BID

21-USDVA-15

1/4" = 1'-0"4 BASEMENT - NEW WORK PLAN - TRB017

1/4" = 1'-0"6 BASEMENT - NEW WORK PLAN - TRB241

1/4" = 1'-0"10 FIRST FLOOR - NEW WORK PLAN - TR1260

1/4" = 1'-0"3 BASEMENT - DEMOLITION PLAN - TRB017

1/4" = 1'-0"5 BASEMENT - DEMOLITION PLAN - TRB241

1/4" = 1'-0"7 FIRST FLOOR - DEMOLITION PLAN - TR1071

1/4" = 1'-0"9 FIRST FLOOR - DEMOLITION PLAN - TR1260

1/4" = 1'-0"1 BASEMENT - DEMOLITION PLAN - B111

1/4" = 1'-0"2 BASEMENT - NEW WORK PLAN - B111

1/4" = 1'-0"8 FIRST FLOOR - NEW WORK PLAN - TR1071

NOTE: FIRE PROTECTION CONTRACTOR TO REMOVE (E) HOSE CABINET SUPPLY PIPING BACK

TO BRANCH LINE OR MAIN PIPING AND CAP.

1ST FLOOR - LIBERTY BUILDING

3/32" = 1'-0"11 BASEMENT - NEW WORK - CORRIDOR

NOTE: SECTION OF EXISTING 4” EAST TO WEST RUNNING FIRE MAIN ALONG THE NORTH SIDE OF THE CORRIDOR BETWEEN OUTSIDE OF B102 AND INTO B018 SHALL BE REMOVED AND RELOCATED TO RUN PARALLEL ON THE SOUTH SIDE OF THE CORRIDOR. RECONNECT 2” BRANCH TO FIRE HOSECABINT AT B014. FINAL LOCATION OF

NEW MAIN AND BRANCH PIPING TO BE FIELD COORDINATED WITH VA COR AND OTHER TRADES.

BASEMENT - LIBERTY BUILDING

1/4" = 1'-0"12 FIRST FLOOR - NEW WORK PLAN - TR 1203

Revisions: Date:

1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS

2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR

IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING

CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE

PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD

LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.

4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE

RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON

DRAWING FP001.

5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF

SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO

INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION

IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO

LONGER NEEDED.

6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE

WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.

7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.

8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.

9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS

& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE

PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE

INSTRUCTED BY VA COR.

DRAWING NOTES

HAZARD RATING NOTE

SPRINKLER LEGEND

SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD

REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.

(E) - EXISTING TO REMAIN

(R) - EXISTING TO BE REMOVED

(N) - NEW

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R)(R)

2HR

2HR

2HR

TR

1-2103

SEE DETAILS

FP001

FP001

(N)

NO CEILING

2HR

2HR

2HR

G.6 G.7

5.7

5.3

4.2

ROOM

1-2WA-21

ROOM

1-2WA-20

ROOM

1-2WA-19

ROOM

1-2WA-18

CORRIDOR

1-2WC-37

ROOM

1-2WC-28

ROOM

1-2WA-15

ROOM

1-2WA-22

TR

1-2W-37C

GWB

8' - 0"

(E) CLG

@ 8'-6"

(E) CLG

@ 8'-6"

OPEN TO

STRUCTURE

ABOVE(N) (N)

(N)

(N)

FP001

SEE DETAILS

(TYP.4)

(N)

(E)

FP001

& FP001

SEE DETAILS

SM

(N)

(N)

(N)

FP001

& FP001

SEE DETAILS

(N)

2WC-P

(R)

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(E)

(E)

(E) ROOM

1-2WC-28

ROOM

1-2WA-15

CORRIDOR

CORRIDOR

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R)

(R)

(E) CLG @

8'-10"

(E) CLG @

9'-0"

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R)

(R)

(R)

RECEPTION

1-2111

FP001

& FP001

SEE DETAIL

(TYP.)

(N)(N)

2238 2236A

(E) CLG

@ 8'-7"

(R)(R)

ALL (E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

1HR

1HR

1HR

TR

ELECTRICAL

TR

1-2238

ELECTRICAL

1-2236A

OPEN TO

STRUCTURE

ABOVEOPEN TO

STRUCTURE

ABOVE

FP001

& FP001

SEE DETAILS

(N)

(N)

1HR

1HR

1HR

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING

CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)

EXISTING 45 MIN.EXISTING

ONE HOUR1HR

SM

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.

FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER

LOCATIONS

INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)

EXISTING 90 MIN.2HR

EXISTING

TWO HOUR

CEILING DEMOLITION NOTE

WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE

BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED

TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING

SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF

SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.

AREA OF WORK

(1-2WC-37A)

N

P N

AREA OF WORK

(TR2101)

AREA OF WORK

(TR2111)

AREA OF WORK

(TR2238)

HAZARDOUS MATERIALS NOTE

SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS

INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.

REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)

AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR

INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF

HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE

HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP

ALL WORK AND NOTIFY THE COR IMMEDIATELY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

FO

R

BI

DC:

\U se rs\

AA

hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck

EV

BM

P.

rvt

6/1 /20 :57 :30 P M

1-FP102

BUILDING 1 - FIRE PROTECTION FLOOR PLANS

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

ISSUED FOR BID

21-USDVA-15

1/4" = 1'-0"3 SECOND FLOOR - DEMOLITION PLAN - TR2103

1/4" = 1'-0"4 SECOND FLOOR - NEW WORK PLAN - TR2103

1/4" = 1'-0"2 SECOND FLOOR - NEW WORK FLOOR PLAN

1/4" = 1'-0"1 SECOND FLOOR - DEMOLITION FLOOR PLAN

1/4" = 1'-0"7 SECOND FLOOR - DEMOLITION FLOOR PLAN - RECEPTION

1/4" = 1'-0"8 SECOND FLOOR - NEW WORK PLAN - RECEPTION

1/4" = 1'-0"5 SECOND FLOOR - DEMOLITION FLOOR PLAN - TR2238

1/4" = 1'-0"6 SECOND FLOOR RCP - NEW WORK PLAN - TR2238

2ND FLOOR - LIBERTY BUILDING

Revisions: Date:

TR

2-115

NO CEILING

SOILED UTILITY ROOM

2-117B

HAC

2-117A

CORRIDOR

2-116

RESTROOM

2-118A

RESTROOM

2-118B

AT-1

8' - 0"

AT-1

8' - 0"

AT-1

8' - 0"

AT-1

8' - 0"

AT-1

8' - 0"

(N)

(N)

(N)

(N) (N)

FP001

& FP001

SEE DETAILS

(TYP. 5)

FP001

& FP001

SEE DETAILS

(N)

1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS

2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR

IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING

CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE

PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD

LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.

4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE

RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON

DRAWING FP001.

5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF

SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO

INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION

IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO

LONGER NEEDED.

6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE

WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.

7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.

8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.

9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS

& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE

PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE

INSTRUCTED BY VA COR.

DRAWING NOTES

HAZARD RATING NOTE

SPRINKLER LEGEND

SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD

REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.

(E) - EXISTING TO REMAIN

(R) - EXISTING TO BE REMOVED

(N) - NEW

(R)

(R)

(R)

(R)

(R)

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

SM

SM

TR

2-209

ACCESS

2-210C

CORRIDOR

2-210

RESTROOM

2-210B

RESTROOM

2-210A

AT-1

8' - 0"

AT-1

8' - 0" AT-1

8' - 0"

NO CEILINGFP001

& FP001

(TYP. 5)

SEE DETAILS

(N)

(N)

(N)

FP001

& FP001

SEE DETAILS

(N)

(N)

SM

SM

(R)

(R)

(R)

(R)

(R)

(R)

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R)

2HR

FP001

& FP001

(TYP. 7)

SEE DETAILS

(N)(N)

(N)

(N)(N)

(N)(N)

2HR

(R)

(R)

(R)(R)

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R)

(R)

(R)

GENERAL AREA

OF WORK

N

P N

GENERAL AREA

OF WORK

(ROOM 208)

N

P N

GENERAL AREA

OF WORK

(ROOM 213)

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING

CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)

EXISTING 45 MIN.EXISTING

ONE HOUR1HR

SM

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.

FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER

LOCATIONS

INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)

EXISTING 90 MIN.2HR

EXISTING

TWO HOUR

CEILING DEMOLITION NOTE

WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE

BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED

TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING

SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF

SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.

GENERAL AREA OF WORK

N

P N

(R) (R)

(R)

(R)

(R)

(R)

(R)

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

HAZARDOUS MATERIALS NOTE

SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS

INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.

REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)

AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR

INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF

HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE

HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP

ALL WORK AND NOTIFY THE COR IMMEDIATELY.

FP001

& FP001

(TYP. 9)

SEE DETAILS

(N) (N)

(N) (N)

(N) (N)

(N) (N)

(N)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

FO

R

BI

DC:

\U se rs\

AA

hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck

EV

BM

P.

rvt

6/1 /20 :57 :39 P M

2-FP101

BUILDING 2 - FIRE PROTECTION FLOOR PLANS

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

ISSUED FOR BID

21-USDVA-15

1/4" = 1'-0"2 FIRST FLOOR - NEW WORK PLAN - TR115

1/4" = 1'-0"3 SECOND FLOOR - DEMOLITION PLAN -TR210

1/4" = 1'-0"4 SECOND FLOOR - NEW WORK PLAN - TR210

1/4" = 1'-0"5 SECOND FLOOR - DEMOLITION PLAN - TR213

1/4" = 1'-0"6 SECOND FLOOR - NEW WORK PLAN - TR213

1/4" = 1'-0"1 FIRST FLOOR - DEMOLITION PLAN - TR115

2ND FLOOR - MEADOW BUILDING

2ND FLOOR - MEADOW BUILDING

1ST FLOOR - MEADOW BUILDING

1/4" = 1'-0"7 SECOND FLOOR FIRE PROTECTION DEMOLITION - DATA CENTER 208

1/4" = 1'-0"8 SECOND FLOOR - NEW WORK PLAN - DATA CENTER 208

Revisions: Date:

RESTROOM

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R)

(R)

(E)

TR

3-120

NO CEILING

FP001

SEE DETAILS

FP001

&(N)

1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS

2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR

IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING

CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE

PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD

LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.

4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE

RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON

DRAWING FP001.

5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF

SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO

INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION

IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO

LONGER NEEDED.

6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE

WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.

7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.

8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.

9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS

& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE

PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE

INSTRUCTED BY VA COR.

DRAWING NOTES

HAZARD RATING NOTE

SPRINKLER LEGEND

SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD

REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.

(E) - EXISTING TO REMAIN

(R) - EXISTING TO BE REMOVED

(N) - NEW

(R) (R)

(E) SPRINKLER

HEAD(S) TO BE

REMOVED- VIF

SM

HAC

3-124

AT-1

8' - 0"

FP001

FP001

(N)

(N)

SEE DETAILS

SM

(R)

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(E) (E)

TR

3-218

NO CEILING

SEE DETAILS

FP001

FP001

(N)

(R)

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

SM

AT-1

8' - 0" STORAGE

3-220

FP001

FP001

SEE DETAILS

(N)

SM

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING

CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)

EXISTING 45 MIN.EXISTING

ONE HOUR1HR

SM

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.

FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER

LOCATIONS

INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)

EXISTING 90 MIN.2HR

EXISTING

TWO HOUR

CEILING DEMOLITION NOTE

WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE

BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED

TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING

SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF

SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.

AREA OF WORK

(HAC124)

N

P N

AREA OF WORK

(TR120)

N

P N

AREA OF WORK

(HAC220)

AREA OF WORK

(TR218)

HAZARDOUS MATERIALS NOTE

SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS

INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.

REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)

AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR

INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF

HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE

HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP

ALL WORK AND NOTIFY THE COR IMMEDIATELY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

FO

R

BI

DC:

\U se rs\

AA

hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck

EV

BM

P.

rvt

6/1 /20 :57 :45 P M

3-FP101

BUILDING 3 - FIRE PROTECTION FLOOR PLANS

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

ISSUED FOR BID

21-USDVA-15

1/4" = 1'-0"1 FIRST FLOOR - DEMOLITION PLAN -TR120

1/4" = 1'-0"2 FIRST FLOOR - NEW WORK PLAN - TR120

1/4" = 1'-0"3 FIRST FLOOR - DEMOLITION PLAN - HAC124

1/4" = 1'-0"4 FIRST FLOOR - NEW WORK PLAN - HAC124

1/4" = 1'-0"5 SECOND FLOOR - DEMOLITION PLAN - TR218

1/4" = 1'-0"6 SECOND FLOOR - NEW WORK PLAN - TR218

1/4" = 1'-0"7 SECOND FLOOR - DEMOLITION PLAN - HAC220

1/4" = 1'-0"8 SECOND FLOOR - NEW WORK PLAN - HAC220 1ST FLOOR - MAPLE BUILDING

2ND FLOOR - MAPLE BUILDING

Revisions: Date:

(R)(R)

(R) (R)

(E) SPRINKLER

HEAD(S) TO BE

REMOVED - VIF

TR

4-105 NO CEILING

FP001

SEE DETAILS

FP001

(N)

1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS

2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR

IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING

CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE

PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD

LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.

4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE

RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON

DRAWING FP001.

5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF

SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO

INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION

IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO

LONGER NEEDED.

6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE

WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.

7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.

8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.

9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS

& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE

PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE

INSTRUCTED BY VA COR.

DRAWING NOTES

HAZARD RATING NOTE

SPRINKLER LEGEND

SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD

REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.

(E) - EXISTING TO REMAIN

(R) - EXISTING TO BE REMOVED

(N) - NEW

(R) (R)

(E) SPRINKLER HEAD(S)

TO BE REMOVED- VIF

SM

TR

4-233 NO CEILING

FP001

FP001

SEE DETAILS

(N) (E)

SM

(R)

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

AT-1

9' - 0"

FP001

SEE DETAILS

(N)

FP001

GENERAL AREA OF WORK

N

P N

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING

CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)

EXISTING 45 MIN.EXISTING

ONE HOUR1HR

SM

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.

FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER

LOCATIONS

INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)

EXISTING 90 MIN.2HR

EXISTING

TWO HOUR

CEILING DEMOLITION NOTE

WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE

BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED

TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING

SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF

SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.

AREA OF WORK

(TR 233)

N

P N

AREA OF WORK

(TR 224)

HAZARDOUS MATERIALS NOTE

SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS

INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.

REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)

AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR

INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF

HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE

HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP

ALL WORK AND NOTIFY THE COR IMMEDIATELY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

FO

R

BI

DC:

\U se rs\

AA

hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck

EV

BM

P.

rvt

6/1 /20 :57 :53 P M

4-FP101

BUILDING 4 - FIRE PROTECTION FLOOR PLANS

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700EHRM INFRASTRUCTURE UPGRADE

CENTRAL WESTERN MASSACHUSETTS

ISSUED FOR BID

21-USDVA-15

1/4" = 1'-0"1 FIRST FLOOR - DEMOLITION PLAN - TR105

1/4" = 1'-0"2 FIRST FLOOR RCP - NEW WORK PLAN - TR105

1/4" = 1'-0"3 SECOND FLOOR - DEMOLITION PLAN -TR233

1/4" = 1'-0"4 SECOND FLOOR - NEW WORK PLAN - TR233

1/4" = 1'-0"5 SECOND FLOOR - DEMOLITION PLAN - TR224

1/4" = 1'-0"6 SECOND FLOOR - NEW WORK PLAN - TR224

1ST FLOOR - HORIZON BUILDING

2ND FLOOR - HORIZON BUILDING

Revisions: Date:

PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR

IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING

CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE

PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD

LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.

4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE

RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON

DRAWING FP001.

5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF

SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO

INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION

IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO

LONGER NEEDED.

6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE

WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.

7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.

8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.

9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS

& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE

PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE

INSTRUCTED BY VA COR.

DRAWING NOTES

HAZARD RATING NOTE

SPRINKLER LEGEND

SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD

REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.

(E) - EXISTING TO REMAIN

(R) - EXISTING TO BE REMOVED

(N) - NEW

(E) SPRINKLER HEAD(S)

TO BE REMOVED - VIF

(R) (R)

(R) (R)

(N) (N)

(N) (N)

STORAGE

5-017B

TR

5-017A

ROOM

5-017

FP001

SEE DETAILS

& FP001

(TYP. 4)

GENERAL AREA OF WORK

N

P N

CEILING DEMOLITION NOTE

WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE

BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED

TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING

SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF

SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.

HAZARDOUS MATERIALS NOTE

SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS

INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.

REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)

AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR

INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF

HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE

HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP

ALL WORK AND NOTIFY THE COR IMMEDIATELY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

ACELAJLH

FO

R

BI

DC:

\U se rs\

AA

hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck

EV

BM

P.

rvt

6/1 /20 :57 :56 P M

5-FP101

BUILDING 5 - FIRE PROTECTION FLOOR PLANS

06/06/2023

Edward P. Boland VA Medical Center

MULTIPLE

621-21-700…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .