S02 - ATTACHMENT 5 - COMBINED-MEP_FP_IT_06012023_Part1.pdf
PDF 18 MB Posted
- Attached to
- EHRM Infrastructure Upgrades Construction - Central Western Massachusetts Federal contract opportunity
- Solicitation number
- 36C77623R0051
About this file
This document provides details for a federal construction solicitation. The solicitation number is 36C77623R0051 and seeks construction services for EHRM Infrastructure Upgrades - Central Western Massachusetts. The solicitation is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin as a design-bid-build project. Responses are due on June 1, 2023. Construction services will include upgrades to infrastructure at medical centers in Central Western Massachusetts. Interested parties should monitor the Federal Business Opportunities website for additional details.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION ABBREVIATIONSFIRE PROTECTION NOTES
GENERAL SYMBOLS
FIRE PROTECTION SYMBOLS
POINT OF CONNECTION (NEW TO
EXISTING)
EXTENT OF DEMOLITION
DIAMETERØ
POINT OF CONNECTION TO EQUIPMENT
SUPPLIED BY CONTRACTOR
BREAK LINE (SINGLE LINE)
EQUIPMENT TAG - SEE EQUIPMENT DATA SHEET:
EQPM = EQUIPMENT ABBREVIATION
# = EQUIPMENT NUMBER
SIM
DETAIL BUBBLE:
1 = DENOTES DETAIL NUMBER
# = DENOTES DRAWING NUMBER OF DETAIL LOCATION
SIM SECTION CUT ARROW:
A = DENOTES SECTION IDENTIFICATION
# = DENOTES DRAWING NUMBER OF SECTION DETAIL
EQP
CO2
FSCP
CO2
FHV
VS
XXX
XX
XXX
XX
XXX
ABORT SWITCH (INDICATE TYPE)
ABORT SWITCH - CO2
FLUSH FIRE DEPARTMENT CONNECTION
FREESTANDING SIAMESE FIRE DEPTARTMENT CONNECTION
SIAMESE FIRE DEPARTMENT CONNECTION
FIRE SUPPRESSION CONTROL PANEL
FESTANDING TEST HEADER
WALL-MOUNTED TEST HEADER
METER
MANUAL STATION (INDICATE TYPE)
MANUAL STATION (INDICATE TYPE)
MANUAL STATION - CARBON DIOXIDE
MONITOR SWITCH (INDICATE TYPE)
PIPE CAP
CONCENTRIC REDUCER
ECCENTRIC REDUCER
PIPE FLOW DIRECTION
MECHANICAL PIPE COUPLING
PIPE DROP
PIPE RISE
PIPE TEE
PIPE TRACE HEATER
PIPE CONTINUATION
POINT OF CONNECTION - NEW/EXISTING
POINT OF CONNECTION - DEMOLITION
HORIZONTAL FIRE PUMP
VERTICAL FIRE PUMP
SRINKLER
SIDEWALL SPRINKLER
UPRIGHT SPRINKLER
WINDOW SPRINKLER
RISER CHECK VALVE
ANGLE VALVE
CHECK VALVE
BACKFLOW PREVENTOR - DOUBLE CHECK TYPE
DELUGE VALVE
DRY PIPE VALVE
DRY PIPE VALVE W/ QUICK OPENING DEVICE
PREACTION VALVE
FIRE HOSE VALVE
VALVE (GENERAL)
OUTSIDE SCREW & YOKE (OS&Y) VALVE
POST-INDICATOR VAVLE
PRESSURE RELIEF VALVE
PRESSURE REGULATING VALVE
CONTROL VALVE W/ TAMPER SWITCH
WALL CABINET (INDICATE TYPE)
ABOVE FINISHED FLOOR
APPROXIMATE
BACK FLOW PREVENTER- (TYPE)
BRAKE HORSEPOWER
CENTERLINE
CARBON DIOXIDE
COMBINATION
CONNECTION
DRY CHEMICAL
DEPARTMENT
DELUGE SPRINKLER SYSTEM
DETAIL
DEGREE
DEGREES FAHRENHEIT
DIAMETER
DISCHARGE
DOWN
DRAIN
DRY STANDPIPE
DRY SPRINKLER SYSTEM
DRAWING
EACH
ELEVATION
ELECTRICAL
FIRE MAIN - UNDERGROUND
FLOOR CONTROL VALVE ASSEMBLY
FIRE DEPARTMENT CONNECTION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE HOSE VALVE CABINET
FIRE HOSE RACK
FIRE HOSE VALVE
FLOOR
FOAM SYSTEM
FIRE PUMP
FEET PER SECOND
FLOW SWITCH
FIRE SUPRESSION CONTROL PANEL
FEET
GAUGE
GALLON
GALVANIZED
GALLONS PER MINUTE
HAZARDOUS
HORIZONTAL
HORSEPOWER
HOUR
HERTZ
JOCKEY PUMP
KILOWATT
LITER
LITERS PER MINUTE
MECHANICAL
MANUFACTURER
MINIMUM
NUMBER
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
OUTSIDE SCREW AND YOKE
PHASE
POST INDICATOR VALVE
PENTHOUSE
PRESSURE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH GAUGE
PREACTION SPRINKLER SYSTEM
QUICK RESPONSE
QUANTITY
ROOM
SPECIFICATION
SQUARE FOOT
SQUARE METER
SPRINKLER
STAINLESS STEEL
SUCTION
SYSTEM
TEMPERATURE
TAMPER SWITCH
TYPICAL
UNLESS NOTED OTHERWISE
VOLTS
WITH
WITHOUT
WATER FLOW SWITCH
WET STANDPIPE
WET SPRINKLER RISER
WET SPRINKLER SYSTEM
AFF
APPROX
BFP- ()
BHP
COMB
CONN
DCH
DEPT
DESS
DET
DEG
DEG F
DIA
DISC
DN
DR
DSP
DSS
DWG
EA
EL
ELEC
F
FCVA
FDC
FE
FEC
FHVC
FHR
FHV
FLR
FOM
FP
FPS
FS
FSCP
FT
GA
GAL
GALV
GPM
HAZ
HORIZ
HP
HR
HZ
JP
KW
L
LPM
MECH
MFR
MIN
NO.
NC
NIC
NO
NTS
OS&Y
PH
PIV
PNTHSE
PRESS
PSI
PSIG
PSS
QR
QTY
RM
SPEC
SQ FT
SQ M
SPKR
SS
SUCT
SYS
TEMP
TS
TYP
UNO
V W/ W/O
WFS
WSP
WSR
WSS
NOTE - NOT ALL ABBREVIATIONS MAY BE USED
1. PROVIDE THE SPRINKLER SYSTEM MODIFICATIONS IN ACCORDANCE WITH THE VA FIRE
PROTECTION DESIGN MANUAL - EIGTH EDITION - JUNE 1, 2021 AND NFPA 13 2022.
2. FIRE PROTECTION SYSTEM MATERIALS SHALL BE UL LISTED(FM GLOBAL APPROVED IF
APPLICABLE, VERIFY WITH INSURANCE UNDERWRITER).
3. SURVEY EXISTING SPRINKLER SYSTEM TO VERIFY PIPING LOCATIONS AND SIZES PRIOR TO
BEGINNING PROJECT WORK. COORDINATE THE INSTALLATION OF FIRE PROTECTION PIPING
WITH EXISTING CONDITIONS AND WORK OF ALL OTHER TRADES PRIOR TO COMMENCING
INSTALLATION.
4. IN EXISTING SPACES, TO BE RENOVATED, THROUGHOUT THE PROJECT THE FIRE
PROTECTION SCOPE SHALL BE THE RELOCATION AND REPLACEMENT OF EXISTING
SPRINKLER HEADS AND BRANCH PIPING TO ACCOMMODATE THE REVISED ARCHITECTURAL
LAYOUT. HEAD RELOCATION AND REPLACEMENT SHALL BE ON A ONE FOR ONE BASIS AND
SHALL NOT REQUIRE HYDRAULIC CALCULATION.
5. IN BUILDINGS WITH ADDITIONS, AND BUILDINGS WHERE ENTIRE SYSTEM IS NEW SCOPE OF
WORK SHALL BE TO PROVIDE A HYDRAULICALLY CALCULATED SYSTEM TO PROVIDE
COMPLETE COVERAGE THROUGHOUT THE PROJECT WORK AREA.
6. WHERE HYDRAULIC CALCULATIONS ARE REQUIRED, THE FIRE PROTECTION CONTRACTOR
SHALL PERFORM FLOW TEST TO OBTAIN REQUIRED DATA FOR HYDRAULIC CALCULATIONS.
SCHEDULE FLOW TEST WITH THE VA COR.
7. SYSTEM DESIGN SHALL BE BASED ON THE COVERAGE REQUIREMENTS OF THE VA FIRE
PROTECTION DESIGN MANUAL. ALL SPACES WITHIN THE PROJECT SCOPE OF WORK SHALL
BE LIGHT HAZARD EXCEPT ELECTRICAL ROOMS, STORAGE ROOMS, AND MECHANICAL
ROOMS; WHICH SHALL BE ORDINARY HAZARD.
* ALL SCOPE OF WORK ROOMS WHERE THE NUMBER OF SPRINKLER HEADS DOES NOT CHANGE
(OR IS REDUCED) HYDRAULIC CALCULATIONS ARE NOT REQUIRED.
8. PROVIDE COMPLETE WORKING PLANS, INCLUDING HYDRAULIC CALCULATIONS (WHERE
REQUIRED), TO CLEARLY DEFINE THE WORK FOR THE SPRINKLER SYSTEM MODIFICATIONS
WITHIN THE DEFINED SCOPE OF WORK AREA. THE PLANS SHALL INCLUDE INDICATION OF
PIPE SIZES, LOCATIONS AND ROUTING. LOCATION AND ROUTING SHALL BE AS REQUIRED TO
SATISFY THE DESIGN CRITERIA AS SPECIFIED IN THE VA FIRE PROTECTION DESIGN MANUAL.
EXISTING PIPING LOCATIONS, SIZES AND ROUTING SHALL BE INDICATED (INCLUDING NON-
SCOPE AREA) WITH HYDRAULIC NODE POINTS (AS NEEDED) BACK TO SOURCE OF FIRE
PROTECTION WATER TO COMPLEMENT THE HYDRAULIC CALCULATIONS.
9. A MINIMUM TEN (10) PERCENT OR TEN (10) PSI PRESSURE SAFETY FACTOR (WHICHEVER IS
GREATER) SHALL BE MAINTAINED BETWEEN AVAILABLE WATER SUPPLY
AND COMBINED DEMAND OF SPRINKLER SYSTEM AND HOSE STREAM ALLOWANCE TO
ACCOUNT FOR FUTURE DETERIORATION.
10. PIPE VELOCITIES SHALL BE LIMITED TO 20 FPS IN BRANCHLINES AND 25 FPS IN MAINS.
11. CONTRACTOR SHALL PROVIDE PROTECTION FOR PIPING AGAINST DAMAGE BY
EARTHQUAKES IN ACCORDANCE WITH NFPA 13 AND ASCE/SEI 7-05 “MINIMUM DESIGN LOADS
FOR BUILDINGS AND OTHER STRUCTURES”.
12. EXCEPT IN DATA CENTER, NEW SPRINKLERS HEADS SHALL BE ORDINARY TEMPERATURE,
QUICK RESPONSE. IN DATA CENTER HEAD SHALL BE ORDINARY RESPONSE. K FACTOR SHALL
MATCH EXISTING REMOVED HEAD OR SHALL BE SELECTED BASED ON HYDRAULIC
CALCULATIONS AS REQUIRED.
13. PIPING SIZE CHANGES SHALL BE MADE WITH REDUCING FITTINGS. FLUSH OR HEX BUSHINGS
ARE NOT ACCEPTABLE.
14. FLUSHING CONNECTIONS CONSISTING OF A THREADED CAPPED NIPPLE OR APPROVED
MECHANICAL GROOVED END CAP SHALL BE PROVIDED ON THE END(S) OF
ALL CROSS-MAINS. THE NIPPLE SHALL BE THE SAME DIAMETER AS THE END PIPE BUT NOT
LARGER THAN 2 INCHES.
15. PROVIDE SPECIAL SPRINKLER WRENCHES, SPARE SPRINKLER HEADS, AND STORAGE
CABINETS IN ACCORDANCE WITH NFPA 13.
16. DO NOT RUN PIPING OVER ELECTRICAL EQUIPMENT. FOR ELECTRICAL EQUIPMENT ROOMS
AND ELEVATOR MACHINE ROOMS, ONLY SPRINKLERS AND PIPING WHICH ARE DIRECTLY AND
EXCLUSIVELY PROVIDING PROTECTION TO THESE SPACES MAY ENTER THESE SPACES.
17. LOCATE PIPING SO THAT ACCESS TO AND CLEARANCE AROUND EQUIPMENT AND MINIMUM
HEADROOM OF 8 FEET ARE MAINTAINED. RUN PIPING IN THE MOST DIRECT MANNER,
FORMING RIGHT ANGLES WITH OR PARALLEL TO BUILDING LINES.
18. SPRINKLER DISCHARGE SHALL NOT BE OBSTRUCTED IN ANY WAY. WHERE OBSTRUCTIONS
TO SPRINKLER DISCHARGE EXIST, LOCATE SPRINKLERS WITH RESPECT TO THESE
OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13.
19. INSTALL DRAIN PIPING FOR GRAVITY DRAINAGE IN ACCORDANCE WITH NFPA 13. ALL
SPRINKLER PIPING SHALL BE INSTALLED SO THAT THE FIRE PROTECTION SYSTEMS MAY BE
DRAINED. ALL DROPS TO MORE THAN ONE SPRINKLER HEAD AND ALL CHANGES IN
ELEVATION THAT CREATE TRAPPED SECTIONS SHALL BE PROVIDED WITH AUXILIARY DRAINS
IN ACCORDANCE WITH NFPA 13.
20. SUBMIT SHOP DRAWINGS, AND CATALOG CUTS BEARING THIS APPROVAL TO THE OWNER
AND DESIGN PROFESSIONAL FOR APPROVAL. SUBMIT DRAWINGS, CUTS AND CATALOG
INFORMATION SHOWING DIMENSIONS, WEIGHT PERFORMANCE, ETC. OF ALL EQUIPMENT.
SUBMIT ALL SHOP DRAWINGS, CALCULATIONS AND CATALOG CUTS AT ONE TIME. PARTIAL
SUBMISSIONS WILL NOT BE ACCEPTED.
21. TEST NEW AND MODIFIED SPRINKLER PIPING IN ACCORDANCE WITH NFPA 13.
22. ALL NEW SPRINKLER PIPING SHALL BE TESTED AND FLUSHED IN ACCORDANCE WITH NFPA
13. REPAIR ALL DAMAGE CAUSED BY LEAKS, FLOODING, OR DRAINING DURING OR TESTING
WORK.
23. SPRINKLER SYSTEM SHUTDOWNS SHALL BE KEPT TO A MINIMUM. COORDINATE SHUTDOWNS
WITH VA COR.
24. COMPLETE AND FORWARD CONTRACTOR'S MATERIAL AND TEST CERTIFICATE(S) TO VA COR.
25. WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE BEING PERMANENTLY
REMOVED, THAT WORK SHALL BE COORDINATED TO OCCUR AT THE SAME TIME AS
REPLACEMENT OF THE EXISTING SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID
LOSS OF SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.
NOTE - NOT ALL SYMBOLS MAY BE USED
NOTE - NOT ALL SYMBOLS MAY BE USED
1. WITHIN THE AREAS DESIGNATED FOR DEMOLITION THE SPRINKLER SYSTEM AFFECTED
BY THIS WORK SHALL MEET ALL REQUIREMENTS OF THE VA FIRE PROTECTION MANULA -
EIGTH EDITION - JUNE 1, 2021
2. WHEN AREA'S OF THE FIRE PROTECTION SYSTEM NEED TP BE OUT OF SERVICE,
THE OUTAGE SHALL BE COORDINATED W/ THE VA COR. AND AN APPROVED FIRE
WATCH SHALL BE PROVIDED FOR UNPROTECTED ARE FOR THE DURATION OF
THE OUTAGE.
3. WHERE UTILIZED, FIRE WATCH PERSONNEL SHALL BE DEDICATED TO PROVIDE THE
FIRE WATCH AND SHALL BE PROVIDED WITH AT LEAST ONE APPROVED MEANS FOR
NOTIFICATION OF THE FIRE DEPARTMENT.
4. A TAG SHALL BE USED TO INDICATE THAT A SYSTEM, OR PORTION THEREOF, HAS
BEEN REMOVED FROM SERVICE. THE TAG SHALL BE POSTED AT EACH FIRE DEPARTMENT
CONNECTION, SYSTEM CONTROL VALVE, FIRE ALARM CONTROL UNIT, FIRE ALARM
ENUNCIATOR AND FIRE COMMAND CENTER, INDICATING WHICH SYSTEM, OR PART THEREOF,
HAS BEEN REMOVED FROM SERVICE.
5. OUTAGES SHALL BE AUTHORIZED BY THE VA COR. BEFORE AUTHORIZATION IS GIVEN,
A DESIGNATED INDIVIDUAL FROM THE FIRE PROTECTION CONTRACTOR SHALL
BE RESPONSIBLE FOR VERIFYING THAT ALL OF THE FOLLOWING PROCEDURES HAVE
BEEN IMPLEMENTED:
a. THE EXTENT AND EXPECTED DURATION OF THE IMPAIRMENT HAVE BEEN
DETERMINED.
b. THE AREAS OF BUILDINGS INVOLVED HAVE BEEN INSPECTED AND THE
INCREASED RISKS DETERMINED.
c. RECOMMENDATIONS HAVE BEEN SUBMITTED TO, REVIEWED BY AND
ACCEPTED BY THE VA CORE.
d. THE FIRE DEPARTMENT HAS BEEN NOTIFIED. THE INSURANCE CARRIER, THE ALARM COMPANY, VA CORE, HAVE BEEN NOTIFIED.
e. THE SUPERVISOR IN THE AREAS TO BE AFFECTED HAVE BEEN NOTIFIED.
f. AN OUTAGE TAG SYSTEM HAS BEEN IMPLEMENTED
g. NECESSARY TOOLS AND REQUIRED MATERIALS HAVE BEEN ASSEMBLED
AT THE OUTAGE SITE.
6. WHEN SERVICE IS RESTORED TO NORMAL WORKING ORDER, THE CONTRACTOR AND
VA COR SHALL VERIFY THAT ALL THE FOLLOWING PROCEDURES HAVE BEEN IMPLEMENTED:
a. NECESSARY INSPECTIONS AND TESTS HAVE BEEN CONDUCTED TO VERIFY THAT
AFFECTED SYSTEMS ARE OPERATIONAL.
b. VA CORE HAS BEEN ADVISED THAT PROTECTION IS RESTORED.
c. THE FIRE DEPARTMENT ALARM COMPANY, AND OTHER INVOLVED PARTIES HAVE
BEEN ADVISED THAT PROTECTION IS RESTORED.
d. THE OUTAGE TAG HAS BEEN REMOVED.
7. THE EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED AS REQUIRED FOR TEMPORARY
COVERAGE DURING CONSTRUCTION. THE EXISTING SPRINKLER HEADS AND
DROPS SHALL BE REMOVED. A TEMPORARY 1" DIAMETER SPIG SHALL BE INSTALLED
WITH A 1/2" DIAMETER ORIFICE, 165° UPRIGHT BRASS SPRINKLER.
SPRINKLER DEMOLITION NOTES
LAYOUT DRAWING APROVAL NOTE
CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE DETAIL
LAYOUT DRAWINGS HAVE BEEN APPROVED BY VA.
BOTTOM OF
DECK
NIPPLE AS
REQUIRED
FINISH CEILING
TEE
EXISTING BRANCH
SUPPLY LINE
REDUCER AS
REQUIRED
1" SUPPLY LINE
SEMI-RECESSED
SPRINKLER HEAD
ARM-OVER
SEE NOTE BELOW
CUP
RETAINER
TEE
UPRIGHT PENDENT
SPRINKLER HEAD
REDUCER AS
REQUIRED
BRANCH SUPPLY LINE
1" SUPPLY LINE
NEW SEMI RECESSED
SPRINKLER HEAD
IN NEW LOCATION
CEILING
1"
HANGER
3/8" ROD
SUPPORT HANGER FROM
CONCRETE INSERT OR TOP
BEAM CLAMP
SPRINKLER TO BE
DEMOLISHED
TO BE
REMOVED
CONNECT TO (E) 1" FITTING AND
EXTEND 1" THREADED SCH.40 STEEL
PIPE TO NEW LOCATION
(E) BRANCH PIPE
NEW UPRIGHT PENDENTSPRINKLER
HEAD IN NEW LOCATION
1"
HANGER
3/8" ROD
SUPPORT HANGER FROM
CONCRETE INSERT OR TOP
BEAM CLAMP
SPRINKLER TO BE
DEMOLISHED
TO BE
REMOVED
CONNECT TO (E) 1" FITTING AND
EXTEND 1" THREADED SCH.40 STEEL
PIPE TO NEW LOCATION
(E) BRANCH PIPE
SEMI-RECESSED SPRINKLER
UPRIGHT PENDENT SPRINKLER
CODE COMPLIANCE
COMPLY WITH U.S. DEPARTMENT OF VETERANS AFFAIRS FIRE
PROTECTION DESIGN MANUAL & CURRENT NFPA CODES AS NOTED.
SEISMIC DESIGN NOTE
THIS PROJECT HAS BEEN ASSESSED AT RISK CATEGORY IV,
SEISMIC DESIGN CATEGORY C. ALL EQUIPMENT AND COMPONENTS
BEING INSTALLED UNDER THIS CONTRACT SHALL BE INSTALLED
AND RESTRAINED TO COMPLY WITH APPLICABLE CODES AND THE
VA PUBLICATION H-18-8, SEISMIC DESIGN HANDBOOK.
HAZARDOUS MATERIALS NOTE
HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO
ASBESTOS AND/OR LEAD HAVE BEEN IDENTIFIED IN BUILDINGS
THROUGHOUT THE CAMPUS. REFER TO HAZARDOUS MATERIALS
REPORT AND DIVISION 2 SPECIFICATIONS SECTIONS 02, 82, 11
(ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT REMOVAL
AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT
OF MATERIALS PRESENT, AND THE REQUIRED ABATEMENT
PROCESS. IF HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE
HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL
WORK AND NOTIFY THE COR IMMEDIATELY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
FO
R
BI
DC:
\U se rs\
AA
hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck
EV
BM
P.
rvt
6/1 /20 :59 :14 P M
FP001
FIRE PROTECTION - SYMBOLS , ABBREVATIONS,
NOTES
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
ISSUED FOR BID
21-USDVA-15
NTS
1 SEMI RECESSED SPRINKLER HEAD DETAIL
NTS
2 UPRIGHT PENDENT SPRINKLER HEAD DETAIL
NTS
3 ARM OVER SPRINKLER HEAD DETAIL
NOTE: WHEN ARM-OVER IS MORE THEN 24" IN LENGTH, IT MUST BE SUPPORTED
WITH A PIPE HANGER.
Revisions: Date:
malbitz Image
H
23"
8.5"
8'-2"
8.5"
4'-11" 4'-9.5"
22"
APPROX 4"
DIA DRAIN
COVERS (TYP)
VISIBLE
ACTIVE DRAIN
DEPARTMENT Area
Major Vertical Penetrations Primary Circulation Area Bldg Core & Service Area
Common Space (Total) 15141
OXYGEN
TANK
Reserve Tanks
Emergency Oxy Valve Box
MAIN STREET GRILL
5th
AVE.
DELI
JUICE
GRILL
SD (1-35) tag 13
SS (M1-35) tag 12
SS (M1-45) tag 14
SD (1-45) tag 15
SD (1-79) tag 19
SS (M1-79) tag 18
SS (M1-19) tag 20
SD (1-19) tag 21
SD (1-54A) tag 2
SS (M1-54) tag 1
SD (1-54B) tag 10
SS (M1-52) tag 2
SS (M1-82) no tag #
SS (M1-5) tag 3 SS (M1-6) tag ?
SS (M1-7) tag 4 SS (M1-8) tag 5
SD (1-8) tag 6
SD (1-52) Inspector's test valve for steam chase room B-PC-2
M e ta
F A C P
Building Core & Service Area (Part of Common Space)
(7664 GSF)
Major Vertical Penetrations (Part of Common Space)
(2,011 GSF)
Primary Circulation Area (Part of Common Space)
(5,466 GSF) Beds NHC (Nursing Home Beds storage) 527 GSF
Prosthetics
(1068 GSF)
Pathology
(579 GSF)
Audiology
(2206 GSF)
Linen Service
(568 GSF)
Canteen Service
(9,359 GSF)
Rehab Medicine
(7,585 GSF)
SPD Service
(3,520 GSF)
Library
(3610 SF)
A&MM Administration
(614 GSF)
Credit Union
(314 GSF)
Medical Admin (MAS & Records
4,286 GSF)
Human Resource (Union Office)
(1128 GSF)
C.A.I.
Capital Asset Inventory
Engineering (1168 GSF)
Building Core & Service Area
(Part of Common Space)
Major Vertical Penetrations
(Part of Common Space)
Primary Circulation Area (Part of Common Space)
(4829 GSF) Beds NHC (Nursing Home
Beds storage) 536 GSF
Pathology
(306 GSF)
Audiology
Linen Service
Canteen Service
207 SF
Rehab Medicine
(7,549 GSF)
SPD Service
3,523 SF
Library
A&MM Administration
(605 GSF)
Credit Union
(314 GSF)
Medical Admin (MAS & Records)
Human Resource (Union Office)
C.A.I.
Capital Asset Inventory
Engineering
351 SF
(3,874 GSF)
131 SF
694 SF
249 SF
Prosthetics
141 SF
150 SF
179 SF
244 SF
(929 GSF)7975 SF
(9256 GSF)
607 SF
66 SF
419 SF
466 SF
111 SF
(7267 GSF)
588 SF
42 SF
3225 SF
28 SF
74 SF
199 SF
112 SF
123 SF
315 SF
295 SF
413 SF
(2045 GSF)
292 SF
268 SF
371 SF
239 SF
366 SF
269 SF
240 SF
(1556 GSF)
379 SF
1099 SF
78 SF
(480 GSF)
177 SF
(366) GSF
115 SF
566 SF
(3151 GSF)
2470 SF
184 SF
261 SF
204 SF
691 SF
(1156 GSF)
215 SF
141 SF
303 SF
(3144 GSF)
4673 SF
SPS Space
813 SF
CONSTRUCTION
4673 SF
FAR EAST
CENTER
EAST
CENTER
WEST
FAR WEST
RAMP
UP
RAMP
UP
STEP
UP
EXAM
ROOM
B151B
CONTROL
ROOM
B151A
EXAM
ROOM
B153B
CONTROL
ROOM
B153A
ROOM DESCRIPTIONS
ME - Mechcnical Room EL - Electrical Room HK - House Keeping Room PC - Pipe Chase FC - Fire Closet TC - Telephone Closet (IRM)
- Handicapped Restroom
Clean Room
M e c h a n ic a l R o o m
Sterilization Room
Clean Room
Clean Room
D e c o m ta m in a ti o n a re a
D e c o m ta m in a ti o n a re a
Office
Break-out bulk area restroom
Bulk room
W o rk
F lo w D ir ty to c le a n fo r c o n ta m in a te d
It e m s.
P e o p le
F lo w C le a n to d ir ty
A ir
F lo w C le a n P o si ti ve
A ir e xc h a n g e s p e r h o u r
D ir ty
N e g a ti ve w it h a ir e xc h a n g e s p e r h o u r
3184 SF
256 SF
215 SF
220 SF
614 SF
692 SF
80 SF
76 SF
5466 SF
1832 SF
593 SF
199 SF
188 SF
420 SF
66 SF
480 SF
142 SF
222 SF
51 SF
239 SF
587 SF
122 SF
112 SF314 SF348 SF
295 SF
2836 SF
7976 SF
268 SF
694 SF
250 SF
130 SF
314 SF
2206 SF
566 SF
365 SF
3520 SF
239 SF
351 SF 177 SF
378 SF
272 SF
117 SF
302 SF
527 SF 435 SF
356 SF
102 SF
202 SF
91 SF
366 SF
119 SF
516 SF
1856 SF
579 SF
208 SF 179 SF
271 SF
142 SF
141 SF
7585 SF
274 SF
3225SF
261SF
215SF
204SF
605SF
691SF
78SF
74SF
4829SF
588SF
199SF
184SF
419SF
66SF
466SF
141SF
147SF
42SF 607SF
123SF
112SF315SF413SF
295SF
2470SF
7975SF
269SF
694SF
249SF
131SF
314SF
2112SF
566SF
366SF
3523SF
240SF
351SF
177SF 379SF
244SF
115SF
239SF
536SF
371SF 111SF
813SF
366SF
120SF
514SF
287SF
207SF 179SF
268SF
150SF
141SF
7549SF
292SF
28SF
1032SF
1099SF
1032SF
303SF
(5627 GSF)
306SF
DEPARTMENT Area
Beds NHC (Nursing Home Beds-storage) Audiology Pathology Prosthetics Rehab Medicine Canteen Service Linen Service (Automated Staff Laundry) Library SPD Service A&MM Administration (patient effects) Engineering Medical Admin (MAS & Records/IRM) Credit Union Human Resource (Union Office) Common Space (total in red)
TOTAL
15141
51673
DEPARTMENT AREA DEPARTMENT AREA
Beds NHC (Nursing Home Beds-storage)
Audiology Pathology Prosthetics Rehab Medicine Canteen Serivce Linen Service (Automated Staff Laundry
Library SPD Service A&MM Administration (Patient Effects)
Engineering Medical Admin (MAS & Records/IRM)
Credit Union Human Resources (Union Office)
Common Space (total of Red)
TOTAL SF THIS FLOOR
536 SF
3144 SF
306 SF
929 SF
7549 SF
9256 SF
366 SF
3151 SF
3874 SF
605 SF
1156 SF
1556 SF
314 SF
480 SF
14141 SF
Major Vertical Penetrations
Primary Circulation Area Bldg Core & Service Area
Common Space (total)
2045 SF
4829 SF
7267 SF
14141 SF
53277 SF
CONSTRUCTION ((SPS Space)) 5627 SF
NHC (Nursing Home Care Unit East)
NHC (Nursing Home Care Unit East)
(287 GSF)
287 SF
B111A
P
P P
P
P PP
P
P
P P
P
P
P
P
P P PP P
P
P
P
P
P
P
P
P PPPP
P
P
P
P
PPP
P
P
P
P
P
P
P
P
PP
PAGING SYSTEM
P = Paging System Speaker
P
P
P
SPACE SURVEY
Canteen Store Storage
Canteen Store
ENG
Vending Machine Area Break Room
Credit Union
ENG
Library Storage
File/Records Room
Medical Library
Prosthetic Storage
PM
Storage
Prosth Storage
Elec Storage
Patient Effects
ENG
Bio-Med Shop
Uniform Storage Valet
General Library
Chief, Canteen Office
Engineering
SPD
Office
StorageStorage Canteen
Bio Storage Hazard
Fire Pump Rm
Storage
NHCU
Soiled Linen
MASS Nurse Assoc
AFGE Local 218
Sanitation Storage
Print Shop
Postal Mail Room
Prosthetic Storage
Storage
Morgue ENG
Barber Shop
Prosthetic Rep
Kitchen
Occupational Therapy
Rehab Mgr.
Catie Blake-Burnette
OT Office
Maryanne Kotran
Cris Valest PT Super
Physical Therapy
PT Secratary
Audiology Speech Therapy
Storage
Prostetics
Spinal Cord Clinic
Prosth.
Storage
Kitchen
Canteen Cafeteria
Canteen Cafeteria
Storage Library
SPD
SPD
SPD
SPD
SPD
SPD
SPDSPD
Union
NAGE
R1-274
Union R-107
Storage
ENG
Chief, PM&RS Dr. Karagh
ENG
ENGENG
ENG
ENG
Bio-Med Shop
ENG
File/Records Room
Storage
Storage
Medical Library Supervisor
Storage
Audiology Booth
Morgue
Furniture Plan
1EB-8
1EB-7
Normal Emergency
1E
MDP-2
MDP-1
X-Ray C/B
E1E
E1E
EB
E1E-B1
1EB-9
1EB-10
1EB-2
1EB-3
1EB-4
1EB-5
1EB-6
1EB-12
1EB-11
EPB
PPB-1
PPB-2
1EB-13
1WB-11
E1W-B2 1WB-8
1WB-9
1WB-7
1WB-5
1WB-3
1WB-4
E1WB-1
1WB-2
1WB-1
EMER
HOLD
RELAYS
E1W-LS
E1W
E1W-CB
E1W-EB
1WB-14
MDP
1WB-13EDP
EX
EDPLS
ELB
EDPCB
ATS2
ATS1
MDP
X-RAYRM
2108 LB
FIRE
PUMP
NORM.C/B
OLP
1EB-1
1E
1EB
OLP
CB
LS
E1E
1S
1S
1S
1S
1S
1S
1S
1S
STREET
LIGHT
1W
ETD
1W-GH
1EB-14
E1E-B2
1S
1S
1S
1W-B6
1WB
Electrical Utility Panel Plan
M e c h R M in su b b sm n t O
O Low PressureEmergency Connection
FACP
META
Utilitiy Location Plan Shutoff Valves and Switches
W
HS LS
W
W
ED
ED
N
E 1-E/1-S of ctr Bldg 1 for East of ctr
Bldg 1 for West of ctr
Bldg 1 N
E
F for West of ctr Bldg 1 for West of ctr Bldg 1 for South of ctr Bldg 1N for South of ctr Bldg
FDP
DV
Fire Pump Controler & Transfer Switch
W O Low pressure line
Crawl Space
(3,347 GSF)
Crawl Space
(3,347 GSF)
OLD LAYOUT FOR AUDIOLOGY
B152
VA
MC
NO
RT
HA
MP
TO
N
V A
V e te ra n s A ff a ir s
D e p a rt m e n t o f
Revisions Date Professional Seal
Checked
VAMC, NORTHAMPTON
Drawing Title
Approved: Service Chief
Approved: Project Manager
BASEMENT FLOOR
Project Title
Location
Building Number
Date
DrawnDrawing No.
Project No.
MASS.
TREATMENT, WARD AND
ADMINISTRATION
NORTH
E
W
S
03/2021
10' 15' 25' 50'
THIS WILL BE THE MAIN SCREEN WITH CCS
OVERALL LENGTH OF BUILDING 536' 6-3/16"
G.Tatro
THIS WILL BE THE MAIN SCREEN WITH CCS
EXT. GROSS : 55101.67 SQ. FT.
INT. GROSS : 51093.39 SQ. FT.
B280D
B280C
B282
B-FC-3
B280E
B280
B280B
B280A
B260A B260
B268
B266
B246
B245 MEC
B244 B240 B221
B243
B040
B040C
B100
B012
B108 B106
B107 B105
B103
B-FC-1
B042
B013 B015 B015A
B014 B016
B017
B040A
B-EL-1
B021
B018
B-FC2
B044
B046
B047
B060E
B040B
B060C
B060A
B060F
B060D
B060B
B041
B060
B043
PATIO
FREEZER
B241
B223
B242 B222
B224
B225
B226
B227
B229
B228 B230
B232
B110 B116 B114 B112
B111
B113 B109 underdeck access
B-ME-1
B201
B204
B203
B203C
B226A
Audiology test booth
B108A
HK
B202
B203D
B250
B252 EL EL
EL EL
ME
ME
ME
ME
B271
ME
CRAWL SPACE
Elevator Mechanical Room
Elevator Mechanical Room water valve
B104
B125
B102
B171A
B168
B169
B171
B170
B A
B167B166
B165
B162B
B A
B
B164
B161B
B 1A
B
B163
B160
B111
B050 MEC
B P C
B121
B123
B124
B126
B127
B128
B130
B129
B129A
EL
EL
B146
B148
B
B
B
B
B141
HK
B151
ELEC
MEC
MEC
MEC
MEC
MEC
B260B
B260C
ELEC RM
B153
B153B
B153A
B153C
B151A B151B
B151C B151D
B153D
B203B
B203A
B-PC-1
B272
B273
B274
B275
B276
B272A
B280
B279
B278
B277
B281
B
B203E
E
LE
V A T O R
P
IT P
IT
E
LE
V A T O R
D N
D N
UP
U P
U P
U P
UP
U P
U P
U P
D N
U P
U P
S
HH
TR
1-B017
(N)
SEE DETAILS
FP001
2 & 3
FP001
SM
TR
1-B241
FP001
SEE DETAILS
& FP001
3(N)
NO CEILING
TR
1-1260
FP001
SEE DETAILS
(N)
FP001
(E)
STORAGE
1-1270
STAFF TOILET
(E)
1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS
2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR
IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING
CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE
PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD
LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.
4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE
RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON
DRAWING FP001.
5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF
SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO
INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION
IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO
LONGER NEEDED.
6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE
WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.
7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.
8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.
9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS
& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE
PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE
INSTRUCTED BY VA COR.
DRAWING NOTES
HAZARD RATING NOTE
SPRINKLER LEGEND
SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD
REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.
(E) - EXISTING TO REMAIN
(R) - EXISTING TO BE REMOVED
(N) - NEW
ALL (E) SPRINKLER
HEAD(S) TO BE
REMOVED - VIF
(R)
(R) B017
SM
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R) (R)
B241
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED
(R)(R)
(R)(R)
(R) EXISTING HOSE
CABINET SUPPLY
PIPING & VALVE TO
BE REMOVED
(SEE NOTE BELOW)
SM
(R)
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R)
(E) 1270
1270A
(E)
B111
B111A
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R)(R)
AT-1
8' - 0"
FP001
SEE DETAILS
& FP001
(N) (N)
(TYP.)
B111
STAFF LOUNGE
OFFICE
1-1071
TR
1-1071B
AT-1
8' - 6"
CORRIDOR
C100
AT-1
8' - 6"
FP001
SEE DETAILS
FP001
3&
(N)
(N)
(N)
(N)
SEE DETAIL
FP001
(TYP.)
FP001
3&SM
FIRE RATING LEGEND
SYMBOL
(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING
CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)
EXISTING 45 MIN.EXISTING
ONE HOUR1HR
SM
NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.
FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER
LOCATIONS
INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)
EXISTING 90 MIN.2HR
EXISTING
TWO HOUR
CEILING DEMOLITION NOTE
WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE
BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED
TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING
SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF
SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.
AREA OF
WORK
(ROOM 1071)
N
P NAREA OF WORK
(ROOM 1260)
AREA OF WORK (ROOM 1203)
HAZARDOUS MATERIALS NOTE
SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS
INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.
REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)
AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR
INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF
HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE
HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP
ALL WORK AND NOTIFY THE COR IMMEDIATELY.
NOTE 1
GENERAL AREA
OF WORK
N
P N
AREA OF WORK
(B241)
AREA OF WORK
(B111)
STORAGE
1-1203
FP001
SEE DETAILS
(N)
FP001
3&
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
FO
R
BI
DC:
\U se rs\
AA
hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck
EV
BM
P.
rvt
6/1 /20 :57 :23 P M
1-FP101
BUILDING 1 - FIRE PROTECTION FLOOR PLANS
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
ISSUED FOR BID
21-USDVA-15
1/4" = 1'-0"4 BASEMENT - NEW WORK PLAN - TRB017
1/4" = 1'-0"6 BASEMENT - NEW WORK PLAN - TRB241
1/4" = 1'-0"10 FIRST FLOOR - NEW WORK PLAN - TR1260
1/4" = 1'-0"3 BASEMENT - DEMOLITION PLAN - TRB017
1/4" = 1'-0"5 BASEMENT - DEMOLITION PLAN - TRB241
1/4" = 1'-0"7 FIRST FLOOR - DEMOLITION PLAN - TR1071
1/4" = 1'-0"9 FIRST FLOOR - DEMOLITION PLAN - TR1260
1/4" = 1'-0"1 BASEMENT - DEMOLITION PLAN - B111
1/4" = 1'-0"2 BASEMENT - NEW WORK PLAN - B111
1/4" = 1'-0"8 FIRST FLOOR - NEW WORK PLAN - TR1071
NOTE: FIRE PROTECTION CONTRACTOR TO REMOVE (E) HOSE CABINET SUPPLY PIPING BACK
TO BRANCH LINE OR MAIN PIPING AND CAP.
1ST FLOOR - LIBERTY BUILDING
3/32" = 1'-0"11 BASEMENT - NEW WORK - CORRIDOR
NOTE: SECTION OF EXISTING 4” EAST TO WEST RUNNING FIRE MAIN ALONG THE NORTH SIDE OF THE CORRIDOR BETWEEN OUTSIDE OF B102 AND INTO B018 SHALL BE REMOVED AND RELOCATED TO RUN PARALLEL ON THE SOUTH SIDE OF THE CORRIDOR. RECONNECT 2” BRANCH TO FIRE HOSECABINT AT B014. FINAL LOCATION OF
NEW MAIN AND BRANCH PIPING TO BE FIELD COORDINATED WITH VA COR AND OTHER TRADES.
BASEMENT - LIBERTY BUILDING
1/4" = 1'-0"12 FIRST FLOOR - NEW WORK PLAN - TR 1203
Revisions: Date:
1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS
2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR
IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING
CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE
PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD
LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.
4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE
RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON
DRAWING FP001.
5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF
SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO
INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION
IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO
LONGER NEEDED.
6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE
WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.
7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.
8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.
9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS
& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE
PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE
INSTRUCTED BY VA COR.
DRAWING NOTES
HAZARD RATING NOTE
SPRINKLER LEGEND
SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD
REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.
(E) - EXISTING TO REMAIN
(R) - EXISTING TO BE REMOVED
(N) - NEW
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R)(R)
2HR
2HR
2HR
TR
1-2103
SEE DETAILS
FP001
FP001
(N)
NO CEILING
2HR
2HR
2HR
G.6 G.7
5.7
5.3
4.2
ROOM
1-2WA-21
ROOM
1-2WA-20
ROOM
1-2WA-19
ROOM
1-2WA-18
CORRIDOR
1-2WC-37
ROOM
1-2WC-28
ROOM
1-2WA-15
ROOM
1-2WA-22
TR
1-2W-37C
GWB
8' - 0"
(E) CLG
@ 8'-6"
(E) CLG
@ 8'-6"
OPEN TO
STRUCTURE
ABOVE(N) (N)
(N)
(N)
FP001
SEE DETAILS
(TYP.4)
(N)
(E)
FP001
& FP001
SEE DETAILS
SM
(N)
(N)
(N)
FP001
& FP001
SEE DETAILS
(N)
2WC-P
(R)
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(E)
(E)
(E) ROOM
1-2WC-28
ROOM
1-2WA-15
CORRIDOR
CORRIDOR
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R)
(R)
(E) CLG @
8'-10"
(E) CLG @
9'-0"
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R)
(R)
(R)
RECEPTION
1-2111
FP001
& FP001
SEE DETAIL
(TYP.)
(N)(N)
2238 2236A
(E) CLG
@ 8'-7"
(R)(R)
ALL (E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
1HR
1HR
1HR
TR
ELECTRICAL
TR
1-2238
ELECTRICAL
1-2236A
OPEN TO
STRUCTURE
ABOVEOPEN TO
STRUCTURE
ABOVE
FP001
& FP001
SEE DETAILS
(N)
(N)
1HR
1HR
1HR
FIRE RATING LEGEND
SYMBOL
(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING
CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)
EXISTING 45 MIN.EXISTING
ONE HOUR1HR
SM
NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.
FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER
LOCATIONS
INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)
EXISTING 90 MIN.2HR
EXISTING
TWO HOUR
CEILING DEMOLITION NOTE
WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE
BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED
TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING
SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF
SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.
AREA OF WORK
(1-2WC-37A)
N
P N
AREA OF WORK
(TR2101)
AREA OF WORK
(TR2111)
AREA OF WORK
(TR2238)
HAZARDOUS MATERIALS NOTE
SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS
INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.
REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)
AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR
INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF
HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE
HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP
ALL WORK AND NOTIFY THE COR IMMEDIATELY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
FO
R
BI
DC:
\U se rs\
AA
hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck
EV
BM
P.
rvt
6/1 /20 :57 :30 P M
1-FP102
BUILDING 1 - FIRE PROTECTION FLOOR PLANS
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
ISSUED FOR BID
21-USDVA-15
1/4" = 1'-0"3 SECOND FLOOR - DEMOLITION PLAN - TR2103
1/4" = 1'-0"4 SECOND FLOOR - NEW WORK PLAN - TR2103
1/4" = 1'-0"2 SECOND FLOOR - NEW WORK FLOOR PLAN
1/4" = 1'-0"1 SECOND FLOOR - DEMOLITION FLOOR PLAN
1/4" = 1'-0"7 SECOND FLOOR - DEMOLITION FLOOR PLAN - RECEPTION
1/4" = 1'-0"8 SECOND FLOOR - NEW WORK PLAN - RECEPTION
1/4" = 1'-0"5 SECOND FLOOR - DEMOLITION FLOOR PLAN - TR2238
1/4" = 1'-0"6 SECOND FLOOR RCP - NEW WORK PLAN - TR2238
2ND FLOOR - LIBERTY BUILDING
Revisions: Date:
TR
2-115
NO CEILING
SOILED UTILITY ROOM
2-117B
HAC
2-117A
CORRIDOR
2-116
RESTROOM
2-118A
RESTROOM
2-118B
AT-1
8' - 0"
AT-1
8' - 0"
AT-1
8' - 0"
AT-1
8' - 0"
AT-1
8' - 0"
(N)
(N)
(N)
(N) (N)
FP001
& FP001
SEE DETAILS
(TYP. 5)
FP001
& FP001
SEE DETAILS
(N)
1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS
2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR
IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING
CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE
PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD
LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.
4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE
RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON
DRAWING FP001.
5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF
SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO
INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION
IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO
LONGER NEEDED.
6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE
WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.
7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.
8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.
9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS
& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE
PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE
INSTRUCTED BY VA COR.
DRAWING NOTES
HAZARD RATING NOTE
SPRINKLER LEGEND
SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD
REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.
(E) - EXISTING TO REMAIN
(R) - EXISTING TO BE REMOVED
(N) - NEW
(R)
(R)
(R)
(R)
(R)
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
SM
SM
TR
2-209
ACCESS
2-210C
CORRIDOR
2-210
RESTROOM
2-210B
RESTROOM
2-210A
AT-1
8' - 0"
AT-1
8' - 0" AT-1
8' - 0"
NO CEILINGFP001
& FP001
(TYP. 5)
SEE DETAILS
(N)
(N)
(N)
FP001
& FP001
SEE DETAILS
(N)
(N)
SM
SM
(R)
(R)
(R)
(R)
(R)
(R)
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R)
2HR
FP001
& FP001
(TYP. 7)
SEE DETAILS
(N)(N)
(N)
(N)(N)
(N)(N)
2HR
(R)
(R)
(R)(R)
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R)
(R)
(R)
GENERAL AREA
OF WORK
N
P N
GENERAL AREA
OF WORK
(ROOM 208)
N
P N
GENERAL AREA
OF WORK
(ROOM 213)
FIRE RATING LEGEND
SYMBOL
(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING
CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)
EXISTING 45 MIN.EXISTING
ONE HOUR1HR
SM
NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.
FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER
LOCATIONS
INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)
EXISTING 90 MIN.2HR
EXISTING
TWO HOUR
CEILING DEMOLITION NOTE
WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE
BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED
TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING
SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF
SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.
GENERAL AREA OF WORK
N
P N
(R) (R)
(R)
(R)
(R)
(R)
(R)
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
HAZARDOUS MATERIALS NOTE
SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS
INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.
REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)
AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR
INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF
HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE
HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP
ALL WORK AND NOTIFY THE COR IMMEDIATELY.
FP001
& FP001
(TYP. 9)
SEE DETAILS
(N) (N)
(N) (N)
(N) (N)
(N) (N)
(N)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
FO
R
BI
DC:
\U se rs\
AA
hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck
EV
BM
P.
rvt
6/1 /20 :57 :39 P M
2-FP101
BUILDING 2 - FIRE PROTECTION FLOOR PLANS
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
ISSUED FOR BID
21-USDVA-15
1/4" = 1'-0"2 FIRST FLOOR - NEW WORK PLAN - TR115
1/4" = 1'-0"3 SECOND FLOOR - DEMOLITION PLAN -TR210
1/4" = 1'-0"4 SECOND FLOOR - NEW WORK PLAN - TR210
1/4" = 1'-0"5 SECOND FLOOR - DEMOLITION PLAN - TR213
1/4" = 1'-0"6 SECOND FLOOR - NEW WORK PLAN - TR213
1/4" = 1'-0"1 FIRST FLOOR - DEMOLITION PLAN - TR115
2ND FLOOR - MEADOW BUILDING
2ND FLOOR - MEADOW BUILDING
1ST FLOOR - MEADOW BUILDING
1/4" = 1'-0"7 SECOND FLOOR FIRE PROTECTION DEMOLITION - DATA CENTER 208
1/4" = 1'-0"8 SECOND FLOOR - NEW WORK PLAN - DATA CENTER 208
Revisions: Date:
RESTROOM
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R)
(R)
(E)
TR
3-120
NO CEILING
FP001
SEE DETAILS
FP001
&(N)
1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS
2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR
IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING
CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE
PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD
LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.
4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE
RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON
DRAWING FP001.
5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF
SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO
INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION
IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO
LONGER NEEDED.
6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE
WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.
7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.
8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.
9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS
& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE
PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE
INSTRUCTED BY VA COR.
DRAWING NOTES
HAZARD RATING NOTE
SPRINKLER LEGEND
SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD
REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.
(E) - EXISTING TO REMAIN
(R) - EXISTING TO BE REMOVED
(N) - NEW
(R) (R)
(E) SPRINKLER
HEAD(S) TO BE
REMOVED- VIF
SM
HAC
3-124
AT-1
8' - 0"
FP001
FP001
(N)
(N)
SEE DETAILS
SM
(R)
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(E) (E)
TR
3-218
NO CEILING
SEE DETAILS
FP001
FP001
(N)
(R)
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
SM
AT-1
8' - 0" STORAGE
3-220
FP001
FP001
SEE DETAILS
(N)
SM
FIRE RATING LEGEND
SYMBOL
(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING
CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)
EXISTING 45 MIN.EXISTING
ONE HOUR1HR
SM
NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.
FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER
LOCATIONS
INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)
EXISTING 90 MIN.2HR
EXISTING
TWO HOUR
CEILING DEMOLITION NOTE
WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE
BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED
TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING
SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF
SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.
AREA OF WORK
(HAC124)
N
P N
AREA OF WORK
(TR120)
N
P N
AREA OF WORK
(HAC220)
AREA OF WORK
(TR218)
HAZARDOUS MATERIALS NOTE
SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS
INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.
REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)
AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR
INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF
HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE
HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP
ALL WORK AND NOTIFY THE COR IMMEDIATELY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
FO
R
BI
DC:
\U se rs\
AA
hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck
EV
BM
P.
rvt
6/1 /20 :57 :45 P M
3-FP101
BUILDING 3 - FIRE PROTECTION FLOOR PLANS
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
ISSUED FOR BID
21-USDVA-15
1/4" = 1'-0"1 FIRST FLOOR - DEMOLITION PLAN -TR120
1/4" = 1'-0"2 FIRST FLOOR - NEW WORK PLAN - TR120
1/4" = 1'-0"3 FIRST FLOOR - DEMOLITION PLAN - HAC124
1/4" = 1'-0"4 FIRST FLOOR - NEW WORK PLAN - HAC124
1/4" = 1'-0"5 SECOND FLOOR - DEMOLITION PLAN - TR218
1/4" = 1'-0"6 SECOND FLOOR - NEW WORK PLAN - TR218
1/4" = 1'-0"7 SECOND FLOOR - DEMOLITION PLAN - HAC220
1/4" = 1'-0"8 SECOND FLOOR - NEW WORK PLAN - HAC220 1ST FLOOR - MAPLE BUILDING
2ND FLOOR - MAPLE BUILDING
Revisions: Date:
(R)(R)
(R) (R)
(E) SPRINKLER
HEAD(S) TO BE
REMOVED - VIF
TR
4-105 NO CEILING
FP001
SEE DETAILS
FP001
(N)
1. SEE DRAWING FP001 FOR SYMBOLS, ABBREVIATIONS, NOTES & DETAILS
2. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR
IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING
CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE
PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD
LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.
4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE
RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON
DRAWING FP001.
5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF
SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO
INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION
IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO
LONGER NEEDED.
6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE
WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.
7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.
8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.
9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS
& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE
PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE
INSTRUCTED BY VA COR.
DRAWING NOTES
HAZARD RATING NOTE
SPRINKLER LEGEND
SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD
REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.
(E) - EXISTING TO REMAIN
(R) - EXISTING TO BE REMOVED
(N) - NEW
(R) (R)
(E) SPRINKLER HEAD(S)
TO BE REMOVED- VIF
SM
TR
4-233 NO CEILING
FP001
FP001
SEE DETAILS
(N) (E)
SM
(R)
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
AT-1
9' - 0"
FP001
SEE DETAILS
(N)
FP001
GENERAL AREA OF WORK
N
P N
FIRE RATING LEGEND
SYMBOL
(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING
CORRIDOR POSITIVE LATCH DOOR HARDWARE(SMOKE BARRIER)
EXISTING 45 MIN.EXISTING
ONE HOUR1HR
SM
NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.
FIRE EXTINGUISHER, PROVIDE 'S12' SIGNAGE AT ALL NEW EXTINGUISHER
LOCATIONS
INDICATES PATH OF TRAVEL TO POINT OF EXIT (FROM COMMON PATH OF TRAVEL)
EXISTING 90 MIN.2HR
EXISTING
TWO HOUR
CEILING DEMOLITION NOTE
WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE
BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED
TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING
SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF
SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.
AREA OF WORK
(TR 233)
N
P N
AREA OF WORK
(TR 224)
HAZARDOUS MATERIALS NOTE
SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS
INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.
REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)
AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR
INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF
HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE
HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP
ALL WORK AND NOTIFY THE COR IMMEDIATELY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
FO
R
BI
DC:
\U se rs\
AA
hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck
EV
BM
P.
rvt
6/1 /20 :57 :53 P M
4-FP101
BUILDING 4 - FIRE PROTECTION FLOOR PLANS
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700EHRM INFRASTRUCTURE UPGRADE
CENTRAL WESTERN MASSACHUSETTS
ISSUED FOR BID
21-USDVA-15
1/4" = 1'-0"1 FIRST FLOOR - DEMOLITION PLAN - TR105
1/4" = 1'-0"2 FIRST FLOOR RCP - NEW WORK PLAN - TR105
1/4" = 1'-0"3 SECOND FLOOR - DEMOLITION PLAN -TR233
1/4" = 1'-0"4 SECOND FLOOR - NEW WORK PLAN - TR233
1/4" = 1'-0"5 SECOND FLOOR - DEMOLITION PLAN - TR224
1/4" = 1'-0"6 SECOND FLOOR - NEW WORK PLAN - TR224
1ST FLOOR - HORIZON BUILDING
2ND FLOOR - HORIZON BUILDING
Revisions: Date:
PERTAINING TO SCOPE OF WORK AREAS. CONTRACTOR SHALL NOTIFY VA COR
IN WRITING OF ANY DISCREPANCIES BETWEEN CONTRACT DRAWINGS AND EXISTING
CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
3. ALL EXISTING SPRINKLER HEADS IN SCOPE OF WORK AREAS (AS INDICATED ON THESE FIRE
PROTECTION DRAWINGS) ARE TO BE DEMOLISHED. CONTRACTOR TO VERIFY IN FIELD
LOCATION(S) OF (E) SPRINKLER HEAD(S) TO BE REMOVED.
4. FIRE PROTECTION CONTRACTOR TO USE EXISTING ARM-OVER PIPING FOR THE
RELOCATION OF NEW SPRINKLER HEADS. REFER TO SPRINKLER HEAD DETAILS ON
DRAWING FP001.
5. FIRE PROTECTION CONTRACTOR TO COORDINATE THE DEMOLITION & INSTALLATION OF
SPRINKLER HEADS WITH THE INSTALLATION OF ALL NEW DROP CEILING(S) IN ORDER TO KEEP EXISTING FIRE PROTECTION SYSTEM FUNCTIONAL AT ALL TIMES. IF NEEDED, CONTRACTOR TO
INSTALL TEMPORARY NEW UPRIGHT SPRINKLER TO AVOID LOSS OF SPRINKLER PROTECTION
IN SCOPE OF WORK AREAS. TEMPORARY SPRINKLER HEAD(S) TO BE REMOVED WHEN NO
LONGER NEEDED.
6. FIRE PROTECTION CONTRACTOR TO INSTALL FIRE PROTECTION SYSTEM IN ACCORDANCE
WITH VA SEISMIC DESIGN REQUIREMENT H-18-8.
7. ALL UNUSED ARM-OVER PIPING TO BE REMOVED BACK TO BRANCH LINE PIPING & CAPPED.
8. NEW SEMI-RECESSED SPRINKLER HEADS TO BE INSTALLED TO CENTER OF CEILING TILE.
9. ALL DEMOLISHED FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS, HANGERS
& ALL ASSOCIATED HARDWARE, ETC. SHALL BECOME THE PROPERTY OF THE FIRE
PROTECTION CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS OTHERWISE
INSTRUCTED BY VA COR.
DRAWING NOTES
HAZARD RATING NOTE
SPRINKLER LEGEND
SPRINKLER HEAD SPACING IN ALL "TR" ROOMS & DATA CENTER TO BE OF LIGHT HAZARD
REQUIREMENTS. REFER TO VA MASTER SPRINKLER SPECIFICATION 21 13 13.
(E) - EXISTING TO REMAIN
(R) - EXISTING TO BE REMOVED
(N) - NEW
(E) SPRINKLER HEAD(S)
TO BE REMOVED - VIF
(R) (R)
(R) (R)
(N) (N)
(N) (N)
STORAGE
5-017B
TR
5-017A
ROOM
5-017
FP001
SEE DETAILS
& FP001
(TYP. 4)
GENERAL AREA OF WORK
N
P N
CEILING DEMOLITION NOTE
WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE
BEING PERMANENTLY REMOVED, THAT WORK SHALL BE COORDINATED
TO OCCUR AT THE SAME TIME AS REPLACEMENT OF THE EXISTING
SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF
SPRINKLER PROTECTION IN THESE SCOPE OF WORK AREAS.
HAZARDOUS MATERIALS NOTE
SCOPE OF WORK AREAS MAY CONTAIN HAZARDOUS MATERIALS
INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD.
REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATIONS SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT)
AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR
INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF
HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE
HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP
ALL WORK AND NOTIFY THE COR IMMEDIATELY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ACELAJLH
FO
R
BI
DC:
\U se rs\
AA
hm ed \D oc um en ts\ 1- -7 _1 0- -2 2_ ks ch ne ck
EV
BM
P.
rvt
6/1 /20 :57 :56 P M
5-FP101
BUILDING 5 - FIRE PROTECTION FLOOR PLANS
06/06/2023
Edward P. Boland VA Medical Center
MULTIPLE
621-21-700…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .