Solicitation Addendum Summary
This is Solicitation Addendum #001 for Invitation to Bid S-DASOBO-00016020, issued by the Department of Administrative Services (DAS) for the Oregon Youth Authority's MacLaren Youth Correctional Facility Infirmary & Pharmacy Renovation project located in Woodburn, Oregon. The addendum modifies the original bid document and must be acknowledged with a required signature prior to bid closing. The revised bid closing deadline is August 19, 2026, at 2:00 PM (extended from August 12, 2026). Requests for clarification, change requests, and protests regarding addendum provisions must be submitted to DAS by 5:00 PM Pacific time on Wednesday, August 12, 2026. The addendum includes substantial technical and drawing modifications affecting multiple sections of the specifications and construction documents, including Fluid-Applied Waterproofing (Section 07 14 00), Thermoplastic Membrane Roofing (Section 07 54 00), and Door Hardware (Section 08 71 00), along with revised architectural drawings and additional reference documents including civil plans, utility maps, and clinic plans.
The addendum constitutes a material change to the bid and is a mandatory acknowledgment document. The renovation project encompasses approximately 11,083 total square feet, including 9,052 square feet of existing infirmary space, 2,985 square feet of renovation area, and 1,865 square feet of addition space. The facility is classified as Occupancy Type B construction with Type V-B construction type, fully sprinklered and equipped with a fire alarm system. The project includes expansion of medical laboratory, security station, medical rooms, supply areas, receiving/storage, four patient rooms, shared day room, new nurse station, two supervisor offices, and meeting room. Detailed technical specifications and hardware schedules are provided for all construction components, with door hardware groups specified for multiple doors throughout the facility, including specialized security hardware such as anti-ligature locks, delayed egress magnetic locks, and electric strikes.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
S-DASOBO-00016020
SOLICITATION ADDENDUM #001
MacLaren Youth Correctional Facility Infirmary & Pharmacy Renovation, ADDENDUM #001
This Solicitation Addendum modifies the Bid Document(s) for Work only to the extent indicated herein. All other areas not specifically mentioned or affected by this Solicitation Addendum shall remain in full force. This Solicitation Addendum shall be added as a part of the Original Bidding Document.
This Solicitation Addendum must be acknowledged by providing the required signature prior to Bid Closing. Failure to do so may result in rejection of Bid.
Requests for clarification, requests for change, and protests of Solicitation Addendum provisions addressed in this Solicitation Addendum must be received by DAS by 5:00 P.M. (Pacific time) on Wednesday, August 12, 2026, or they will not be considered. DAS will not consider requests or protests of matters not added to or modified by this Solicitation Addendum.
New language is indicated by bold print and underline, deleted language is indicated by brackets [ ].
1 Addition
ITB, Table of Contents (Page 2) is modified as follows:
Attachment E – Reference Documents
• MYCF Geer – Civil
• MacLaren Utility Maps Full Size
• Geer Intake & Processing Clinic Plans
2 Modification ITB, Section A.3 (Page 3) is modified as follows:
Deadline for Bid Submittal (“Closing”) | August [12] 19, 2026 at 2:00 PM
3 Modification ITB Attachment B – Technical Specifications, Section 07 14 00 is deleted in its entirety and replaced with Section 07 14 00 dated August 5, 2026 attached to this Addendum.
4 Modification ITB Attachment B – Technical Specifications, Section 07 54 00 is deleted in its entirety and replaced with Section 07 54 00 dated August 5, 2026 attached to this Addendum.
5 Modification ITB Attachment B – Technical Specifications, Section 08 71 00 is deleted in its entirety and replaced with Section 08 71 00 dated August 4, 2026 attached to this Addendum.
6 Modification ITB Attachment C – Drawings, Sheet G1.01 is deleted in its entirety and replaced with Drawing Sheet G1.01 dated 08/03/2026 attached to this Addendum.
7 Modification
ITB Attachment C – Drawings, Sheet A2.11 is deleted in its entirety and replaced with Drawing Sheet A2.11 dated 08/03/2026 attached to this Addendum.
INVITATION TO BID
S-DASOBO-00016020
SOLICITATION ADDENDUM #001
MacLaren Youth Correctional Facility Infirmary & Pharmacy Renovation, ADDENDUM #001
8 Modification ITB Attachment C – Drawings, Sheet A8.01 is deleted in its entirety and replaced with Drawing Sheet A8.01 dated 08/03/2026 attached to this Addendum.
9 Modification ITB Attachment C – Drawings, Sheet S2.01 is deleted in its entirety and replaced with Drawing Sheet S2.01 dated 02/01/2024 attached to this Addendum.
10 Modification ITB Attachment C – Drawings, Sheet E0.02 is deleted in its entirety and replaced with Drawing Sheet E0.02 dated 08/05/2026 attached to this Addendum.
12 Addition
ADD new MYCF Geer-Civil document to Attachment E, attached to this Addendum 1.
12 Addition
ADD new MacLaren Utility Maps Full Size document to Attachment E, attached to this Addendum 1.
13 Addition
ADD new Geer Intake & Processing Clinic Plans document to Attachment E, attached to this Addendum 1.
This Solicitation Addendum constitutes a MATERIAL CHANGE to the bid; and it MUST BE SIGNED AND RETURNED PRIOR TO THE BID CLOSING DATE AND TIME. ITS RECEIPT MUST ALSO BE ACKNOWLEDGED BY INSERTING ITS NUMBER ON THE APPROPRIATE BLANK LINES IN SECTION H OF THE BID DOCUMENT.
Signature: ___________________________________________________ Date: ____________________
Bidder Name: __________________________________________________________________________ (Please Print)
Attachments:
• ITB Attachment B – Technical Specifications, Section 07 14 00, dated August 5, 2026
• ITB Attachment B – Technical Specifications, Section 07 54 00, dated August 5, 2026
• ITB Attachment B – Technical Specifications, Section 08 71 00, dated August 4, 2026
• ITB Attachment C – Drawings, Sheet G1.01 Addendum 1, dated 08/03/2026
• ITB Attachment C – Drawings, Sheet A2.11 Addendum 1, dated 08/03/2026
• ITB Attachment C – Drawings, Sheet A8.01 Addendum 1, dated 08/03/2026
• ITB Attachment C – Drawings, Sheet S2.01 dated 02/01/2024
• ITB Attachment C – Drawings, Sheet E0.02 Addendum 1, dated 08/05/2026
• ITB Attachment E - MYCF Geer-Civil
• ITB Attachment E - MacLaren Utility Maps Full Size
• ITB Attachment E - Geer Intake & Processing Clinic Plans
FLUID-APPLIED WATERPROOFING 07 14 00
August 05, 2026 OYA-MacLaren Infirmary 1 of 2
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Cold-applied rubberized asphalt waterproofing.
1.02 RELATED REQUIREMENTS
A. Section 03 30 00 - Cast-in-Place Concrete: Concrete substrate.
1.03 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements for submittal procedures.
B. Product Data: Provide data for membrane.
1.04 QUALITY ASSURANCE
A. Installer Qualifications: Company specializing in performing work of the type specified and with at least three years of documented experience.
1.05 FIELD CONDITIONS
A. Maintain ambient temperatures above 40 degrees F for 24 hours before and during application and until cured.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Polyurethane Waterproofing:
1. Tremco Commercial Sealants & Waterproofing; TREMproof 250GC: www.tremcosealants.com/#sle.
2. GMX: Ultra-Guard Elastomeric HB: https://gmxco.com/commercial-products/ultra-guard-elastomeric-hb/
3. Substitutions: See Section 01 60 00 - Product Requirements.
2.02 FLUID-APPLIED WATERPROOFING MATERIALS
A. Sprayed Thin-Film Elastomeric Waterproofing: Elastomeric, UV-resistant coating capable of being applied to damp masonry and green concrete without adverse effect on adhesion;
complying with requirements of ASTM C 836 except for minimum film thickness.
2.03 ACCESSORIES
A. Surface Conditioner: As recommended by membrane manufacturer.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify existing conditions before starting work.
B. Verify substrate surfaces are free of frozen matter, dampness, loose particles, cracks, pits, projections, penetrations, or foreign matter detrimental to adhesion or application of waterproofing system.
C. Verify that items penetrating surfaces to receive waterproofing are securely installed.
3.02 PREPARATION
A. Protect adjacent surfaces from damage not designated to receive waterproofing.
B. Clean and prepare surfaces to receive waterproofing in accordance with manufacturer's instructions; vacuum substrate clean.
C. Do not apply waterproofing to surfaces unacceptable to waterproofing manufacturer.
3.03 INSTALLATION
A. Install waterproofing to specified minimum thickness in accordance with manufacturers instructions and NRCA (WM) applicable requirements.
FLUID-APPLIED WATERPROOFING 07 14 00
August 05, 2026 OYA-MacLaren Infirmary 2 of 2
B. Apply primer or surface conditioner at a rate recommended by manufacturer, and protect conditioner from rain or frost until dry.
C. Apply waterproofing in accordance with manufacturer's instructions .
1. Applied Thickness: Nominal thickness of 60 mils; minimum thickness at any point of 50 mils.
D. Apply extra thickness of waterproofing material at corners, intersections, and angles.
END OF SECTION
THERMOPLASTIC MEMBRANE ROOFING 07 54 00
August 05, 2026 OYA-MacLaren Infirmary 1 of 5
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Adhered system with thermoplastic roofing membrane.
B. Insulation, flat and tapered.
C. Vapor retarder.
D. Cover boards.
E. Flashings.
F. Roofing cant strips, stack boots, roofing expansion joints, and walkway pads.
1.02 RELATED REQUIREMENTS
A. Section 06 10 00 - Rough Carpentry: Wood cant strips and deck sheathing.
1.03 REFERENCE STANDARDS
A. ASTM C208 - Standard Specification for Cellulosic Fiber Insulating Board; 2022.
B. ASTM C578 - Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation; 2023.
C. ASTM C1325 - Standard Specification for Fiber-Mat Reinforced Cementitious Backer Units;
2025.
D. ASTM D4434/D4434M - Standard Specification for Poly(Vinyl Chloride) Sheet Roofing; 2021.
E. ASTM D6878/D6878M - Standard Specification for Thermoplastic Polyolefin-Based Sheet Roofing; 2021.
F. FM (AG) - FM Approval Guide; Current Edition.
G. FM DS 1-28 - Wind Design; 2015, with Editorial Revision (2022).
H. NRCA (RM) - The NRCA Roofing Manual; 2023.
I. NRCA (WM) - The NRCA Waterproofing Manual; 2021.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements for submittal procedures.
B. Product Data: Provide data indicating membrane materials, flashing materials, insulation, vapor retarder, surfacing, and fasteners.
C. Shop Drawings: Submit drawings that indicate joint or termination detail conditions, conditions of interface with other materials, and paver layout.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Manufacturer's qualification statement.
F. Installer's qualification statement.
G. Warranty Documentation:
1. Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.
2. Submit installer's written verification that installation complies with warranty conditions for waterproof membrane.
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section with minimum three years of documented experience.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials in manufacturer's original containers, dry and undamaged, with seals and labels intact, unless otherwise indicated.
B. Store materials in weather protected environment, clear of ground and moisture.
August 05, 2026 OYA-MacLaren Infirmary 2 of 5
C. Ensure storage and staging of materials does not exceed static and dynamic load-bearing capacities of roof decking.
D. Protect foam insulation from direct exposure to sunlight.
1.07 FIELD CONDITIONS
A. Do not apply roofing membrane during unsuitable weather.
B. Do not apply roofing membrane when ambient temperature is below 40 degrees F or above 140 degrees F.
C. Do not apply roofing membrane to damp or frozen deck surface or when precipitation is expected or occurring.
D. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed the same day.
E. Schedule applications so that no partially completed sections of roof are left exposed at end of workday.
1.08 WARRANTY
A. See Section 01 78 00 - Closeout Submittals for additional warranty requirements.
B. System Warranty: Provide manufacturer's system warranty agreeing to repair or replace roofing that leaks or is damaged due to wind or other natural causes.
1. Warranty Term: 20 years.
2. For repair and replacement include costs of both material and labor in warranty.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Thermoplastic Polyolefin (TPO) Membrane Roofing Materials:
1. Carlisle SynTec: www.carlisle-syntec.com.
2. GAF Materials Corporation; EverGuard TPO: www.gaf.com.
3. GenFlex Roofing Systems, LLC: www.genflex.com/#sle.
4. Versico Roofing Systems: www.versico.com/#sle.
5. Duro Last: Duro-Tech 60 Mil Fully Adhered Reinforce TPO Roofing System:
https://duro-last.com/duro-tech-tpo/
6. Substitutions: See Section 01 60 00 - Product Requirements.
B. Insulation:
1. BASF Corporation; BASF Neopor GPS: www.neopor.basf.us/#sle.
2. Carlisle SynTec Systems; SecurShield Insulation: www.carlisle-syntec.com/#sle.
3. DuPont de Nemours, Inc: building.dupont.com/#sle.
4. GAF: www.gaf.com/#sle.
5. Owens Corning Corporation: www.ocbuildingspec.com/#sle.
6. Versico Roofing Systems: www.versico.com/#sle.
7. Substitutions: See Section 01 60 00 - Product Requirements.
2.02 ROOFING
A. Thermoplastic Membrane Roofing: One ply membrane, fully adhered, over insulation.
B. Roofing Assembly Requirements:
1. Insulation Thermal Resistance (R-Value): 5.5 per inch, minimum; provide insulation of thickness required.
a. Total Minimum R-Value: R-32
C. Acceptable Insulation Types - Constant Thickness Application: Any type that meets requirements and is approved by membrane manufacturer for application.
D. Acceptable Insulation Types - Tapered Application: Any of types specified.
1. Tapered polyisocyanurate or extruded polystyrene board.
August 05, 2026 OYA-MacLaren Infirmary 3 of 5
2. Uniform thickness polyisocyanurate or extruded polystyrene board covered with tapered polyisocyanurate or extruded polystyrene board.
2.03 MEMBRANE ROOFING AND ASSOCIATED MATERIALS
A. Membrane Roofing Materials:
1. TPO: Thermoplastic polyolefin (TPO) complying with ASTM D6878/D6878M, sheet contains reinforcing fabrics or scrims.
a. Thickness: 60 mil, 0.060 inch, minimum.
2. Sheet Width:
B. Seaming Materials: As recommended by membrane manufacturer.
C. Vapor Retarder: Reinforced Kraft paper laminate complying with requirements of fire rating classification; compatible with roofing and insulation materials.
D. Flexible Flashing Material: Same material as membrane.
2.04 COVER BOARDS
A. Cover Board: Cement board complying with ASTM C1325.
1. Board Size: 48 by 96 inches.
2. Board Thickness: 7/16 inch.
3. Thermal Resistance: R-value of 1.6, nominal, at 7/16 inch thick.
4. Products:
a. PermaBASE Building Products, LLC provided by National Gypsum Company;
DEXcell Cement Roof Board: www.permabase.com/#sle.
b. Substitutions: See Section 01 60 00 - Product Requirements.
2.05 INSULATION
A. Extruded Polystyrene (XPS) Board Insulation: Comply with ASTM C578, with natural skin surface and drainage channels on one face.
1. Board Size: 48 by 96 inches.
2. Tapered Board: Slope as indicated; minimum thickness 1 inch; fabricate of fewest layers possible.
3. Products:
a. DuPont de Nemours, Inc: building.dupont.com/#sle.
b. Owens Corning Corporation: www.ocbuildingspec.com/#sle.
4. Substitutions: See Section 01 60 00 - Product Requirements.
2.06 ACCESSORIES
A. Cant Strips: Wood, pressure preservative treated; see Section 06 10 00.
B. Insulation Joint Tape: Glass fiber reinforced type as recommended by insulation manufacturer, compatible with roofing materials; 6 inches wide; self adhering.
C. Insulation Fasteners: Appropriate for purpose intended and approved by roofing manufacturer.
D. Membrane Adhesive: As recommended by membrane manufacturer.
E. Thinners and Cleaners: As recommended by adhesive manufacturer, compatible with membrane.
F. Insulation Adhesive: As recommended by insulation manufacturer.
G. Sealants: As recommended by membrane manufacturer.
H. Walkway Pads: Suitable for maintenance traffic, contrasting color or otherwise visually distinctive from roof membrane.
1. Composition: Asphaltic with mineral granule surface.
2. Surface Color: White or Yellow.
3. Products:
a. W.R. Meadows, Inc; Whitewalk: www.wrmeadows.com/#sle.
b. Substitutions: See Section 01 60 00 - Product Requirements.
August 05, 2026 OYA-MacLaren Infirmary 4 of 5
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that surfaces and site conditions are ready to receive work.
B. Verify deck is supported and secure.
C. Verify deck is clean and smooth, flat, free of depressions, waves, or projections, properly sloped and suitable for installation of roof system.
D. Verify deck surfaces are dry and free of snow or ice.
E. Verify that roof openings, curbs, and penetrations through roof are solidly set, and cant strips are in place.
3.02 PREPARATION - WOOD DECK
A. Verify flatness and tightness of joints in wood decking; fill knot holes with latex filler.
B. Confirm dry deck by moisture meter with 12 percent moisture maximum.
3.03 INSTALLATION, GENERAL
A. Perform work in accordance with manufacturer's instructions, NRCA (RM), and NRCA (WM) applicable requirements.
B. Do not apply roofing membrane during cold or wet weather conditions.
C. Do not apply roofing membrane when ambient temperature is outside the temperature range recommended by manufacturer.
D. Do not apply roofing membrane to damp or frozen deck surface or when precipitation is expected or occurring.
E. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed the same day.
3.04 INSTALLATION - VAPOR RETARDER AND INSULATION, UNDER MEMBRANE
A. Install vapor retarder to deck surface with adhesive in accordance with manufacturer's instructions.
1. Extend vapor retarder under cant strips and blocking to deck edge.
2. Install flexible flashing from vapor retarder to air seal material of wall construction, lap and seal to provide continuity of the air barrier plane.
B. Ensure vapor retarder is clean and dry, continuous, and ready for application of insulation.
C. Attachment of Insulation:
1. Mechanically fasten insulation to deck in accordance with roofing manufacturer's instructions and FM DS 1-28 Factory Mutual requirements.
D. Cover Boards: Mechanically fasten cover boards in accordance with roofing manufacturer's instructions and FM (AG) Factory Mutual requirements.
E. Lay subsequent layers of insulation with joints staggered minimum 6 inches from joints of preceding layer.
F. Place tapered insulation to the required slope pattern in accordance with manufacturer's instructions.
G. Lay boards with edges in moderate contact without forcing. Cut insulation to fit neatly to perimeter blocking and around penetrations through roof.
H. Tape joints of insulation in accordance with roofing and insulation manufacturers' instructions.
I. Do not install more insulation than can be covered with membrane in same day.
3.05 INSTALLATION - MEMBRANE
A. Roll out membrane, free from wrinkles or tears. Place sheet into place without stretching.
B. Shingle joints on sloped substrate in direction of drainage.
August 05, 2026 OYA-MacLaren Infirmary 5 of 5
C. Fully Adhered Application: Apply adhesive to substrate at rate of 40-60 square feet per gallon. Fully embed membrane in adhesive except in areas directly over or within 3 inches of expansion joints. Fully adhere one roll before proceeding to adjacent rolls.
D. Overlap edges and ends and seal seams by contact adhesive, minimum 3 inches. Seal permanently waterproof. Apply uniform bead of sealant to joint edge.
E. At intersections with vertical surfaces:
1. Extend membrane over cant strips and up a minimum of 4 inches onto vertical surfaces.
2. Fully adhere flexible flashing over membrane and up to nailing strips.
F. Around roof penetrations, seal flanges and flashings with flexible flashing.
G. Coordinate installation of roof drains and sumps and related flashings.
3.06 FIELD QUALITY CONTROL
A. See Section 01 40 00 - Quality Requirements for additional requirements.
B. Owner will provide testing services, and Contractor to provide temporary construction and materials for testing in accordance with requirements.
C. Provide daily on-site attendance of roofing and insulation manufacturer's representative during installation of this work.
3.07 CLEANING
A. See Section 01 70 00 - Execution and Closeout Requirements for additional requirements.
B. Remove bituminous markings from finished surfaces.
C. In areas where finished surfaces are soiled by work of this section, consult manufacturer of surfaces for cleaning advice and comply with their documented instructions.
D. Repair or replace defaced or damaged finishes caused by work of this section.
3.08 PROTECTION
A. Protect installed roofing and flashings from construction operations.
B. Where traffic must continue over finished roof membrane, protect surfaces using durable materials.
DOOR HARDWARE 08 71 00
April 24, 2026 OYA-MacLaren Infirmary 1 of 6
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Hardware for wood and hollow metal doors.
B. Lock cylinders for doors that hardware is specified in other sections.
1.02 RELATED REQUIREMENTS
A. Section 08 06 71 - Door Hardware Schedule: Schedule of door hardware sets.
B.A. Section 08 14 16 - Flush Wood Doors.
C.B. Section 10 26 00 - Wall and Door Protection: Door and frame protection.
1.03 REFERENCE STANDARDS
A. ADA Standards - 2010 ADA Standards for Accessible Design 2010.
B. BHMA A156.1 - Standard for Butts and Hinges 2021.
C. BHMA A156.2 - Bored and Preassembled Locks and Latches 2022.
D. BHMA A156.4 - Door Controls - Closers 2019.
E. BHMA A156.8 - Door Controls - Overhead Stops and Holders 2021.
F. BHMA A156.13 - Mortise Locks & Latches Series 1000 2022.
G. BHMA A156.16 - Auxiliary Hardware 2018.
H. BHMA A156.18 - Materials and Finishes 2020.
I. BHMA A156.30 - High Security Cylinders 2020.
J. BHMA A156.115W - Hardware Preparation in Wood Doors with Wood or Steel Frames 2006.
1.04 ADMINISTRATIVE REQUIREMENTS
A. Coordinate the manufacture, fabrication, and installation of products that door hardware is installed on.
B. Keying Requirements Meeting:
1. Schedule meeting at project site prior to Contractor occupancy.
2. Attendance Required:
a. Contractor.
b. Owner.
3. Agenda:
a. Establish keying requirements.
b. Verify locksets and locking hardware are functionally correct for project requirements.
c. Verify that keying and programming complies with project requirements.
d. Establish keying submittal schedule and update requirements.
4. Incorporate "Keying Requirements Meeting" decisions into keying submittal upon review of door hardware keying system including, but not limited to, the following:
5. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
6. Deliver established keying requirements to manufacturers.
1.05 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Manufacturer's catalog literature for each type of hardware, marked to clearly show products to be furnished for this project, and includes construction details, material descriptions, finishes, and dimensions and profiles of individual components.
C. Shop Drawings - Door Hardware Schedule: Submit detailed listing that includes each item of hardware to be installed on each door. Use door numbering scheme as included in Contract Documents.
August 4, April 24, 2026 OYA-MacLaren Infirmary 2 of 6
1. Provide complete description for each door listed.
2. Provide manufacturer's and product names, and catalog numbers; include functions, types, styles, sizes and finishes of each item.
3. Include account of abbreviations and symbols used in schedule.
PART 2 PRODUCTS
2.01 DESIGN AND PERFORMANCE CRITERIA
A. Provide specified door hardware as required to make doors fully functional, compliant with applicable codes, and secure to extent indicated.
B. Provide individual items of single type, of same model, and by same manufacturer.
C. Provide door hardware products that comply with the following requirements:
1. Applicable provisions of federal, state, and local codes.
2.02 HINGES
A. Manufacturers:
1. McKinney; an Assa Abloy Group company: www.assaabloydss.com/#sle.
2. Stanley, dormakaba Group: www.stanleyhardwarefordoors.com/#sle.
3. Ives - Allegion: us.alegion.com.
4. Substitutions: See Section 01 60 00 - Product Requirements.
B. Hinges: Comply with BHMA A156.1, Grade 1.
1. Provide hinges on every swinging door.
2. Provide following quantity of butt hinges for each door:
a. Doors up to 60 inches High: Two hinges.
b. Doors From 60 inches High up to 90 inches High: Three hinges.
2.03 LOCK CYLINDERS
A. Lock Cylinders: Provide key access on outside of each lock, unless otherwise indicated.
1. Provide cylinders from same manufacturer as locking device.
2. Provide cams and/or tailpieces as required for locking devices.
2.04 CYLINDRICAL LOCKS
A. Manufacturers:
1. Best, dormakaba Group: www.bestaccess.com/#sle.
2. Substitutions: See Section 01 60 00 - Product Requirements.
B. Cylindrical Locks (Bored): Comply with BHMA A156.2, Grade 1, 4000 Series.
1. Bored Hole: 2-1/8 inch diameter.
2. Latchbolt Throw: 1/2 inch, minimum.
3. Backset: 2-3/4 inch unless otherwise indicated.
4. Strikes: Provide manufacturer's standard strike for each latchset or lockset with strike box and curved lip extending to protect frame in compliance with indicated requirements.
a. Finish: To match lock or latch.
2.05 MORTISE LOCKS
A. Manufacturers:
1. Best, dormakaba Group: www.bestaccess.com/#sle.
2. Substitutions: See Section 01 60 00 - Product Requirements.
B. Mortise Locks: Comply with BHMA A156.13, Grade 1, Security, 1000 Series.
1. Latchbolt Throw: 3/4 inch, minimum.
2. Deadbolt Throw: 1 inch, minimum.
3. Backset: 2-3/4 inch unless otherwise indicated.
4. Strikes: Provide manufacturer's standard strike for each latchset or lockset with strike box and curved lip extending to protect frame in compliance with indicated requirements.
a. Finish: To match lock or latch.
April 24, 2026 OYA-MacLaren Infirmary 3 of 6
2.06 CLOSERS
A. Manufacturers; Surface Mounted:
1. Norton; an Assa Abloy Group company: www.assaabloydss.com/#sle.
1. Substitutions: See Section 01 60 00 - Product Requirements.
B. Closers: Comply with BHMA A156.4, Grade 1.
1. Type: Surface mounted to door.
2. Provide door closer on each exterior door.
2.07 OVERHEAD STOPS AND HOLDERS
A. Manufacturers:
1. Rixson; an Assa Abloy Group company: www.assaabloydss.com/#sle.
2. Glynn-Johnson, an Allegion brand: www.allegion.com/us/#sle.
2.3. Substitutions: See Section 01 60 00 - Product Requirements.
B. Overhead Stops and Holders (Door Checks): Comply with BHMA A156.8, Grade 1.
1. Provide stop for every swinging door, unless otherwise indicated.
2.08 FLOOR STOPS
A. Manufacturers:
1. Rockwood; an Assa Abloy Group company: www.assaabloydss.com/#sle.
2. Substitutions: See Section 01 60 00 - Product Requirements.
B. Floor Stops: Comply with BHMA A156.16, Grade 1 and Resilient Material Retention Test as described in this standard.
1. Type: Manual hold-open, with pencil floor stop.
2. Material: Aluminum housing with rubber insert.
2.09 WALL STOPS
A. Manufacturers:
1. Rockwood; an Assa Abloy Group company: www.assaabloydss.com/#sle.
1.2. Substitutions: See Section 01 60 00 - Product Requirements.
B. Wall Stops: Comply with BHMA A156.16, Grade 1 and Resilient Material Retention Test as described in this standard.
1. Type: Bumper, concave, wall stop.
2. Material: Aluminum housing with rubber insert.
2.10 FINISHES
A. Finishes: Provide door hardware of same finish, unless otherwise indicated.
1. Primary Finish: 652; satin chromium plated over nickel, with steel base material (formar US equivalent US26D); BHMA A156.18.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that doors and frames are ready to receive this work; labeled, fire-rated doors and frames are properly installed, and dimensions are as indicated on shop drawings.
3.02 INSTALLATION
A. Install hardware in accordance with manufacturer's instructions and applicable codes.
B. Use templates provided by hardware item manufacturer.
C. Door Hardware Mounting Heights: Distance from finished floor to center line of hardware item. As indicated in following list; unless noted otherwise in Door Hardware Schedule or on drawings.
D. Set exterior door thresholds with full-width bead of elastomeric sealant at each point of contact with floor providing a continuous weather seal; anchor thresholds with stainless steel countersunk screws.
April 24, 2026 OYA-MacLaren Infirmary 4 of 6
3.03 ADJUSTING
A. Adjust hardware for smooth operation.
B. Adjust gasketing for complete, continuous seal; replace if unable to make complete seal.
3.04 CLEANING
A. Clean adjacent surfaces soiled by hardware installation.
B. Replace items that cannot be cleaned to manufacturer's level of finish quality at no additional cost.
3.05 PROTECTION
A. Do not permit adjacent work to damage hardware or finish.
3.06 DOOR HARDWARE
HARDWARE GROUP NO. 01
FOR USE ON DOOR #(S):
101E
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 EA CLOSER 7500 689 NOR
BALANCE OF HARDWARE
EXISTING
HARDWARE GROUP NO. 02
FOR USE ON DOOR #(S):
103 112
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA STOREROOM LOCK 45H7D3H 626 BES
1 EA CLOSER 7500 689 NOR
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
1 EA SECURITY WALL STOP 412 630 ROC
3 EA SILENCER SR64 GRY IVE
HARDWARE GROUP NO. 03
104 105 107 109
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA STOREROOM LOCK 45H7D3H 626 BES
HARDWARE GROUP NO. 01
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA STOREROOM LOCK
W/INDICATOR
45H7TD3H-VIN 626 BES
1 EA OH STOP 100S 630 GLY
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
1 SET SEALS S44D
(FOR SOUND)
DKB PEM
HARDWARE GROUP NO. 02
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA STOREROOM LOCK 45H7D3H 626 BES
1 EA CLOSER 7500PA 689 NOR
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
1 EA WALL STOP WS406/407CVX 630 IVE
April 24, 2026 OYA-MacLaren Infirmary 5 of 6
HARDWARE GROUP NO. 04
FOR USE ON DOOR #(S):
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA STOREROOM LOCK 45H7D3H 626 BES
HARDWARE GROUP NO. 05
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA STOREROOM LOCK
W/INDICATOR
45H7TD3H-VIN 626 BES
1 EA CLOSER 7500 689 NOR
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
1 EA WALL STOP WS406/407CVX 630 IVE
1 SET SEALS S44D
(FOR SOUND)
DKB PEM
HARDWARE GROUP NO. 06
109A
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
2 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA DEADBOLT 45H7AD 626 BES
1 EA FLUSH PULL 955 626 IVE
1 EA OH STOP 90S 630 GLY
2 EA SILENCER SR64 GRY IVE
HARDWARE GROUP NO. 07
110E
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA STOREROOM LOCK 45H7D3H 626 BES
1 EA CLOSER 7500PA 689 NOR
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
HARDWARE GROUP NO. 03
20.1 44 45A 45B
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA STOREROOM LOCK 45H7D3H 626 BES
1 EA ELECTRIC STRIKE 6210 FSE CON 24VDC 630 VON
1 EA LOCK GUARD LG14 630 IVE
1 EA CLOSER 7500PA 689 NOR
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
1 EA WALL STOP WS406/407CVX 630 IVE
3 EA SILENCER SR64 GRY IVE
1 EA WIRE HARNESS CON-6W
(FROM EPT OR STRIKE TO
POWER)
SCH
1 EA ACCESS CONTROL PROVIDED BY DIV 28
HARDWARE GROUP NO. 04
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA PASSAGE MORTISE 45H0N3H 626 BES
HARDWARE GROUP NO. 05
47 48
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA OFFICE MORTISE LOCK 45H7AT3H 626 BES
April 24, 2026 OYA-MacLaren Infirmary 6 of 6
HARDWARE GROUP NO. 08
FOR USE ON DOOR #(S):
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 652 IVE
1 EA ANTI LIGATURE
STOREROOM LOCK
45H7DSPSL 626 BES
1 EA OH STOP 100S 630 GLY
HARDWARE GROUP NO. 09
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA STOREROOM LOCK 45H7D3H 626 BES
HARDWARE GROUP NO. 06
FOR USE ON DOOR #(S):
54B 50A
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA PASSAGE MORTISE 45H0N3H 626 BES
1 EA DELAYED EGRESS MAG M490DE 12/24 VDC 628 SCE
1 EA CLOSER 7500PA 689 NOR
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
1 EA WALL STOP WS406/407CVX 630 IVE
3 EA SILENCER SR64 GRY IVE
1 EA POWER SUPPLY PS902 900-2RS 120/240 VAC VON
2 EA ACCESS CONTROL PROVIDED BY DIV 28
POWER SUPPLY REQUIRES 120VAC. DELAYED EGRESS MAGNETIC LOCK REQUIRES 24V FROM
POWER SUPPLY, ACCESS CONTROL AND FIRE ALARM INPUT.
HARDWARE GROUP NO. 07
49 50 52 53
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
1 HARDWARE BY DOOR
MANUFACTURER
HARDWARE GROUP NO. 08
PROVIDE EACH SGL DOOR(S) WITH THE FOLLOWING:
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 EA HINGE 5BB1HW 4.5 X 4.5 NRP 652 IVE
1 EA STOREROOM LOCK 45H7D3H 626 BES
1 EA OH STOP 90S 630 GLY
UP
LEGEND
SECURITY SEPARATION
3 HOUR WALL
SMOKE BARRIER
SMOKE PARTITION
NEW EXIT SIGN, ARROW(S) INDICATES
DIRECTION (IF SHOWN)
KEY LOCKED SECURITY GATE
CHAINLINK FENCE AND GATE
OCCUPANT EXIT LOAD
EGRESS TOTAL PATH OF TRAVEL DISTANCE
FIRE EXTINGUISHER
NOT AN EXIT
SEC LK
XX
X'-X"
FE
NE
BB
CC
2 3 4
159' - 9"
NE
NE
COURTYARD
RECEIVING /
STORAGE
MED LAB
SECURITY
MED SUPPLY
MED ROOM
NURSE
STATION
MEETING
ROOM
NURSE
SUPERVISOR
NURSE
SUPERVISOR
PATIENT
ROOM/AII
PATIENT
ROOM
SHOWER
ROOM
PATIENT
ROOM
PATIENT
ROOM
DAY ROOM
CIRCULATION
DENTAL LAB
VAC STORE
DENTAL
OFFICE
OPERATORY
OFFICE /
EXAM ROOM
SHARED
OFFICE
PSYCH
OFFICE
NURSE
SUPER /
EXAM ROOM
JANITOR
CLOSET
YTH TLT
EXAM ROOMMED SUPPLY
PSYCH
OFFICE
PSYCH
OFFICE
PSYCH
OFFICE
PSYCH
OFFICE
SHARED
OFFICE
YTH TLT
EXAM ROOM
LOCKERS
BREAK
ROOM
STF TLTSTF TLT
HALLWAY
HALLWAY
GENERAL
STORAGE
KIT
COURTYARD
VESTIBULE
DENTAL VAC
YOUTH
WAITING
ELEC. CLOSET
AREA OF WORK
53.52.3 2.8
AA
A.6A.6
9'
9"
FE
FE
FE
DD
0 4.63.90.9 1.5
AREA OF WORK
6 7
AREA OF WORK
NEW 3-HR FIRE
SEPARATION
1,201 SF
SLEEPING AREA
B
120 SF / OCC
10 OCC
7,187 SF
OUTPATIENT
B
100 SF / OCC
72 OCC
COURTYARD
744 SF
GEN. STORAGE
S1
300 SF / OCC
3 OCC
RECEIVING
/ STORAGE
MED LAB
SECURITY
MED
SUPPLY
MED ROOM
NURSE
STATION
MEETING
ROOM
NURSE
SUPERVISOR
NURSE
SUPERVISOR
PATIENT
ROOM/AII
PATIENT
ROOM
SHOWER
ROOM
PATIENT
ROOM
PATIENT
ROOM
DAY ROOM
CIRCULATION
DENTAL
LAB
VAC
STORE
DENTAL
OFFICE
OPERATORY
OFFICE /
EXAM
ROOM
SHARED
OFFICE
PSYCH
OFFICE
NURSE
SUPER /
EXAM
ROOM
JANITOR
CLOSET
YTH TLT
EXAM
ROOM
MED
SUPPLY
PSYCH
OFFICEPSYCH
OFFICE
PSYCH
OFFICEPSYCH
OFFICE
SHARED
OFFICEYTH TLT
EXAM
ROOM
LOCKERS
BREAK
ROOM
STF TLTSTF TLT
HALLWAY
HALLWAY
GENERAL
STORAGE
KIT
COURTYARD
VESTIBULE
DENTAL
VAC
YOUTH
WAITING
ELEC.
CLOSET
1,604 SF
TRANSPORTATION
OFFICE
B
150 SF / OCC
11 OCC
AREA OF WORK
B - OCCUPANCY - 10,333 SF - 91%
LEGEND - OCCUPANCY
S-1 - OCCUPANCY - 980 SF - 8.7%
OCC. B - [36,000 + (9,000 * .5) ] = 40,500, SF
TOTAL ALLOWABLE 40,500 SF
AT COUNTERTOPS
AT COUNTERTOPS
AT WALL-MOUNT
EQUIPMENT
TOP OF WALL PHONES
PULL STATION
(TOP OF BOX)
HORN /S STROBE
(BOTTOM OF BOX)
AT ALL OTHER
LOCATIONS (INCLUDING
OPEN WORK COUNTERS)
ONE URINAL
MINIMUM AT ADA
HEIGHT
ADDITIONAL
URINALS TO BE
MOUNTED AT
TALLER HEIGHT
MR
PROVIDE ADDITIONAL
WALL FINISH BEHIND
MIRROR FOR A FLUSH
MOUNTING SURFACE
M
AX
1'
- 5
1'
- 1
1"
3' - 0" MIN
2'
- 1
0"
7'
- 5
3'
- 8
1'
- 6
4'
- 0
16"-18" (M
AX
2'
- 1
0"CL
EA
RA
NC
E
" M
IN
KN
EE
SD
W / L
AV
AT
OR
Y
3'
- 4
" M
AX
6'
- 8
4'
- 0
1'
- 6
"3'
- 8
3' - 0"
"-1
9" 3'
- 4
"TPD
1' - 0" MAX
3' - 6" MIN
2'
- 1
0"
1'
- 6
3'
- 3
3' - 3" -41"
OF TP
7"-9" TO
CENTER
CONTROLS MUST BE
WITHIN THIS AREA & 15"
(MAX) LEFT OR RIGHT OF
CENTER LINE OF SEAT.1' - 6"
3'
- 2
4'
- 0
M
AX
2'
- 3
M
AX
3'
- 0
" 4'
- 0
4'
- 2
AUTO DOOR OPENER
CARD READER
M
AX
2'
- 1
0"
M
IN
2'
- 3
TYP 40" TO CONTROLS AND
DISPENSER OPENING (MAX. 48"
FRONT REACH AND 48" SIDE
REACH)
ACCESSIBLE
NON-ACCESSIBLE
PROVIDE ADDITIONAL WALL
FINISH BEHIND PTD FOR A
FLUSH MOUNTING SURFACE
PTD
5'
- 4
4'
- 0
NOTES:
1) ALL DIMENSIONS ARE TYPICAL UNLESS NOTED OTHERWISE ON INTERIOR ELEVATIONS.
2) WALL MOUNTED ACCESSORIES SHALL NOT PROJECT MORE THAN 4" FROM FACE OF WALL WHEN LOCATED BELOW 6'-8".
3) NON USED ITEMS ARE HALFTONE
7'
- 0
(T
YP
1'
- 1 0"
4'
- 4
EXTINGUISHER
HANDLE
3'
- 4
A URINAL (RIM HEIGHT) B WATER CLOSET (SEAT HEIGHT) C SIDE GRAB BAR (TO CENTER) D REAR GRAB BAR (TO CENTER) E TOILET PAPER DISP. F LAVATORY G SOAP DISPENSER H MIRROR
J PAPER TOWEL DISP. K COAT HOOK L SHOWER (REF. BENCH LOCATION) M ELECT. OUTLETS
(CENTER OF BOX) N LIGHT SWITCHES
(TOP OF BOX) O TELE / DATA CONN.
(CENTER OF BOX) P FIRE ALARM DEVICES
R VANITY LIGHT FIXTURE
(CENTER OF BOX) S FIRE EXTINGUISHER CABINET T ADA DRINKING FOUNTAIN U DOOR ACCESSORIES
(TOP OF BOX) V SIGNAGE
(CENTER OF BOX) W BABY CHANGING STATION
PULL CORDS & BUTTONS
(CENTER OF BOX)
STAFF STATIONS
(TOP OF BOX)
DOME LIGHTS
(CENTER OF BOX)
8'
- 0
4'
- 0
Q NURSE CALL
SCD
3'
- 4
8"
I SEAT COVER DISP.
MIN
1' - 0"
1' - 0"
W /O
LA
VA
TO
RY
2'
- 1
1" M
AX
MR
STANDING = 38"-43"
1'
- 5
3'
- 2
" 3'
- 1
0"
5'
- 0
THERMOSTAT
LIGHT SWITCH
DOOR LEVER
DUPLEX, PHONE, AND
DATA OUTLERS TO BE
LOCATED 17" AFF. U.N.O.
NOTE:
CONTRACTOR TO VERIFY
ALL DIMENSIONS AT SITE
EQ
A
T
DO
OR
H
IN
GE
S
EQ
A T
DO
OR
H
IN
GE
S
5"
9"
" M
AX
. B
AS
E
OF
T
OP
LI
NE
" M
IN
. B
AS
E
OF
LO
W
EE
ST
LI
NE
A.D.A. SIGNAGE
1' - 0"
RISK PROFILE FOR SPACES
HIGH RISK - YOUTH LEFT UNATTENDED
MODERATE RISK - YOUTH UNRESTRANINED
BUT ATTENDED
LOW RISK - STAFF ONLY ACCESS
(VIA PHYSICAL SECURITY LIKE DOOR LOCKING)
TYLER P CARLSON
E
PORTLAND, OREGON
R
S T
TA
G R E
I
TES
E
FO OR
N
OG
CDE RA
TE
TC
H I
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
KJ
O
S
AR
C H
IT
EC
TS
, L
LC
C O
PY
R
IG
H
T
SW
S ix th
A ve nu e, S ui te
Po rtl an d, O R
Ph on e:
/2
-4
8/ 5/
:2
8:
P M
C :\U se rs
\w ills lo m an \D oc um en ts
\R ev it
\M ac La re n
- 2
_w ills lo m an
.rv t
FIRE AND LIFE SAFETY
06.27.2025
G1.01
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
25015
M ac
L A
R E
N
IN
F
IR
M A
R Y
P
H A
R M
A C
Y R
E N
O V
A T
IO
N
N P
A C
IF
IC
H W
Y . W
O O
D B
U R
N , O
R
O R
EG
O
N Y
O U
TH
A
U
TH
O R
IT
Y
GENERAL NOTES: FIRE & LIFE SAFETY
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL
TRADES ARE THOROUGHLY FAMILIAR AND COMPLY WITH THE
REQUIREMENTS LISTED IN THE "FIRE AND LIFE SAFETY STANDARDS"
(FLSS)
2. ALL RATED ASSEMBLIES SHALL BE CONSTRUCTED TO PREVENT THE
MOVEMENT OF FLAME OR GASSES PER CODE
3. INSTALL RATED ENCLOSURES FOR ALL RECESSED ITEMS IN RATED
WALLS PER CODE. SEE ARCHITECTURAL DETAILS.
4. ALL PENETRATIONS THROUGH RATED ASSEMBLIES IN AREA OF WORK
SHALL BE FIRESTOPPED OR SEALED PER CODE.
5. THE CONTRACTOR SHALL FIELD VERIFY THE CONDITION OF THE
EXISTING FLSS SYSTEMS IN THE AREAS OF WORK THAT MAY REQUIRE
UPDATING. AREAS INCLUDE (BUT ARE NOT LIMITED TO) THE
FOLLOWING:
A. CONTRACTOR TO VERIFY THAT ALL EXISTING PENETRATIONS OF
RATED ASSEMBLIES WHICH ARE EXPOSED TO VIEW DURING
CONSTRUCTION ARE COMPLIANT WITH CODE REQUIREMENTS.
B. CONTRACTOR TO EXTEND ANY EXISTING WALL (WITHIN THE AREA OF
WORK) TO STRUCTURE WHICH IS REQUIRED BY FLSS BUT DOES NOT
PRESENTLY EXIST.
C. CONTRACTOR TO VERIFY THAT ALL DUCTWORK PENETRATIONS
THROUGH RATED ASSEMBLIES ARE EQUIPPED WITH FIRE AND/ OR
SMOKE DAMPERS AS REQUIRED BY CODE.
D. VERIFY THAT THE FIRE ALARM, EMERGENCY LIGHTING, AND
EMERGENCY POWER IN THE AREA OF WORK CONFORMS TO THE FLSS
"ELECTRICAL STANDARDS" SECTION FOR THE OCCUPANCY TYPE
INDICATED ON THE FLS PLANS
6. REFER ELECTRICAL FOR EXIT SIGN LOCATIONS
7. ALL EMERGENCY EXIST HARDWARE ARE DELAYED EGRESS.
CODE SUMMARY
PROJECT NAME: MacLaren Infirmary & Pharmacy Renovation
ADDRESS: 2630 N PACIFIC HWY. WOODBURN, OR
97071
OWNER: OREGON YOUTH AUTHORITY
CODES: 2022 OSSC
NFPA 101-CHAPTER 38
OCCUPANCY: B
OCCUPANCY: UNIT HOUSE A MAXIMUM OF 4 DETAINEES
FOR MEDICAL OBSEVATION ONLY FOR
LESS THAN 48 HRS.
NUMBER OF STORIES: ONE
CONSTRUCTION TYPE: V-B
FIRE PROTECTION: FULLY SPRINKLERED
FIRE ALARM SYSTEM: YES
ALLOWABLE SQUARE FOOTAGE: (TABLE 506.2)
TOTAL AREA OF NEW BUILDING: 11,083 SF
TOTAL AREA ALLOWED: 40,500 SF
INFIRMARY SQUARE FOOTAGE: 9,052 SF
RENOVATION SQUARE FOOTAGE: 2,985 SF
ADDITION SQUARE FOOTAGE: 1,865 SF
FIRE SEPARATION DISTANCE: (602) ≥30'-0"
MAXIMUM AREA OF EXTERIOR WALL
OPENINGS (705.8):
≥30'-0"
UNPROTECTED, SPRINKLERED
UNLIMITED
OCCUPANT LOAD: (1004.5) 1/120 SF, SLEEPING AREAS
1/100 SF, OUTPATIENT AREAS
1/300 SF, STORAGE AREAS
MAX. COMMON PATH OF TRAVEL
(1006.2.1): 75 FT
MAX. TRAVEL DISTANCE (1017.2.1): 200 FT
FIRE RESISTIVE RATINGS: (TABLE NO. 601, 705.5 OF THE I.B.C.)
BUILDING ELEMENT (>10'
SEPARATION)
TYPE V-B
STRUCTURAL FRAME 0 HOUR
BEARING WALLS
EXTERIOR 0 HOUR
INTERIOR 0 HOUR
NON BEARING WALLS AND PARTITIONS
EXTERIOR 1 HOUR, IF <30' FIRE SEPARATION DISTANCE
0 HOUR, IF ≥30' FIRE SEPARATION DISTANCE
INTERIOR 0 HOUR
FLOOR CONSTRUCTION
INCLUDING SUPPORTING BEAMS
AND JOISTS
0 HOUR
NON BEARING WALLS AND PARTITIONS
INCLUDING SUPPORTING BEAMS
AND JOISTS
0 HOUR
1" = 10'-0"G1.01
2 LEVEL 1 - FLS & RISK ASSESSMENT
1" = 40'-0"G1.01
1 LEVEL 1
1" = 20'-0"G1.01
3 LEVEL 1 - PROJECT OCCUPANCY
1/4" = 1'-0"G1.01
4 TYPICAL MOUNTING HEIGHTS
1/2" = 1'-0"G1.01
5 STANDARD MOUNTING HEIGHTS
PLUMBING CALCULATIONS
CALCULATION FACTORS
PROJECT OCCUPANTS FOR CALC. 85 OCCUPANTS
PROJECT CLASSIFICATION FOR
CALC.
B CLASSIFICATION
WATER CLOSETS
REQUIRED COUNT 1 PER 25 FOR FIRST 50, 1 PER 50 AFTER
THAT
REQUIRED IN PROJECT 3 WATER CLOSETS
INCLUDED IN PROJECT 5 WATER CLOSETS
LAVATORY
REQUIRED COUNT 1 PER 40 FOR FIRST 80, 1 PER 80-
AFTER THAT
0 HOUR, IF ≥30' FIRE SEPARATION
DISTANCE
REQUIRED IN PROJECT 2 LAVATORIES
INCLUDED IN PROJECT 5 LAVATORIES
SHOWERS/BATHTUBS
INCLUDED IN PROJECT 1 SHOWER STALL
REQUIRED COUNT 0 SHOWER/BATHTUB
DRINKING FOUNTAINS
INCLUDED IN PROJECT 0 DRINKING FOUNTAIN
REQUIRED COUNT 0 DRINKING FOUNTAIN
1 County Comments 08/19/2025
2 ADDENDUM 01 08/03/2026
60"
LEGEND
EXISTING PARTITION
NEW PARTITION
CARD READER
A4.012
BB
CC
2 3 4
RECEIVING /
STORAGE
MED LAB
SECURITY
C20.1
MED SUPPLY
MED ROOM
NURSE
STATION
MEETING
ROOM
NURSE
SUPERVISOR
NURSE
SUPERVISOR
PATIENT
ROOM/AII
PATIENT
ROOM
SHOWER
ROOM
PATIENT
ROOM
PATIENT
ROOM
DAY ROOM
CIRCULATION
C20
VAC STORE
40.1DENTAL
OFFICE
D21
PSYCH
OFFICE
NURSE
SUPER /
EXAM ROOM
JANITOR
CLOSET
YTH TLT
75EXAM ROOM
PSYCH
OFFICE
PSYCH
OFFICE
PSYCH
OFFICE
PSYCH
OFFICE
SHARED
OFFICE
YTH TLT
LOCKERS
BREAK
ROOM
STF TLT
STF TLT
HALLWAY
C30
CHECK-IN
KIT
41.1
A5.01
A5.01
A5.02 4
A5.02
A5.01 14
A5.01
A5.02
A5.01 5
A5.0218
A5.03
A5.02
A5.02
A5.02
A2.21
A4.01
A .1
A .1
A .1
A .1
54B
.1
45A
45B
78 77
A A
B
B
B C
DE
A4.21
A4.21
A4.21
A4.21
A8.01 F
A8.01G
A8.01H
A8.01
J
A8.01
K
A8.01
L
10' - 2 1/4"
W26
W26
P33
P33 P33P
P33P33 P36
W26
W26
P33P
P33P
P33P
A.1
ALIGN
AL
IG
N
YOUTH
WAITING
C10.1
ENTRY
C10
ALIGN
7' - 8 1/2"
135.00°
ALIGN
8' - 1 3/4" 4' - 9"
F13
W16
CLEAR
5' - 0"
53.52.3 2.8
AA
A.6
FR
OM
F
AC
E
OF
E
XI
ST
IN
G 9'
- 5 1/
2" 1'
- 6
A4.21
A4.21
A2.21
ALIGN
9'
- 2
1/ 4"
5'
- 9
8"
21' - 5 1/2" 24' - 3 1/4" 19' - 11 1/4" 29' - 6 1/2"
13' - 5" 12' - 9 1/2" 12' - 11 1/2" 10' - 7 1/4" 18' - 0" 12' - 3"
3/4
1"
3/4
6' - 10" 6' - 3" 5' - 8 1/2" 5' - 0 3/4" 7' - 2 1/2" 10' - 6"
AL
IG
N
ALIGN
8'
- 4
3/ 4"
4"
6"
5"
6'
- 5
1/ 2"
1/2
7'
- 1
1/4
8'
- 0
1/ 4"
2'
- 1
3/4
9' - 0 1/2"
X16
X16X
P13 P33
P13
P13
P13
P13
P13
P13
P13
P13
86R
85R
LINE OF CANOPY (ABOVE)LINE OF CANOPY
(ABOVE)
4" 4' - 8 1/4"
2' - 9 1/2"
5'
0" A8.01 H R V
P16
P13
P13 P13
P16
P13
P16
FR
OM
F
AC
E
OF
E
XI
ST
IN
G
P13
7'
- 1
1/2
5' - 1 1/4"
1'
- 1
DD
A4.31
A4.31
12' - 10 3/4"
8'
- 3
1/ 2"
1' - 6"
6"
1/ 2"
11' - 8 1/4"
18' - 0"
4.63.9
B
M1 X16
F13AO
F11.5
D.S. D.S.
D.S.D.S.D.S.
ALIGN
M1
ETR
M1
M2
M2
M2 M2 M2
FO
F
0.9 1.54 A4.21
F.O.M.
3'
- 3
3/ 4"
3'
- 5
3/ 4"
3'
- 5
3/ 4"
1/4"
1/
2"
F.O.M.
6'
- 1
1/2
F.O.M.
.50
2 1 /2"5"
50A
PLYWOOD ON BOTH
SIDES OF WALL TYPE
P13P
5' - 0"
2' - 2 1/4"
ALIGN
CL
EA
R
4'
- 3
1' - 11" 5'
- 9
1/ 2"
ALIGN
M2
P13P13
2'
- 6
3/ 4"
5' - 3 1/2"
1' - 8 1/4" 1' - 7 3/4"
X26
MT2
A6.04
A6.04
SIM
A6.05
A6.05
TYLER P CARLSON
E
PORTLAND, OREGON
R
S T
TA
G R E
I
TES
E
FO OR
N
OG
CDE RA
TE
TC
H I
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
KJ
O
S
AR
C H
IT
EC
TS
PY
R
IG
H
T
SW
S ix th
A ve nu e, S ui te
Po rtl an d, O R
Ph on e:
/2
-4
8/ 5/
:2
8:
P M
C :\U se rs
\w ills lo m an \D oc um en ts
\R ev it
\M ac La re n
- 2
_w ills lo m an
.rv t
ENLARGED PLAN -
PATIENT AREA
06.27.2025
A2.11
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
25015
M ac
L A
R E
N
IN
F
IR
M A
R Y
P
H A
R M
A C
Y R
E N
O V
A T
IO
N
N P
A C
IF
IC
H W
Y . W
O O
D B
U R
N , O
R
O R
EG
O
N Y
O U
TH
A
U
TH
O R
IT
Y
KEY PLAN
KEYNOTES
A.1 PROVIDE ANTI-LIGATURE FITTINGS AND FIXTURES IN PATIENT
TOILET - REF SPECS
GENERAL NOTES: PLAN
1. REFER TO PARTITION TYPES SHEET FOR LEGEND AND
CONSTRUCTION ASSEMBLIES.
2. REFER TO PARTITION DETAILS FOR DEFLECTION TRACK, BACKING
PLATE FOR BLOCKING AND FIRE RATED CONNECTION DETAILS
3. REFER TO ELEVATIONS FOR ACCESSORIES AND EQUIPMENT
REQUIRING BLOCKING AND WHEN USING METAL STUDS REFER TO
DETAIL SHEETS FOR BLOCKING REQUIREMENTS AND REGULATIONS.
4. REFER TO STRUCTURAL FOR SHEAR WALLET, MECHANICAL AND
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. NOTIFY
ARCHITECT OF ANY CONFLICTS FOR WRITTEN RESOLUTION.
5. INTEGRAL BASE TO BE INSTALLED IN ALL HOUSEKEEPING CLOSETS,
SOILED HOLD ROOMS, AND TOILET ROOMS (UNLESS NOTED
OTHERWISE).
6. VERIFY ALL EXISTING DIMENSIONS IN FIELD PRIOR TO ORDERING OR
MANUFACTURING ANY COMPONENT.
7. FOR METAL FRAMED WALLS- LOCATE HINGE SIDE OF ALL DOORS 4"
FROM PERPENDICULAR FRAMING AND FOR WOOD FRAMED
WALL-LOCATE HINGE SIDE OF DOOR 4-1/2" FROM PERPENDICULAR
FRAMING U.N.O.
8. ALL DIMENSIONS TO FACE OF STUD UNLESS OTHERWISE NOTED.
9. ALL RESTROOMS, HOUSEKEEPING AREAS AND OTHER AREAS
REQUIRING FLOOR DRAINS SHALL HAVE AN INTEGRAL BASE COVING
U.N.O.
10. GENERAL NOTES ON THIS PAGE DO NOT EXCLUDE NOTES
ELSEWHERE; THIS DOCUMENT SET IS COMPLIMENTARY. NOTES ON
OTHER SHEETS MAY HAVE BEARING/ APPLICATION TO WORK SHOWN
ON THIS SHEET
1/4" = 1'-0"A2.11
1 LEVEL 1 - OPTION 01
1 County Comments 08/19/2025
FINISH FLOOR
SEE
SCHEDULE
SE
E
SC
HE
DU
LE
SEE
SCHEDULE
SE
E
SC
HE
DU
LE2'
- 9
9"
6"8"
SEE
SCHEDULE
SE
E
SC
HE
DU
LE2'
- 9
9"
8" 8"
SEE
SCHEDULE
SE
E
SC
HE
DU
LE
6" 6"
SF
SINGLE FLUSH
VL
VISION LITE
(NON RATED)
HL
HALF LITE
FG
FULL LITE
M
IN
6"
6"
FINISH FLOOR
2" SEE
SCHEDULE
2"
SE
E
SC
HE
DU
LE
2"
SINGLE/DOUBLE
HM FRAME
2"
SEE
SCHEDULE 2" SEE
SCHEDULE
HM FRAME W/
SIDELITE
SE
E
SC
HE
DU
LE
2"
FINISH FLOOR
4'
- 0
4'
- 0
2' - 10"
4'
- 0
3'
- 2
4' - 0"
A
FIXED
DOUBLE LITE
1 7/16" GLASS
4'
- 0
4'
- 0
4' - 0"
B
FIXED
DOUBLE LITE
1 7/16" GLASS
C
FIXED
SINGLE LITE
11/16" GLASS
4'
- 0
3'
- 2
3' - 0"
D
FIXED
SINGLE LITE
11/16" GLASS
4'
- 6
2'
- 8
4' - 7"
E
FIXED
SINGLE LITE
11/16" GLASS
IG
IG
IGIG
7'
- 0
2" 3' - 0" 2" 4" 5' - 11" 4"
FINISH FLOOR
1'
- 6
3'
- 2
2'
- 6
"12
A8.01
A8.01
A8.01
A8.01
IG IG
IG
IG
4'
- 6
3'
- 0
AF
F
FINISH FLOOR
EQ EQ EQ EQ
A8.01
A8.01
A8.01
A8.01
Sim
A8.01
IG IG IG IG
2" 3'
- 8
3'
- 4
AF
F
4" 2' - 2 1/2" 2" 3' - 0" 0"
FINISH FLOOR
A8.01
A8.01
A8.01
IG
4'
- 6
23' - 5 3/4"
FINISH FLOOR
EQ EQ EQ EQ
A8.01
Sim
A8.01
A8.01
A8.01
A8.01
IG IG IG IG
2" 7'
- 1 0"
A
FF
FINISH FLOOR
A8.01
A8.01
A8.01
A8.01
FINISH FLOOR
TOP OF WINDOW
LV-4
4' - 0" - WIDE
LOUVERS
LV-2
2' - 10" - WIDE
LOUVERS
1'
- 9
4' - 0" 2' - 10"
1'
- 9
2" 4'
- 2
2" 3'
- 6
AF
F
EQ EQ EQ EQ EQ
A8.01
A8.01
A8.01
S1
SOLID SURFACE SINKS
CORIAN SINK
805P
1'
- 3
3/ 4"
1' - 5 3/4"
METAL STUD
BASKER ROD AND BH SEALANT
SHIM
NEW WINDOW, PER
SCHEDULE
5/8" GYPSUM BOARD
5"
DATA
CONDUIT
ELECTRICAL
CONDUIT
4 1 /2"
NEW WINDOW, PER SCHEDULE
3 1/2" X 3 1/2" HSS COLUMN
5/8" GYP, SEE PARTITIAN TYPES
SEALANT AND BACKER ROD
SHIM
5/8" GYP, SEE PLAN FOR WALL TYPE
NEW WINDOW, PER SCHEDULE
BH SEALANT AND BACKER ROD
SHIM
METAL STUD
BASKER ROD AND BH SEALANT
SHIM
NEW WINDOW, PER
SCHEDULE
5/8" GYPSUM BOARD
NEW WINDOW, PER SCHEDULE
3 1/2" X 3 1/2" HSS COLUMN
5/8" GYP, SEE PARTITIAN TYPES
SEE WINDOW SCHEDULE FOR TYPE
NEW WINDOW, PER SCHEDULE
NEW WINDOW, PER SCHEDULE
SECURITY METAL MULLION
NEW WINDOW, PER SCHEDULE
SECURITY METAL MULLION
NEW WINDOW, PER SCHEDULE
NEW WINDOW, PER SCHEDULE
CONTINUOUS BACKER ROD AND
SEALANT BOTH SIDES
SHIM
FLOOR MATERIAL OVER
CONCRETE SLAB
NEW WINDOW, PER
SCHEDULE
BACKER ROD AND BH
SEALANT
SHIM
5/8" GYP, REF PLAN FOR WALL
TYPE
TYLER P CARLSON
E
PORTLAND, OREGON
R
S T
TA
G R E
I
TES
E
FO OR
N
OG
CDE RA
TE
TC
H I
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
KJ
O
S
AR
C H
IT
EC
TS
PY
R
IG
H
T
SW
S ix th
A ve nu e, S ui te
Po rtl an d, O R
Ph on e:
/2
-4
8/ 5/
:2
9:
P M
C :\U se rs
\w ills lo m an \D oc um en ts
\R ev it
\M ac La re n
- 2
_w ills lo m an
.rv t
DOOR SCHEDULE &
WINDOW TYPES
06.27.2025
A8.01
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
25015
M ac
L A
R E
N
IN
F
IR
M A
R Y
P
H A
R M
A C
Y R
E N
O V
A T
IO
N
N P
A C
IF
IC
H W
Y . W
O O
D B
U R
N , O
R
O R
EG
O
N Y
O U
TH
A
U
TH
O R
IT
Y
DOOR SCHEDULE
MARK
ROOM
NUMBER ROOM NAME
DOOR FRAME
FIRE
RATING HDWR COMMENTS
SIZE
TYPE MATERIAL TYPE MATERIALWIDTH HEIGHT
20.1 40 MED LAB 3' - 0" 7' - 0" VL SC 1 HM 03
40 C20 CIRCULATION 3' - 0" 7' - 0" VL SC 1 HM 02
41 41 RECEIVING / STORAGE 3' - 0" 7' - 0" SF SC 1 HM 08
43 44 MED SUPPLY 3' - 0" 7' - 0" -- 1 HM
44 43 MED ROOM 3' - 0" 7' - 0" HL SC 1 HM 03
45A 42 NURSE STATION 3' - 0" 7' - 0" HL SC 1 HM 03
45B 42 NURSE STATION 3' - 0" 7' - 0" HL SC SF-H HM 03
46 45 MEETING ROOM 3' - 0" 7' - 0" HL SC 1 HM 04
47 46 NURSE SUPERVISOR 1 3' - 0" 7' - 0" HL SC 1 HM 05
48 47 NURSE SUPERVISOR 2 3' - 0" 7' - 0" HL SC 1 HM 05
49 54 PATIENT ROOM/AII 3' - 0" 7' - 0" FG SC SF-H HM 07
50 53 PATIENT ROOM 3' - 0" 7' - 0" FG SC SF-F HM 07
50A 50 DAY ROOM 3' - 6" 7' - 0" HL SC 2 HM 06
51 55 SHOWER ROOM 3' - 0" 7' - 0" SF SC 1 HM 01
52 52 PATIENT ROOM 3' - 0" 7' - 0" FG SC SF-F HM 07
53 51 PATIENT ROOM 3' - 0" 7' - 0" FG SC SF-F HM 07
54B 50 DAY ROOM 3' - 0" 7' - 0" HL SC 1 HM 06
58 D21 DENTAL OFFICE 3' - 0" 7' - 0" HL SC (E) (E) REUSE DOOR HARDWARE
61 D22 SHARED OFFICE 3' - 0" 7' - 0" HL SC (E) (E) REUSE DOOR HARDWARE
64 77 JANITOR CLOSET 3' - 0" 7' - 0" SF SC (E) (E) REUSE DOOR HARDWARE
77 83 STF TLT 3' - 0" 7' - 0" SF SC (E) (E) REUSE DOOR HARDWARE
78 82 STF TLT 3' - 0" 7' - 0" SF SC (E) (E) REUSE DOOR HARDWARE
80 80 LOCKERS 3' - 0" 7' - 0" (E) (E) (E) (E) REUSE DOOR HARDWARE
85R 41 RECEIVING / STORAGE 5' - 0" 7' - 0" (E) (E) (E) (E) REUSE DOOR HARDWARE
86R 41 RECEIVING / STORAGE 5' - 0" 7' - 0" (E) (E) (E) (E) REUSE DOOR HARDWARE
1/4" = 1'-0"
DOOR TYPES
1/4" = 1'-0"
FRAME TYPES
GENERAL NOTES: DOORS
1. FIELD VERIFY ALL DIMESIONS
2. COORDINATE FRAME SIZES WITH WALL THICKNESS AT NEW AND EXISTING
CONDITIONS
3. WINDOW DIMENSIONS ARE UNIT SIZE NOT ROUGH OPENINGS.
4. PROVIDE SAFETY GLAZING WHERE REQUIRED BY BUILDING CODE.
5. ALL DOORS SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.
6. DOORS SHALL BE PREPARED AND COORDINATED FOR INSTALLATION OF
HARDWARE. DOOR HAND SHALL BE PER PLANS, REFER TO DRAWINGS FOR
DOOR SWING AND RELATIONSHIP TO FRAME.
7. TOPS AND BOTTOMS OF ALL NON-STAINED DOORS EXPOSED TO WEATHER
SHALL BE PRIMED AND PAINTED.
8. CONTRACTOR SHALL COORDINATE ALL DOOR HARDWARE, FINISHES AND
MANUFACTURER PER OWNER. HARDWARE IS OWNER-SELECTED;
CONTRACTOR FURNISHED AND INSTALLED.
9. WHERE INDICATED – SECURITY ACCESS CONTROLS ARE FURNISHED BY
CONTRACTOR; ACCESS CONTROLS TO BE VERIFIED BY OWNER.
10. SHOP DRAWINGS SHALL BE PROVIDED FOR ALL DOORS AND HARDWARE
FOR REVIEW AND APPROVAL PRIOR TO INSTALL.
11. CONTRACTOR TO COORDINATE TRIM PACKAGE AND COLORS WITH
INTERIOR DESIGN DRAWINGS, FINISH SCHEDULE, AND DEVELOPMENT
REVIEW APPROVALS FOR EXTERIOR COLORS.
12. EXTERIOR HOLLOW METAL DOORS SHALL BE INSULATED.
13. HOLLOW METAL DOORS AND FRAMES SHALL BE SHOP PRIMED AND FIELD
PAINTED, TYPICAL UNLESS OTHERWISE NOTED.
14. JAMB ANCHORS AT HOLLOW METAL FRAMES: PROVIDE NUMBER AND
SPACING OF ANCHORS AS FOLLOWS: A.
14.A. A. STUD-WALL TYPE: LOCATE ANCHORS NOT MORE THAN 18-INCHES FROM
TOP AND BOTTOM OF FRAME. SPACE ANCHORS NOT MORE THAN 32-INCHES
O.C. AND AS FOLLOWS:
14.A.i. i. THREE ANCHORS PER JAMB UP TO 60-INCHES HIGH.
14.A.ii. ii. FOUR ANCHORS PER JAMB FROM 60 TO 90-INCHES HIGH.
14.A.iii. iii. FIVE ANCHORS PER JAMB FROM 90 TO 96-INCHES HIGH.
14.A.iv. iv. FIVE ANCHORS PER JAMB PLUS ONE ADDITIONAL ANCHOR PER JAMB FOR
EACH 24-INCHES OR FRACTION THEREOF ABOVE 96-INCHES HIGH.
14.B. B. POST INSTALLED EXPANSION TYPE: LOCATE ANCHORS NOT MORE THAN
6-INCHES FROM TOP AND BOTTOM OF FRAME. SPACE ANCHORS NOT MORE
THAN 26-INCHES ON CENTER.
15. ALL SMOKE DOORS TO BE CONNECTED TO BUILDING FIRE ALARM SYSTEM.
15. HEAD ANCHORS AT HOLLOW METAL FRAMES: PROVIDE TWO ANCHORS PER
HEAD FOR FRAMES MORE THAN 42-INCHES WIDE
16. GENERAL NOTES LISTED ON THIS PAGE ARE NOT INTENDED TO BE AT THE
EXCLUSION OF NOTES LISTED ELSEWHERE; THIS DOCUMENT SET IS MEANT
TO BE COMPLIMENTARY, AND NOTES LISTED ON OTHER SHEETS MAY HAVE
BEARING/ APPLICATION TO WORK SHOWN ON THIS SHEET.
16. MAGNETIC HOLD-OPEN DEVICES SHALL BE TIED TO THE FIRE ALARM
SYSTEM.
17. ALL SMOKE DOORS TO BE CONNECTED TO BUILDING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .