This is a Clarification document issued by the State of Oregon for ITB #S-DASOBO-00016020 regarding the MacLaren Youth Correctional Facility Infirmary & Pharmacy Renovation project. The clarification addresses five key inquiries from bidders submitted on August 3, 2026, and provides official guidance on project scope and specification requirements. The project involves renovation and expansion of the medical facilities at the Oregon Youth Authority's MacLaren facility, including expansion of the medical lab, security station, medical room and supply areas, receiving/storage area, four patient rooms, shared day room, new nurse station, two supervisor offices, and a meeting room. Critical scope clarifications include confirmation that all skylights and suntunnels are new installations primarily located in the expansion area rather than the renovation area, and that contractors must procure HVAC equipment utilizing R-32 refrigerant or other refrigerants compliant with current environmental regulations and building codes per Section 23 81 29 subsection 2.03.
The clarification establishes that manufacturers may substitute proprietary labeling systems for AWI Certification in cabinetwork (Section 06 41 00) provided they guarantee compliance with or exceed AWI standards. Regarding mechanical systems, contractors must bid the project as outlined in the drawings and specifications, including condensate piping routing to existing hand sink tailpieces in Exam Rooms 60 and 61 without additional plumbing support cost allocation. The document confirms that building permit fees totaling $14,932.89 were paid by the agency on July 22, 2025, while all remaining permits remain the contractor's responsibility as specified in the contract documents.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification 01 Date: 8/03/2026
ITB # S-DASOBO-00016020
MacLaren Youth Correctional Facility Infirmary & Pharmacy Renovation
1) Question: Are the skylights are being demolished and replaced? It is hard to tell the scope for these from the ITB.
Answer: No, All skylights and suntunnels are new. The skylight and majority of the suntunnels are in the expasion, not the area of renovation
2) Question: Please review Drawing M2.00 and the VRF equipment schedule. There was a mandatory A2L refrigerant change in 2025 and equipment specified is no longer available.
Answer: Contractors are responsible for purchasing and installing equipment that utilizes the current industry-accepted refrigerant, R-32, or another refrigerant that complies with the latest environmental regulations and applicable building codes, see Section 23 81 29 subsection 2.03.
3) Question: Will the customer forego AWI Certification, listed in (06 41 00) (1.53)(A)(1&2), if manufacturer provides its own proprietary labeling system and can guarantee will meet or exceed AWI standards?
Answer: Yes, if the manufacture can guarantee that they meet or exceed AWI standards.
4) Question: In Drawing M4.01 it shows condensate piping ran to the tailpiece of two existing hand sinks in Exam Rooms 60 & 61. Will plumbing support be needed?
Answer: Please bid the job as outlined in the Drawings and Specifications.
5) Question: How much are the permit fees?
Answer: The building permit fees have already been paid. ($14,932.89 - 7/22/25). All other permits are the responsibility of the Contractor as stated in the Contract Documents.