Clarification-4.pdf
PDF 138 KB Posted
- Solicitation number
- S-DASOBO-00016020
- Issued by
- Oregon
About this file
This is a clarification document issued by the State of Oregon related to the MacLaren Youth Correctional Facility Infirmary & Pharmacy Renovation project. The document provides responses to questions submitted by bidders regarding the project scope, specifications, and bidding requirements. The clarification addresses technical inquiries related to the renovation and expansion of the infirmary at the Oregon Youth Authority's MacLaren facility, which includes expanding the medical lab, security station, medical room and supply areas, receiving and storage areas, four patient rooms, a shared day room, nurse station, two supervisor offices, and a meeting room. This document serves as an official amendment to the original project specifications and contract documents, ensuring all bidders have access to consistent information and clarifications prior to submitting their bids.
The clarification document ensures transparency in the bidding process by providing uniform responses to questions that may affect project execution, cost estimation, and scheduling. All clarifications issued through this document become binding requirements for bidders and the selected contractor. Bidders are advised to incorporate these clarifications into their bid proposals and cost estimates, as they may impact labor requirements, material specifications, equipment needs, and overall project timelines. This document is essential for establishing a level playing field among all competing bidders and reducing disputes or change orders during the construction and renovation phases of the project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification 04 Date: August 25, 2026
ITB # S-DASOBO-00016020
MacLaren Youth Correctional Facility Infirmary & Pharmacy Renovation
1) Question: There is a discrepancy between spec and drawings for the solid surface backsplashes.
Would you please clarify if the splash is integral or silicone applied?
Answer: Detail A7.01 takes precedent, the backsplash is not integral to the counter.
2) Question: Spec section 08 80 00 has section 2.03A for Interior glass which is different from spec 08 88
61. Which one takes precedence?
Answer: See removal of Specification 08 88 61 in Addendum 4.
3) Question: [Q#12 from Clarification 3 is updated as follows] A8.01 Details do not align with the systems shown. Storefronts will not have Tamper Resistant Parts, Aluminum windows have no details shown. Glass Types are not called out anywhere we see. Please clarify. See detail F, H and 12.
New Answer: Glazing types are indicated in section "08 80 00 - Glazing" "2.02 (a.) Basis of Design (Exterior)" and "2.03 Glazing units (Interior)". Aluminum windows are exterior windows with details on sheet A6.01.
4) Question: [Q#24 from Clarification 3 is updated as follows] Where are all the locations for the impact rated vision control glass?
New Answer: Per specification 08 80 00 2.03A - Interior, all interior glazing is to be impact rated glazing units.