S-5 _PP Information.pdf

PDF 377 KB Posted

Attached to
USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
Solicitation number
N6817125R0001
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is an attachment titled "Attachment S-5 (Past Performance/CPARS Information Sheet)" that is part of a federal contract opportunity for the USS LEWIS P. PULLER (ESB 3). The attachment provides a template for the offeror to submit details on their past performance, including contract numbers, availability types, award values, periods of performance, information on whether the offeror was the prime or subcontractor, and a detailed description of work performed that demonstrates similarity to the current solicitation's work packages. The related federal contract opportunity is for the USS LEWIS B. PULLER (ESB-3) Force Generation Risk Reduction (FGRR), which includes a regular overhaul-drydock (ROH-DD), lay berth and industrial assistance (IA), and a mid-term availability (MTA) to be performed at the contractor's facility within the U.S. 6th Fleet's area of responsibility. The solicitation number is N6817125R0001, and it is being issued by the Department of the Navy Naval Supply Systems Command, with a closing date of December 18, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION, newest first.
File Type Posted
Attachment S7 PPI Form Final v5.xlsx XLSX spreadsheet
N6817125R0001 amd 0004.pdf PDF
N6817125R0001 Amend 0002.pdf PDF
Attachment S7 PPI Form Final v4.xlsx XLSX spreadsheet
N6817125R0001 conformed.pdf PDF
N6817125R0001 Amend 0003.pdf PDF
N6817125R0001 USS LBP FGRR.pdf PDF
Attachment S7 PPI Form v4 Posted.xlsx XLSX spreadsheet
N6817125R0001-0002.docx DOCX document
J-2c MSC MTA WI.pdf PDF
J-5_MSC Facility Survey.pdf PDF
S-4_Foreign National Cert.pdf PDF
S-7 Fire and Safety Plan Checklist.pdf PDF
S-9 Vessel Status Report.pdf PDF
S-10 LBP Planned Maintenance_Sample SAMM Tasks.xlsx XLSX spreadsheet
J-1a ROH.xlsx XLSX spreadsheet
J-1c MTA.xlsx XLSX spreadsheet
J-2a MSC ROH WI.pdf PDF
J-2a FDRMC ROH WI.pdf PDF
S-2_QA Checklist updated.pdf PDF
J-2a part2 MSC ROH WI.pdf PDF
S-1_NDA.pdf PDF
S-6 PPQ.pdf PDF
S-8 MSC DRY DOCK Sheet.pdf PDF
J-1b Lay berth_IA.xlsx XLSX spreadsheet
J-2a part1 MSC ROH WI.pdf PDF
J-2b MSC Lay berth_IA WI.pdf PDF
J-2c FDRMC MTA WI.pdf PDF
J-4 GFP LIST.xlsx XLSX spreadsheet
S-3_Foreign ACP Questionnaire.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS LEWIS P. PULLER (ESB 3) Attachment S-5

ATTACHMENT S-5 (PAST PERFORMANCE/CPARS INFORMATION SHEET)

TO BE COMPLETED BY OFFEROR

Contractor:

Unique Identifier ID/CAGE Code:

Reference #1 Reference #2 Reference #3

Contract Number / Delivery Order Number

Was CPARS completed?

If so, when?

Type of Contract

Ship Name

Type of Availability

Amount of Total Award

Period of Performance

Final Dollar Value of Contract (Award + Growth/New Work) **If work performed as a subcontractor, identify the final dollar value and hours of the subcontract and only those portions.**

Procuring Agency Point(s) of Contact (not to exceed 3):

Name, Email and Telephone Number(s) of Government or Commercial Entity for which the contract was performed.

Was your company the prime or subcontractor? (If the subcontractor, identify only those portions of the contract performed by your company).

DETAILED DESCRIPTION OF WORK (DEMONSTRATING THE SIMILARITY OF THE WORK PERFORMED TO ATTACHMENT J-2(a), J-2 (b) and J-2 (c) (WORK SPECIFICATION PACKAGE)

Work Specification Package Content: Provide detailed descriptions on work package similarities with current solicited work package.

Ship Systems: Propulsion, Electrical, Communication & Navigation, Auxiliary Machinery, Heating, Ventilation & air Conditioning (HVAC), etc.

Hull / Structural: Types of welding procedures and certifications used, type and scope of structural repair.

Preservation: Preservation efforts similar in scope to current requirement.

Dry-Dock: Duration of time spent in dry-dock as well as scope of work performed while in dry-dock.

Material Control and Storage

Quality Control

Facilities: Description of Facilities utilized for contract.

Key Personnel and OEM Management

Management of Contract:

Description of schedule and critical path analysis. Was the contract completed on time?

If not, provide detailed explanation. Discuss any growth/new work performed during the course of the contract and impact, if any, on project completion.

File details come from the government source that posted it. Updated .