S-3_Foreign ACP Questionnaire.pdf

PDF 592 KB Posted

Attached to
USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
Solicitation number
N6817125R0001
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is the Foreign National Access Control Plan (ACP) Questionnaire for the USS Lewis B. Puller Force Generation Risk Reduction (FGRR) contract. The questionnaire covers various security requirements and procedures that the contractor must comply with, including having a badge/pass identification system, conducting background checks on personnel, complying with OPSEC and anti-terrorism requirements, and obtaining approval from the local commanding officer for foreign national employees. The contractor must also understand that noncompliance with the approved ACP may result in contract termination. This ACP only applies to the current job orders awarded under this contract agreement.

The related federal contract opportunity is the Request for Proposal (RFP) for the USS LEWIS B. PULLER (ESB-3) FGRR. The contract requires the contractor to prepare for and accomplish three phases: regular overhaul-drydock, lay berth and industrial assistance, and mid-term availability. The scope of work consists of repair and maintenance packages from the Military Sealift Command and Forward Deployed Regional Maintenance Center. The place of performance is at the contractor's facility or facilities within the U.S. 6th Fleet Area of Responsibility. The RFP is issued by the Department of the Navy Naval Supply Systems Command and closes on 18 December 2024.

View the file

Other files for this federal contract opportunity

Other files attached to USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION, newest first.
File Type Posted
Attachment S7 PPI Form Final v5.xlsx XLSX spreadsheet
N6817125R0001 amd 0004.pdf PDF
N6817125R0001 conformed.pdf PDF
N6817125R0001 Amend 0003.pdf PDF
Attachment S7 PPI Form Final v4.xlsx XLSX spreadsheet
N6817125R0001 Amend 0002.pdf PDF
N6817125R0001 USS LBP FGRR.pdf PDF
N6817125R0001-0002.docx DOCX document
Attachment S7 PPI Form v4 Posted.xlsx XLSX spreadsheet
J-1b Lay berth_IA.xlsx XLSX spreadsheet
J-2a part1 MSC ROH WI.pdf PDF
J-2b MSC Lay berth_IA WI.pdf PDF
J-2c FDRMC MTA WI.pdf PDF
J-4 GFP LIST.xlsx XLSX spreadsheet
J-2c MSC MTA WI.pdf PDF
J-5_MSC Facility Survey.pdf PDF
S-4_Foreign National Cert.pdf PDF
S-5 _PP Information.pdf PDF
S-7 Fire and Safety Plan Checklist.pdf PDF
S-9 Vessel Status Report.pdf PDF
S-10 LBP Planned Maintenance_Sample SAMM Tasks.xlsx XLSX spreadsheet
J-2a part2 MSC ROH WI.pdf PDF
S-1_NDA.pdf PDF
S-6 PPQ.pdf PDF
S-8 MSC DRY DOCK Sheet.pdf PDF
J-1a ROH.xlsx XLSX spreadsheet
J-1c MTA.xlsx XLSX spreadsheet
J-2a MSC ROH WI.pdf PDF
J-2a FDRMC ROH WI.pdf PDF
S-2_QA Checklist updated.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS Lewis B Puller Force Generation Risk Reduction (FGRR) Attachment S-3: Foreign National Access Control Plan NAVSEA M-5510.2.C

Questions Yes or No

Does the contractor have a badge or pass identification system that controls access and movement control that must be worn or displayed on the outer garment at all times?

Are badges easily recognizable to facilitate quick and positive identification?

Contractors will wear assigned badge/pass as briefed by the escort?

Is there a control system that provides rigid accountability procedures for handling of lost, damaged, forgotten, and no longer required badges?

EXPLAIN:

Does the contractor understand and will comply with all entry control check point requirements, and that they are subject to being searched prior to being granted entry.

The contractor will provide a copy of employee passports for ascertaining citizenship?

Has an official favorable background check been conducted on all contracted personnel?

Will the contractor comply with the local standard operating procedures for ship and or shore based operations?

Will the contractor comply with all OPSEC and anti-terrorism requirements as briefed by the escort?

Do employees understand that they must stay with the assigned escort at all times?

Do employees understand not to discuss activities taking place at the jobsite or disclose priority information to third parties?

Does the contractor understand that they must contact and update the cognizant Contract Administration Officer of any foreign national data changes?

Does the contractor understand that all subcontractors must conform to the provisions of the primary contractor’s ACP?

Does the contractor understand that in order to receive approval for foreign national employees, the contractor shall include in their ACP the following employee data: full name, place of birth, citizenship, number of years employed by the contractor, and position?

Does the contractor understand that the local ship or shore facility commanding officer will make individual determinations of desirability of access for foreign nationals?

USS Lewis B Puller Force Generation Risk Reduction (FGRR) Attachment S-3: Foreign National Access Control Plan

NAVSEA M-5510.2.C

Questions Yes or No Does the contractor understand that until written authorization from the commanding officer is received, foreign nationals will be denied access to the ship or shore facility?

Does the contactor understand that this ACP only applies to current job orders awarded under this agreement?

Does the contractor understand that they must comply with the approved ACP, and that noncompliance may result in termination of the contract if it is not in the best interest of the United States Government?

Does the contractor understand that the United States Government reserves the right to cancel the contract when determined to be in the Government’s best interest?

Does the contractor understand that the use of foreign nationals without an approved ACP or when a previously authorization has been cancelled, will be considered a violation of the security regulations, and upon confirmation by the CAO of such violation, the contract, agreement or job order issued under this agreement may be terminated for default?

Does the contractor understand that they are responsible for the actions by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, and adjacent areas and work sites?

Submitted by:

Request for Proposal (RFP) Number: N6817125R0001

Approved by:

COR or Designated Representative

Security Manager/Officer

Contract Administration Office

File details come from the government source that posted it. Updated .