Attachment S7 PPI Form Final v5.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
- Solicitation number
- N6817125R0001
About this file
This is a Pricing Proposal/Information (PPI) form template attachment (S7) for solicitation N6817125R0001. The file appears to be an Excel spreadsheet template for offerors to submit pricing information related to the USS LEWIS B. PULLER Force Generation Risk Reduction (FGRR) requirement.
The associated opportunity is a Navy solicitation for maintenance and repair work on the USS LEWIS B. PULLER (ESB-3), consisting of three phases: Phase 1 regular overhaul-drydock (ROH-DD), Phase 2 lay berth and Industrial Assistance, and Phase 3 mid-term availability (MTA). Work will be performed at the contractor's facility within the Command 6th Fleet Area of Responsibility, which includes various seas and portions of the Atlantic Ocean. The solicitation closes on December 18, 2024 at 1500 CET, with the Naval Supply Systems Command (NAVSUP) as the contracting agency. Questions should be directed to Julian Thornton, the contract specialist.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPI FORM
| USS LEWIS B. PULLER FY25 ROH-DD N68171-25-R-0001 | RFP | |||
| Attachment S-7 (Pre-Proposal Information (PPI) Form) | Attachment J-1 | |||
| Question # | Date of Request: | Contractor Question | Government's Response | Attachment J-4 |
| 01 | 11/20/24 | Can you please advise the name of the vessel related to the below? | The United States vessel for the requirement below is the USS LEWIS B. PULLER | Attachment J-5 |
| 02 | 11/20/24 | Where is the Place of Performance? | The place of performance for this requirement is at the Contractor's Facility that is in the Command Sixth Fleet Area of Responsibility (C6F AOR). The C6F AOR covers approximately half of the Atlantic Ocean, from the Arctic Ocean to the coast of Antarctica, as well as the Adriatic, Baltic, Barents, Black, Caspian, Mediterranean, and North Seas. | Attachment S-1 |
| Command Sixth | 11/22/24 | Maximum Draft of the USS Lewis B Puller | The dimensions and draft requirements of the vessels are located in WI 0003 of the solicitation package. Additonally, this information can also be found in Section C of the solicitation. | Attachment S-2 |
| 04 | 12/3/24 | What would be the minimum draft at arrival at the dry dock? | Per WI 0901 Section 3.2, Minimum draft 24'-8" (7.55m) for dry dock |
arrival. Please note: Per WI 0901 Section 7.1.4.b: "Provide at least 8.2 feet of clearance between the vessel's keel and the dry dock floor."
Provide at least 5 feet of clearance on each side of the vessel to allow performance of dry dock work. Exceptions to these clearance requirements will be considered on a case by case basis by the OMT REP during the bid phase. Additionally WI 0901 Section 7.1.10.a.2: " A minimum clearance of 12 inches of water between vessel's keel and blocks during the docking evolution shall be maintained un