- USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
- Solicitation number
- N6817125R0001
About this file
This document is a Request for Proposal (RFP) for the USS LEWIS B. PULLER (ESB-3) Force Generation Risk Reduction (FGRR) requirement. The scope of work consists of repair and maintenance packages for a regular overhaul-drydock (ROH-DD), lay berth, industrial assistance (IA), and a mid-term availability (MTA) to be performed at the contractor's facility within the Command 6th Fleet (C6F) Area of Responsibility (AOR). The contract will be awarded by the Department of the Navy Naval Supply Systems Command. The RFP closes on 18 December 2024 at 1500 Central European Time (CET). Contractors are requested to review the RFP and accompanying documents, and direct any questions to the contract specialist.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 6
10 06
ITEM NO. Title Change Date Change 009-01 General Criteria; accomplish 09/29/2023 Original 009-02 Environmental Compliance Report for Material Usage; accomplish 09/29/2023 Original 009-03 Toxic and Hazardous Substance; control 09/29/2023 Original 009-04 Quality Management System; provide 03/13/2024 CH-1 009-05 Temporary Access; accomplish 09/29/2023 Original 009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish 09/29/2023 Original 009-07 Confined Space Entry, and Certification; accomplish 09/29/2023 Original 009-08 Shipboard Fire Protection and Fire Prevention; accomplish 09/29/2023 Original 009-10 Asbestos-Containing Material (ACM); control 09/29/2023 Original 009-18 Mine Warfare Ships Magnetic Material; control 09/29/2023 Original 009-19 Provisioning Technical Documentation (PTD); provide 09/29/2023 Original 009-20 Government Property; control 03/13/2024 CH-1 009-21 Alteration Verification, Logistic and Technical Data; provide 09/29/2023 Original 009-23 Interference; remove and install 09/29/2023 Original 009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/29/2023 Original 009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/29/2023 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
09/29/2023 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
09/29/2023 Original
009-60 Schedule and Associated Report for CNO Availability; provide and manage 09/29/2023 Original 009-61 Shipboard Use of Fluorocarbons; control 09/29/2023 Original 009-67 Integrated Total Ship Testing; manage 09/05/2023 Original 009-69 Heavy Weather/Mooring Plan; provide 09/29/2023 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
09/29/2023 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 09/29/2023 Original 009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair 09/29/2023 Original 009-74 Occupational, Safety and Health Plan; accomplish 09/29/2023 Original 009-80 Ship Facility; maintain 09/05/2023 Original 009-81 Compartment Closeout; accomplish 09/29/2023 Original 009-82 Installation of Equal Component Vice Specified Component; report 09/29/2023 Original 009-84 Threaded Fastener Requirement; accomplish 09/05/2023 Original
009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify
09/18/2023 Original
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
09/29/2023 Original
009-99 Ship Departure Report; provide 09/29/2023 Original 009-100 Ship's Stability; maintain 09/05/2023 Original 009-101 Ship Transit and Berthing; accomplish 09/29/2023 Original 009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/29/2023 Original 009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/29/2023 Original 009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/29/2023 Original 009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2023 Original 009-117 Combat Systems, Light-Off Suport; provide 09/29/2023 Original 009-118 CG Deck Loading; accomplish 09/29/2023 Original 009-120 Fact Finding and Critique of Unplanned Event; manage 09/06/2023 Original 009-122 Temporary Padeye; install and remove 08/23/2023 Original 009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/06/2023 Original 009-126 Schedule Model Review (SMR); accomplish 10/01/2023 Original
SHIP: USS LEWIS B PULLER (ESB 3) BAHR-001-26
INDEX
ITEM THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO. Title Change Date Change 009-11 Insulation and Lagging; accomplish 09/29/2023 Original 009-12 Weld, Fabricate, and Inspect; accomplish 03/13/2024 CH-1 009-25 Structural Boundary Test; accomplish 09/29/2023 Original 009-26 Deck Covering; accomplish 09/01/2023 Original 009-32 Cleaning and Painting Requirements; accomplish 03/13/2024 CH-1 009-90 Technical Representative; provide 09/29/2023 Original
ITEM THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
SHIP: USS LEWIS B PULLER (ESB 3)
INDEX
CATEGORY II. FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
BAHR-001-26
INDEX
SHIP: USS LEWIS B PULLER (ESB 3) BAHR-001-26
ITEM NO. TITLE
1) 167-00-001 Joiner Door and Handle; repair
2) 167-11-001 Security Combination Door Lock; install
3) 492-61-001 Spot Pad Light; replace
4) 508-11-001 Lagging and Insulation; replace
5) 512-00-001 Ventilation Cleaning; accomplish
6) 512-00-002 Split Air Condition Cleaning; accomplish
7) 516-10-001 Container (CONEX) Refrigeration Unit Box; repair
8) 526-11-001 Deck Drain; clean
9) 573-41-001 Certified Forklift Weight; provide
10) 583-31-001 Rigid Inflatable Boat (RIB) Overhaul; accomplish
11) 588-21-001 Hangar Bay Roll-Up Door Repair; accomplish
12) 631-13-001 Aircraft Electrical Service Station (AESS) Hardware Repair and Foundation
Preservation; accomplish
13) 631-21-001 MILDET-AT/FP Armory Door; repair and preserve
14) 631-21-002 Forward House Preservation; accomplish
15) 634-10-001 Cosmetic Polymeric (PRC) Deck Covering; replace
16) 634-11-001 Weather Deck Non-Skid Replacement; accomplish
17) 634-21-001 VLA Marking Flight Deck; accomplish
18) 654-00-001 T-ALT-18-007 Ship's Store Modification; accomplish
19) 763-11-001 Ready Service Lockers (RSL) Repair and Preservation; accomplish
20) 991-00-001 Mast Scaffolding; provide
21) 992-21-001 Project Team Office Space; provide
PRELIMINARY SPECIFICATION
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-00-001
COAR: 26 PCN: SERV-L132
CC01-L021
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 2 ITEM NO: 167-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Joiner Door and Handle; repair
1.2 Location of Work:
1.2.1 Forward House, A1-A8 Level
1.2.2 A8 Training Room (A8-90-2)
1.3 Identification:
1.3.1 Quantity (12 EA), Metal Joiner Door, Non-Watertight Door, located in 1.2.1
1.3.2 Quantity (One EA), Door (A8-89-2) Hinges are offsets
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 624-8390167 Rev C, Joiner Door Details
2.3 801-8468127 Rev Q, General Arrangement
2.4 S9086-UF-STM-020/CH-600, Non-Structural Closures
2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each equipment identified in 1.3 and located in 1.2 including each frame, handle, hardware, gasket, hinge, locking mechanism and surrounding structure for deterioration, areas of damage or distortion using 2.2 through 2.4 for guidance. Note: Ships Force will identify 1.3.1 required for repair upon arrival located in 1.2.1
3.1.1 Cycle each door assembly twice (open and close) and check for proper seating, binding or erratic operation.
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.1.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 and 3.1.1 to the SUPERVISOR.
3.2 Template exact size, configuration, and location of each joiner door from existing shipboard condition. Repair equipment based on the result of 3.1, identified in 1.3 and located in 1.2, using 2.2 thru 2.4 for guidance.
SHIP: USS LEWIS B PULLER (ESB 3)
SSP: BAHR-001-26 2 of 2 ITEM NO: 167-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2.1 Remove door from frame, replace each faulty hardware, hinge, handle, hook, hasp, locking mechanism, gasket and associated door assembly with new.
3.2.1.1 Each door removed must be replaced lumber, plywood and staging boards, except that used for pallets, must be fire-retardant in accordance with Category Two, Type II, of MIL-L- 19140 with the functional ability to close from inside and out the door.
3.2.2 Fair and straighten each door and frame using 2.2 through 2.4 for guidance as directed by SUPERVISOR.
3.2.3 Replace each gasket, flush type tower bolt, stainless steel corner cup and new skin for Leafs, using 2.2 through 2.4 for guidance as directed by SUPERVISOR.
3.2.4 Replace each hinge identified in 1.3.2 and located in 1.2.2, using 2.4 as guidance.
(V)(G) "CHALK TEST"
3.3 Accomplish the requirements of 009-25 of 2.1 for a chalk test of each structural closure listed in 1.3. Each chalk imprint must be centered with 100 percent contact.
(V)(G) "HOSE TEST"
3.4 Accomplish the requirements of 009-25 of 2.1 for a water hose test of each structural closure identified in 1.3 located in 1.2. Allowable leakage: None.
(V)(G) "OPERATIONAL TEST"
3.5 Accomplish an operational test of each newly installed and repaired equipment identified in 1.3 and located in 1.2, opening and closing 4 times each. Allowable binding or sticking: None.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-11-001
COAR: 26 PCN: CC01-L020
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 2 ITEM NO: 167-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Security Combination Door Lock; install
1.2 Location of Work:
1.2.1 Tactical Ops Center (A8-91-0)
1.2.2 Briefing Room (A4-94-4)
1.3 Identification:
1.3.1 Quantity (3 EA), Door (A4-91-6, A8-90-2, A8-91-0), Combination Lock, Part No. X10 NSN: 5340016132078; APL: X105440VX67
1.3.1.1 Door No. A4-91-6
1.3.1.2 Door No. A8-90-2
1.3.1.3 Door No. A4-91-0
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 Installation Instructions, X-10 Type 1F High Security Electronic Lock
2.3 S9086-UF-STM-010/CH-600 Rev 5, Structural Closures
3. REQUIREMENTS:
3.1 Remove existing and install new security combination door lock assembly, identified in 1.3.1, for door located in 1.2, accordance with 2.2, using 2.3 for guidance. Note: Combination lock provided by Ship's force.
(V)(G) "OPERATIONAL TEST"
3.2 Accomplish operational test of each new electronic cypher lock and each mechanical cypher lock by demonstrating, lock function, open function with code and combination can be rest Allowable non-operational:
None
3.2.1 Accomplish final door locking adjustments ensuring a tight fit.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
5.2 PUSH MATERIAL:
SSP: BAHR-001-26 2 of 2 ITEM NO: 167-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 492-61-001
COAR: 26 PCN: EE02-L022
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 3 ITEM NO: 492-61-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Spot Pad Light; replace
1.2 Location of Work:
1.2.1 Flight Deck (A5-86-0)
1.2.1.1 Spot Pad Lighting System Landing Spot No. 3, Sheet 25 of 2.2
1.3 Identification:
1.3.1 Quantity (4 EA), Transformer Enclosure Assembly, 120V/ 6.6V, 12.5V, 15V, 30V, 200VA, for Line-up Lights and Spot Pad Lights, Item No. 3 of 2.2, Part No. 616702-1, NSN: 5950-00-165-3654
1.3.2 Quantity (4 EA), Spot Pad Light, With Lamp (MS15564-6) 35W, 12.5V, Item No. 4 of 2.2, Model Part No. 609024-1; NSN: 6220-862-3221
1.3.3 Quantity (4 EA), Lamp, Incandescent, Par 36, 18W, 12V, Red, Item No. 16 of 2.2, Part No. 411113-8, NSN: 6240-00-942-5018
1.3.4 Quantity (4 EA), Guard (Cres), Part No. 505085-1, Item No. 17 of 2.2, NSN: 6210-00-845-1426
1.3.5 Quantity (4 EA), Quantity (10 EA), Lens, Light, Part Number:
318837-3, Item Number 18 of 2.2, NSN: 6210-00-550-9037
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 330-8393798 Rev F, BWD, Flight Deck Lighting/Hangar Bay
2.3 S0400-AD-URM-010/TUM Rev 8, Tag-out User's Manual
2.4 MIL-STD-1310H, Shipboard Bonding, Grounding and Other Techniques for EMC and Safety
2.5 S9086-VG-STM-010/CH-634 Rev 4, Deck Covering
2.6 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
2.7 NAVAIR 51-50ABA-1 Rev 4, Visual Landing Aids on Air Capable Ships
3. REQUIREMENTS:
3.1 Disconnect electrically and mechanically and remove each equipment identified in 1.3 and located in 1.2. Record and retain electrical hook-up data, using 2.2 as guidance.
(V)(G) "TAG-OUT VERIFICATION"
3.1.1 Contractor must obtain Ship’s Force signature on Enclosure (One) as verification of tag out and record tag out serial number in accordance with 2.3, prior to commencement of work, Allowable
SSP: BAHR-001-26 2 of 3 ITEM NO: 492-61-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
discrepancy: None.
3.1.2 Chip and grind each surface flush in way of repair.
3.1.3 Provide Man-lift/JLG Boom Lift for the removal and
installation of Spot Pad Light and Transformer identified in 1.3 and located in 1.2.
(V)(G) "VISUAL INSPECTION"
3.2 Inspect each hole vacated by the lights and adjacent areas for defects, corrosion and deterioration.
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.2.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing the result of each requirement of 3.2 to the SUPERVISOR.
3.3 Accomplish repair or replace each damaged deck covering in way of new work or disturbed areas found in 3.2 in accordance with 2.5.
3.4 Install each new equipment identified in 1.3 and located in 1.2, using 2.2 and 2.4 for guidance and reconnect each cable using recorded hook-up data of 3.1.
3.4.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
3.4.2 Bond and ground electrical equipment and cables in accordance with 2.4.
(V)(G) "AIR HOSE TEST"
3.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test on the topside and soap solution on the underside compartment for each new light installed in 3.3. Allowable leakage: None.
(V)(G) "OPERATIONAL TEST"
3.6 Accomplish an operational test and verify each electrical device and component unit installed operates to confirm illumination and operation in conformance to their operating characteristics using 2.2 and 2.7 as guidance. Allowable dimming, flickering, and non-illumination: None.
3.6.1 Spot pad lighting must show a bright and steady glow when turned on at maximum intensity and gradually dim as the dimmer control is adjusted to low.
3.7 Accomplish repair or replace each damaged deck covering in way of new work or disturbed areas in accordance with 2.5.
3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.8.1 Do not paint each item listed in Paragraph 631-8.17 of 2.6.
4. NOTES:
4.1 None.
SSP: BAHR-001-26 3 of 3 ITEM NO: 492-61-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 4 EA
Transformer Enclosure Assembly, 120V/ 6.6V, 12.5V, 15V, 30V, 200VA, Part No. 616702- 3 2.2
59500016 53654 3.4
2. 4 EA
Spot Pad Light, With Lamp
(MS15564-6) 35W,
12.5V, Part No.
609024-1 4 2.2
59500016 53654 3.4
3. 4 EA
Lamp, Incandescent, Par 36, 18W, 12V, Red, Part No. 411113-8 16 2.2
62400094 25018 3.4
4. 4 EA
Guard (Cres), Part No. 505085- 1 17 2.2
62100084 51426 3.4
5. 4 EA
Lens, Light, Part No. 318837- 3 18 2.2
62100055 09037 3.4
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 508-11-001
COAR: 26 PCN: V101-L036
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 2 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Lagging and Insulation; replace
1.2 Location of Work:
1.2.1 A6 Port Mezzanine, FR 88-89 (A6-88-2-L)
1.3 Identification:
1.3.1 Quantity (30 SF), Lagging on most Forward Port Mezzanine, FR 86-89 Bulkhead near the AC Unit, located in 1.2.7
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 S9086-VH-STM-010/CH-635 Rev 3, Thermal, Fire and Acoustic Insulation
2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-11 of 2.1 for bulkhead insulation, lagging, ducting and buttons listed in 1.3 and located in 1.2 using 2.2 and 2.3 for guidance.
3.1.1 Record and retain each system identification, and each
miscellaneous sign and marking prior to removing or disturbing existing lagging and insulation, identified in 1.3 and located in 1.2.
3.1.2 Accomplish the requirements of 009-32 of 2.1 for new bulkhead insulation and lagging to match each surrounding area.
(V)(G) "FINAL ACCEPTANCE"
3.2 Accomplish an inspection of the replaced lagging as identified in
1.3 and located in 1.2 for workmanship and proper fit. Acceptance criteria; Loose or sagging: None.
3.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.3.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
5.2 PUSH MATERIAL:
SSP: BAHR-001-26 2 of 2 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 512-00-001
COAR: 26 PCN: ER04-L018
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 4 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Ventilation Cleaning; accomplish
1.2 Location of Work:
1.2.1 Forward House, A1-A8 Level
1.3 Identification:
1.3.1 Quantity (Various), FWD House Ventilation Systems
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 S9086-RQ-STM-010/CH-510 Rev 7, Heating, Ventilating, and Air Conditioning Systems for Surface Ships
2.3 512-8468130 Rev D, HVAD Diagram FWD Accommodation
2.4 510-8468302 Rev D, Fan Room Arrangement
2.5 512-7624117 Rev A, Instructions for Ventilation Testing and Balancing
2.6 512-8468337 Rev C, HVAC Diagram Accommodations
2.7 512-8468241 Rev D, Machinery Room Ventilation Diagram
2.8 S9086-RW-STM-010/CH 516 Rev 5, Refrigerant Systems
2.9 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each HVAC and ventilation system, listed in 1.3 and located in 1.2, inspecting for damage, each missing access cover, screen, terminal, gasket and fastener, using 2.2 through
2.8 for guidance.
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Provide temporary air conditioning to maintain each space listed in
1.2 at a temperature of 65 to 75 degrees Fahrenheit for the duration of ventilation cleaning and repair.
3.2.1 Disconnect and remove temporary air conditioning when
directed by the SUPERVISOR.
SSP: BAHR-001-26 2 of 4 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3 Accomplish dry ice cleaning of each ventilation systems system listed in 1.3 and located in 1.2 from each weather opening to terminal end, including in-place cleaning of each installed ventilation system heat exchanger, to include each air conditioning chill water refrigerant coil, steam, and electric main and booster heater coil in accordance with
2.3 through 2.8, Appendix B of 2.2.
3.3.1 Verify each company providing dry ice cleaning have an
approved vent cleaning procedure prior to start of any vent cleaning.
NAVSEA Code 05Z42 and Naval Surface Warfare Center, Philadelphia Division-Ship Systems Engineering Station (NSWCPD-SSES) Code 416 must approve each procedure.
3.3.2 All mechanical cleaning methods must be approved by the SUPERVISOR and minimize damage to lint lined ductwork.
3.3.3 Remove each ventilation diffuser cover, loosen debris for each duct running from air handling unit to each diffuser. Ensure dust free throughout each ventilation duct.
3.3.4 Remove, clean and re-install each installed re-usable
ventilation system air filter in accordance with 2.2.
3.3.5 Replace each disposable air filter element with a new air filter in accordance with 2.2.
3.3.6 Compressed air used for drying of each cleaned ventilation system component must be reduced to less than 30 PSI.
3.3.7 Matchmark, remove and clean each wire mesh screen, damper, diverting/balancing plate, orifice plate and access plate. Retain for reuse.
3.3.8 Clean interior of each ducting free of rust, dirt, grease, lint and other contaminants.
3.3.9 Clean each system fan to include each fan blade and housing interior. Remove all accumulation of dust, dirt, oil and grease.
3.3.10 Each cleaning method must include, but not be limited to, the use of vacuums, brushes, scrapers, compressed air, detergents/degreasers and wiping clean with lint free cloths.
3.3.11 Each ductwork with grease accumulation must be cleaned by hand versus with a duct cleaning tool.
3.3.12 Consider materials, debris, and/or residue associated with ventilation systems to contain toxic/hazardous substances including but not limited to cadmium, chromium, and PCB's.
3.4 Fabricate and replace (10) duct screens, (10) inspection covers, 50 linear feet of gasket material, (100) fasteners.
(V)(G) "FINAL CLEANLINESS"
3.5 Accomplish a visual inspection of each cleaned interior surface of each ventilation branch and fan for each ventilation system, listed in
1.3 and located in 1.2, for cleanliness and completion of work prior to installation of each wire mesh screen, damper, orifice plate and access plate. Allowable foreign material and debris: None.
SSP: BAHR-001-26 3 of 4 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Report: FINAL CLEANLINESS (WC) - WORK COMPLETE + 1 day
3.5.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
3.6 Install each ventilation piece, including wire mesh screen, damper, diverting/balancing plate, orifice plate and access plate, removed in 3.4.7, using 2.2 through 2.7 for guidance.
3.6.1 Install each new gasket at each disturbed ventilation joint in accordance with each material requirement of A-A-59588.
(V)(G) "OPERATIONAL TEST"
3.7 Accomplish an operational test of each ventilation system in accordance with 2.5, listed in 1.3 and located in 1.2.1 at system operating pressure to ensure ventilation joint tightness. Allowable leakage: None.
3.8 Accomplish the requirements of 009-11 of 2.1 for each for new and disturbed insulation, lagging, and reusable covers.
3.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.9.1 Do not paint each item listed in Paragraph 631-8.17 of 2.9.
4. NOTES:
4.1 Known sources for dry ice ventilation cleaning:
4.1.1 AGT, Inc. 612 Greenwing Dr., Chesapeake, VA, 23383, Tel: (757) 621-3893 (Approved for dry ice cleaning by NSWCCD-SSES)
4.1.2 AMEE Bay, 540-B Woodlake Circle, Chesapeake, VA, 23320 Tel:
(757) 299-0888 (Approved for dry ice cleaning by NSWCCD-SSES)
4.1.3 Core Mechanical, Inc., 7150 North Park Drive, Pennsauken, NJ, 08109, Tel: (856) 665-0636 (Approved for dry ice cleaning by
NSWCCDSSES)
4.1.4 EMS Ice, 101 Liberty St. Chesapeake, VA, 23324 Tel: (757) 494- 9903 (Approved for dry ice cleaning by NSWCCD-SSES)
4.1.5 VIACS, 12803 Mukilteo Speedway, Lynwood WA, 98087, Tel: (425) 903-4488 (Approved for dry ice cleaning by NSWCCD-SSES)
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: BAHR-001-26 4 of 4 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 512-00-002
COAR: 26 PCN: SERV-L128
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 3 ITEM NO: 512-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Split Air Condition Cleaning; accomplish
1.2 Location of Work:
1.2.1 Fan Room A6 Level, Radio Module No. 1 (A6-95-2)
1.2.2 Fan Room A6 Level, Radio Module No. 2 (A7-95-2)
1.2.3 Fire/Crash Rescue Team Staging Area (A5-87-1)
1.2.4 Embarked Forces Space (A5-87-2)
1.2.5 Vertrep/Helo/Aviation Crash Locker (A5-87-3)
1.2.6 AVN & AMCM Det Maint Cont/QA (A5-88-1)
1.2.7 Aviation Det Ordinance Configurations (A5-92-2)
1.2.8 Embarked Forces Space (A5-96-2)
1.2.9 Embarked Forces Space (A5-96-6)
1.3 Identification:
1.3.1 Quantity (9 EA), Split Air Conditioner, Model: 42KHG018HS
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 S9086-RQ-STM-010/CH-510 Rev 7, Heating, Ventilating, and Air Conditioning Systems for Surface Ships
2.4 512-8468130 Rev D, HVAD Diagram FWD Accommodation
2.5 510-8468302 Rev D, Fan Room Arrangement
2.6 512-7624117 Rev A, Instructions for Ventilation Testing and Balancing
2.7 S9086-RW-STM-010/CH 516 Rev 5, Refrigerant Systems
2.8 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each split air condition ventilation system, listed in 1.3 and located in 1.2, inspecting for damage, each missing access cover, screen, terminal, gasket, fastener and lagging, using 2.2 through 2.5 for guidance.
3.1.1 Inspect each copper refrigerant lines to ensure no cracks or stress points along each unit.
SSP: BAHR-001-26 2 of 3 ITEM NO: 512-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.1.2 Inspect each belt for wear, cracks, dry rotting, defects, alignment and tightness.
3.1.3 Inspect each motor in accordance with Paragraph 510-A.9.3.8 of 2.3.
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.1.4 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 through
3.1.3 to the SUPERVISOR.
3.2 Accomplish cleaning of each split air conditioning, condenser, evaporator and filter, listed in 1.3 and located in 1.2, from weather openings to terminal ends using 2.3 through 2.5 for guidance.
3.2.1 Matchmark, remove and clean each wire mesh screen, damper, diverting/balancing plate, orifice plate and access plate. Retain for reuse.
3.3 Accomplish required maintenance of 1.3 identified in 3.1.
(V)(G) "REFRIGERANT LEVELS"
3.3.1 Accomplish a refrigerant evacuation and charge of equipment listed in 1.3 and located in 1.2 in accordance with 2.7.
Report: REFRIGERANT LEVELS (WC) - WORK COMPLETE + 1 day
3.3.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.3.1 to include the refrigerant levels before and after the charge to the SUPERVISOR.
(V)(G) "FINAL CLEANLINESS"
3.4 Accomplish a visual inspection of each cleaned interior surface of each ventilation branch and fan for each ventilation system, listed in
1.3 and located in 1.2, for cleanliness and completion of work prior to installation of each wire mesh screen, damper, orifice plate and access plate.
Report: FINAL CLEANLINESS (WC) - WORK COMPLETE + 1 day
3.4.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.4 to the SUPERVISOR.
3.5 Install each ventilation piece, including wire mesh screen, damper, diverting/balancing plate, orifice plate and access plate, removed in 3.3.2, using 2.3 through 2.5 for guidance.
(V)(G) "OPERATIONAL TEST"
SSP: BAHR-001-26 3 of 3 ITEM NO: 512-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.6 Accomplish an operational test of the ventilation systems cleaned in
3.4 at system operating pressure to ensure ventilation joint tightness.
Allowable leakage: None, No faults, unusual vibration/noise, proper operation in accordance with 2.7.
3.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.7.1 Do not paint each item listed in Paragraph 631-8.17 of 2.8.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 516-10-001
COAR: 26 PCN: EA01-L051
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 3 ITEM NO: 516-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Container (CONEX) Refrigeration Unit Box; repair
1.2 Location of Work:
1.2.1 Mission Deck (A1 Level)
1.3 Identification:
1.3.1 Quantity (4 EA), Seabox 541.6, 20 Foot Refrigerated Storage Container, Refrigerant: 7.3 LB (R-134A), Carrier Model No. 69NT40, Part ID Number: NT0630; Part No.: 54-00586-20 of 2.2
1.3.1.1 Quantity (2 EA), Refrigerator
1.3.1.2 Quantity (2 EA), Freezer
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 T-363 Rev E, Operation and Service Manual for 69NT40-561-500 to 599 Container Refrigeration Units
2.3 T-285 Rev I, Operation and Service Manual for 69NT40-511-300 to 399 Container Refrigeration Units
2.4 62-10327 Rev A, Annual Inspection for ThinLINE 69NT40-541, PrimeLINE 69NT561 Container Refrigeration Units
2.5 T-354PL Rev A, Service Parts List for 69NT40 Upflow Container Refrigeration Units
2.6 S0400-AD-URM-010/TUM Rev 8, Tag-out Users Manual
2.7 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
3.1 Provide a Carrier certified Air Conditioning and Refrigeration Technician to accomplish inspection, service, repair, adjustment and testing of each equipment listed 1.3 and located in 1.2 using 2.2 through
2.5 for guidance.
3.1.1 Provide special tooling, materials, laptop and software, and parts required for the accomplishment of this Work Item.
3.1.2 Provide to the SUPERVISOR, documentation that the individual is a Carrier certified Air Conditioning and Refrigeration Technician prior to commencement of work.
3.1.2.1 Provide electrical power to conduct all electrical
testing and operational test.
(V)(G) "PRE-OPERATIONAL TEST"
3.2 Accomplish with the SUPERVISOR and Ship's Force a pre-operational
SSP: BAHR-001-26 2 of 3 ITEM NO: 516-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
test of each equipment listed in 1.3 and located in 1.2 using 2.2 through
2.5 for guidance. Acceptance Criteria: Pressure, temperature and settings within normal operating parameters.
(V)(G) "VISUAL INSPECTION"
3.3 Accomplish service and inspection of each equipment listed in 1.3 and located in 1.2 including fan motor and refrigerant charge listed in
1.3 and located in 1.2 in accordance with 2.4, using 2.2 and 2.3 for guidance.
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.3.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR. Include part numbers, and estimated time to repair for each item listed in 1.3 and located in 1.2.
(V)(G) "TAG-OUT VERIFICATION"
3.4 Contractor must obtain Ship’s Force signature on Enclosure (One) as verification of tag out and record tag out serial number in accordance with 2.6, prior to commencement of work, Allowable discrepancy: None.
(V)(G) "LEAK TEST"
3.5 Clean each condenser coil inside and out, check for leaks of each equipment listed in 1.3 and located in 1.2 using 2.2 through 2.4 for guidance. Allowable leakage: None
3.5.1 Check for refrigerant charge using 2.2 and 2.3 for guidance.
(V)(G) "INSPECT DOOR SEAL"
3.6 Inspect each door seal, window, hinge, fitting, fastener and frontloading gasket. Test and operate each refrigerated container door safety devices and door seal of the equipment listed in 1.3 and located in 1.2 using 2.2 through 2.4 for guidance. Accept/Reject Criteria: Seals, no leaks, no wear, tear, no binding/grinding, no damage and properly seated.
(V)(G) "OPERATIONAL TEST"
3.7 Accomplish operational test of each equipment listed in 1.3 and located in 1.2 under systems normal operating pressure and temperature in accordance with 2.2 through 2.4. Allowable leakage or malfunction: None.
3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.8.1 Do not paint each item listed in Paragraph 631-8.17 of 2.7.
4. NOTES:
5. GOVERNMENT FURNISHED MATERIAL(GFM):
SSP: BAHR-001-26 3 of 3 ITEM NO: 516-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 526-11-001
COAR: 26 PCN: SERV-L127
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 4 ITEM NO: 526-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Deck Drain; clean
1.2 Location of Work:
1.2.1 Forward House (A1-A8 Level)
1.3 Identification:
1.3.1 Quantity (400 LF), Plumbing Deck Drain Piping
1.3.2 Quantity (28 EA) Deck Drains identified in Attachment A
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 528-8468142 Rev F, Plumbing Drains System Diagram
2.3 S9086-RK-STM-010/505 Rev 6, Piping Systems
2.4 S9086-VD-STM-010/CH631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a joint visual inspection with the SUPERVISOR of each equipment listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion, and to determine required repair, using 2.2 and 2.3 for guidance
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.
(V)(G) "HYDRO BLAST"
3.2 Accomplish hydro blasting, cleaning and flushing of deck drain and drain piping system, 400 linear feet free of obstructions and foreign matter located in 1.2, in accordance with paragraph 505-4.7 of 2.3, using
2.2 and 2.3 for guidance.
(V)(G) "POST REPAIR UNOBSTRUCTED FLOW TEST"
3.3 Accomplish post-repair unobstructed flow test for each deck drain located in 1.2 using clean fresh water for a minimum of 30 minutes.
Allowable leakage and obstruction: None.
3.4 Accomplish the requirement of 009-32 of 2.1 including Table 2, Line 26, Column A, B and E for the preservation of the interior of deck drain
SSP: BAHR-001-26 2 of 4 ITEM NO: 526-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
listed in 1.3 and located in 1.2 using 2.2 as guidance.
3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.5.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: BAHR-001-26 3 of 4 ITEM NO: 526-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, SSP: BAHR-001-26 4 of 4 ITEM NO: 526-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 573-41-001
COAR: 26 PCN: VM04-L007
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 1 ITEM NO: 573-41-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Certified Forklift Weight; provide
1.2 Location of Work:
1.2.1 Mission Deck (A1 Level)
1.3 Identification:
1.3.1 Quantity (16 EA), TRK, FKLFT20K DED MDLW200YSB,2H-220/145, FSCM 60764; APL: 950006599
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 NAVSUP PUBLICATION 538 SIXTH REVISION, MHE INSPECTION FORM
2.3 SW023-AH-WHM-010 Rev 8, Handling Ammunition and Explosives with Industrial Materials Handling Equipment (MHE)
3. REQUIREMENTS:
3.1 Provide Certification documents and weights for each forklift listed in 1.3 and located in 1.2, in accordance with Chapter 6, paragraph 6-5 of 2.3.
3.1.1 Weights totaling 20,000 pounds (9,071 kg), with 4,000 pounds (1,814 kg), 6,000 pounds (2,722 kg) and 10,000 pounds (4,536 kg) increments in accordance with 2.3.
3.1.2 Manufacture and provide Safety Certification Tag in accordance with Chapter 6, Para 6-5 of 2.3.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 583-31-001
COAR: 26 PCN: DA01-L029
EA01-L050
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 2 ITEM NO: 583-31-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Rigid Inflatable Boat (RIB) Overhaul; accomplish
1.2 Location of Work:
1.2.1 Mission Deck (A1 Level)
1.2.2 Contractor's Facility
1.3 Identification:
1.3.1 Quantity (2 EA) Boat, Rigid Inflatable, 7MRB1419, 7MRB1422
APL: 72A040216
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 S9008-LC-BIB-010 Rev 1, 7-Meter Rigid Inflatable Boat (RIB), Hulls 7MRB1409 Thru 7MRB1432, 7MRB1509 Thru 7MRB1530, 7MRB1608 Thru 7MRB1625, AND 7MRB1708 Thru 7MRB1720
2.3 MIL-STD-2003-4B, Electrical Plant Installation Standard Methods for Surface Ships and Submarines
2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
3.1 Remove from 1.2.1 and transport each Rigid Inflatable Boat (RIB) located in 1.2 and identified in 1.3 to 1.2.2.
(V)(G) "INSPECT AND ASSESS"
3.2 Accomplish the following inspection and assessment identified in 1.3 and located in 1.2, using 2.2 and 2.3 for guidance. Store RIB until end of the availability.
Report: INSPECT AND ASSESS (WC) - WORK COMPLETE + 1 day
3.2.1 Submit one legible copy, in hard or approved transferable media in English, of a report listing results of 3.2 to the
SUPERVISOR.
3.3 Accomplish the repair and service of each Rigid Inflatable Boat (RIB) identified in 1.3 and located in 1.2 as a result of the inspection and assessment in 3.2, and as designated by the SUPERVISOR, using 2.2 and
2.3 for guidance.
(V)(G) "OPERATIONAL TEST"
3.4 Accomplish the operational test of each electrical/electronic
SSP: BAHR-001-26 2 of 2 ITEM NO: 583-31-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
equipment, system and or component in accordance with 2.2 and 2.3.
Allowable leaks or malfunction: None.
3.5 Upon completion of the requirements of 3.4, contractor must store and secure until end of the availability and deliver the Rigid Inflatable Boat (RIB) to the ship.
3.5.1 Storage must be enclosed and climate controlled and must not impose damage to RIB. Free of rodents and pests in accordance with Chapter 8 of 2.2.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 588-21-001
COAR: 26 PCN: EA01-L049
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-001-26 1 of 5 ITEM NO: 588-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hangar Bay Roll Up Door Repair; accomplish
1.2 Location of Work:
1.2.1 Flight Deck (A5-86-0)
1.2.2 Passageway (A5-96-3)
1.2.3 MHE Stowage/Maintenance/Repair Area (A5-96-4)
1.3 Identification:
1.3.1 Quantity (One EA), Rollup Door Assembly, Mfr: Federal
Equipment Company, 1830MM X 2440MM, MFR Dwg: HH9000; APL 31A150134
1.3.1.1 Quantity (One EA), Left Hand Guide Rail Assembly, HH9021, Table 7.6 of 2.2
1.3.1.2 Quantity (One EA), Right Hand Guide Rail Assembly, HH9022, Table 7.6 of 2.2
1.3.1.3 Quantity (40 EA), Windlock Assembly 14FW, WD0170-3, Table 7.10 Item 6 of 2.2
1.3.1.4 Quantity (40 EA), Windlock Assembly 14JW, WD0170-1, Table 7.10 Item 7 of 2.2
1.3.1.5 Quantity (One EA), Top Slat, HH9041, Table 7.10 Item 1 of 2.2
1.3.1.6 Quantity (One EA), Bottom Slat, HH9044, Table 7.10 Item 4 of 2.2
1.3.1.7 Quantity (11 EA), Un-insulated Slat, HH9042, Table 7.10 Item 2 of 2.2
1.3.1.8 Quantity (40 EA), Insulated Slat, HH9043, Table 7.10
Item 3 of 2.2
1.3.1.9 Quantity (12 EA), Endlock Assembly 14J, WD0170-4, Table
7.10 Item 5 of 2.2
1.3.1.10 Quantity (One EA), Bottom Bar Assembly (HH9050), Table 7-11 of 2.2
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 T9167-BY-MMC-010 Rev 2, Door, Rollup, Curtain Type, HH8000, HD8000, HH9000 for Lewis B. Puller (ESB 3) Class; Installation, Operation and Maintenance Manual
2.3 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
2.4 602-8390171 Rev D, Aviation Facility Paint Lines
SSP: BAHR-001-26 2 of 5 ITEM NO: 588-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.5 631-8452125 Rev K, Paint Schedule
2.6 631-8452132 Rev AA, Paint Code Matrix
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-90 of 2.1 for Original Equipment Manufacturer (OEM) qualified Technical Representative service for removal, repair, installation, adjustment, and testing of the equipment listed in 1.3 and located in 1.2 in accordance with 2.2.
TOTAL
QUANTITY
NAME
OF PART
Table and Item No. REF
PART
No.
One EA Left Hand Guide Rail Assembly
Table 7.6 2.2 HH9021
One EA Right Hand Guide Rail Assembly
Table 7.6 2.2 HH9022
40 EA Windlock Assembly 14FW
Table 7.10 Item 6
2.2 WD0170-3
40 EA Windlock Assembly 14JW
Table 7.10 Item 7
2.2 WD0170-1
One EA Top Slat Table 7.10 Item 1
2.2 HH9041
One EA Bottom Slat Table 7.10 Item 4
2.2 HH9044
11 EA Un-insulated Slat
Table 7.10 Item 2
2.2 HH9042
40 EA Insulated Slat Table 7.10 Item 3
2.2 HH9043
12 EA Endlock Assembly 14J
Table 7.10 Item 5
2.2 WD0170-4
One EA Bottom Bar Assembly
Table 7-11 2.2 HH9050
3.1.1 Technical Representative provide each special tool required for installation, adjustment, and testing of equipment listed 1.3, and located in 1.2 in accordance with 2.2.
(V)(G) "VISUAL INSPECTION""
3.2 Accomplish a joint visual inspection and operational test with the SUPERVISOR of the equipment identified in 1.3, and located in 1.2 for deterioration and distortion to determine each required repair using approved ship's procedure and 2.2.
Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day
3.2.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements
SSP: BAHR-001-26 3 of 5 ITEM NO: 588-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign…