J-5_MSC Facility Survey.pdf

PDF 550 KB Posted

Attached to
USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
Solicitation number
N6817125R0001
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is a MSC Ship Repair Facility Survey form that collects detailed information about a shipyard's capabilities, including building ways, cranes, dry docks, berths, shops, storage, and employment. It requires the shipyard to provide a plot plan, depth of water plot, equipment lists, past work experience, and management/staffing qualifications.

The related federal contract opportunity is a Request for Proposal (RFP) for the USS LEWIS B. PULLER (ESB-3) Force Generation Risk Reduction (FGRR) work, which includes a regular overhaul-drydock, layberth, industrial assistance, and a mid-term availability to be performed at the contractor's facility within the 6th Fleet Area of Responsibility. The solicitation closes on 18 December 2024 at 1500 Central European Time. The contracting agency is the Department of the Navy Naval Supply Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION, newest first.
File Type Posted
Attachment S7 PPI Form Final v5.xlsx XLSX spreadsheet
N6817125R0001 amd 0004.pdf PDF
N6817125R0001 conformed.pdf PDF
N6817125R0001 Amend 0003.pdf PDF
N6817125R0001 Amend 0002.pdf PDF
Attachment S7 PPI Form Final v4.xlsx XLSX spreadsheet
Attachment S7 PPI Form v4 Posted.xlsx XLSX spreadsheet
N6817125R0001-0002.docx DOCX document
N6817125R0001 USS LBP FGRR.pdf PDF
J-1b Lay berth_IA.xlsx XLSX spreadsheet
J-2a part1 MSC ROH WI.pdf PDF
J-2b MSC Lay berth_IA WI.pdf PDF
J-2c FDRMC MTA WI.pdf PDF
J-4 GFP LIST.xlsx XLSX spreadsheet
S-3_Foreign ACP Questionnaire.pdf PDF
J-1a ROH.xlsx XLSX spreadsheet
J-1c MTA.xlsx XLSX spreadsheet
J-2a MSC ROH WI.pdf PDF
J-2a FDRMC ROH WI.pdf PDF
S-2_QA Checklist updated.pdf PDF
J-2a part2 MSC ROH WI.pdf PDF
S-1_NDA.pdf PDF
S-6 PPQ.pdf PDF
S-8 MSC DRY DOCK Sheet.pdf PDF
J-2c MSC MTA WI.pdf PDF
S-4_Foreign National Cert.pdf PDF
S-5 _PP Information.pdf PDF
S-7 Fire and Safety Plan Checklist.pdf PDF
S-9 Vessel Status Report.pdf PDF
S-10 LBP Planned Maintenance_Sample SAMM Tasks.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMSCINST 4330.21C

Report Control Symbol: MSC 4330-4

MSC SHIP REPAIR FACILITY SURVEY

NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

To:

Commander (Code N4) Military Sealift Command Washington, DC 20390

SHIPYARD AND ADDRESS SHIPYARD DATA

Telephone No:

Telex No:

Date Founded:

BUILDING WAYS (M. L. W.)

NO.

OF

WAY

LAUNCHING

(check one)

DIMENSIONS MAXIMUM SHIP SIZE

(ton 2,240 lbs)

DEPTH OF WATER CRANES SERVING WAY

OVER

WAY END

AT DROP

OFF NO. TYPE

LIFT CAPACITY

(std. tons)

CERTIFICATION DATE &

CERTIFIED BY WHOM

END

SIDE

BASIN

SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

WIDTH:

DEPTH:

END

SIDE

BASIN

SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

WIDTH:

DEPTH:

END

SIDE

BASIN

SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

WIDTH:

DEPTH:

END

SIDE

BASIN

SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

WIDTH:

DEPTH:

END

SIDE

BASIN

SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

WIDTH:

DEPTH:

END

SIDE

BASIN

SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

WIDTH:

DEPTH:

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W. TIDAL RANGE (DIFF. OF M.L. - M.H.) IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

IS SNUBBING NECESSARY?

YES NO

MSC FORM 4330/26 (12-83) SHEET 1 OF 5

USS Hershel ‘Woody’ Williams FY-24 MTA Attachment J-5 (MSC Ship Repair Facility Survey)

MSC SHIP REPAIR FACILITY SURVEY (continued)

SHIPYARD:

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (mean high water)

NO. TYPE

LENGTH

(actual & usable)

WATER DEPTH

(M. L. W.)

HEIGHT

OF

DOCK

(M. L. W.)

USE

REPAIR/

OUTFIT-

TING

SERVICES AVAILABLE

(use abbreviation of service below)

DOCK

NO.

MATERIAL TYPE

IN-

BOARD

OUT-

BOARD

Floating---(FD) Graving---(GD) Marine Railway (MR)

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

DRY DOCKS (continued)

DOCK

NO.

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH CLEAR WIDTH DEPTH/DRAFT

LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES OVERALL

at coping (GD), a keel blocks on cradle (MR), on PONTOON

(FD)

at top cradle (MR), at top inboard wing wall (FD, GD) at keel block height

OVER

SILL

(GD)

OVER

FLOOR

OVER

KEEL

BLOCKS

LEGEND (abbreviation of services)

Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I. Air -------- A - C.F.M. - P.S.I. Electric Power --- E - V - DC - AMP Sanitary Sewer -- SS - YES - NO

MSC FORM 4330/26 (12-83) SHEET 2 OF 5

SHIPYARD

BERTHING, SHIP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

NO TYPE CAPACITY

(STD TONS)

MAX REACH/

MAX SPAN

(BRIDGE)

CAPACITY AT

REACH

BOOM

LENGTH

HEIGHT

HINGE

HEIGHT OF HOOK

ABOVE BASE

AT OUT REACH

HEIGHT OF HOOK

(BRIDGE)

AREA SERVED DATE CERTIFIED, CERTIFIED BY WHOM &

DATE CERTIFICATION EXPIRES

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.) DISTANCE TO NEAREST

RAILROAD CONNECTION

DISTANCE TO NEAREST

AIRPORT (Identify)

MINIMUM CHANNEL (depth/width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

LIST ANY OTHER RESTRICTIONS (include projects under construction which will alter navigational restrictions)

MSC FORM 4330/26 (12-83) SHEET 3 OF 5

PRINCIPAL SHOPS AND BUILDINGS

NAME OF SHOP

OR BUILDING

DIMENSIONS OF

SHOP OR BUILDING

LARGEST EXIT ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED) WIDTH HEIGHT

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

CARPENTER

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY RAW STEEL STORAGE (SQ. FT.) _________________________________________

WELDING AND ASSEMBLY (SQ. FT.) ______________________________________

RIGGER

LIST TYPES OF WORK NORMALLY SUBCONTRACTED ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

EXISTING LOCAL ORDINANCES LIMITING PRODUCTIVE USE

LIMITATION IMPOSED BY PROPERTY ZONING CLASSIFICATION

MSC FORM 4330/26 (12-83) SHEET 4 OF 5

EMPLOYMENT CURRENT CURRENT

SHIFTS

POTENTIAL MAXIMUM MAXIMUM

SHIFTS

NORMAL NORMAL

SHIFTS

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT.

3. FOR EACH SHOP LISTED ON SHEET 4. A LIST OF MACHINE TOOLS AND EQUIPMENT WHICH

INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUDE, NAME OF SHIP, DATES, AND DOLLAR AMOUNT OF JOB)

OF SHIP REPAIR WORK WHICH HAS BEEN ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP REPAIR (INCLUDE AS

A MINIMUM JOBS HELD, YEARS HELD, ONE LINE DESCRIPTION OF DUTIES FOR EACH JOB).

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN LIST EACH FACILITY AND

ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM (NAME/TITLE/PHONE

NUMBER).

MANAGEMENT, ADMINISTRATION

PROFESSIONAL, ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

ARE YOU CERTIFIED AS A SMALL BUSINESS? YES NO

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

MSC FORM 4330/26 (12-83) SHEET 5 OF 5

File details come from the government source that posted it. Updated .