J-2a FDRMC ROH WI.pdf

PDF 2 MB Posted

Attached to
USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
Solicitation number
N6817125R0001
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is a specification for work to be accomplished on the USS LEWIS B. PULLER (ESB 3) ship as part of a federal contract opportunity. The work includes a variety of repairs and maintenance tasks across the ship, including weather deck preservation, deck plate replacement, joiner door and handle repair, door vent screen replacement, installation of hold open devices and cage/wire mesh gates, repair and installation of intrusion detection systems, antenna mounts, HVAC systems, piping systems, magazine sprinkler stations, deck drains, and deck coverings. The work is to be accomplished during a Force Generation Risk Reduction (FGRR) availability consisting of a regular overhaul-drydock (ROH-DD), a lay berth and industrial assistance (IA) period, and a mid-term availability (MTA) at the contractor's facility. The contract is being solicited by the Department of the Navy Naval Supply Systems Command and the place of performance is within the U.S. Navy's 6th Fleet Area of Responsibility. The solicitation closes on December 18, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION, newest first.
File Type Posted
Attachment S7 PPI Form Final v5.xlsx XLSX spreadsheet
N6817125R0001 amd 0004.pdf PDF
Attachment S7 PPI Form Final v4.xlsx XLSX spreadsheet
N6817125R0001 conformed.pdf PDF
N6817125R0001 Amend 0003.pdf PDF
N6817125R0001 Amend 0002.pdf PDF
N6817125R0001 USS LBP FGRR.pdf PDF
N6817125R0001-0002.docx DOCX document
Attachment S7 PPI Form v4 Posted.xlsx XLSX spreadsheet
J-2c MSC MTA WI.pdf PDF
J-5_MSC Facility Survey.pdf PDF
S-4_Foreign National Cert.pdf PDF
S-5 _PP Information.pdf PDF
S-7 Fire and Safety Plan Checklist.pdf PDF
S-9 Vessel Status Report.pdf PDF
S-10 LBP Planned Maintenance_Sample SAMM Tasks.xlsx XLSX spreadsheet
J-2a part2 MSC ROH WI.pdf PDF
S-1_NDA.pdf PDF
S-6 PPQ.pdf PDF
S-8 MSC DRY DOCK Sheet.pdf PDF
J-1b Lay berth_IA.xlsx XLSX spreadsheet
J-2a part1 MSC ROH WI.pdf PDF
J-2b MSC Lay berth_IA WI.pdf PDF
J-2c FDRMC MTA WI.pdf PDF
J-4 GFP LIST.xlsx XLSX spreadsheet
S-3_Foreign ACP Questionnaire.pdf PDF
J-1a ROH.xlsx XLSX spreadsheet
J-1c MTA.xlsx XLSX spreadsheet
J-2a MSC ROH WI.pdf PDF
S-2_QA Checklist updated.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

FDRMC BAHRAIN

USS LEWIS B PULLER (ESB 3)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: BAHR-005-25

INCLUDES ALL CHANGES THROUGH 11/02/2024

INDEX

SHIP: USS LEWIS B PULLER (ESB 3) BAHR-005-25

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 09/29/2023 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 09/29/2023 Original

009-03 Toxic and Hazardous Substance; control 09/29/2023 Original

009-04 Quality Management System; provide 03/13/2024 CH-1

009-05 Temporary Access; accomplish 09/29/2023 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

09/29/2023 Original

009-07 Confined Space Entry, and Certification; accomplish 09/29/2023 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 09/29/2023 Original

009-10 Asbestos-Containing Material (ACM); control 09/29/2023 Original

009-18 Mine Warfare Ships Magnetic Material; control 09/29/2023 Original

009-19 Provisioning Technical Documentation (PTD); provide 09/29/2023 Original

009-20 Government Property; control 03/13/2024 CH-1

009-21 Alteration Verification, Logistic and Technical Data; provide 09/29/2023 Original

009-23 Interference; remove and install 09/29/2023 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/29/2023 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/29/2023 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for

Commercial Equipment/Component; accomplish

09/29/2023 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a

Naval Facility; provide

09/29/2023 Original

009-60 Schedule and Associated Report for CNO Availability; provide and manage 09/29/2023 Original

009-61 Shipboard Use of Fluorocarbons; control 09/29/2023 Original

009-67 Integrated Total Ship Testing; manage 09/05/2023 Original

009-69 Heavy Weather/Mooring Plan; provide 09/29/2023 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

09/29/2023 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 09/29/2023 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

09/29/2023 Original

009-74 Occupational, Safety and Health Plan; accomplish 09/29/2023 Original

009-80 Ship Facility; maintain 09/05/2023 Original

009-81 Compartment Closeout; accomplish 09/29/2023 Original

009-82 Installation of Equal Component Vice Specified Component; report 09/29/2023 Original

009-84 Threaded Fastener Requirement; accomplish 09/05/2023 Original

009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify

09/18/2023 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

09/29/2023 Original

009-99 Ship Departure Report; provide 09/29/2023 Original

Page 1 of 5 PLANNED WORK

ITEM_NO. TITLE CHANGE DATE CHANGE

009-100 Ship's Stability; maintain 09/05/2023 Original

009-101 Ship Transit and Berthing; accomplish 09/29/2023 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/29/2023 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/29/2023 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/29/2023 Original

009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2023 Original

009-117 Combat Systems, Light-Off Suport; provide 09/29/2023 Original

009-118 CG Deck Loading; accomplish 09/29/2023 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 09/06/2023 Original

009-122 Temporary Padeye; install and remove 08/23/2023 Original

009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/06/2023 Original

009-126 Schedule Model Review (SMR); accomplish 10/01/2023 Original

Page 2 of 5 PLANNED WORK

CATEGORY II. FY-25 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.

TITLE CHANGE DATEITEM NO. CHANGE

009-09 Process Control Procedure (PCP); provide and accomplish

09/29/2023 Original

009-11 Insulation and Lagging; accomplish 09/29/2023 Original

009-12 Weld, Fabricate, and Inspect; accomplish 03/13/2024 CH-1

009-25 Structural Boundary Test; accomplish 09/29/2023 Original

009-26 Deck Covering; accomplish 09/01/2023 Original

009-32 Cleaning and Painting Requirements; accomplish 03/13/2024 CH-1

009-71 Piping System; test 09/29/2023 Original

009-90 Technical Representative; provide 09/29/2023 Original

009-107 Piping System Cleanliness Restoration and Flushing

(Non-Nuclear); accomplish

09/29/2023 Original

Page 3 of 5 PLANNED WORK

ITEM NO. TITLE

1) 130-00-001 A9 Weather Deck Preservation; accomplish

2) 130-00-002 Deck Plate; replace

3) 167-00-001 Joiner Door and Handle; repair

4) 167-00-002 Door Vent Screen Replace; accomplish

5) 167-10-001 Hold Open Device; install

6) 167-11-001 Cage/Wire Mesh Gate Installation; accomplish

7) 436-11-001 A8 Level Intrusion Detection System (IDS) Alarm System; install

8) 441-51-001 Antenna 2-3 Coupler Mount Preservation; accomplish

9) 508-11-001 Lagging and Insulation; replace

10) 512-00-001 Split Air Condition Cleaning; accomplish

11) 516-10-001 Container (CONEX) Refrigeration Unit Box; repair

12) 522-00-001 Magazine Sprinkler Station; repair

13) 526-11-001 Deck Drain; clean

14) 573-41-001 Certified Forklift Weight; provide

15) 583-10-001 Rigid Inflatable Boat (RIB) Sling Weight Test; accomplish

16) 583-31-001 Rigid Inflatable Boat (RIB) Overhaul; accomplish

17) 588-21-001 Helicopter Hangar Door; repair

18) 593-11-001 Vacuum, Collection, Holding and Transfer (VCHT) Piping System Chemical Cleaning; accomplish

19) 631-13-001 Aircraft Electrical Service Station (AESS) Hardware Repair and Foundation Preservation;

accomplish

20) 631-21-001 Forward House Preservation; accomplish

21) 634-10-001 Deck Tile; replace

22) 634-10-002 Cosmetic Polymeric (PRC) Deck Covering; replace

23) 634-11-001 A9 Level Weather Deck Non-Skid Replacement; accomplish

24) 634-11-002 A7 Level Starboard Weather Deck Non-Skid Replacement; accomplish

25) 634-11-003 A6 Level Starboard Weather Deck Non-Skid Replacement; accomplish

26) 634-11-004 A2 Level Non-Skid Replacement; accomplish

27) 634-20-001 Flight Deck Coaming Repair and Preservation; accomplish

28) 634-21-001 Flight Deck Non-skid Replacement; accomplish

29) 634-21-002 Hangar Bay Non-skid Replacement; accomplish

30) 640-00-001 Mount Safe to Deck; accomplish

31) 640-00-002 Knell Knocker Replace; accomplish

32) 651-11-001 Galley Refrigerator Compressor Replace; accomplish

33) 703-00-002 Seafox Magazine No. 2 Tie Downs; install

34) 857-10-001 Temporary Duty Section Berthing Off-Ship; provide

35) 991-00-001 Mast Scaffolding; provide

36) 992-00-001 Temporary Air Conditioning; provide

37) 992-11-001 Temporary Food Storage Facility; provide

38) 992-11-002 Ships Crew Office and Hygiene Facility; provide

39) 992-11-003 Temporary Local Area Network; provide

40) 992-21-001 Project Team Office Space; provide

41) 992-21-002 Ship's Force Office; provide

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 130-00-001

COAR: 26 PCN: CC01-L016

CC01-0278

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 130-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: A9 Weather Deck Preservation; accomplish

1.2 Location of Work:

1.2.1 A9 Level Weather Deck (A9-WD-0)

1.3 Identification:

1.3.1 Quantity (8,000 LF), A9 Weather Deck Stanchions

1.3.2 Quantity (3,000 SF), A9 Weather Deck Mast

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ship in Service General

2.4 631-8393784 Rev P, Paint Schedule

2.5 631-8452132 Rev AA, Paint Code Matrix

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a joint visual inspection with the SUPERVISOR of the areas located in 1.2 and identified in 1.3 for structural integrity, deterioration, oxidation, delamination, pitting, cracks, and areas of damage, or distortion, using 2.2 through 2.5 for guidance.

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR

3.2 Accomplish the requirement of 009-32 of 2.1 including Table 2, Line 25, Column A, B, C and E for the preservation identified in 1.3 and located in 1.2 using 2.2 through 2.5 as guidance.

3.2.1 Accomplish the requirement of 009-12 of 2.1, including Table 2, Columns A and D, Lines One through 7, clad weld and build up (100) linear feet of weather deck.

3.3 Provide each support service to include but not limited to scaffolding, crane, and JLG.

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.3.

4. NOTES:

SHIP: USS LEWIS B PULLER (ESB 3)

SSP: BAHR-005-25 2 of 2 ITEM NO: 130-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 12 GL

Epoxy Coating, MIL-PRF-23236

(White), Type V or VI, Class 5 or 7 None 2.1

80100155 69969 3.2

2. 100 GL

Epoxy Coating, Buff, MIL-PRF- 23236 None 2.1

80100159 84110 3.2

3. 100 GL

Epoxy Coating, Haze Gray, MIL- PRF-23236 None 2.1

80100159 83543 3.2

4. 200 GL

Enamel, Dark Gray, MIL-PRF- 24635 None 2.1

80100135 04727 3.2

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 130-00-002

COAR: 26 PCN: CC02-0240

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 130-00-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Deck Plate; replace

1.2 Location of Work:

1.2.1 Tactical Ops Center (A8-91-0)

1.3 Identification:

1.3.1 Quantity (4 EA), Deck Plate, 22-Inch X 22-Inch Each

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 634-8393776 Rev F, Joiner Deck Covering Schedule

2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each deck plate, located in 1.2, identified in 1.3, using 2.2 and 2.3 as guidance and as designated by the

SUPERVISOR.

3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Remove existing, procure and install each new two square feet deck plate, a total of 500 square feet of deck plating identified in 1.3 and located in 1.2, using 2.2 for guidance and as designated by the

SUPERVISOR.

3.2.1 Template exact size, configuration, and location from each existing shipboard condition.

3.2.2 Chip and grind each surface flush in way of each repair.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A or D, Lines One through 7.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 21 Columns A and B for preservation of each new deck plate identified in 1.3 and located in 1.2.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.5.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.

SSP: BAHR-005-25 2 of 2 ITEM NO: 130-00-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-00-001

COAR: 26 PCN: SERV-L111

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 167-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Joiner Door and Handle; repair

1.2 Location of Work:

1.2.1 Forward House, A1-A8 Level

1.3 Identification:

1.3.1 Quantity (12 EA), Metal Joiner Door, Non-Watertight Door, located in 1.2.1

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 624-8390167 Rev C, Joiner Door Details

2.3 801-8468127 Rev Q, General Arrangement

2.4 S9086-UF-STM-020/CH-600, Non-Structural Closures

2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each equipment identified in 1.3 and located in 1.2 including each frame, handle, hardware, gasket, locking mechanism and surrounding structure for deterioration, areas of damage or distortion using 2.2 through 2.4 for guidance. Note: Ships Force will identify 1.3.1 required for repair upon arrival located in 1.2.1

3.1.1 Cycle each door assembly twice (open and close) and check for proper seating, binding or erratic operation.

3.1.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 and 3.1.1 to the SUPERVISOR.

3.2 Template exact size, configuration, and location of each joiner door from existing shipboard condition. Repair equipment based on the result of 3.1.1, identified in 1.3 and located in 1.2, using 2.2 thru 2.4 for guidance.

3.2.1 Remove door from frame, replace each faulty hardware, hinge, handle, hook, hasp, locking mechanism, gasket and associated door assembly with new.

3.2.1.1 Each door removed must be replaced lumber, plywood and staging boards, except that used for pallets, must be fire-retardant in accordance with Category Two, Type II, of MIL-L- 19140 with the functional ability to close from inside and out

SSP: BAHR-005-25 2 of 2 ITEM NO: 167-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

the door.

3.2.2 Fair and straighten each door and frame using 2.2 through 2.4 for guidance as directed by SUPERVISOR.

3.2.3 Replace each gasket, flush type tower bolt, stainless steel corner cup and new skin for Leafs, using 2.2 through 2.4 for guidance as directed by SUPERVISOR.

(V)(G) "OPERATIONAL TEST"

3.3 Accomplish an operational test of each newly installed and repaired equipment identified in 1.3 and located in 1.2, opening and closing 4 times each. Allowable binding or sticking: None.

(V)(G) "VISUAL LIGHT TEST"

3.3.1 Accomplish visual light test for each door repaired in 3.2, using 2.2 through 2.4 for guidance. Allowable visible light: None.

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.

4. NOTES:

4.1 Perform final test in accordance with 009-25 for doors identified by Ship's Force.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-00-002

COAR: 26 PCN: CC01-0287

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 167-00-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Door Vent Screen Replace; accomplish

1.2 Location of Work:

1.2.1 Passage (A8-94-4-Q)

1.3 Identification:

1.3.1 Quantity (One EA), Door Vent Screen, Door No. A8-96-2

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 624-8468286 Rev H, Joiner Door and Passing Window Schedule

2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each door vent screen, located in 1.2, identified in 1.3, using 2.2 and 2.3 as guidance and as designated by the SUPERVISOR.

3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Fabricate and install each new door vent screen, located in 1.2, using 2.2 and 2.3 for guidance.

3.2.1 Template each exact dimension and clearance from existing shipboard conditions.

3.2.2 Chip and grind each surface flush and smooth in way of

removals.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line One Columns A and B for preservation of each new door vent screen, identified in 1.3 and located in 1.2.

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

SSP: BAHR-005-25 2 of 2 ITEM NO: 167-00-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-10-001

COAR: 26 PCN: CG03-1004

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 167-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Hold Open Device; install

1.2 Location of Work:

1.2.1 MILDET-AT/FP Armory (A1-80-2)

1.3 Identification:

1.3.1 Quantity (One EA), Hold Open Device, WTRT Door No. A1-79-4, page 15/21 of 2.3

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 624-8468311 Rev L, Steel Door List

2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each hold open device, located in 1.2, identified in 1.3, using 2.2 through 2.4 as guidance and as designated by the SUPERVISOR.

3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Fabricate and install each new hold open device identified in 1.3 and located in 1.2, using 2.2 for guidance and as designated by the

SUPERVISOR.

3.2.1 Template exact size, configuration, and location from existing shipboard conditions, using 2.2 for guidance.

3.2.2 Chip and grind each surface flush and smooth in way of

existing damage hold open device.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A or D, Lines One through 7.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One Columns A and B for preservation of each new hold open device identified in 1.3 and located in 1.2.

(V)(G) "OPERATIONAL TEST"

3.5 Accomplish an operational test of each newly installed hold open device installed in 3.2 and located in 1.2. Allowable binding and

SSP: BAHR-005-25 2 of 2 ITEM NO: 167-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

sticking: None.

3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-11-001

COAR: 26 PCN: CG03-1044

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Cage/Wire Mesh Gate Installation; accomplish

1.2 Location of Work:

1.2.1 Aviation/AMCM Det Armory (A5-94-2)

1.3 Identification:

1.3.1 Quantity (One EA), 36-inch X 40-inch Cage/Wire Mesh

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 637-8468279 Rev G, General Arrangement A5 level

2.4 783-8468124 Rev B, Grating, Magazine Layouts & Details

2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each armory gate, located in 1.2, identified in 1.3, using 2.2 through 2.4 as guidance and as designated by the SUPERVISOR.

3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Fabricate and install each new cage/wire mesh, located in 1.2, using

2.2 through 2.4 for guidance and as designated by the SUPERVISOR.

3.2.1 Template configuration, material, and location from existing shipboard conditions and as designated by the SUPERVISOR.

3.2.2 Chip and grind each surface flush and smooth in way of

removals.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, C or D, Lines One through 7.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 26 Columns A and B for preservation of each new cage/wire mesh identified in 1.3 and located in 1.2.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.5.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.

SSP: BAHR-005-25 2 of 2 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 436-11-001

COAR: 26 PCN: CC01-0300

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 436-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: A8 Level Intrusion Detection System (IDS) Alarm System;

install

1.2 Location of Work:

1.2.1 Intel Center (A8-93-2-Q)

1.3 Identification:

1.3.1 Intrusion Detection System

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 ICS 705, Version 1.3, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities

2.3 432-8497111, Misc IC CKT Mods Incdt to Stbr Mods (A8 LVL)

2.4 436-8498095, Intrusion Detection System Modification

2.5 320-8497110 Rev B, Power and Lighting Mods Incdt to Stbr Mods

2.6 637-8497105, Structural and Joiner Bhd & Outfitting Mods Incdt toStbr Mods

2.7 624-8468286 Rev H, Joiner Door and Passing Window Schedule

2.8 624-8390167 Rev C, Joiner Door Details

2.9 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1 for Original Equipment Manufacturer (OEM) qualified Technical Representative service for installation, adjustment, and testing of the equipment listed in 1.3 and located in 1.2 in accordance with Chapter 7 of 2.2, using 2.3 through 2.9 for guidance. Refer to 4.1 for known source of Technical Representative.

3.1.1 Technical Representative provide each special tool required for installation, adjustment, and testing of equipment listed 1.3, and located in 1.2 in accordance with 2.2.

3.1.2 Prior to commencement of work, contractor shall obtain Ship’s Force signature on Enclosure (Two) as verification of tag out and record tag out serial number using 2.2 through 2.8 for guidance:

Allowance discrepancy: None.

3.1.3 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 through 3.1.2 the SUPERVISOR.

(V)(G) "OPERATIONAL TEST"

3.2 Accomplish an operational test of each new repaired intrusion

SSP: BAHR-005-25 2 of 2 ITEM NO: 436-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

detection system in accordance with Chapter 7 of 2.2.

3.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.3.1 Do not paint each item listed in Paragraph 631-8.17 of 2.9.

4. NOTES:

4.1 Known possible source for qualified Technical Representative:

SIDUS, 7352 Trade Street, San Diego, CA 92121, (619) 275-5533

Larry Hagstrom, email: L.Hagstrom@sidus-solutions.com

Tel: (352) 665-1083

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 441-51-001

COAR: 26 PCN: CC01-0289

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 441-51-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Antenna 2-3 Coupler Mount Preservation; accomplish

1.2 Location of Work:

1.2.1 Weather Deck Starboard, A7.5 level

1.3 Identification:

1.3.1 Quantity (One EA), Antenna 2-3 High Frequency (HF) Mount

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 170-004-1000181, AS-4679/U Antenna Outline and Installation Drawing

2.4 801-8494508, Topside Arrangement Drawing

2.5 SB-V35S HF Antenna System, Instruction Manual for SB-V35S HF Antenna System

2.6 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each whip antenna's coupler mount and grounding strap listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, each crack, and each area of damage or distortion, using 2.2 through 2.6 for guidance.

3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Accomplish the removal of each antenna coupler mount listed in 1.3 and located in 1.2 using 2.2 through 2.6 for guidance.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One Columns A, B, C and E for preservation of each new cable bracket identified in 1.3 and located in 1.2.

3.4 Accomplish the installation of each antenna coupler mount and grounding strap with new stainless-steel fastener and Teflon washer listed in 1.3 and located in 1.2 using 2.2 through 2.6 for guidance.

(V)(G) "OPERATIONAL TEST"

3.5 Accomplish an operational test of equipment listed in 1.3 in accordance with ship's procedure and 2.5, using 2.2 through 2.4 for guidance. Allowable malfunction: NONE

SSP: BAHR-005-25 2 of 2 ITEM NO: 441-51-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.6.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 5 KT

Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1

80100159 84110 3.3

2. 5 KT

Amercoat 240, Dark Gray, MIL- PRF- 23236, One Gallon Kit None 2.1

80100159 83547 3.3

3. 5 KT

Amercoat 240, Haze Gray, MIL- PRF-24635, One Gallon Kit None 2.1

80100138 21864 3.3

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 508-11-001

COAR: 26 PCN: CG03-1068

CC01-0259

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 508-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Lagging and Insulation; replace

1.2 Location of Work:

1.2.1 Fan Room/ELECT EQPT (A8-96-0-Q)

1.2.2 Vestibule (A5-96-7-Q)

1.3 Identification:

1.3.1 Quantity (120 LF), Piping Insulation and Lagging, 1-1/4 Inch Pipe Diameter

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 MIL-STD-769K, Insulation Requirements for U.S. Naval Vessels

2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-11 of 2.1 for piping insulation and lagging listed in 1.3 and located in 1.2 using 2.2 for guidance.

3.1.1 Remove mold located on piping, ventilation and bulkhead in 1.2 prior to accomplishing 009-11 of 2.1

3.1.2 Record and retain each directional flow arrow, system

identification, and each miscellaneous sign and marking prior to removing or disturbing existing lagging and insulation, identified in

1.3.1 located in 1.2.1.

3.1.3 Accomplish the requirements of 009-32 of 2.1 for new

insulation, lagging, and each reusable cover to match each surrounding area.

(V)(G) "FINAL ACCEPTANCE"

3.2 Accomplish an inspection of the replaced lagging as identified in

1.3 and located in 1.2 for workmanship and proper fit. Acceptance criteria; Loose or sagging: None.

3.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.3.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

SSP: BAHR-005-25 2 of 2 ITEM NO: 508-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 10 GL

Amercoat 240, Buff, MIL-PRF 23236, One Gallon Kit None 2.1

80100159 84110 3.1.3

2. 10 GL

Amercoat 3234, Soft White None 2.1

80100134 45089 3.1.3

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 512-00-001

COAR: 26 PCN: SERV-L112

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 3 ITEM NO: 512-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Split Air Condition Cleaning; accomplish

1.2 Location of Work:

1.2.1 Fan Room A6 Level, Radio Module No. 1 (A6-95-2)

1.2.2 Fan Room A6 Level, Radio Module No. 2 (A7-95-2)

1.2.3 Fire/Crash Rescue Team Staging Area (A5-87-1)

1.2.4 Embarked Forces Space (A5-87-2)

1.2.5 Vertrep/Helo/Aviation Crash Locker (A5-87-3)

1.2.6 AVN & AMCM Det Maint Cont/QA (A5-88-1)

1.2.7 Aviation Det Ordinance Configurations (A5-92-2)

1.2.8 Embarked Forces Space (A5-96-2)

1.2.9 Embarked Forces Space (A5-96-6)

1.3 Identification:

1.3.1 Quantity (9 EA), Split Air Conditioner, Model: 42KHG018HS

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 S9086-RQ-STM-010/CH-510 Rev 7, Heating, Ventilating, and Air Conditioning Systems for Surface Ships

2.4 512-8468130 Rev D, HVAD Diagram FWD Accommodation

2.5 510-8468302 Rev D, Fan Room Arrangement

2.6 512-7624117 Rev A, Instructions for Ventilation Testing and Balancing

2.7 S9086-RW-STM-010/CH 516 Rev 5, Refrigerant Systems

2.8 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each split air condition ventilation system, listed in 1.3 and located in 1.2, inspecting for damage, each missing access cover, screen, terminal, gasket, fastener and lagging, using 2.2 through 2.5 for guidance.

3.1.1 Inspect each copper refrigerant lines to ensure no cracks or stress points along each unit.

3.1.2 Inspect each belt for wear, cracks, dry rotting, defects, SSP: BAHR-005-25 2 of 3 ITEM NO: 512-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

alignment and tightness.

3.1.3 Inspect each motor in accordance with Paragraph 510-A.9.3.8 of 2.3.

3.1.4 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 through

3.1.3 to the SUPERVISOR.

3.2 Accomplish cleaning of each split air conditioning, condenser, evaporator and filter, listed in 1.3 and located in 1.2, from weather openings to terminal ends using 2.3 through 2.5 for guidance.

3.2.1 All mechanical cleaning methods must be approved by the SUPERVISOR and minimize damage to lint lined ductwork.

3.2.2 Match mark, remove and clean each wire mesh screen, damper, diverting/balancing plate, orifice plate and access plate. Retain for reuse.

3.3 Accomplish required maintenance of 1.3 identified in 3.1.

(V)(G) ""REFRIGERANT LEVELS"

3.3.1 Accomplish a refrigerant evacuation and charge of equipment listed in 1.3 and located in 1.2 in accordance with 2.7.

3.3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.4.1 to include the refrigerant levels before and after the charge to the SUPERVISOR.

(V)(G) "FINAL CLEANLINESS"

3.4 Accomplish a visual inspection of each cleaned interior surface of each ventilation branch and fan for each ventilation system, listed in

1.3 and located in 1.2, for cleanliness and completion of work prior to installation of each wire mesh screen, damper, orifice plate and access plate.

3.4.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.

3.5 Install each ventilation piece, including wire mesh screen, damper, diverting/balancing plate, orifice plate and access plate, removed in 3.3.2, using 2.3 through 2.5 for guidance.

(V)(G) "OPERATIONAL TEST"

3.6 Accomplish an operational test of the ventilation systems cleaned in

3.4 at system operating pressure to ensure ventilation joint tightness.

Allowable leakage: None, No faults, unusual vibration/noise, proper operation in accordance with 2.7.

3.7 Accomplish the requirements of 009-11 of 2.1 for each for new insulation, lagging, and reusable covers.

SSP: BAHR-005-25 3 of 3 ITEM NO: 512-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.8.1 Do not paint each item listed in Paragraph 631-8.17 of 2.8.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 516-10-001

COAR: 26 PCN: SERV-L113

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 3 ITEM NO: 516-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Container (CONEX) Refrigeration Unit Box; repair

1.2 Location of Work:

1.2.1 Off Ship, Dockside/Pier Side

1.3 Identification:

1.3.1 Quantity (4 EA), Seabox 541.6, 20 Foot Refrigerated Storage Container, Refrigerant: 7.3 LB (R-134A), Carrier Model No. 69NT40, Part ID Number: NT0630; Part No.: 54-00586-20 of 2.2

1.3.1.1 Quantity (2 EA), Refrigerator

1.3.1.2 Quantity (2 EA), Freezer

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 T-363 Rev E, Operation and Service Manual for 69NT40-561-500 to 599 Container Refrigeration Units

2.3 T-285 Rev I, Operation and Service Manual for 69NT40-511-300 to 399 Container Refrigeration Units

2.4 62-10327 Rev A, Annual Inspection for ThinLINE 69NT40-541, PrimeLINE 69NT561 Container Refrigeration Units

2.5 T-354PL Rev A, Service Parts List for 69NT40 Upflow Container Refrigeration Units

2.6 S0400-AD-URM-010/TUM Rev 8, Tag-out Users Manual

2.7 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

3.1 Provide a Carrier certified Air Conditioning and Refrigeration Technician to accomplish inspection, service, repair, adjustment and testing of each equipment listed 1.3 and located in 1.2 using 2.2 through

2.4 for guidance.

3.1.1 Provide special tooling, materials, laptop and software, and parts required for the accomplishment of this Work Item.

3.1.2 Provide to the SUPERVISOR, documentation that the individual is a Carrier certified Air Conditioning and Refrigeration Technician prior to commencement of work.

3.1.2.1 Provide electrical power to conduct all electrical

testing and operational test.

(V)(G) "PRE-OPERATIONAL TEST"

3.2 Accomplish with the SUPERVISOR and Ship's Force a pre-operational test of each equipment listed in 1.3 and located in 1.2 using 2.2 through

SSP: BAHR-005-25 2 of 3 ITEM NO: 516-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2.4 for guidance. Acceptance Criteria: Pressure, temperature and settings within normal operating parameters.

(V)(G) "VISUAL INSPECTION"

3.3 Accomplish service and inspection of each equipment listed in 1.3 and located in 1.2 including fan motor and refrigerant charge listed in

1.3 and located in 1.2 in accordance with 2.4, using 2.2 and 2.3 for guidance.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR. Include part numbers, and estimated time to repair for each item listed in 1.3 and located in 1.2.

(V)(G) "TAG-OUT VERIFICATION"

3.4 Contractor must obtain Ship’s Force signature on Enclosure (One) as verification of tag out and record tag out serial number in accordance with 2.6, prior to commencement of work, Allowable discrepancy: None.

(V)(G) "LEAK TEST"

3.5 Clean each condenser coil inside and out, check for leaks of each equipment listed in 1.3 and located in 1.2 using 2.2 through 2.4 for guidance. Allowable leakage: None

3.5.1 Check for refrigerant charge using 2.2 and 2.3 for guidance.

(V)(G) "INSPECT DOOR SEAL"

3.6 Inspect each door seal, window, hinge, fitting, fastener and front-loading gasket. Test and operate each refrigerated container door safety devices and door seal of the equipment listed in 1.3 and located in 1.2 using 2.2 through 2.4 for guidance. Accept/Reject Criteria: no wear, tear, damage and properly seated.

(V)(G) "OPERATIONAL TEST"

3.7 Accomplish operational test of each equipment listed in 1.3 and located in 1.2 under systems normal operating pressure and temperature in accordance with 2.3 and 2.4. Allowable leakage or malfunction: None.

3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.8.1 Do not paint each item listed in Paragraph 631-8.17 of 2.7.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

5.2 PUSH MATERIAL:

SSP: BAHR-005-25 3 of 3 ITEM NO: 516-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 522-00-001

COAR: 26 PCN: CG03-1016

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 2 ITEM NO: 522-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Magazine Sprinkler Station; repair

1.2 Location of Work:

1.2.1 Aviation AMCM Det Armory (A5-94-2-A)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 529-8468148 Rev F, Sprinkling Diagram

2.3 S9522-AA-HBK-010 Rev 4, Magazine Sprinkling Systems

2.4 S6435-Q2-OMI-010 Rev 3, Washdown Counter Measure Control Valve

2.5 MIL-STD-777F Change 2, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships

2.6 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each Magazine Sprinkler Station, located in 1.2, using 2.2 through 2.4 as guidance and as designated by the SUPERVISOR.

3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 9 Columns A, B, D and E for preservation of each new Magazine Sprinkler Station located in 1.2.

3.3 Install each valve, and install new gaskets and fasteners conforming to 2.4, including Category and Group N-2 of 2.5. All required valves provided by Ship's Force.

(V)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of each valve and piping system at nominal system operating pressure and temperature in accordance with 2.3.

Allowable external leakage: None.

3.5 Accomplish the requirements of 009-11 of 2.1 for each new and disturbed insulation and lagging.

3.6 Accomplish the requirements of 009-32 of 2.1 for each new and

SSP: BAHR-005-25 2 of 2 ITEM NO: 522-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

disturbed surface.

3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.6.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 5 GL

Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1

80100159 84110 3.2

2. 10 GL

Amercoat 240, Haze Gray, MIL- PRF- 23236, One Gallon Kit None 2.1

80100159 83543 3.2

3. 5 GL

MIL-DTL-24607,

Gray None 2.1

80100134 45091 3.2

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 526-11-001

COAR: 26 PCN: SERV-L110

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-005-25 1 of 4 ITEM NO: 526-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Deck Drain; clean

1.2 Location of Work:

1.2.1 A1-A8 Level

1.3 Identification:

1.3.1 Quantity (400 LF), Plumbing Deck Drain Piping

1.3.2 Quantity (28 EA) Deck Drains identified in Attachment A

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 528-8468142 Rev F, Plumbing Drains System Diagram

2.3 S9086-RK-STM-010/505 Rev 6, Piping Systems

2.4 S9086-VD-STM-010/CH631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a joint visual inspection with the SUPERVISOR of each equipment listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion, and to determine required repair, using 2.2 and 2.3 for guidance

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

(V)(G) "HYDRO BLAST"

3.2 Accomplish hydro blasting, cleaning and flushing of deck drain and drain piping system, 400 linear feet free of obstructions and foreign matter located in 1.2, in accordance with paragraph 505-4.7 of 2.3, using

2.2 and 2.3 for guidance.

(V)(G) "POST REPAIR UNOBSTRUCTED FLOW TEST"

3.3 Accomplish post-repair unobstructed flow test for each deck drain located in 1.2 using clean fresh water for a minimum of 30 minutes.

Allowable leakage and obstruction: None.

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.

SSP: BAHR-005-25 2 of 4 ITEM NO: 526-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 Embarkation Laundry Room.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: BAHR-005-25 3 of 4 ITEM NO: 526-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SSP: BAHR-005-25 4 of 4 ITEM NO: 526-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 573-41-001

COAR: 26 PCN: VM04-L006

VM04-L002

VM04-L004

BWST FILE NO: 000-001 CMP: NONE

REVISED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .