Exhibit_C_Form_D_Subcontract_Schedule_-_FINAL.doc

DOC document 69 KB Posted

Attached to
TA-21 DP West Slabs D&D and Remediation Project
Solicitation number
RFP-0000300
Issued by

About this file

Exhibit C Form D Subcontract Schedule Final

View the file

Other files

File Type Posted
Exhibit_A_General_Conditions_Rev_0.doc DOC document
IMG_0015_TA21_150_basement.jpg JPG image
Exhibit_B_Special_Conditions_Rev_0_Draft.docx DOCX document
RFP-0000300_questions_log_-_6.12.19_-_Amendment_4.docx DOCX document
IMG_0018_TA21_150_basement.jpg JPG image
IMG_0016_TA21_150_basement.jpg JPG image
IMG_0014_TA21_150_basement.jpg JPG image
DB_NM190022_04-05-2019_NM22.pdf PDF
IMG_0008_TA21_150_basement.jpg JPG image
IMG_0017_TA21_150_basement.jpg JPG image
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_4_-_6.13.19.docx DOCX document
IMG_0019_TA21_150_basement.jpg JPG image
Exhibit_H_TA_21_DP_West_Slabs_Final_with_signatures_-_Amendment_4_-_6.12.19.pdf PDF
EXHIBIT_L_Prime_Contract_Flow_Downs.docx DOCX document
IMG_0013_TA21_150_basement.jpg JPG image
RFP-0000300_questions_log_-_5.28.19_-_Amendment_3_FINAL.docx DOCX document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.30.19__-_Amendment_3_FINAL.doc DOC document
Exhibit_F_Attachments,_F7.0_revised_5.30.19.pdf PDF
N3B_Waste_Acceptance_Criteria,_N3B-P409-1,_Rev._0.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs_-_Exhibit_F_-_Amendment_3_-_5.30.19.pdf PDF
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_3_-_5.30.19_FINAL.docx DOCX document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_5-30-19)_for_amendment_3.docx DOCX document
RFP-0000300_questions_log_-_5.20.19.docx DOCX document
18-0031_TA21_DPWest_Contour_Map.pdf PDF
Attachment_D-18_map_point_202_pipe_stub_photo_5.8.19.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-_revised_for_amendment_2_-_5.20.19.docx DOCX document
RFP-0000300_Amendment__1_Reissue_5_01_19.docx DOCX document
Exhibit_C_Form_F_Project_Organization_and_Workplan_-_4.30.19.doc DOC document
Exhibit_C_Form_H_Resumes_of_Key_Personnel_-_05.01.19.doc DOC document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_4-30-19).docx DOCX document
Exhibit_C_Form_C-1_Lower_Tier_Experience_Statement_-_4.30.19.doc DOC document
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_FINAL_-_4.30.19.docx DOCX document
Exhibit_C_Form_N_Experience_Statement_-_FINAL_4.30.19.doc DOC document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.01.19.doc DOC document
D-_10_(17_of_18)_N3B-SOP-ER-2005,_r.0_-_Background_Comparisons_for_Radionuclides.pdf PDF
Exhibit_G_TA-21_Delta_Prime_West_Slabs_Project.pdf PDF
N3B_Form_9060_Insurance_Requirements.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs.pdf PDF
Attachment_D-13_N3B_Request_for_Information_Form.pdf PDF
D-_10_(4_of_18)_N3B_P101-17_R3_Excavation_Fill_Soil_Disturbance.pdf PDF
D-_10_(12_of_18)_N3B_LA-UR-11-10371_R0_N3B_Storm_Water_BMP_Manual.pdf PDF
D-12_Threemile_SIR_R1_July18.pdf PDF
D-16_(2_of_3)_NMED_SSG_VOL-I_-March_2017_revised.pdf PDF
D-14_N3B_CoE_SDDR.pdf PDF
D-_10_(14_of_18)_N3B-AP-ER-0001,_r.0_Document_Development_for_Environmental_Deliverables.pdf PDF
D-_10_(5_of_18)_N3B_P151-1_R5_Packaging_and_Transportation_Program_Procedure.pdf PDF
Attachment_D-18_TA-21_Site_Cleanup_Items.pdf PDF
D-_10_(9_of_18)_N3B_ER-SOP-10093_R1_Sample_Control_and_Field_Documentation.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-Final.pdf PDF
Exhibit_C_Form_B_Construction_Plant_Equipment_List_(new)_-_FINAL.doc DOC document
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ex C Form D (Rev. 1, 9/22/08) Exhibit C Form D – Subcontract Schedule April 8, 2019

EXHIBIT “C”

FORM D

SUBCONTRACT SCHEDULE

PN: Edit the Clause titles identified below to fit the Subcontract pro forma being used. For example, Services and Architect/Engineer proformas incorporate schedule requirements in the milestone clause.

Bidder to submit a Preliminary Subcontract Schedule addressing the Subcontract Target and Milestone dates listed in the Task Order Schedule and the Target/Milestone dates in the table below.

Bidder is to identify at least three potential problem areas that may affect successful subcontract completion and Bidder’s proposed resolution of each problem should it occur.

Based on the successful Bidder’s Preliminary Subcontract Schedule and CONTRACTOR requirements, an agreed schedule shall be developed after award, in accordance with RFP-0000300 Section 15.0, Schedule.

Milestones
Due Date
Issue RFP
04/08/2019
Pre-bid Meeting & Site Visit
04/10/2019 & 04/11/2019
Questions Due
05/03/2019
Offer/Proposal Due Date
05/17/2019
Notice of Award (NOA)
06/19/2019
Readiness Review Complete
08/13/2019
Notice to Proceed (NTP)
08/16/2019
Begin Mobilization
08/19/2019

TA-21 Delta Prime (DP) West Investigations

Letter Report Due to NMED 09/30/2019

Letter Report Documenting Field Work Completion and Sampling Conducted at DP West Due to NMED
09/30/2019
TA-21 Delta Prime Site Aggregate Area Final Investigation Report Due to NMED
09/30/2021
Targets
Due Date
Issue RFP
04/08/2019
Pre-bid Meeting & Site Visit
04/10/2019 & 04/11/2019
Questions Due
05/03/2019
Offer/Proposal Due Date
05/17/2019
Notice of Award (NOA)
06/19/2019
Submittals, Readiness Review, SAP, PEP, Training Complete
08/13/2019
Concrete Slabs and Soils Beneath Basement Slabs Characterization Complete
10/17/2019
Investigation and Remediation of SWMU 21-022(i) and AOC C-21-006 Complete
12/05/2019
DP West Tunnels Characterization Complete
03/14/2020
D&D, Size Reduction, Soil Sampling & Remediation, Waste Loading & Weighing & Staging of Western 1/3 DP West Slabs, Tunnels & Foundations Compete
04/24/2020
D&D, Size Reduction, Soil Sampling & Remediation, Waste Loading & Weighing & Staging of Middle 1/3 DP West Slabs, Tunnels & Foundations Compete
05/25/2020
D&D, Size Reduction, Soil Sampling & Remediation, Waste Loading & Weighing & Staging of Eastern 1/3 DP West Slabs, Tunnels & Foundations Compete
06/23/2020
Backfilling and Site Restoration Complete
08/18/2020
Demobilization and Site Cleanup Complete
09/01/2020
30% IR Draft for SWMU 21-22(i) and AOC C-21-006 Due to N3B
09/16/2020
Final Closeout Report Due
09/23/2020
60% IR Draft for SWMU 21-22(i) and AOC C-21-006 Due to N3B
11/13/2020
95% IR Draft for SWMU 21-22(i) and AOC C-21-006 Due to N3B
01/13/2021
Investigation Report for SWMU 21-022(i) & AOC C-21-006 Including Incorporation of N3B and EM-LA Comments Complete
03/05/2021

PR# RFP-0000300

File details come from the government source that posted it.