Appendix D-13 N3B Request for Information Form

View the file

Other files

File Type Posted
Exhibit_A_General_Conditions_Rev_0.doc DOC document
IMG_0015_TA21_150_basement.jpg JPG image
Exhibit_B_Special_Conditions_Rev_0_Draft.docx DOCX document
RFP-0000300_questions_log_-_6.12.19_-_Amendment_4.docx DOCX document
IMG_0018_TA21_150_basement.jpg JPG image
IMG_0016_TA21_150_basement.jpg JPG image
IMG_0014_TA21_150_basement.jpg JPG image
DB_NM190022_04-05-2019_NM22.pdf PDF
IMG_0008_TA21_150_basement.jpg JPG image
IMG_0017_TA21_150_basement.jpg JPG image
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_4_-_6.13.19.docx DOCX document
IMG_0019_TA21_150_basement.jpg JPG image
Exhibit_H_TA_21_DP_West_Slabs_Final_with_signatures_-_Amendment_4_-_6.12.19.pdf PDF
EXHIBIT_L_Prime_Contract_Flow_Downs.docx DOCX document
IMG_0013_TA21_150_basement.jpg JPG image
RFP-0000300_questions_log_-_5.28.19_-_Amendment_3_FINAL.docx DOCX document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.30.19__-_Amendment_3_FINAL.doc DOC document
Exhibit_F_Attachments,_F7.0_revised_5.30.19.pdf PDF
N3B_Waste_Acceptance_Criteria,_N3B-P409-1,_Rev._0.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs_-_Exhibit_F_-_Amendment_3_-_5.30.19.pdf PDF
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_3_-_5.30.19_FINAL.docx DOCX document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_5-30-19)_for_amendment_3.docx DOCX document
RFP-0000300_questions_log_-_5.20.19.docx DOCX document
18-0031_TA21_DPWest_Contour_Map.pdf PDF
Attachment_D-18_map_point_202_pipe_stub_photo_5.8.19.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-_revised_for_amendment_2_-_5.20.19.docx DOCX document
RFP-0000300_Amendment__1_Reissue_5_01_19.docx DOCX document
Exhibit_C_Form_F_Project_Organization_and_Workplan_-_4.30.19.doc DOC document
Exhibit_C_Form_H_Resumes_of_Key_Personnel_-_05.01.19.doc DOC document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_4-30-19).docx DOCX document
Exhibit_C_Form_C-1_Lower_Tier_Experience_Statement_-_4.30.19.doc DOC document
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_FINAL_-_4.30.19.docx DOCX document
Exhibit_C_Form_N_Experience_Statement_-_FINAL_4.30.19.doc DOC document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.01.19.doc DOC document
D-_10_(17_of_18)_N3B-SOP-ER-2005,_r.0_-_Background_Comparisons_for_Radionuclides.pdf PDF
Exhibit_G_TA-21_Delta_Prime_West_Slabs_Project.pdf PDF
N3B_Form_9060_Insurance_Requirements.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs.pdf PDF
D-_10_(4_of_18)_N3B_P101-17_R3_Excavation_Fill_Soil_Disturbance.pdf PDF
D-_10_(12_of_18)_N3B_LA-UR-11-10371_R0_N3B_Storm_Water_BMP_Manual.pdf PDF
D-12_Threemile_SIR_R1_July18.pdf PDF
D-16_(2_of_3)_NMED_SSG_VOL-I_-March_2017_revised.pdf PDF
D-14_N3B_CoE_SDDR.pdf PDF
D-_10_(14_of_18)_N3B-AP-ER-0001,_r.0_Document_Development_for_Environmental_Deliverables.pdf PDF
D-_10_(5_of_18)_N3B_P151-1_R5_Packaging_and_Transportation_Program_Procedure.pdf PDF
Attachment_D-18_TA-21_Site_Cleanup_Items.pdf PDF
D-_10_(9_of_18)_N3B_ER-SOP-10093_R1_Sample_Control_and_Field_Documentation.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-Final.pdf PDF
Exhibit_C_Form_B_Construction_Plant_Equipment_List_(new)_-_FINAL.doc DOC document
D-_10_(7_of_18)_N3B_ER-SOP-20145_R0_REQUESTING_AND_MANAGING_DATA_SETS.pdf PDF
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Subcontract Management

REQUEST FOR INFORMATION

SUBCONTRACT No. RFI No. Date: Page 1 of

Project ID: Date Reply Requested By:

Reference Information (Document/Drawing/Specification/Location)

INFORMATION REQUESTED / PROBLEM:

PROPOSED RESPONSE / SOLUTION:

SUBCONTRACTOR Representative: STR: Receipt Date:

INFORMATION TO SUBCONTRACTOR

REQUESTED INFORMATION:

CONTRACTOR Representative: Date:

RFP No. 0000300

Attachment D-13

Technical Subcontract Management

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION

INSTRUCTIONS

This procedure provides for controlled identification, notification and resolution of SUBCONTRACTOR initiated technical questions. A Request for Information (RFI) is a SUBCONTRACTOR initiated technical question. An RFI is initiated if the

SUBCONTRACTOR:

• Is unable to understand technical documents: scope, specifications, drawings or data.

• Discovers or perceives a conflict, ambiguity, error or omission in or among the technical documents.

Upon determination that an RFI is required, the SUBCONTRACTOR should prepare its question on the attached form, log the RFI using a sequential numbering system (e.g., the first RFI is [SUBCONTRACT #]-RFI-0001), and deliver the RFI to CONTRACTOR’S STR or designated location (address). SUBCONTRACTOR shall maintain a log to track and document status. At a minimum the log shall contain the RFI identifier, date submitted, date returned, status, and a section for comments. SUBCONTRACTOR shall provide an updated copy of this log at each weekly Project Status Meeting for review.

RFI’s that request a specific date for a required response should be monitored for a response and, if no response has been issued three (3) days before the response is due, the originator should contact CONTRACTOR to ascertain the status of the response. CONTRACTOR will target to respond to most RFI’s with three (3) working days and all RFI’s within two (2) weeks.

The RFI may not be used to request deviations to the Subcontract. See the Supplier Deviation Disposition Request (SDDR) section of the Subcontract Documents for deviations. CONTRACTOR responses to RFIs shall not be construed as permission to deviate from contract requirements. RFI’s are not authorized change documents and cannot be used to direct a change in subcontract requirements. If CONTRACTOR’S response on the RFI has a cost and/or schedule effect, it is the SUBCONTRACTOR’S responsibility to immediately advise CONTRACTOR’S Procurement Specialist with a SUBCONTRACTOR Change Proposal. Work undertaken without CONTRACTOR authorization is at the SUBCONTRACTOR’S risk and expense.

RFP No. 0000300

Attachment D-13

INFORMATION TO SUBCONTRACTOR

File details come from the government source that posted it.