Ex C Form A (LS) (Rev. C, 04/30/2019) Exhibit C Form A, Schedule of Quantities and Prices Revision #C, Dated 04/30/2019
EXHIBIT “C”
FORM A
SCHEDULE OF QUANTITIES AND PRICES
TA-21 DP West Slabs D&D and Remediation Project
1.0 WORK TO BE PERFORMED
Complete the TA-21 DP West Slabs D&D and Remediation Project work in accordance with the requirements of all Subcontract Documents.
2.0 BASE SCOPE LUMP SUM PRICING
The Total Lump Sum Price for performing all base scope work is $__________________. The breakdown of this Lump Sum Price against pay items are detailed below. The following items under 2.0 “Base Scope” are to be used for measured monthly progress payments. NOTE: The distribution of cost / pricing allocated to each of the below pay items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process. Bold numerical indicators below refer to Exhibit D sections.
| Item |
| Description |
| Unit |
| Total Units |
| Lump Sum |
| 2.1 | |
| Prepare prejob submittals: Waste Sampling Analysis Plans (SAP), Project Execution Plan (PEP), etc., & complete |
required training (2.2, 2.3 – inclusive, 2.4.4, 2.4.4.1 – inclusive, 4.8)
| 2.2 |
| Prepare & participate in Readiness Review (including resolution of findings) (2.4.4, 2.4.5.1) |
| LS |
| 1 |
| 2.3 |
| Perform Mobilization to the Site (2.4.4, 1.1.14) |
| LS |
| 1 |
| 2.4 |
| Install BMPs for the project (2.4.11, 2.4.11.1) |
| LS |
| 1 |
| 2.5 |
| Perform Soil sampling underneath 21-5 & 21-150 basement slabs (1.1.1.3, 1.1.5, 1.1.6, 1.1.7, 1.1.10, 1.1.11) |
| LS |
| 1 |
| 2.6 |
| Characterize slabs per waste Sample Analysis Plan (1.1.1, 1.1.1.3, 1.1.2, 1.1.5, 1.1.10, 1.1.11) |
| LS |
| 1 |
| 2.7 |
| Investigation & remediation of SWMU 21-022(i) & AOC C-21-006 (1.1.1, 1.1.2, 1.1.5, 1.1.5.1 - inclusive, 1.1.5.2 - inclusive, 1.1.8 – inclusive, 1.1.9, 1.1.10, 1.1.11, 1.1.12) |
| LS |
| 1 |
| 2.8 |
| Package & load debris from SWMU 21-022(i) & AOC C-21-006 (1.1.2, 1.1.3, 1.1.4, 1.1.4.1, 1.1.4.2, 1.1.4.3, 1.1.13, 2.4.1.2, 2.4.22, 2.4.23) |
| LS |
| 1 |
| 2.9 |
| Collect & analyze soil samples from SWMU 21-022(i) & AOC C-21-006 (1.1.1, 1.1.5, 1.1.5.1 - inclusive, 1.1.5.2 – inclusive, 1.1.10, 1.1.11) |
| LS |
| 1 |
| 2.10 |
| Investigation & remediation of Bldgs 3 & 4 North/South wings (1.1.5, 1.1.5.3 – inclusive, 1.1.8 – inclusive, 1.1.9, 1.1.10, 1.1.11, 1.1.12) |
| LS |
| 1 |
| 2.11 |
| Package & load debris from Bldgs 3 & 4 North/South wings (1.1.2, 1.1.3, 1.1.4, 1.1.4.2, 1.1.4.3, 1.1.13, 2.4.1.2, 2.4.22, 2.4.23) |
| LS |
| 1 |
| 2.12 |
| Collect & analyze soil samples from Bldgs 3 & 4 North/South wings (1.1.1, 1.1.5, 1.1.5.3 – inclusive, 1.1.10, 1.1.11) |
| LS |
| 1 |
| 2.13 |
| Characterize Bldgs 2, 3, 4 & 5 utility tunnels (1.1.1, 1.1.1.1, 1.1.5, 1.1.6, 1.1.7, 1.1.10, 1.1.11) |
| LS |
| 1 |
| 2.14 |
| Package & load debris/soil from the utility tunnels (1.1.2, 1.1.3, 1.1.1.2, 1.1.4, 1.1.4.2, 1.1.4.3, 1.1.13, 2.4.1.2, 2.4.22, 2.4.23) |
| LS |
| 1 |
| 2.15 |
| Demolition of the Western 1/3 of slabs (including Hallway east of 210, 328, 312, 2 & 458) (1.1.4, 1.1.4.1, 1.1.4.2, 1.1.4.3, 2.4.1.2) |
| LS |
| 1 |
| 2.16 |
| Size reduction of the Western 1/3 of slabs (2.4.22) |
| LS |
| 1 |
2.17
| Collect & analyze soil samples Western 1/3 of slabs (including Hallway east of 210, 328, 312, 2 & 458) (1.1.1, 1.1.5, 1.1.5.2 – inclusive, 1.1.6, 1.1.7, 1.1.10, 1.1.11) |
| LS |
| 1 |
| 2.18 |
| Package & Load Concrete Debris from Western 1/3 of slabs (1.1.2, 1.1.3, 1.1.4, 1.1.4.2, 1.1.4.3, 1.1.13, 2.4.22, 2.4.23) |
| LS |
| 1 |
| 2.19 |
| Soil remediation of Western 1/3 of slabs (1.1.8 – inclusive, 1.1.9, 1.1.12) |
| LS |
| 1 |
| 2.20 |
| Demolition of the Middle 1/3 of slabs (including 313, 3, 314, 4, 315 & 116) (1.1.4, 1.1.4.1, 1.1.4.2, 1.1.4.3, 2.4.1.2) |
| LS |
| 1 |
| 2.21 |
| Size Reduction of the Middle 1/3 of slabs (2.4.22) |
| LS |
| 1 |
| 2.22 |
| Collect & analyze soil samples of the Middle 1/3 of slabs (including 313, 3, 314, 4, 315 & 116) (1.1.1, 1.1.5, 1.1.5.3 – inclusive, 1.1.6, 1.1.7, 1.1.10, 1.1.11) |
| LS |
| 1 |
| 2.23 |
| Package & Load Concrete Debris from Middle 1/3 of slabs (1.1.2, 1.1.3, 1.1.4, 1.1.4.1, 1.1.4.2, 1.1.4.3, 1.1.13, 2.4.22, 2.4.23) |
| LS |
| 1 |
| 2.24 |
| Soil remediation of Middle 1/3 of slabs (1.1.8 – inclusive, 1.1.9, 1.1.12) |
| LS |
| 1 |
| 2.25 |
| Demolition of the Eastern 1/3 of slabs (including 5, 149 & 150) (1.1.4 – inclusive, 2.4.1.2) |
| LS |
| 1 |
| 2.26 |
| Size Reduction of the Eastern 1/3 of slabs (2.4.22) |
| LS |
| 1 |
| 2.27 |
| Collect & analyze soil samples of the Eastern 1/3 of slabs (Including 5, 149 & 150) (1.1.1, 1.1.6, 1.1.7, 1.1.10, 1.1.11) |
| LS |
| 1 |
| 2.28 |
| Package & Load Concrete Debris from Eastern 1/3 of slabs (1.1.2, 1.1.3, 1.1.4 – inclusive, 1.1.13, 2.4.22, 2.4.23) |
| LS |
| 1 |
| 2.29 |
| Soil remediation of Eastern 1/3 of slabs (1.1.8 – inclusive, 1.1.9, 1.1.12) |
| LS |
| 1 |
| 2.30 |
| Backfill & Site Restoration (1.1.4.4, 1.1.9, 1.1.12, 2.4.1.3, 2.4.17) |
| LS |
| 1 |
| 2.31 |
| Develop Final Project Closeout Report (include Non-CO Sampling and Remediation) (2.4.30 – inclusive, 2.6 - inclusive) |
| LS |
| 1 |
| 2.32 |
| Perform Site Cleanup and Demobilization (2.4.1, 2.4.1.1) |
| LS |
| 1 |
| 2.33 |
| Prepare Investigation Report (SWMU 21-022(i) & AOC C-21-006) 30% (1.2.1 – inclusive, 1.2.2, 1.2.3 – inclusive, 1.2.4.1, 1.2.5 – inclusive, 4.1–4.6) |
| LS |
| 1 |
| 2.34 |
| Prepare Investigation Report (SWMU 21-022(i) & AOC C-21-006) 60% (1.2.1 – inclusive, 1.2.2, 1.2.3 – inclusive, 1.2.4.2, 1.2.5 – inclusive, 4.1–4.6) |
| LS |
| 1 |
| 2.35 |
| Prepare Investigation Report (SWMU 21-022(i) & AOC C-21-006) 95% (1.2.1 – inclusive, 1.2.2, 1.2.3 – inclusive, 1.2.4.3, 1.2.5 – inclusive, 4.1–4.6) |
| LS |
| 1 |
| 2.36 |
| Incorporate N3B internal review comments for Investigation Report (SWMU 21-022(i) & AOC C-21-006) (1.2.6 – inclusive, 4.1-4.6) |
| LS |
| 1 |
| 2.37 |
| Incorporate EM-LA Investigation Report Comments (SWMU 21-022(i) & AOC C-21-006) (1.2.6 – inclusive, 2.4.1.4, 4.1-4.6) |
| LS |
| 1 |
| TOTAL FIRM FIXED PRICE |
| LS |
| 1 |
3.0 OPTIONAL SCOPE LUMP SUM PRICING
The breakdown of this Lump Sum Price against pay items is detailed below. Payment for additional work in “Optional Scope” will be paid by the “Unit” until the total unit quantities are met. The additional item quantities required to complete the SOW are unknown; therefore, none, a portion of, or all of the optional scope may be executed. NOTE: The distribution of cost / pricing allocated to each of the below pay items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process.
| Item |
| Description |
| Unit |
| Total Units |
| Lump Sum Rate |
| 3.1 |
| Pump LLW aqueous waste from DP West Slabs Basements |
| gal |
| 10,000 |
| 3.2 |
| Investigation samples 0’-4’ (bgs) |
| Each |
| 35 |
| 3.3 |
| Investigation samples 4’-8’ (bgs) |
| Each |
| 35 |
| 3.4 |
| Investigation samples 8’-12’ (bgs) |
| Each |
| 35 |
| 3.5 |
| Remediation/Excavation and Site Restoration of Contaminated Soils above and beyond scope included in Section 2.0 above. |
| YD³ |
| 100 |
| 3.6 |
| Complete removal & packaging/weighing of sewer system. Optional scope item 3.1 and 3.7. |
| Entirety |
| 1 |
| 3.7 |
| Complete removal, packaging, weighing, and staging of items 83-100 in Attachment D-18. Optional scope items 3.1, 3.2, 3.2.1, 3.8 and 3.2.2 |
| Entirety |
| 1 |
| 3.8 |
| Complete removal, packaging, weighing, and staging of items 101-125 in Attachment D-18. Optional scope items 3.1, 3.2, 3.2.1, and 3.2.2 |
| Entirety |
| 1 |
| 3.9 |
| Complete removal, packaging, weighing, and staging of items 126-150 in Attachment D-18. Optional scope items 3.1, 3.2, 3.2.1, and 3.2.2 |
| Entirety |
| 1 |
| 3.10 |
| Complete removal, packaging, weighing, and staging of items 151-175 in Attachment D-18. Optional scope items 3.1, 3.2, 3.2.1, and 3.2.2 |
| Entirety |
| 1 |
| 3.11 |
| Complete removal, packaging, weighing, and staging of items 176-203 in Attachment D-18. Optional scope items 3.1, 3.2, 3.2.1, and 3.2.2 |
| Entirety |
| 1 |
| 3.12 |
| Complete geophysical surveys (including report submission). Optional scope item 3.3 |
| Entirety |
| 1 |
| 3.13 |
| Complete milling and consolidation of asphalt paving. Optional scope item 3.6. |
| Entirety |
| 1 |
| 3.14 |
| Complete grading and road-basing of container laydown areas. Complete removal, packaging, weighing, staging, and backfill/base-coursing of underground structure 21-0357 in Attachment D-18. Optional scope items 3.1, 3.2, 3.2.1, 3.2.2, 3.4 and 3.4.1. |
| Entirety |
| 1 |
| 3.15 |
| Further reduce slabs’ concrete beyond EnergySolutions (ES) WAC levels outlined in Exhibit D to 6” minus. Concrete shall meet TA-54 Pit 38 WAC requirements. |
| Ton |
| 2,500 |
| 3.16 |
| Segregate rebar from concrete to be size reduced in 3.15 above. |
| Ton |
| 100 |
4.0 FIXED UNIT RATE PRICING
The following unit rate prices for changes shall be full and complete compensation for additional work or credit for deleted work. Prices are inclusive of all costs including, but not limited to labor, material, services, overhead and profit. Because these are all-inclusive rates (inclusive of overhead and profit) they are not for use as component rates in negotiated changes where overhead and profit are separately determined. NOTE: The cost / pricing allocated to each of the below Unit Rate items will be an element of evaluation under the Cost/Price Analysis component of the Source Evaluation and Selection process.
| Item |
| Description |
| Unit |
| Unit Rate |
| 4.1 |
| Pumping & containerizing aqueous waste (e.g., basement floor water) |
| 1,000 gal |
| 4.2 |
| Investigation sample 0’-4’ (bgs) |
| 1 |
| 4.3 |
| Investigation sample 4’-8’ (bgs) |
| 1 |
| 4.4 |
| Investigation sample 8’-12’ (bgs) |
| 1 |
| 4.5 |
| Investigation sample 12’-18’ (bgs) |
| 1 |
| 4.6 |
| Investigation sample 18’-26’ (bgs) |
| 1 |
| 4.7 |
| Load, package, weigh contaminated soils |
| 20 YD³ rolloff |
| 4.8 |
| Size reduce, load, package, weigh misc. metal equipment |
| 20 YD³ rolloff |
| 4.9 |
| Size reduce, load, package, weigh concrete |
| 20 YD³ rolloff |
| 4.10 |
| Size reduce, load, package, weigh asphalt |
| 20 YD³ rolloff |
| 4.11 |
| Stabilize areas with 4” compacted base course |
| TN |
| 4.12 |
| Backfill material (including placement & compaction) |
| TN |
| 4.13 |
| Excavate, size reduce, remove, load, package and weigh; 2-6 inch pipe (e.g., Cast iron/Duriron, orangeburg, fiber, or steel pipe) |
| LF |
5.0 ADJUSTMENTS
All prices are fixed for the duration of the Subcontract and are not subject to escalation for any cause. Payment of the Total Lump Sum Price shall constitute full payment for performance of the Work and covers all costs of whatever nature incurred by SUBCONTRACTOR in accomplishing the Work in accordance with the provisions of this Subcontract.
SUBCONTRACTOR shall maintain all work in progress until it is accepted. SUBCONTRACTOR shall repair, rework or replace, as necessary, any damage or lost work due to normal wear and tear, anticipated events, or conditions within its control. No separate payment shall be made for such maintenance costs which are deemed included in the original Subcontract price. Any failure to maintain the Work shall be considered a defect in accordance with the General Condition titled “WARRANTY.”
6.0 REQUIRED SUBMITTALS
The following submittals are prerequisite to payment for mobilization:
| 6.1 | Subcontract cost-loaded schedule and spend plan |
| 6.2 | Insurance Certificates, Insurance Endorsements |
| 6.3 | SSESHP Plan |
| 6.4 | Readiness Concurrence Meeting submittals. Includes all ESH and security documents as required by Exhibits D, F, G, and I. |
| 6.5 | Proof of completed training per Exhibit D, Appendix D-7 - Training Requirements Matrix |
| 6.6 | Project Execution Plan (PEP) |
| 6.7 | Project specific Sample and Analysis Plan (SAP) |
| 6.8 | Identification of Key Personnel |