N3B_Form_9060_Insurance_Requirements.pdf

PDF 723 KB Posted

Attached to
TA-21 DP West Slabs D&D and Remediation Project
Solicitation number
RFP-0000300
Issued by

About this file

N3B Form 9060 Insurance Requirements

View the file

Other files

File Type Posted
Exhibit_A_General_Conditions_Rev_0.doc DOC document
IMG_0015_TA21_150_basement.jpg JPG image
Exhibit_B_Special_Conditions_Rev_0_Draft.docx DOCX document
RFP-0000300_questions_log_-_6.12.19_-_Amendment_4.docx DOCX document
IMG_0018_TA21_150_basement.jpg JPG image
IMG_0016_TA21_150_basement.jpg JPG image
IMG_0014_TA21_150_basement.jpg JPG image
DB_NM190022_04-05-2019_NM22.pdf PDF
IMG_0008_TA21_150_basement.jpg JPG image
IMG_0017_TA21_150_basement.jpg JPG image
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_4_-_6.13.19.docx DOCX document
IMG_0019_TA21_150_basement.jpg JPG image
Exhibit_H_TA_21_DP_West_Slabs_Final_with_signatures_-_Amendment_4_-_6.12.19.pdf PDF
EXHIBIT_L_Prime_Contract_Flow_Downs.docx DOCX document
IMG_0013_TA21_150_basement.jpg JPG image
RFP-0000300_questions_log_-_5.28.19_-_Amendment_3_FINAL.docx DOCX document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.30.19__-_Amendment_3_FINAL.doc DOC document
Exhibit_F_Attachments,_F7.0_revised_5.30.19.pdf PDF
N3B_Waste_Acceptance_Criteria,_N3B-P409-1,_Rev._0.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs_-_Exhibit_F_-_Amendment_3_-_5.30.19.pdf PDF
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_3_-_5.30.19_FINAL.docx DOCX document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_5-30-19)_for_amendment_3.docx DOCX document
RFP-0000300_questions_log_-_5.20.19.docx DOCX document
18-0031_TA21_DPWest_Contour_Map.pdf PDF
Attachment_D-18_map_point_202_pipe_stub_photo_5.8.19.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-_revised_for_amendment_2_-_5.20.19.docx DOCX document
RFP-0000300_Amendment__1_Reissue_5_01_19.docx DOCX document
Exhibit_C_Form_F_Project_Organization_and_Workplan_-_4.30.19.doc DOC document
Exhibit_C_Form_H_Resumes_of_Key_Personnel_-_05.01.19.doc DOC document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_4-30-19).docx DOCX document
Exhibit_C_Form_C-1_Lower_Tier_Experience_Statement_-_4.30.19.doc DOC document
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_FINAL_-_4.30.19.docx DOCX document
Exhibit_C_Form_N_Experience_Statement_-_FINAL_4.30.19.doc DOC document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.01.19.doc DOC document
D-_10_(17_of_18)_N3B-SOP-ER-2005,_r.0_-_Background_Comparisons_for_Radionuclides.pdf PDF
Exhibit_G_TA-21_Delta_Prime_West_Slabs_Project.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs.pdf PDF
Attachment_D-13_N3B_Request_for_Information_Form.pdf PDF
D-_10_(4_of_18)_N3B_P101-17_R3_Excavation_Fill_Soil_Disturbance.pdf PDF
D-_10_(12_of_18)_N3B_LA-UR-11-10371_R0_N3B_Storm_Water_BMP_Manual.pdf PDF
D-12_Threemile_SIR_R1_July18.pdf PDF
D-16_(2_of_3)_NMED_SSG_VOL-I_-March_2017_revised.pdf PDF
D-14_N3B_CoE_SDDR.pdf PDF
D-_10_(14_of_18)_N3B-AP-ER-0001,_r.0_Document_Development_for_Environmental_Deliverables.pdf PDF
D-_10_(5_of_18)_N3B_P151-1_R5_Packaging_and_Transportation_Program_Procedure.pdf PDF
Attachment_D-18_TA-21_Site_Cleanup_Items.pdf PDF
D-_10_(9_of_18)_N3B_ER-SOP-10093_R1_Sample_Control_and_Field_Documentation.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-Final.pdf PDF
Exhibit_C_Form_B_Construction_Plant_Equipment_List_(new)_-_FINAL.doc DOC document
D-_10_(7_of_18)_N3B_ER-SOP-20145_R0_REQUESTING_AND_MANAGING_DATA_SETS.pdf PDF
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

– Insurance Requirements

N3B Form 9060, Rev. 0, (04/18)

N3B-U-PRP-0001

INSURANCE

1. Unless otherwise specified in the Agreement, Subcontractor agrees that it shall obtain and maintain during the performance of any Services at the Facility Site and until the acceptance thereof, the insurance described in item 2 below and shall be carried with insurance companies with at least a Best's "A" rating.

Subcontractor will furnish to Contractor three (3) copies of the certificate(s) evidencing such insurance prior to commencing, performance or physically present on the Facility site under the Agreement.

2. The required insurance coverage is as follows:

(a) Worker's Compensation Insurance and Employer's Liability Insurance (including occupational disease) to cover statutory benefits and limits of the Worker's Compensation laws of any applicable jurisdiction in which the Services are to be performed hereunder, and Employers' Liability Insurance with limits of five hundred thousand dollars ($500,000) for trauma, each accident; five hundred thousand dollars ($500,000) for disease, each person and five hundred thousand dollars ($500,000) disease, policy limit.

(b) Commercial General Liability Insurance written on the latest ISO occurrence form and including coverage for Contractual Liability and Products and Completed Operations (to remain in force for two (2) years following acceptance of the Services). The insurance required by this clause (b) shall have the following limits of liability: Third Party Bodily Injury and Property Damage Liability: $1,000,000 combined single limit per occurrence and $2,000,000 combined single limit general aggregate, with such limits available to the Project.

(c) Business Automobile Liability insurance covering all owned, leased and non-owned vehicles used in connection with the Services, with not less than $1,000,000 combined single limit per occurrence for bodily injury and property damage.

(d) If professional services are involved, Professional Liability Insurance with not less than $1,000,000 per occurrence with a 24 months discovery period after completion of the performance under the Agreement.

3. The following endorsements shall be included in the above insurance coverage:

(a) Thirty (30) days advance written notice in the event of cancellation, non-renewal or material change of any policy. Language referring to "endeavor to" and "but failure to mail such notice shall impose no obligation or liability of any kind upon the company, its agents or representatives" shall be stricken from the certificate of insurance.

(b) Contractor and Owner named as additional insured (except on Workers' Compensation and Professional Liability Insurance).

(c) A waiver of subrogation in favor of Contractor and Owner.

(d) Severability of Interest or Separation of Insured.

(e) Subcontractor's insurance is primary, and any insurance maintained by Contractor is considered excess and non-contributory.

Subcontractor expressly understands and agrees that any insurance coverage required by this Agreement or otherwise provided by Subcontractor in no way limits the obligation or liabilities of the Subcontractor assumed elsewhere in this Agreement. Deductibles, if any, are for the account of the Subcontractor.

RFP-0000297

File details come from the government source that posted it.