TA-21 DP West Slabs D&D and Remediation Project
Solicitation number
RFP-0000300
Issued by

About this file

Amendment 1 RFP-0000300

View the file

Other files

File Type Posted
Exhibit_A_General_Conditions_Rev_0.doc DOC document
IMG_0015_TA21_150_basement.jpg JPG image
Exhibit_B_Special_Conditions_Rev_0_Draft.docx DOCX document
RFP-0000300_questions_log_-_6.12.19_-_Amendment_4.docx DOCX document
IMG_0018_TA21_150_basement.jpg JPG image
IMG_0016_TA21_150_basement.jpg JPG image
IMG_0014_TA21_150_basement.jpg JPG image
DB_NM190022_04-05-2019_NM22.pdf PDF
IMG_0008_TA21_150_basement.jpg JPG image
IMG_0017_TA21_150_basement.jpg JPG image
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_4_-_6.13.19.docx DOCX document
IMG_0019_TA21_150_basement.jpg JPG image
Exhibit_H_TA_21_DP_West_Slabs_Final_with_signatures_-_Amendment_4_-_6.12.19.pdf PDF
EXHIBIT_L_Prime_Contract_Flow_Downs.docx DOCX document
IMG_0013_TA21_150_basement.jpg JPG image
RFP-0000300_questions_log_-_5.28.19_-_Amendment_3_FINAL.docx DOCX document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.30.19__-_Amendment_3_FINAL.doc DOC document
Exhibit_F_Attachments,_F7.0_revised_5.30.19.pdf PDF
N3B_Waste_Acceptance_Criteria,_N3B-P409-1,_Rev._0.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs_-_Exhibit_F_-_Amendment_3_-_5.30.19.pdf PDF
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_Amendment_3_-_5.30.19_FINAL.docx DOCX document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_5-30-19)_for_amendment_3.docx DOCX document
RFP-0000300_questions_log_-_5.20.19.docx DOCX document
18-0031_TA21_DPWest_Contour_Map.pdf PDF
Attachment_D-18_map_point_202_pipe_stub_photo_5.8.19.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-_revised_for_amendment_2_-_5.20.19.docx DOCX document
Exhibit_C_Form_F_Project_Organization_and_Workplan_-_4.30.19.doc DOC document
Exhibit_C_Form_H_Resumes_of_Key_Personnel_-_05.01.19.doc DOC document
Exhibit_D_TA-21_DP_West_Slabs_(FINAL_4-30-19).docx DOCX document
Exhibit_C_Form_C-1_Lower_Tier_Experience_Statement_-_4.30.19.doc DOC document
Exhibit_C_Form_A_-_DP_West_Slabs_Schedule_Activities_-_FINAL_-_4.30.19.docx DOCX document
Exhibit_C_Form_N_Experience_Statement_-_FINAL_4.30.19.doc DOC document
Exhibit_C_Form_D_Subcontract_Schedule_-_5.01.19.doc DOC document
D-_10_(17_of_18)_N3B-SOP-ER-2005,_r.0_-_Background_Comparisons_for_Radionuclides.pdf PDF
Exhibit_G_TA-21_Delta_Prime_West_Slabs_Project.pdf PDF
N3B_Form_9060_Insurance_Requirements.pdf PDF
Appendix_D-7_Training_matrix_TA-21_DP_West_Slabs.pdf PDF
Attachment_D-13_N3B_Request_for_Information_Form.pdf PDF
D-_10_(4_of_18)_N3B_P101-17_R3_Excavation_Fill_Soil_Disturbance.pdf PDF
D-_10_(12_of_18)_N3B_LA-UR-11-10371_R0_N3B_Storm_Water_BMP_Manual.pdf PDF
D-12_Threemile_SIR_R1_July18.pdf PDF
D-16_(2_of_3)_NMED_SSG_VOL-I_-March_2017_revised.pdf PDF
D-14_N3B_CoE_SDDR.pdf PDF
D-_10_(14_of_18)_N3B-AP-ER-0001,_r.0_Document_Development_for_Environmental_Deliverables.pdf PDF
D-_10_(5_of_18)_N3B_P151-1_R5_Packaging_and_Transportation_Program_Procedure.pdf PDF
Attachment_D-18_TA-21_Site_Cleanup_Items.pdf PDF
D-_10_(9_of_18)_N3B_ER-SOP-10093_R1_Sample_Control_and_Field_Documentation.pdf PDF
Form_9072_-_RFP-0000300_TA-21_DP_West_Slabs_-Final.pdf PDF
Exhibit_C_Form_B_Construction_Plant_Equipment_List_(new)_-_FINAL.doc DOC document
D-_10_(7_of_18)_N3B_ER-SOP-20145_R0_REQUESTING_AND_MANAGING_DATA_SETS.pdf PDF
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP-0000300 TA-21 DP West Slabs D&D and Remediation Project

Amendment #1 May 1, 2019 Re-Issuance

As discussed at Industry Day, the Investigation Report scope has been removed, forms have been updated to reflect this change.

The Intent to Bid Notification Date has been extended to Friday May 10, 2019. Please provide your notification by 3:00 MST on May 10, 2019 to heather.evans@em-la.doe.gov Exhibit C Form C Subcontractor and Vendor List has not been changed from the issuance of the RFP.

Included

1. Exhibit C Form C-1 Lower Tier Experience

2. Exhibit C Form N Experience Statement

3. Exhibit C Form D Subcontract Schedule

4. Exhibit C Form F Project Organization and Workplan

5. Exhibit C Form A- DP West Slabs Schedule Activites

6. Exhibit D TA-21 DP West Slabs D&D and Remediation Project

7. Exhibit I – Subcontractor Submittal Requirements DP West Slabs

8. Exhibit C Form H Resumes of Key Personnel

Questions
Answers
1. Verify milestones in Exhbit C form D are correct. Please confirm.
See revised Exhibit C Form D –Subcontract Schedule, included.
2. RFP Section 8.1 and Section 8.1.5 insurance statements conflict on which volume of the RFP response in which they should be included (Volume I or II).
Include Certificate of Insurance in Volume I- Commercial Proposal Volume
3. N3B Represenations and Certifications were not provided or listed as a requirement. Please confirm.
N3B Representations & Certifications are not required. Offeror’s are encouraged to register in the System for Award Management (SAM)
4. RFP Section 8.1 references possibly providing a W-9 with the proposal. Is this mandatory and should it be included in the response Volume I or II?
A W-9 is not mandatory and will be requested of the Offeror who is selected for Award.
5. The proposed due date is May 17th, 2019. Will N3B consider an extension of the time to sumit proposals?
The proposal due date is adjusted to 06/07/2019.
6. Would N3B consider revising Exhibit C Form N to be consistent with Exhibit C Form C-1, with both documents requesting experience listings for work completed in the last five years.
Due to the lesser complex nature of the is project, N3B will require 3 years experience for both the prime and subcontractors, Form C-1 will be revised to reflect this change.

7. Section 8.1.1 of the RFP requests a copy of the offeror’s license and/or registration. However, it is our understanding that state licensing requirements generally do not apply at Federal sites. Please clarify this requirement.

The expectation would be to include any license or registration that provides descriptions or evidence of your firms qualifications, see section 8.1.1 of the RFP.

8. Appendix D-1 Photos was not included with the solicitation package
There are no photos for Appendix D-1 at this time.
9. Appendix D-4, Map 1: DP West Slab Sampling Locations – There are two green dots labelled “78” in Building 3. Should the southernmost dot be “76”?
Yes
10. Appendix D-4, Map 1: DP West Slab Sampling Locations – There are two blue dots labelled “67” in Building 205 North Wing. Please clarify.
Duplicate error, 67 to west should read 67A
11. Appendix D-4, Map 1: DP West Slab Sampling Locations – There are two blue dots labelled “86”. One is east of Building 4 and south of the corridor; the other is in the southern half of Building 5. Please advise.
East of building 4 is # 36, not 86

Bidder acknowledges receipt (Signed Amendment #1 must be included with proposal submission)

By:______________________________________________(Signature)
_____________________________________________(Printed Name)
_____________________________________________(Title)

image1.png